CN104037652B CN201410254383.5A CN201410254383A CN104037652B CN 104037652 B CN104037652 B CN 104037652B CN 201410254383 A CN201410254383 A CN 201410254383A CN 104037652 B CN104037652 B CN 104037652B
Authority
CN
China
Prior art keywords
casing
locking plate
fixed block
groove
distribution line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410254383.5A
Other languages
Chinese (zh)
Other versions
CN104037652A (en
Inventor
刘笑园
卢峰
周安仁
张页
张兵
邢翼
崔小菱
钦伟
季旭
林才富
苏毅方
陈蕾
庄晓丹
蒋建杰
岑梁
黄益军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Changxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Changxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Huzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Changxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410254383.5A priority Critical patent/CN104037652B/en
Publication of CN104037652A publication Critical patent/CN104037652A/en
Application granted granted Critical
Publication of CN104037652B publication Critical patent/CN104037652B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to be applicable to 10kV distribution line shaft tower restoring material case, including casing, rotate case lid, described casing is provided with installing plate, and described casing is provided with groove, fixation kit, at least one horizontal back strap, is provided with two fixing bands on the vertical direction of horizontal back strap;Advantages of the present invention: casing is arranged on 10kV distribution line shaft tower by installing plate, the material that inspection and repair shop needs is placed by trough, effectively solve existing daily restoring material to prepare, reduce and expand power failure range work, by horizontal back strap and the combination of fixing band, it is effectively reduced working strength during casing carrying, effectively raise handling efficiency, by the setting of groove, effectively raise the contact surface of casing and operator, avoid operator's casing when climbing to depart from, security performance is higher, by groove, placing trough is separated into two blowing portions, effectively different materials is classified, personnel convenient to operate take.

Description

It is applicable to 10kV distribution line shaft tower restoring material case
Technical field
The present invention relates to be applicable to 10kV distribution line shaft tower restoring material case.
Background technology
10kV distribution line branch line falls more with electric fuse model, and after fault, repair personnel needs to carry relatively The goods and materials of polytypic are reached the spot, and rush to repair goods and materials according to onsite application accordingly, extend the time of repairing, Can not quickly carry out troubleshooting, increase the workload of operation maintenance personnel, it is impossible to fast quick-recovery resident is normal Electricity consumption, easily causes user discontented and complains, affect enterprise's productive power, and the material of existing repairing is the most logical Crossing casing to place, owing to the weight ratio of casing is heavier, in handling process, there is workload big in operating personnel, Security performance is low.
Summary of the invention
The technical problem to be solved in the present invention is that existing 10kV distribution line repairing case exists when installing carrying Defect, thus provide be applicable to 10kV distribution line shaft tower restoring material case.
In order to solve above-mentioned technical problem, the present invention is achieved by the following technical solutions: is applicable to 10kV Distribution line shaft tower restoring material case, including the casing being provided with placing trough, the case that is rotatably connected on casing Lid, one end of described case lid is connected on casing by axis of rotation, and the other end of described case lid passes through Magnet Being fixedly connected on casing, it is the groove of circular arc that the both sides of described casing are equipped with a cross section, described Being provided with the dividing plate that placing trough is separated into two blowing portions in placing trough, described casing is provided with for operative employee The fixation kit that tool bag hangs, being provided with on the casing at each groove two ends that at least one width is adjustable can Dismounting horizontal back strap, is provided with two fixing bands, on every described fixing band on the vertical direction of horizontal back strap Be equipped with the adjusting button of width between two vertical fixing bands of regulation, on the medial wall of horizontal back strap and Being equipped with one layer of slipmat on the medial wall of fixing band, described slipmat is provided with massage block, described fixing group Part is provided with the collecting bag being easy to garbage collection.
Preferably, described fixation kit include the fixed block being fixedly connected on casing, be fixedly connected on fixing Block cross section is the hook of circular arc, the locking plate that is rotatably connected on fixed block, and one end of described locking plate leads to Crossing bearing pin to be rotatably connected on fixed block, the other end of described locking plate is fixedly connected on hook, on locking plate The fixed block of side is provided with the latch being fixedly connected on fixed block by locking plate, and described fixed block is provided with to be easy to Collecting bag installs fixing fixing groove, is fixedly connected in hook by operation tool kit by locking plate, and passes through Latch regulates locking plate installation site on fixed block, it is to avoid operates tool kit again in handling process and departs from Hook, Practical Performance is good.
Preferably, the cross section of described locking plate is L-shaped, and the vertical portion of described locking plate is rotatably connected on fixed block On, the horizontal part of described locking plate is fixedly connected on hook, the horizontal part of described locking plate and the vertical portion of locking plate On be equipped with the installing hole coordinated with latch, described latch is fixedly connected on fixed block by screw, structure letter Single, locking effect is good, and screw attachment security is reliable, controls effective, and easy to operate, Practical Performance is good.
Preferably, the cross section of described casing is circular or polygon, is provided with circle between described groove and casing Arc angling, the medial wall of described groove is provided with neonychium, and the thickness of described neonychium is 10~20mm, By the setting of neonychium, effectively avoid in handling process, the casing injury to operator, work as guarantor When the thickness of protective pad is less than 10mm, neonychium is easy to wear, poor to the protected effect of operator, works as neonychium Thickness more than 20mm time, be unfavorable for that operator carry, using effect is poor.
Preferably, two described fixing bands are equipped with at least one and tighten band by what two fixing bands tightened, It is equipped with the placement pocket that instrument convenient to operate is placed on described fixing band, improves the safety in handling process Performance, casing is unfavorable for coming off, and Practical Performance is good, is placed on by operation instrument in placement pocket, effectively Decreasing and operate coming off of instrument when carrying again, using effect is good.
Preferably, the lateral wall of described slipmat is provided with the heat dissipating layer that cross section is grid-shaped, is easy to during carrying Heat radiation, good heat dissipation effect, unfailing performance is good.
In sum, advantages of the present invention: casing is arranged on 10kV distribution line shaft tower by installing plate, By inspection and repair shop need material place by trough, effectively solve existing daily restoring material preparation, Material model is many, updating decision, reduce expand power failure range work, reduce daily restoring material transmit up and down, Placement in height principle condition occurs, and has the benefit that 1) reduce repairing time, improve repairing effect Rate;2) time of repairing is shortened;3) recover user power utilization in advance, increase economic well-being of workers and staff;4) confession is reduced Electricity enterprise maintenance work amount, reduces personnel cost;5) reduce restoring material to transmit the most up and down, improve safety Management;And waste material unified to collect by the collecting bag being provided with by fixation kit, decrease operator Waste material at will being abandoned phenomenon, decreases the pollution of environment, Practical Performance is good, decreases waste material and height occurs Empty junk, improves security performance, by horizontal back strap and the combination of fixing band, is effectively reduced casing Working strength during carrying, effectively raises handling efficiency, by the setting of groove, effectively raises The contact surface of casing and operator, it is to avoid operator casing when climbing departs from, security performance Higher, and by groove, placing trough is separated into two blowing portions, effectively different materials is classified, just Take in operator.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation that the present invention is applicable to 10kV distribution line shaft tower restoring material case;
Fig. 2 is the structural representation of casing of the present invention;
Fig. 3 is the structural representation of fixation kit of the present invention.
Detailed description of the invention
As shown in Figure 1, Figure 2, Figure 3 shows, it is adaptable to 10kV distribution line shaft tower restoring material case, including The casing 1 being provided with placing trough 10, the case lid 2 being rotatably connected on casing 1, one end of described case lid 2 leads to Crossing axis of rotation to be connected on casing 1, the other end of described case lid 2 is fixedly connected on casing 1 by Magnet On, the both sides of described casing 1 are equipped with the groove 11 that cross section is circular arc, in described placing trough 10 Being provided with the dividing plate 12 that placing trough 10 is separated into two blowing portions, described casing 1 is provided with for operating instrument The fixation kit 4 that bag hangs, is provided with at least one width scalable on the casing 1 at each groove 11 two ends Detachable horizontal back strap 3, the vertical direction of horizontal back strap 3 is provided with two fixing bands 5, described in every It is equipped with the adjusting button 51 of width between two vertical fixing bands 5 of regulation on fixing band 5, carries on the back in level It is equipped with one layer of slipmat 6 with on the medial wall of 3 and on the medial wall of fixing band 5, described slipmat 6 sets Massage block 61, described fixation kit 4 is had to be provided with the collecting bag 7 being easy to garbage collection, described fixation kit 4 Including the fixed block 41 being fixedly connected on casing 1, to be fixedly connected on fixed block 41 cross section be circular arc Hook 42, the locking plate 43 that is rotatably connected on fixed block 41, one end of described locking plate 43 is turned by bearing pin Being automatically connected on fixed block 41, the other end of described locking plate 43 is fixedly connected on hook 42, at locking plate 43 The fixed block 41 of top is provided with the latch 44 being fixedly connected on fixed block 41 by locking plate 43, described fixing Block 41 is provided with is easy to the fixing groove that collecting bag 7 installation is fixing, is fixed by operation tool kit by locking plate 43 In being connected to link up with 42, and regulate the locking plate 43 installation site on fixed block 41 by latch 44, Avoiding and operate tool kit disengaging hook in handling process, Practical Performance is good, the cross section of described locking plate 43 For L-shaped, the vertical portion of described locking plate 43 is rotatably connected on fixed block 41, the horizontal part of described locking plate 43 It is fixedly connected on hook 42, the horizontal part of described locking plate 43 and the vertical portion of locking plate 43 is equipped with and inserts The installing hole 40 that pin 44 coordinates, described latch 44 is fixedly connected on fixed block 41 by screw, structure letter Single, locking effect is good, and screw attachment security is reliable, controls effective, and easy to operate, Practical Performance is good, The cross section of described casing 1 is circular or polygon, is provided with circular arc between described groove 11 and casing 1 Angle 13, the medial wall of described groove 11 is provided with neonychium 14, and the thickness of described neonychium 14 is 10~20mm, By the setting of neonychium, effectively avoid in handling process, the casing 1 injury to operator, when When the thickness of neonychium is less than 10mm, neonychium is easy to wear, poor to the protected effect of operator, works as protection When the thickness of pad is more than 20mm, being unfavorable for that operator carry, using effect is poor, two described fixing bands 5 On be equipped with at least one two fixing bands 5 are tightened tighten band 52, described fixing band 5 is equipped with just In the placement pocket 53 that operation instrument is placed, improve the security performance in handling process, casing 1 is unfavorable for Coming off, Practical Performance is good, is placed on by operation instrument in placement pocket, is effectively reduced when carrying again and grasps Making coming off of instrument, using effect is good, and it is dissipating of grid-shaped that the lateral wall of described slipmat 6 is provided with cross section Thermosphere 60, is easy to heat radiation during carrying, good heat dissipation effect, unfailing performance is good.
During use, the material that inspection and repair shop on 10kV distribution line shaft tower needs is placed in placing trough 10 In blowing portion, during carrying, casing 1 is suspended on operation by horizontal back strap 3 and fixing band 5 by operator On personnel, the groove 11 being provided with by casing 1 contacts with operator, and the tool kit needed during by operation leads to Cross on the fixation kit 4 that casing 1 is provided with, during operation, only need to open case lid 2, the material needing to change of taking Material just can carry out overhaul plan to 10kV distribution line shaft tower, and the material scrapped is placed on fixation kit 4 In the collecting bag 7 being provided with.
By installing plate, casing is arranged on 10kV distribution line shaft tower, the material that inspection and repair shop needs is passed through Trough is placed, and effectively solves that existing daily restoring material prepares, material model is many, updating decision, subtracts Less expand power failure range work, reduce daily restoring material transmit up and down, placement in height principle condition occur, bring Provide the benefit that: 1) reduce repairing time, improve first-aid repair efficiency;2) shorten repairing time Between;3) recover user power utilization in advance, increase economic well-being of workers and staff;4) power supply enterprise's maintenance work amount is reduced, fall Low personnel cost;5) reduce restoring material to transmit the most up and down, improve safety management;And pass through fixation kit Waste material is unified to collect by the collecting bag being provided with, and decreases operator and waste material is at will abandoned phenomenon, Decreasing the pollution of environment, Practical Performance is good, decreases waste material and high-altitude junk occurs, improve security performance, By horizontal back strap and the combination of fixing band, it is effectively reduced working strength during casing carrying, effectively Improve handling efficiency, by the setting of groove, effectively raise the contact surface of casing and operator, Avoiding operator's casing when climbing to depart from, security performance is higher, and by groove by placing trough It is separated into two blowing portions, effectively different materials is classified, it is simple to operator take.

Claims (4)

  1. null1. it is applicable to 10kV distribution line shaft tower restoring material case,It is characterized in that: include being provided with the casing (1) of placing trough (10)、The case lid (2) being rotatably connected on casing (1),One end of described case lid (2) is connected on casing (1) by axis of rotation,The other end of described case lid (2) is fixedly connected on casing (1) by Magnet,The both sides of described casing (1) are equipped with the groove (11) that cross section is circular arc,The dividing plate (12) that placing trough (10) is separated into the blowing chamber that two materials are placed it is provided with in described placing trough (10),Described casing (1) is provided with for operating the fixation kit (4) that tool kit hangs,The casing (1) at each groove (11) two ends is provided with at least one adjustable detachable horizontal back strap of width (3),The vertical direction of horizontal back strap (3) is provided with two fixing bands (5),The adjusting button (51) of width between two vertical fixing bands (5) of regulation it is equipped with on every described fixing band (5),It is equipped with one layer of slipmat (6) on the medial wall of horizontal back strap (3) and on the medial wall of fixing band (5),Described slipmat (6) is provided with massage block (61),Described fixation kit (4) is provided with the collecting bag (7) being easy to garbage collection,Described fixation kit (4) includes the fixed block (41) being fixedly connected on casing (1)、It is fixedly connected on the hook (42) that fixed block (41) cross section is circular arc、The locking plate (43) being rotatably connected on fixed block (41),One end of described locking plate (43) is rotatably connected on fixed block (41) by bearing pin,The other end of described locking plate (43) is fixedly connected on hook (42),The fixed block (41) of locking plate (43) top is provided with the latch (44) being fixedly connected on by locking plate on fixed block (41) or hook (42),Described fixed block is provided with is easy to the fixing groove that collecting bag (7) installation is fixing,Article two, described fixing band (5) is equipped with at least one and tightens band (52) by what two fixing bands (5) tightened,The placement pocket (53) that instrument convenient to operate is placed it is equipped with on described fixing band (5).
  2. The most according to claim 1 it is applicable to 10kV distribution line shaft tower restoring material case, it is characterized in that: the cross section of described locking plate (43) is L-shaped, the vertical portion of described locking plate (43) is rotatably connected on fixed block (41), the horizontal part of described locking plate (43) is fixedly connected on hook (42), being equipped with, on the horizontal part of described locking plate (43) and the vertical portion of locking plate (43), the installing hole (40) coordinated with latch (44), described latch (44) is fixedly connected on fixed block (41) by screw.
  3. The most according to claim 1 it is applicable to 10kV distribution line shaft tower restoring material case; it is characterized in that: the cross section of described casing (1) is circular or polygon; circular arc chamfering (13) it is provided with between described groove (11) and casing (1); the medial wall of described groove (11) is provided with neonychium (14), and the thickness of described neonychium (14) is 10~20mm.
  4. The most according to claim 1 it is applicable to 10kV distribution line shaft tower restoring material case, it is characterised in that: the lateral wall of described slipmat (6) is provided with the heat dissipating layer (60) that cross section is grid-shaped.
CN201410254383.5A 2014-06-10 2014-06-10 It is applicable to 10kV distribution line shaft tower restoring material case Active CN104037652B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410254383.5A CN104037652B (en) 2014-06-10 2014-06-10 It is applicable to 10kV distribution line shaft tower restoring material case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410254383.5A CN104037652B (en) 2014-06-10 2014-06-10 It is applicable to 10kV distribution line shaft tower restoring material case

Publications (2)

Publication Number Publication Date
CN104037652A CN104037652A (en) 2014-09-10
CN104037652B true CN104037652B (en) 2016-10-26

Family

ID=51468321

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410254383.5A Active CN104037652B (en) 2014-06-10 2014-06-10 It is applicable to 10kV distribution line shaft tower restoring material case

Country Status (1)

Country Link
CN (1) CN104037652B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106742568B (en) * 2016-12-23 2018-07-27 国网浙江省电力公司湖州供电公司 One kind being suitable for 10kV electricity distributing and metering attaching stuffing-boxs

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201214240Y (en) * 2008-06-05 2009-04-01 济南供电公司 Combination tool box for operation team attendant
CN202333610U (en) * 2011-11-28 2012-07-11 辽宁省电力有限公司本溪供电公司 Backpack for erecting grounding wire on aerial conducting wire
CN203527442U (en) * 2013-11-05 2014-04-09 江苏力沛电力工程技术服务有限公司 Electric power overhaul work box
CN203883373U (en) * 2014-06-10 2014-10-15 国家电网公司 Rush-repair material box suitable for 10kV distribution line tower

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090302080A1 (en) * 2008-06-05 2009-12-10 Yi-Ting Lin Carry unit for tool box

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201214240Y (en) * 2008-06-05 2009-04-01 济南供电公司 Combination tool box for operation team attendant
CN202333610U (en) * 2011-11-28 2012-07-11 辽宁省电力有限公司本溪供电公司 Backpack for erecting grounding wire on aerial conducting wire
CN203527442U (en) * 2013-11-05 2014-04-09 江苏力沛电力工程技术服务有限公司 Electric power overhaul work box
CN203883373U (en) * 2014-06-10 2014-10-15 国家电网公司 Rush-repair material box suitable for 10kV distribution line tower

Also Published As

Publication number Publication date
CN104037652A (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN104037652B (en) It is applicable to 10kV distribution line shaft tower restoring material case
CN204524711U (en) A kind of wind generating set yaw brake examine and replace device
CN203883373U (en) Rush-repair material box suitable for 10kV distribution line tower
CN105004241B (en) A kind of rotor blade measurement apparatus
CN104037653A (en) Material box for repairing 10kV distribution line poles and towers
CN211448745U (en) Colliery safety ventilation switch
CN205309682U (en) Wheel prosthetic devices
CN208280706U (en) A kind of electric pole facilitating climbing
CN203883374U (en) Rush-repair material box suitable for 10kV distribution line tower
CN207098554U (en) One kind combination installing type heavy punch piece
CN104037651B (en) One is applicable to 10kV distribution line shaft tower restoring material case
CN204868608U (en) Interim clamping belt dressing of belt feeder maintenance
CN203423430U (en) Insulator maintenance device
CN204138184U (en) Collector-block
CN106090798A (en) A kind of outdoor use power switch cabinet solar illumination apparatus
CN208929651U (en) A kind of dismantling device of scrap cutter blade screw
CN205773020U (en) A kind of Large Hydropower Station brake more changing device
CN206028926U (en) Valve chasing bar
CN206263856U (en) The specific purpose tool of dismounting large size bearing seat gland
CN205238136U (en) Handheld emery wheel carbon pipe circumference cutting device
CN103557249A (en) Device capable of adjusting gap between brake pads and facilitating detachment thereof
CN202084849U (en) Hand winch for live-line work
CN203259548U (en) Special bracket for online monitoring instrument of 110kV arrester
CN204424768U (en) A kind of mounting operation platform of outdoor disconnector operating mechanism
CN203292937U (en) Saw blade protection cover for saw blade cutting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant