CN104047264B - Barge formula moves training dyke and using method thereof - Google Patents

Barge formula moves training dyke and using method thereof Download PDF

Info

Publication number
CN104047264B
CN104047264B CN201410271107.XA CN201410271107A CN104047264B CN 104047264 B CN104047264 B CN 104047264B CN 201410271107 A CN201410271107 A CN 201410271107A CN 104047264 B CN104047264 B CN 104047264B
Authority
CN
China
Prior art keywords
barge
water
ballast compartments
filling component
injection valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410271107.XA
Other languages
Chinese (zh)
Other versions
CN104047264A (en
Inventor
杨瑞庆
桑勇
朱长虎
谢凤
谢凤一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Changjiang Waterway Engineering Bureau
Original Assignee
Nanjing Changjiang Waterway Engineering Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Changjiang Waterway Engineering Bureau filed Critical Nanjing Changjiang Waterway Engineering Bureau
Priority to CN201410271107.XA priority Critical patent/CN104047264B/en
Publication of CN104047264A publication Critical patent/CN104047264A/en
Application granted granted Critical
Publication of CN104047264B publication Critical patent/CN104047264B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Barge formula of the present invention moves training dyke and using method refers to a kind of waterway regulation works utilizing barge to construct as training dyke.Barge formula moves training dyke and includes barge, water filling component, water discharge member and control member;Barge formula moves training dyke using barge as the main body of dam structure, watertight ballast compartments is set in barge, at the water discharge member that is arranged over of watertight ballast compartments, lower section is provided with water filling component, and the upper surface at barge hull corresponding to watertight ballast compartments is provided with control member;Water filling component includes water injection valve, water injection valve pipeline, flase floor;Water filling component is distributed in barge hull side, and position, below minimum drinking water position, is provided with water injection valve in barge hull side, and water injection valve connects water injection valve pipeline, is provided with the flase floor filtering foreign material on water injection valve pipeline;Water discharge member includes gully, well lid, and gully gos deep into watertight ballast compartments and connects with watertight ballast compartments, is provided with well lid in the outer face of gully.

Description

Barge formula moves training dyke and using method thereof
Technical field
Barge formula of the present invention moves training dyke and using method refers to a kind of waterway regulation works utilizing barge to construct as training dyke, utilize barge as the agent structure of training dyke, by by barge and the angled submerged of current, play change local flow direction, guide current district shallow to river shoal to wash away.
Background technology
At present, waterway regulation construction technology is all by using structure regulating structure such as groynes, longitudinal dike, shore protection, closure dam etc. in river to adjust and control current, and guide river into predetermined drainage gallery and lead off toward downstream, reach stably favourable river gesture, improve the purpose of Fairway navigation condition.
Mostly traditional regulating structure is by utilizing geotextile to use the material pell mell constructions such as soil, block stone, concrete to become dike in the case of carrying out river bottom protection in riverbed.This kind of regulating structure once molding, will become permanent construction (except temporary structure), it is impossible to adjust according to extraneous bed configuration change, and difficulty of construction is big, cost is high, the time cycle is long.
Additionally with regard to current river middle and lower reaches waterway regulation technical merit, traditional regulating structure still cannot solve the technical barrier faced.Particularly as follows: 1, after Riverine area dam builds up, river middle and lower reaches current are complicated, the husky defeated shifting rule of water, the rule of river bed change are difficult to grasp, river middle and lower reaches are as plain tract, riverbed is the widest, the riverbed of most sections be not the most stable or can rush, movable, regulating structure is often difficult to arrange regulating structure according to the hydrology, water husky defeated shifting rule, river bed change rule etc.;2, river middle and lower reaches alluvial river, feature is that point bar constantly disappears change of rising, and the height of point bar determines the regulated water stage of regulating structure and the width of regulation line, therefore rise along with disappearing of point bar, the regulated water stage of former regulating structure and the layout of regulation line are not meeting design requirement originally, and regulation function is also affected.
From the problems referred to above, for river middle and lower reaches alluvial river characteristic, river bed change at every moment occurs, and once changes, the relevant art such as the regulated water stage of original building and regulation line require all to be unsatisfactory for renovating requirement, the most just do not reach original renovating effect.It is therefore desirable to design a kind of can be according to the situation of change in riverbed, the regulating structure dynamically adjusted.
Summary of the invention
It is an object of the invention to, for above-mentioned weak point, provide a kind of barge formula through exploratory development and move training dyke and using method thereof.This kind of training dyke compares traditional jackstone fill training dyke, and difficulty of construction is little, low cost, instant effect, short construction period;Can flexible arrangement, solve the drawback that can only be verified of design effect of tradition training dyke by laboratory model;And remove conveniently, can be recycled, decrease after dam body pell mell construction completes, the reconstruction that brings because river bed change fails to reach renovating effect, the risk extended, remove;Avoid the too much tissue of ship machine equipment, the scope of operation various, the link that building stones are drawn materials, transported, and barge is easy to traction, on the spot floating, easy to use.
Barge formula moves training dyke and takes techniques below scheme to realize:
Barge formula moves training dyke and includes barge, water filling component, water discharge member and control member;
Barge formula moves training dyke using barge as the main body of dam structure, watertight ballast compartments is set in barge, at the water discharge member that is arranged over of watertight ballast compartments, lower section is provided with water filling component, and the upper surface at barge hull corresponding to watertight ballast compartments is provided with control member;
Water filling component includes water injection valve, water injection valve pipeline, flase floor;Water filling component is distributed in barge hull side, and position, below minimum drinking water position, is provided with water injection valve in barge hull side, and water injection valve connects water injection valve pipeline, is provided with the flase floor filtering foreign material on water injection valve pipeline;
Water discharge member includes gully, well lid, and gully gos deep into watertight ballast compartments and connects with watertight ballast compartments, is provided with well lid in the outer face of gully;When barge needs displacement, by putting into some immersible pumps, watertight ballast compartments inner storing water is expelled to outboard, it is possible to observed watertight ballast compartments height of water level by gully.The position of gully is arranged according to hull watertight ballast compartments Design coordination.
Described control member includes extension rod, threshold switch and handle;Being provided with threshold switch on water filling component, one end of threshold switch connects extension rod, and extension rod is through the hull of barge, and the other end at extension rod is provided with handle, the closedown switched by handle control valve.
The quantity of described watertight ballast compartments is no less than one.
Described watertight ballast compartments, each watertight ballast compartments correspondence is installed no less than a water filling component.
Described watertight ballast compartments, each watertight ballast compartments correspondence is installed no less than a water discharge member.
On described water filling component, emergent flashboard is installed, for making emergent closure when water injection valve lost efficacy.
Barge formula move training dyke by traction, position, lay, form training dyke in regulation waters, complete regulation function;After riverbed changes with upstream sluicing, water husky defeated shifting rule change, former training dyke regulation function is obstructed or declines, and can comply with adjustment regulation line position according to riverbed river change, re-start former barge training dyke and lay, reach to recirculate use.
Barge uses existing general barge structure, for " cuboid " structure, existing barge converts.
Barge hull, according to stability and ballast demand, is separated into some watertight ballast compartments, can distinguish water injection, adjusts hull floading condition.
It is as follows that barge formula moves training dyke using method:
(1): according to regulation training dyke axis, the index such as regulation scope determines barge riding position;
(2): riverbed, installation position foundation trench is flattened, reaches the requirement laid;
(3): be dispatched to barge waters is installed, according to construction survey unwrapping wire, and cast anchor, open the water filling component of barge side, watertight ballast compartments irrigation water filling in barge, notice that the axis according to training dyke adjusts position at any time, sink to the precalculated position that barge is laid;
A plurality of boats and ships are the most then used to increase training dyke length side by side;
(4): when needs shift position, close water filling component, open water discharge member, by gully, immersible pump being put into watertight ballast compartments and discharges unnecessary water, barge floats, and barge moves to the position needed, open water filling component, sink to the precalculated position that barge is laid.
The invention has the beneficial effects as follows:
The present invention designs simply, effect is notable.Using barge as the main body of training dyke, training dyke uses barge to carry out water storage lattice transformation, barge opsition dependent fixed point is cast anchor and can use after sinking to the bottom.Technique is simple, streamlining, it is to avoid too much ship machine puts into and the scope of operation arranges;Barge formula structure training dyke flexible arrangement, can dispose flexibly mobile and reusable, can be with the regulation line after river bed change and regulated water stage, readjust the layout of training dyke, decrease relate to river bed change after fixed dam builds up reconstruction, extend, remove risk.
Accompanying drawing explanation
In order to make the object, technical solutions and advantages of the present invention clearer, the invention will be further described with embodiment below in conjunction with the accompanying drawings, wherein:
Fig. 1 is that barge formula of the present invention moves training dyke structure overall structure schematic diagram.
Fig. 2 is that barge formula of the present invention moves the structural representation within training dyke.
Fig. 3 is the structural representation that barge formula of the present invention moves component of intaking on training dyke.
In figure 1, barge, 2, water discharge member, 3, water filling component, 4, control member;
2-1, well lid, 2-2, gully;
3-1, water injection valve, 3-2, flase floor, 3-3, water injection valve pipeline, 3-4, emergent flashboard;
4-1, handle, 4-2, extension rod, 4-3, threshold switch;
Barge formula moves training dyke and includes barge 1, water filling component 3, water discharge member 2 and control member 4;
Barge formula moves training dyke using barge 1 as the main body of dam structure, in barge 1, watertight ballast compartments is set, being arranged over water discharge member 2 in watertight ballast compartments, lower section is provided with water filling component 3, and the upper surface at barge 1 hull corresponding to watertight ballast compartments is provided with control member 4;
Water filling component 3 includes water injection valve 3-1, water injection valve pipeline 3-3, flase floor 3-2;Water filling component 3 is distributed at barge 1 profile, and position, below minimum drinking water position, is provided with water injection valve 3-1 at barge 1 profile, and on water injection valve 3-1, connection has water injection valve pipeline 3-3, is provided with the flase floor 3-2 filtering foreign material on water injection valve pipeline 3-3;
Water discharge member 2 includes gully 2-2, well lid 2-1, and gully 2-2 gos deep into watertight ballast compartments and connects with watertight ballast compartments, is provided with well lid 2-1 in the outer face of gully 2-2;When barge 1 needs displacement, by putting into some immersible pumps, watertight ballast compartments inner storing water is expelled to outboard, it is possible to observed watertight ballast compartments height of water level by gully 2-2.The position of gully is arranged according to the watertight ballast compartments Design coordination of hull 1.
Described control member 4 includes extension rod 4-2, threshold switch 4-3 and handle 4-1;The one end being provided with threshold switch 4-3, threshold switch 4-3 on water filling component 4 connects extension rod 4-2, the extension rod 4-2 hull through barge 1, and the other end at extension rod 4-2 is provided with handle 4-1, by the closedown of handle 4-1 control valve switch 4-3.
The quantity of described watertight ballast compartments is no less than one.
Described watertight ballast compartments, each watertight ballast compartments correspondence is installed no less than a water filling component 3.
Described watertight ballast compartments, each watertight ballast compartments correspondence is installed no less than a water discharge member 2.
Emergent flashboard 3-4 is installed, for making emergent closure when water injection valve 3-1 lost efficacy on described water filling component 3.
Barge formula move training dyke by traction, position, lay, form training dyke in regulation waters, complete regulation function;After riverbed changes with upstream sluicing, water husky defeated shifting rule change, former training dyke regulation function is obstructed or declines, and can comply with adjustment regulation line position according to riverbed river change, re-start former barge training dyke and lay, reach to recirculate use.
Barge uses existing general barge structure, for " cuboid " structure, existing barge converts.
Barge hull, according to stability and ballast demand, is separated into some watertight ballast compartments, can distinguish water injection, adjusts hull floading condition.
It is as follows that barge formula moves training dyke using method:
(1): according to regulation training dyke axis, the index such as regulation scope determines barge riding position;
(2): riverbed, installation position foundation trench is flattened, reaches the requirement laid;
(3): be dispatched to barge 1 waters is installed, according to construction survey unwrapping wire, and cast anchor, open the water filling component 3 of barge side, watertight ballast compartments irrigation water filling in barge 1, notices that the axis according to training dyke adjusts position at any time, sinks to the precalculated position that barge is laid;
A plurality of boats and ships are the most then used to increase training dyke length side by side;
(4): when needs shift position, close water filling component 3, open water discharge member 2, by gully 2-2, immersible pump being put into watertight ballast compartments and discharges unnecessary water, barge 1 floats, and barge 1 moves to the position needed, open water filling component 3 to sink, sink to the precalculated position that barge is laid.

Claims (4)

1. a barge formula moves training dyke, it is characterised in that: include barge, water filling component, water discharge member and control member;
Barge formula moves training dyke using barge as the main body of dam structure, watertight ballast compartments is set in barge, at the water discharge member that is arranged over of watertight ballast compartments, lower section is provided with water filling component, and the upper surface at barge hull corresponding to watertight ballast compartments is provided with control member;
Water filling component includes water injection valve, water injection valve pipeline, flase floor;Water filling component is distributed in barge hull side, and position, below minimum drinking water position, is provided with water injection valve in barge hull side, and water injection valve connects water injection valve pipeline, is provided with the flase floor filtering foreign material on water injection valve pipeline;
Water discharge member includes gully, well lid, and gully gos deep into watertight ballast compartments and connects with watertight ballast compartments, is provided with well lid in the outer face of gully;When barge needs displacement, by putting into some immersible pumps, watertight ballast compartments inner storing water is expelled to outboard, it is possible to observed watertight ballast compartments height of water level by gully;The position of gully is arranged according to hull watertight ballast compartments Design coordination;
Described control member includes extension rod, threshold switch and handle;Being provided with threshold switch on water filling component, one end of threshold switch connects extension rod, and extension rod is through the hull of barge, and the other end at extension rod is provided with handle, the closedown switched by handle control valve;
The quantity of described watertight ballast compartments is no less than one;
On described water filling component, emergent flashboard is installed.
Barge formula the most according to claim 1 moves training dyke, it is characterised in that: described watertight ballast compartments, each watertight ballast compartments correspondence is installed no less than a water filling component.
Barge formula the most according to claim 1 moves training dyke, it is characterised in that: described watertight ballast compartments, each watertight ballast compartments correspondence is installed no less than a water discharge member.
4. the barge formula described in claim 1 moves the using method of training dyke, and its feature is as follows:
(1): according to regulation training dyke axis, regulation range specifications determines barge riding position;
(2): riverbed, installation position foundation trench is flattened, reaches the requirement laid;
(3): be dispatched to barge waters is installed, according to construction survey unwrapping wire, and cast anchor, open the water filling component of barge side, watertight ballast compartments irrigation water filling in barge, notice that the axis according to training dyke adjusts position at any time, sink to the precalculated position that barge is laid;
A plurality of boats and ships are the most then used to increase training dyke length side by side;
(4): when needs shift position, close water filling component, open water discharge member, by gully, immersible pump being put into watertight ballast compartments and discharges unnecessary water, barge floats, and barge moves to the position needed, open water filling component, sink to the precalculated position that barge is laid.
CN201410271107.XA 2014-06-18 2014-06-18 Barge formula moves training dyke and using method thereof Active CN104047264B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410271107.XA CN104047264B (en) 2014-06-18 2014-06-18 Barge formula moves training dyke and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410271107.XA CN104047264B (en) 2014-06-18 2014-06-18 Barge formula moves training dyke and using method thereof

Publications (2)

Publication Number Publication Date
CN104047264A CN104047264A (en) 2014-09-17
CN104047264B true CN104047264B (en) 2016-08-24

Family

ID=51500635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410271107.XA Active CN104047264B (en) 2014-06-18 2014-06-18 Barge formula moves training dyke and using method thereof

Country Status (1)

Country Link
CN (1) CN104047264B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1293288A (en) * 2000-11-27 2001-05-02 梁兆轩 Method for dedicated apparatus for harnessing rivers
CN2560680Y (en) * 2002-08-07 2003-07-16 庄士贵 Dam
CN1560376A (en) * 2004-02-16 2005-01-05 王一添 Movable dam capable of moving and submerged floating
CN202593840U (en) * 2012-05-03 2012-12-12 长江南京航道工程局 Boat outboard water inlet opening grating shield
CN203569526U (en) * 2013-12-07 2014-04-30 林鹏 Flood prevention device with flexible water bag
CN203977357U (en) * 2014-06-18 2014-12-03 长江南京航道工程局 Barge formula moves training dyke

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7491016B2 (en) * 2005-12-29 2009-02-17 Baruh Bradford G Portable dike and floatation device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1293288A (en) * 2000-11-27 2001-05-02 梁兆轩 Method for dedicated apparatus for harnessing rivers
CN2560680Y (en) * 2002-08-07 2003-07-16 庄士贵 Dam
CN1560376A (en) * 2004-02-16 2005-01-05 王一添 Movable dam capable of moving and submerged floating
CN202593840U (en) * 2012-05-03 2012-12-12 长江南京航道工程局 Boat outboard water inlet opening grating shield
CN203569526U (en) * 2013-12-07 2014-04-30 林鹏 Flood prevention device with flexible water bag
CN203977357U (en) * 2014-06-18 2014-12-03 长江南京航道工程局 Barge formula moves training dyke

Also Published As

Publication number Publication date
CN104047264A (en) 2014-09-17

Similar Documents

Publication Publication Date Title
CN202284289U (en) Combined ecological river bank revetment structure
US20190112770A1 (en) Lost sand collecting apparatus for preventing coastal erosion
CN103898867A (en) Spur dike, for inland waterway improvement, not connected with embankment
CN104594290A (en) Soft mattress sinking construction method
KR20110085080A (en) Geotextile tube structure for reservoir and method for constructing the same
CN203977357U (en) Barge formula moves training dyke
CN104047264B (en) Barge formula moves training dyke and using method thereof
KR101367005B1 (en) An ecology river
CN105064291A (en) Step sand-blocking dam ecosystem for reservoir desilting and sand prevention
CN104863097A (en) Flexible sand stop curtain structure
JP2016503467A (en) Assembling-type variable height type blocking structure with wave barrier function
CN102828489B (en) System for arranging piles to fix riverbed main stream
CN104612106B (en) A kind of permeable geotechnique soft raft structure
CN201580547U (en) Pontoon applicable to excavation operation on water surface
CN204452814U (en) A kind of landing stage mooring unitized construction
RU153378U1 (en) HIGH RIVER SOIL RIVER DAM
CN203834427U (en) Combined shore protection building block
JP2005220610A (en) Continuous flow type slit sand control dam
CN203977358U (en) Caisson type moves training dyke
CN202430683U (en) Underwater bearing platform type shore protection facility
TWI610008B (en) A kind of remediation structure technology of hydraulic ecosystem
CN105256764A (en) Wave type ecological river bank structure
CN205116087U (en) Ecological river bank of ripples formula structure
CN204728267U (en) A kind of combined type for outlet area of ship lock subtracts silt structure
CN102505661A (en) Construction scheme of stone-piled foot protector of underwater bearing platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant