CN104064990A - Novel in-out equal potential working method - Google Patents

Novel in-out equal potential working method Download PDF

Info

Publication number
CN104064990A
CN104064990A CN201410269585.7A CN201410269585A CN104064990A CN 104064990 A CN104064990 A CN 104064990A CN 201410269585 A CN201410269585 A CN 201410269585A CN 104064990 A CN104064990 A CN 104064990A
Authority
CN
China
Prior art keywords
rope
equipotential
annulus
electrician
equal potential
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410269585.7A
Other languages
Chinese (zh)
Other versions
CN104064990B (en
Inventor
李昌甫
吴正树
陆文叁
刘宝龙
卢李仪
樊干戈
袁震
韦海效
侯俊
黄旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanning Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Nanning Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanning Bureau of Extra High Voltage Power Transmission Co filed Critical Nanning Bureau of Extra High Voltage Power Transmission Co
Priority to CN201410269585.7A priority Critical patent/CN104064990B/en
Priority claimed from CN201410269585.7A external-priority patent/CN104064990B/en
Publication of CN104064990A publication Critical patent/CN104064990A/en
Application granted granted Critical
Publication of CN104064990B publication Critical patent/CN104064990B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a novel in-out equal potential working method. The method includes the following steps of (1) climbing a cross arm of an iron tower, (2) fixing an insulated tackle to the cross arm of the iron tower, (3) knotting a first clove hitch on a first transmission rope, enabling a first screw thread main lock to penetrate through the first clove hitch and to be arranged on double buckling rings in a penetrating mode, (4) after an equal potential operator descends, swinging a backup protection rope through a ground potential operator so that the equal potential operator can be sent to be at an equal potential wire, (5) after the equal potential operator enters an equal potential, carrying out hot-line work, (6) after the work is finished, arranging 8-shaped rings on the first transmission rope and a second transmission rope in a sleeved mode, arranging a steel hook on the first transmission rope and hanging the steel hook on the equal potential wire, and (7) unknotting the backup protection rope on the double buckling rings, and allowing the equal potential operator to descend to the ground by enabling the equal potential operator to hold the first transmission rope on the upper side and the lower side of the first 8-shaped ring. The number of tools is reduced as much as possible and labor consumption is reduced.

Description

Novel turnover equal potential working method
Technical field
The present invention relates to high voltage power transmission technical field, be specifically related to a kind of equipotential live line working method of rope turnover of transmitting that only relies on.
Background technology
Current domestic live line working enters equipotential method: 1, utilize motor-driven grinding mill, promote hanging basket equipotential electrician is delivered to wire place by main pull rope, equipotential electrician enters equipotential again; 2, equipotential electrician utilizes rope ladder or " doing " word ladder to enter equipotential.Transmission line many places are in lofty mountains and steep hills, and instrument is various can increase manpower consumption undoubtedly, increase economic input, cause operation loaded down with trivial details, and efficiency is low.If weeds are luxuriant near steel tower basal plane, be unfavorable for carrying out the work, need on-the-spot cleaning, this undoubtedly can elapsed time, consumes personnel's muscle power simultaneously.
Summary of the invention
The object of the present invention is to provide a kind of novel turnover equal potential working method, it only adopts the lightweight parts such as rope and screw thread master lock can realize the equipotential live line working of turnover, in the situation that task is constant, reduced the use of Work tool, also improved fail safe simultaneously.
For realizing above object, the technical scheme that the present invention takes is:
A novel turnover equal potential working method, it comprises the following steps:
Step 1, earth potential electrician and equipotential electrician carry through the transmission rope of insulation coaster and climb up steel tower cross-arm along the pin nail of steel tower, and described transmission rope is ring junction hook;
Step 2, insulation coaster is fixed on to steel tower cross-arm by the first electrodeless rope sling, transmits rope to downward-extension, wherein, the transmission rope that is positioned at insulation coaster one side is defined as the first transmission rope, and the transmission rope that is positioned at insulation coaster opposite side is defined as the second transmission rope;
Step 3, on the first transmission rope, make a call to one first Portuguese bowline, one first screw thread master lock is passed to this first Portuguese bowline, this the first screw thread master lock being through on the two clasps on the safety belt of equipotential electrician front simultaneously, one end of one backup protection rope is fixed on two clasps, and the other end is fixed on steel tower cross arm end;
The slow pine second of step 4, ground electrician is transmitted rope declines equipotential electrician, when equipotential electrician drops to while maintaining an equal level with equipotential wire, stops declining, and earth potential electrician swings backup protection rope equipotential electrician is delivered to equipotential wire place;
Step 5, equipotential electrician enter equipotential, accomplish fluently safety belt on wire, untie the backup protection rope on two clasps, untie the first screw thread master lock and transmit being connected of rope with first, carry out live line working;
Step 6, after operation, on the first transmission rope, overlap one the 1 word ring, described the one 8 word ring comprise the first annulus and with integrated the second annulus of the first annulus, described first transmits rope through the first annulus and walks around the second annulus, described the second annulus is fixed by the two clasps on one second screw thread master lock and equipotential electrician front safety belt, the first transmission rope between the one 8 word ring and insulation coaster arranges a steel hook, described steel is hooked on equipotential wire, on the second transmission rope relevant position, overlap one the 28 word ring, described the 28 word ring comprise the 3rd annulus and with integrated the 4th annulus of the 3rd annulus, described second transmits rope through the 3rd annulus and walks around the 4th annulus, described the 4th annulus is fixed by one the 3rd screw thread master lock and equipotential safety belt side clasp,
Step 7, equipotential electrician's both hands are held respectively first of the one 8 upper and lower both sides of word ring and are transmitted rope, by first of slow loose the one 8 word ring downside, transmit rope, drop to ground.
In step 3, also comprise: in the first screw thread master lock, be also installed with one second electrodeless rope sling, described the second electrodeless rope sling is ring junction hook, for equipotential electrician, sole is stretched into this second electrodeless rope sling.
The path length of described the second electrodeless rope sling is 1m.
Described steel hook comprises hook and the steel disc hinged with hook, described hook be provided with a connecting hole, one the 4th screw thread master lock is through in this connecting hole, described first transmits rope is provided with one second Portuguese bowline, described the 4th screw thread master lock is also through on this second Portuguese bowline.
Between step 5 and step 6, also comprise: it is fixing to facilitate service kit to be restricted and given equipotential electrician by transmission that earth potential electrician moves to steel tower cross arm end place by insulation coaster.
Near the hanging point place that described steel tower cross arm end is insulator string.
The invention has the beneficial effects as follows: 1, the present invention only adopts the lightweight parts such as rope and screw thread master lock can realize the equipotential live line working of turnover, in the situation that task is constant, has reduced the use of Work tool, has also improved fail safe simultaneously;
2, utilize one to transmit rope, adopt the mode of " pendulum " that equipotential electrician is sent into equipotential, saved muscle power;
While 3, going out equipotential, utilize cleek, by one, transmit rope and be divided into two sections on knot hook, reach the effect of two ropes, wherein the second transmission rope is used as backup protection, first transmits rope is used for prompt drop, and combination utilizes two " 8 word ring " to complete prompt drop, guarantees safe time efficient;
4, reduce the carrying of Work tool, reduced manpower consumption, saved Financial cost, guaranteed the reasonable utilization of operating personnel's muscle power; Reduce the turnover equipotential time, improved operating efficiency.
Accompanying drawing explanation
Fig. 1 is that the present invention passes in and out Equipotential live working method schematic diagram;
Tu2Shi Tu1Zhong A district enlarged drawing;
Tu3Shi Tu1Zhong B district enlarged drawing;
Fig. 4 is the working state schematic representation of equipotential electrician steel hook while exiting equipotential;
Fig. 5 is the working state schematic representation of earth potential electrician steel hook while taking off steel hook.
Wherein: 1, steel tower; 11, steel tower cross-arm; 2, transmit rope; 21, transmit rope; 22, transmit rope; 23, insulation coaster; 24, electrodeless rope sling; 3,8 word rings; 31, annulus; 32, annulus; 4, screw thread master lock; 5,8 word rings; 51, annulus; 52, annulus; 6, screw thread master lock; 7, steel hook; 71, screw thread master lock; 72, hook; 73, steel disc; 74, connecting hole; 8, equipotential wire; 9, insulator string.
Embodiment
Below in conjunction with the drawings and specific embodiments, content of the present invention is described in further details.
Embodiment
One, equipotential electrician enters equipotential, and it comprises the following steps:
Step 1, earth potential electrician and equipotential electrician carry through the transmission rope 2 of insulation coaster 23 and climb up steel tower cross-arm 11 along the pin nail of steel tower 1, and transmitting rope 2 is ring junction hook.
Step 2, insulation coaster 23 is fixed on to steel tower cross-arm 11 by electrodeless rope sling 24, transmit rope 2 to downward-extension, wherein, the transmission rope 2 that is positioned at insulation coaster 23 1 sides is defined as and transmits rope 21, the transmission rope 2 that is positioned at insulation coaster 23 opposite sides is defined as and transmits rope 22, no matter how transmission rope 2 slides on insulation coaster 23, all to transmitting rope 21 and transmitting rope 22, defines according to the method described above, that is to say that the position of transmitting rope 21 and transmitting rope 22 changes.
Step 3, make a call to one first Portuguese bowline transmitting on rope 21, one first screw thread master lock is passed to this first Portuguese bowline, this the first screw thread master lock being through on the two clasps on the safety belt of equipotential electrician front simultaneously, one end of backup protection rope is fixed on two clasps, the other end is fixed on steel tower cross-arm 11 ends by earth potential electrician, steel tower cross-arm 11 ends refer near the hanging point of insulator string 9, one end of insulator string 9 is vertically connected on equipotential wire 8, and the other end is vertically connected on steel tower cross-arm 11; In this first screw thread master lock, be also installed with the electrodeless rope sling that a path length is about 1m, electrodeless rope sling is ring junction hook.Equipotential electrician can stretch into sole this continuous rope and put, and can control lower limb, keeps self effective length, and both hands obtain liberating and can work simultaneously simultaneously.
The slow pine of step 4, ground electrician is transmitted rope 22 declines equipotential electrician, when equipotential electrician drops to while maintaining an equal level with equipotential wire 8, stops declining, and treats power, and earth potential electrician swings backup protection rope equipotential electrician is delivered to equipotential wire place; Equipotential electrician stretches out one's hand rapidly and catches wherein an equipotential wire 8 and enter equipotential when apart from 0.4 meter, equipotential wire.After upper conductor, accomplish fluently safety belt, untie the backup protection rope on two clasps, untie the first screw thread master lock and transmit being connected of rope 21, carry out live line working.Now earth potential electrician takes off cross-arm place coaster, is adjusted near fixing near insulator string hanging point place, is convenient to by transmissions 2 transmission Work tool and the materials of restricting.
Two, equipotential electrician exits equipotential, and it comprises the following steps:
Step 1, after operation, on transmission rope 21, overlap one 8 word rings 3, 8 word rings 3 comprise annulus 31 and with the integrated annulus 32 of annulus 31, transmit rope 21 through annulus 31 and walk around annulus 32, annulus 32 is fixed by a screw thread master lock 4 and two clasps, transmission rope 21 between 8 word rings 3 and insulation coaster 23 arranges a steel hook 7, steel hook 7 is hung on equipotential wire 8, on transmission rope 22 relevant positions, overlap one 8 word rings 5, 8 word rings 5 comprise annulus 51 and with the integrated annulus 52 of annulus 51, transmit rope 22 through annulus 51 and walk around annulus 52, annulus 52 is fixed with equipotential electrician safety belt side clasp by a screw thread master lock 6.As a kind of preferred version, the radius of annulus 31 is greater than the radius of annulus 32, and the radius of annulus 51 is greater than the radius of annulus 52.
Above-mentioned steel hook 7 is fixed on equipotential wire 8, can be with reference to shown in Fig. 1 and 4, steel hook 7 comprises hook 72 and the steel disc 73 hinged with hook 72, hook 72 is provided with a connecting hole 74, screw thread master lock 71 is through in this connecting hole 74, transmit rope 21 and be provided with one second Portuguese bowline, screw thread master lock 71 is also through on this second Portuguese bowline.Steel structure 7 is divided into two sections by transmission rope 2 on knot hook; wherein one section is the part (part between steel structure 7 and transmission rope 22) transmitting rope 22 and transmit rope 21; another section is for transmitting another part of rope 21; transmitting rope 21 coordinates for realizing equipotential electrician's prompt drop with 8 word rings 3; transmit rope 22 and 8 word rings 5 in the situation that ground cooperation personnel treat power; play backup protection effect; make in equipotential electrician dropping process safer; reasonably utilized the effective length of transmitting rope, in support protection.
Step 2, untie the backup protection rope on two clasps; equipotential electrician's both hands are held respectively the transmission rope 21 of 8 word ring 3 upper and lower both sides; by the transmission rope 21 of slow loose 8 word ring 3 downsides; drop to ground; in decline process, the structure of steel hook 7 as shown in Figure 4, now; steel disc 73, because self gravitation coordinates the coupler body that forms sealing with hook 72, has guaranteed fail safe when equipotential electrician declines.
3, tower under earth potential electrician
After equipotential electrician arrival point face, earth potential electrician mentions steel hook 7, as shown in Figure 5, the steel disc 73 at the closed place of steel hook is because deadweight is automatic and hook 72 places depart from, steel disc 73 is greater than diameter of wire with hook 72 spacings, can easily from wire, depart from, take off after steel hook 7 tower under earth potential electrician.
Although the present invention describes by specific embodiment, it will be appreciated by those skilled in the art that, without departing from the present invention, can also carry out various conversion and be equal to alternative the present invention.In addition, for particular condition or application, can make various modifications to the present invention, and not depart from the scope of the present invention.Therefore, the present invention is not limited to disclosed specific embodiment, and should comprise the whole execution modes that fall within the scope of the claims in the present invention.

Claims (6)

1. a novel turnover equal potential working method, is characterized in that, it comprises the following steps:
Step 1, earth potential electrician and equipotential electrician carry through the transmission rope (2) of insulation coaster (23) and climb up steel tower cross-arm (11) along the pin nail of steel tower (1), and described transmission rope (2) is ring junction hook;
Step 2, the coaster (23) that will insulate are fixed on steel tower cross-arm (11) by the first electrodeless rope sling (24), transmit rope (2) to downward-extension, wherein, the transmission rope (2) that is positioned at insulation coaster (23) one sides is defined as the first transmission rope (21), and the transmission rope (2) that is positioned at insulation coaster (23) opposite side is defined as the second transmission rope (22);
Step 3, at upper one first Portuguese bowline of making a call to of the first transmission rope (21), one first screw thread master lock is passed to this first Portuguese bowline, this the first screw thread master lock being through on the two clasps on the safety belt of equipotential electrician front simultaneously, one end of one backup protection rope is fixed on two clasps, and the other end is fixed on steel tower cross-arm (11) end;
Step 4, ground electrician slow loose second transmit rope (22) declines equipotential electrician, when equipotential electrician drops to while maintaining an equal level with equipotential wire (8), stop declining, earth potential electrician swings backup protection rope equipotential electrician is delivered to equipotential wire place;
Step 5, equipotential electrician enter equipotential, accomplish fluently safety belt on wire, untie the backup protection rope on two clasps, untie the first screw thread master lock and transmit being connected of rope (21) with first, carry out live line working;
Step 6, after operation, at the upper cover of the first transmission rope (21) one the 1 word ring (3), described the one 8 word ring (3) comprise the first annulus (31) and with integrated the second annulus of the first annulus (31) (32), described first transmits rope (21) through the first annulus (31) and walks around the second annulus (32), described the second annulus (32) is fixed by one second screw thread master lock (4) and the two clasps on the safety belt of equipotential electrician front, the first transmission rope (21) between the one 8 word ring (3) and insulation coaster (23) arranges a steel hook (7), described steel hook (7) is hung on equipotential wire (8), on the second transmission rope (22) relevant position, overlap one the 28 word ring (5), described the 28 word ring (5) comprise the 3rd annulus (51) and with integrated the 4th annulus (52) of the 3rd annulus (51), described second transmits rope (22) through the 3rd annulus (51) and walks around the 4th annulus (52), described the 4th annulus (52) is fixed by one the 3rd screw thread master lock (6) and equipotential electrician safety belt side clasp,
Step 7, equipotential electrician's both hands are held respectively first of the one 8 upper and lower both sides of word ring (3) and are transmitted rope (21), by first of slow loose the one 8 word ring (3) downside, transmit rope (21), drop to ground.
2. novel turnover equal potential working method according to claim 1, it is characterized in that, in step 3, also comprise: in the first screw thread master lock, be also installed with one second electrodeless rope sling, described the second electrodeless rope sling is ring junction hook, for equipotential electrician, sole is stretched into this second electrodeless rope sling.
3. novel turnover equal potential working method according to claim 2, is characterized in that, the path length of described the second electrodeless rope sling is 1m.
4. novel turnover equal potential working method according to claim 1, it is characterized in that, described steel hook (7) comprises hook (72) and the steel disc (73) hinged with hook (72), described hook (72) is provided with a connecting hole (74), one the 4th screw thread master lock (71) is through in this connecting hole (74), described first transmits rope (21) is provided with one second Portuguese bowline, and described the 4th screw thread master lock (71) is also through on this second Portuguese bowline.
5. novel turnover equal potential working method according to claim 1, it is characterized in that, between step 5 and step 6, also comprise: earth potential electrician will insulate coaster (23) move to steel tower cross-arm (11) end fixing with facilitate service kit by transmission restrict (2) give equipotential electrician.
6. novel turnover equal potential working method according to claim 1 or 5, is characterized in that, described steel tower cross-arm (11) end is near the hanging point place of insulator string (9).
CN201410269585.7A 2014-06-17 Turnover equipotential live line work method Active CN104064990B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410269585.7A CN104064990B (en) 2014-06-17 Turnover equipotential live line work method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410269585.7A CN104064990B (en) 2014-06-17 Turnover equipotential live line work method

Publications (2)

Publication Number Publication Date
CN104064990A true CN104064990A (en) 2014-09-24
CN104064990B CN104064990B (en) 2016-11-30

Family

ID=

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105375395A (en) * 2015-12-17 2016-03-02 国家电网公司 Insulation rotation ladder for +-8000kV DC circuit electrified circuit upkeep and working method
CN105762702A (en) * 2016-04-01 2016-07-13 中国南方电网有限责任公司超高压输电公司南宁局 Method for replacing L-shaped insulator string of +/-800kV direct current transmission line
CN110943396A (en) * 2019-10-30 2020-03-31 国家电网有限公司 Operation process for live access equipotential of power transmission line in river network area
CN113904264A (en) * 2021-11-05 2022-01-07 国网辽宁省电力有限公司铁岭供电公司 Equipotential personnel access safety protection equipment based on big data and access protection process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252264A (en) * 2008-04-02 2008-08-27 云南电网公司大理供电局 Equipotential electrical highfield hot-line working method
WO2009014457A1 (en) * 2007-07-24 2009-01-29 Vector Limited Equipotential bonding system
CN101728787A (en) * 2008-10-29 2010-06-09 国网电力科学研究院 Equipotential access method of 500kV same-tower four-circuit transmission line tangent tower live-wire work
CN103618249A (en) * 2013-11-27 2014-03-05 国家电网公司 technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009014457A1 (en) * 2007-07-24 2009-01-29 Vector Limited Equipotential bonding system
CN101252264A (en) * 2008-04-02 2008-08-27 云南电网公司大理供电局 Equipotential electrical highfield hot-line working method
CN101728787A (en) * 2008-10-29 2010-06-09 国网电力科学研究院 Equipotential access method of 500kV same-tower four-circuit transmission line tangent tower live-wire work
CN103618249A (en) * 2013-11-27 2014-03-05 国家电网公司 technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李如虎: "带电作业进入等电位方式点评", 《南方电网技术》, vol. 3, no. 2, 30 April 2009 (2009-04-30) *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105375395A (en) * 2015-12-17 2016-03-02 国家电网公司 Insulation rotation ladder for +-8000kV DC circuit electrified circuit upkeep and working method
CN105762702A (en) * 2016-04-01 2016-07-13 中国南方电网有限责任公司超高压输电公司南宁局 Method for replacing L-shaped insulator string of +/-800kV direct current transmission line
CN105762702B (en) * 2016-04-01 2017-08-04 中国南方电网有限责任公司超高压输电公司南宁局 The method of replacing ± 800kV DC power transmission line L insulator strings
CN110943396A (en) * 2019-10-30 2020-03-31 国家电网有限公司 Operation process for live access equipotential of power transmission line in river network area
CN110943396B (en) * 2019-10-30 2022-04-12 国家电网有限公司 Operation method for live access equipotential of power transmission line in river network area
CN113904264A (en) * 2021-11-05 2022-01-07 国网辽宁省电力有限公司铁岭供电公司 Equipotential personnel access safety protection equipment based on big data and access protection process

Similar Documents

Publication Publication Date Title
CN205759484U (en) Novel climbing rod grappler
CN205820581U (en) Earth lead combination draw off gear
CN204230769U (en) Climb type steel cable ladder
CN106490775A (en) A kind of Intelligent bracelet for automatically adjusting length
CN205431331U (en) Controller is swung to to trees
CN104917098A (en) Trip pulley capable of automatic locking
CN201543129U (en) Escape rope
CN104064990A (en) Novel in-out equal potential working method
CN105363149A (en) Safety device for pole climbing work
CN205159908U (en) Backup protection fixing -line device
CN203408377U (en) Simple escape device
CN207624197U (en) A kind of wireline operation training platform
CN104064990B (en) Turnover equipotential live line work method
CN202802569U (en) Electric power tower climbing protector
CN207512611U (en) A kind of drafting tool for steel strand wires
CN207339076U (en) A kind of province's force transfering device being fixed in line bar
CN207082777U (en) A kind of ground wire walks device certainly
CN205159907U (en) Monolithic insulator transmission link
CN202526799U (en) Motor-pumped well rescuing device
CN204118591U (en) A kind of protection rope for conductor
CN103479027A (en) Aloft-work falling-prevention tool sleeve
CN207591136U (en) Cement shaft tower anti-fall device above and below transmission line high-altitude operation
CN204519603U (en) Resource exploration Special walking stick
CN201692537U (en) Building or high-altitude escaping rope
CN201684364U (en) Anti-falling climbing plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant