The content of the invention
In view of this, it is necessary to a kind of raising work efficiency is provided, and is easy to process hole group, make the hole position one for processing
The bamboo frame plate of cause goes to save boring machine automatically.
The present invention is achieved in that bamboo frame plate goes to save boring machine, including workbench automatically, also including lifting platform, lifting
Platform drive mechanism, drilling rod, drilling rod drive mechanism and workpiece drive mechanism, the side of the workbench are provided with workpiece conveying
Mouthful, opposite side is provided with switching door, and being provided with workpiece delivery port on the workbench saves knife;The lifting platform is located at
The top of workbench, and be between workpiece delivery port and switching door, the lifting platform drive mechanism is interior located at workbench
Bottom of chamber portion, and lifting platform drive mechanism is connected with lifting platform;The lifting platform is provided with multiple evenly distributed drilling rods, and drilling rod is erected
It is straight downward, and just to table surface, the drilling rod drive mechanism is on lifting platform, and drilling rod drive mechanism is connected with drilling rod
Connect;The workpiece drive mechanism is on the table top of workbench and straight in same with workpiece delivery port and switching door
On line, underface of the workpiece drive mechanism in drilling rod.
Two ends on the workbench are provided with guide pin bushing, and the position of the guide pin bushing on the lifting platform on the correspondence workbench sets
Have a guide rod coordinated with guide pin bushing, the lifting platform passes through the cooperation of guide rod and guide pin bushing, spacing fixation on the table, the lifting
Platform drive mechanism includes the first motor, the first rotary shaft, the first electromagnetic clutch, reductor, cam, crankshaft-link rod, swing
Bar and connecting rod, in workbench, the first motor connects the first rotary shaft by transmission belt to first motor, and first is electric
In the first rotary shaft, first rotary shaft connects reductor to magnet clutch, and the output shaft of reductor is provided with described convex
Wheel, the cam face connect one end of the crankshaft-link rod, and the other end of crankshaft-link rod is connected with swing arm, the swing arm
Be respectively arranged at two ends with the connecting rod, the connecting rod is fastened on lifting platform.
The workpiece drive mechanism includes three-motor, flywheel, the second electromagnetic clutch, the second rotary shaft, active
Take turns in shaft coupling, driven shaft coupling, conveying lower whorl and conveying, in workbench inner chamber, the 3rd is electronic for the three-motor
Machine connects flywheel by belt pulley, and in the second rotary shaft, second electromagnetic clutch is located in the second rotary shaft flywheel,
Second rotary shaft connects one end of active shaft coupling by chain, and the driven shaft coupling is provided with phase with active shaft coupling
One end of intermeshed gear, active shaft coupling and driven shaft coupling is equipped with bearing block, the active shaft coupling and driven
Axle device is fixed on the table by bearing block, and under the table top of workbench, driven shaft coupling is in work to active shaft coupling
On the table top of platform, located at the end of active shaft coupling, in conveying, wheel is located at the end of driven shaft coupling to the conveying lower whorl,
Take turns on the conveying lower whorl and conveying and cooperate, for clamping and transmitting workpiece.
Further, the lifting platform is provided with 6 evenly distributed drilling rods.
Further, the drilling rod drive mechanism includes the second motor, and second motor is located on lifting platform, and
On the centrage of the line segment formed in 6 evenly distributed drilling rods, in the second motor and 6 evenly distributed drilling rods
Between two drilling rods form trianglees, and the second motor passes through the centre two of belt pulley and 6 evenly distributed drilling rods respectively
Drilling rod connects, and is connected with each other by belt pulley between other drilling rods and adjacent drilling rod.
Further, also including air clamper, the air clamper is located in the inner chamber of workbench, the gas
Dynamic clamping device includes cylinder, two groups of drive links, two gears and two grippers, and the cylinder connects two groups of drivings simultaneously and connects
Bar, the other end of two groups of drive links are connected with two grippers by an even gear respectively, and described two grippers cooperate, and lead to
The stretching that cylinder drives drive link is crossed, drives two gears to carry out back rotation, controlled the closure of two grippers and relax.
Further, the material of the conveying lower whorl is Steel material.
Further, the material taken turns in the conveying is polyurethane material.
The present invention provide bamboo frame plate go automatically save boring machine advantage be:Present configuration advantages of simple, and be easy to
Assembling is made, and all realizes automatization, when bamboo frame plate is processed, can effectively be improved work efficiency, and be easy to processing
Hole group, makes the hole position for processing consistent, is easy to the later stage of bamboo frame plate to use.
Present configuration is reasonable, original, is easy to make manufacture, to frame plate bamboo chip go save, the whole that drill course of processing realities
Existing automatization, can reduce the raising work efficiency of labor intensity, tenfold, and reliable in quality, the bamboo for processing energetically
Piece hole position is consistent, is easy to bamboo frame plate to assemble, brings great convenience to subsequent handling.Meanwhile, change hole position and can meet other
The processing request of bamboo and wood product.
Specific embodiment
In order that the objects, technical solutions and advantages of the present invention become more apparent, it is below in conjunction with drawings and Examples, right
The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, and
It is not used in the restriction present invention.
Fig. 1 is referred to, Fig. 1 is that bamboo frame plate of the present invention goes to save the structural representation of boring machine automatically.
The bamboo frame plate goes to save boring machine, including workbench 10 automatically, also including lifting platform 20, lifting platform drive mechanism
30th, drilling rod 40, drilling rod drive mechanism 50 and workpiece drive mechanism 60, the side of the workbench 10 is provided with workpiece delivery port
11, opposite side is provided with switching door 12, and being provided with workpiece delivery port 11 on the workbench 10 saves knife 13;The liter
Drop platform 20 is located at the top of workbench 10, and is between workpiece delivery port 11 and switching door 12, the lifting platform driver
Structure 30 is located at the intracavity bottom of workbench 10, and lifting platform drive mechanism 30 is connected with lifting platform 20;Set on the lifting platform 20
There are 6 evenly distributed drilling rods 40, straight down, and just to 10 table top of workbench, the drilling rod drive mechanism 50 sets drilling rod 40
On lifting platform 20, and drilling rod drive mechanism 50 is connected with drilling rod 40;The workpiece drive mechanism 60 is located at workbench 10
On table top and on the same line with workpiece delivery port 11 and switching door 12, workpiece drive mechanism 60 is in drilling rod
40 underface.
Two ends on the workbench 10 are provided with guide pin bushing a, the guide pin bushing a on the lifting platform 20 on the corresponding workbench 10
Position be provided with the guide rod b coordinated with guide pin bushing a, the lifting platform 20 is by the cooperation of guide rod b and guide pin bushing a, spacing to be fixed on work
Make on platform 10, be easy to lifting platform 20 to be installed on workbench 10.
Fig. 2 is referred to, and combines Fig. 1, structural representations of the Fig. 2 for the lifting platform drive mechanism in Fig. 1.
The lifting platform drive mechanism 30 includes the first motor 31, the first rotary shaft 32, the first electromagnetic clutch 33, subtracts
Fast machine 34, cam 35, crankshaft-link rod 36, swing arm 37 and connecting rod 38, first motor 31 are located in workbench 10, and first
Motor 31 connects the first rotary shaft 32 by transmission belt, the first electromagnetic clutch 33 in the first rotary shaft 32, described the
One rotary shaft 32 connects reductor 34, and the output shaft of reductor 34 is provided with the cam 35,35 end face of cam connection institute
One end of crankshaft-link rod 36 is stated, the other end of crankshaft-link rod 36 is connected with swing arm 37, and the two ends of the swing arm 37 set respectively
There is the connecting rod 38, the connecting rod 38 is fastened on lifting platform 20.
First motor 31 is used to provide power, drives the first rotary shaft 32, the first rotary shaft 32 to carry by transmission belt
First electromagnetic clutch 33, is driven to rapid disconnection, eliminates inertia;It is when 31 driving cam of the first motor 35 is rotated, bent
Axle connecting rod 36 drives swing arm 37 to swing up and down, and then drives lifting platform 20 to move up and down, completes the drilling of drilling operating
With exit action.
Fig. 3 is referred to, and combines Fig. 1, structural representations of the Fig. 3 for the drilling rod drive mechanism in Fig. 1.
The drilling rod drive mechanism 50 includes the second motor 51, and second motor 51 is located on lifting platform 20, and
On the centrage c of the line segment formed in 6 evenly distributed drilling rods 40, the second motor 51 and 6 evenly distributed brills
The drilling rod 40 of centre two of bar 40 forms triangle, and the second motor 51 passes through belt pulley and 6 evenly distributed brills respectively
The drilling rod 40 of centre two of bar 40 connects, and is connected with each other by belt pulley between other drilling rods 40 and adjacent drilling rod 40.
Fig. 4 is referred to, and combines Fig. 1, structural representations of the Fig. 4 for the workpiece drive mechanism in Fig. 1.
The workpiece drive mechanism 60 includes that three-motor 61, flywheel 62, the second electromagnetic clutch 63, second are rotated
68 are taken turns in axle 64, active shaft coupling 65, driven shaft coupling 66, conveying lower whorl 67 and conveying, the three-motor 61 is located at work
Make in 10 inner chamber of platform, three-motor 61 connects flywheel 62 by belt pulley, flywheel 62 in the second rotary shaft 64, described the
In the second rotary shaft 64, second rotary shaft 64 connects the one of active shaft coupling 65 to two electromagnetic clutchs 63 by chain
End, the driven shaft coupling 66 are provided with pitch wheel d, active shaft coupling 65 and driven shaft coupling with active shaft coupling 65
One end of device 66 is equipped with bearing block e, and the active shaft coupling 65 and driven shaft coupling 66 are fixed on workbench by bearing block e
On 10, under the table top of workbench 10, driven shaft coupling 66 is on the table top of workbench 10, described defeated for active shaft coupling 65
Send lower whorl 67 located at the end of active shaft coupling 65, wheel 68 is located at the end of driven shaft coupling 66, the conveying in conveying
On lower whorl 67 and conveying, wheel 68 cooperates, and for clamping and transmitting workpiece f, the material of the conveying lower whorl 67 is steel
Material, in the conveying, the material of wheel 68 is polyurethane material.
Three-motor 61 is used to provide power, by pulley rotation flywheel 62, flywheel 62 and the second electromagnetic clutch
63 are connected in the second rotary shaft 64, and the effect of the second electromagnetic clutch 63 is the transmission for disconnecting rapidly flywheel 62, is eliminated in chain
Inertia, the effect of flywheel 62 is to make to connect next time using inertia obtain at once energy.
Fig. 5 is referred to, and combines Fig. 1, structural representations of the Fig. 5 for the air clamper in Fig. 1.
The bamboo frame plate goes to save boring machine also including air clamper 70 automatically, and the air clamper 70 is located at work
Make in the inner chamber of platform 10, the air clamper 70 includes 71, two groups of the cylinder gear 73 of drive link 72, two and two are grabbed
Pawl 74, the cylinder 71 connect two groups of drive links 72 simultaneously, and the other end of two groups of drive links 72 is respectively by an even gear
73 are connected with two grippers 74, and described two grippers 74 cooperate, and drive the stretching of drive link 72 by cylinder 71, are driven
Two gears 73 carry out back rotation, control the closure of two grippers 74 and relax.
Bamboo frame plate of the present invention go automatically save boring machine use step be:A piece of bamboo chip is put into into workpiece delivery port 11,
And bamboo chip has a placed face down of ring, under the strength of wheel 68 and conveying lower whorl 67 is dragged in the conveying, bamboo chip is rapid
Into, now going at workpiece delivery port 11 saves the ring that knife 13 has been eliminated on bamboo chip, and bamboo chip stops at switching door 12,
Workpiece in place when, limit switch instruction conveying stops, and air clamper 70 clamps workpiece, and lifting platform 20 is descending, drilling
Start;In place, lifting platform 20 is up, and switching door 12 is opened, and workpiece drive mechanism 60 starts, and workpiece f takes work out of for drilling
Platform 10, switching door 12 are closed.Subsequently into next cycle of operation, as long as according to the fabrication cycles 3.5 seconds or so of measurement one.
Present configuration is reasonable, original, is easy to make manufacture, to frame plate bamboo chip go save, the whole that drill course of processing realities
Existing automatization, can reduce the raising work efficiency of labor intensity, tenfold, and reliable in quality, the bamboo for processing energetically
Piece hole position is consistent, is easy to bamboo frame plate to assemble, brings great convenience to subsequent handling.Meanwhile, change hole position and can meet other
The processing request of bamboo and wood product.
Presently preferred embodiments of the present invention is the foregoing is only, not to limit the present invention, all essences in the present invention