CN104029189A - Steel wire rope suspension and placement frame - Google Patents

Steel wire rope suspension and placement frame Download PDF

Info

Publication number
CN104029189A
CN104029189A CN201410280511.3A CN201410280511A CN104029189A CN 104029189 A CN104029189 A CN 104029189A CN 201410280511 A CN201410280511 A CN 201410280511A CN 104029189 A CN104029189 A CN 104029189A
Authority
CN
China
Prior art keywords
steel wire
wire rope
suspension
sections
placement frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410280511.3A
Other languages
Chinese (zh)
Inventor
赵立波
曹青
孙其胜
王刚
贾锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201410280511.3A priority Critical patent/CN104029189A/en
Publication of CN104029189A publication Critical patent/CN104029189A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a steel wire rope suspension and placement frame which comprises two uprights with supporting bases at the bottoms. A cross beam is connected between the tops of the uprights, a plurality of equal-length suspension supporting rods with upwarped tail ends are longitudinally arranged on two sides of the cross beam, a transverse sleeve is arranged at the tail end of each suspension supporting rod, pin shafts penetrate the sleeves on the suspension supporting rods on the same side, the pin shaft on each side is formed by docking of two sections of short pin shafts, a limiting rod is perpendicularly arranged at the outer end of each section of the short pin shafts, locking rings which are docked with each other are arranged at the inner ends of each two sections of the short pin shafts, and a lock is arranged on each locking ring. The steel wire rope suspension and placement frame has the advantages that the steel wire rope suspension and placement frame is simple in structure and reasonable in design; by placing steel wire ropes on the uprights in a sleeved manner, the problem of disorderly stacking of the steel wire ropes is solved, the steel wire ropes are enabled to be orderly in placement, potential safety hazards are reduced, and the steel wire rope suspension and placement frame is convenient for popularization and application.

Description

Steel wire hang rack
Technical field
The present invention relates to a kind of steel wire hang rack.
Background technology
Steel wire rope, because its intensity is high, from heavy and light, reliable operation, becomes the region equipment installation and repairings such as factories and miness workshop, and material is had bad luck the most frequently used hoisting sling arriving in lifting.Many for the steel wire rope specification that lifts in workshop, quantity is large, therefore deposits very inconvenient.In the past, the steel wire rope of different size was always optionally deposited in together or was adopted easy rack, caused various steel wire ropes to be intertwined pell-mell.While causing lifting, require a great deal of time to arrange out needed rope at every turn, have a strong impact on operating efficiency.In addition, in Quality of Steel Wire Rope inspection and maintenance, because rope is arbitrarily to stack, therefore inconvenience checks whether rope exists the quality problems such as fracture of wire, burr.Moreover the steel wire rope of arbitrarily stacking has not only had a strong impact on the clean and tidy of place, workshop, has also caused certain potential safety hazard.Also have, for 6 meters of above long steel wire ropes, hang up just more difficult.At present, for hanging long steel wire rope, need build inclined ladder and manually hang or take off, and work with crane is auxiliary simultaneously, extremely inconvenient.Therefore, lifting is placed difficulty with steel wire rope ubiquity, gets rope difficult, and it is more difficult that rope is got in long rope placement, and the problem of wasting in a large number material resources, equipment and manpower.
Summary of the invention
For solving above technical deficiency, the invention provides a kind of steel wire hang rack, it is little that it takies plane site, and steel wire rope is difficult at will being diverted and losing.
The present invention is achieved by the following measures:
A kind of steel wire hang rack of the present invention, comprise that two bottoms are with the column of base for supporting, between two column tops, be connected with crossbeam, the both sides of described crossbeam are vertically arranged with some isometric and suspension struts that end is upturned, hang strut end and be provided with horizontal sleeve pipe, sleeve pipe on the some suspension struts of homonymy is installed with bearing pin jointly, the bearing pin of every side is comprised of two sections of short pin shaft docking, two sections of short pin shaft outer ends are vertically installed with gag lever post, two sections of short pin shaft the inners are provided with the lock ring connecting, and on described lock ring, are provided with lockset.
Above-mentioned column bottom vertical is connected to longitudinally in the middle of base for supporting, is connected with reinforcement diagonal brace between base for supporting both sides and column.
Above-mentioned crossbeam top is provided with hoisting ring.
Above-mentioned column below is provided with a circle safe fence.
The invention has the beneficial effects as follows: simple in structure, reasonable in design, by steel wire loop is placed on column, solved the problem that steel wire rope is stacked carelessly, make it put clean and tidy and reduce potential safety hazard, be easy to be extended and applied.Each steel wire rope is separately put, and is convenient to check whether rope exists the quality problems such as fracture of wire, burr.On different columns, for overlapping, put dissimilar steel wire rope, while getting steel wire rope, without ransacing, be difficult for makeing mistakes and saving manpower.Anti-theft pin is locked with lockset through retainer ring, is convenient to management, improves security.Strengthen the intensity that diagonal brace has improved column, extended the service life of column, safety and stability reliability is high.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is partial enlarged drawing of the present invention.
Wherein: 1 base for supporting, 2 columns, 3 strengthen diagonal brace, 4 crossbeams, 5 hang strut, 6 gag lever posts, 7 bearing pins, 8 sleeve pipes, 9 locksets, 10 steel wire ropes, 11 safe fences, 12 hoisting rings, 13 lock rings.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is done to further detailed description:
As shown in Figure 1, 2, a kind of steel wire rope 10 of the present invention hangs rack, comprise that two bottoms are with the column 2 of base for supporting 1, between two column 2 tops, be connected with crossbeam 4, the both sides of crossbeam 4 are vertically arranged with some isometric and suspension struts 5 that end is upturned, hang the steel wire rope 10 that can place respectively different size model on strut 5, facilitate steel wire rope 10 to take and take care of.Suspension strut 5 ends are upturned and can improve the structure stress that hangs strut 5, increase steel wire rope 10 and place quantity.Column 2 and base for supporting 1 adopt channel-section steel, and crossbeam 4 and suspension strut 5 adopt steel pipes, and each parts are combined by welding manner, not only simple in structure, and have further saved manufacturing cost.The length of crossbeam 4 and width can be determined according to the actual size of existing plant and equipment maintenance lifting hole or platform over-hang part bit space, place flexibly the steel wire rope 10 that length differs.
Hang strut 5 ends and be provided with horizontal sleeve pipe 8, sleeve pipe 8 on the some suspension struts 5 of homonymy is installed with bearing pin 7 jointly, the bearing pin 7 of every side is comprised of two sections of short pin shaft docking, two sections of short pin shaft outer ends are vertically installed with gag lever post 6, two sections of short pin shaft the inners are provided with the lock ring 13 connecting, and are provided with lockset 9 on lock ring 13.Can be convenient to use common lockset 9 bearing pin 7 is locked, prevent that steel wire rope 10 from arbitrarily being moved and losing.
Column 2 bottom vertical are connected to base for supporting 1 centre longitudinally, be connected with and strengthen diagonal brace 3 between base for supporting 1 both sides and column 2, improve the intensity of column 2, extend the service life of column 2, and safety and stability reliability is high.Crossbeam 4 tops are provided with hoisting ring 12, facilitate the lifting of rack to move.Column 2 belows are provided with a circle safe fence 11.Open the lockset 9 on one-sided bearing pin 7, extract the bearing pin 7 that needs hanging steel rope 10 places, Support Position out.According to steel wire rope 10, place classification, directly with steel wire rope 10 one end slings, directly overlap to be suspended to and hang on strut 5.Penetrate bearing pin 7, close lockset 9.When placing steel wire rope 10, should note both sides steel wire rope 10 evenly placement as far as possible, improve the steadiness of rack.Avoid one-sided weight too concentrated.Hang on strut 5 material nameplate is set, be convenient to different steel wire ropes 10 or other Locking Device for Hoistings 9 and store classifiedly, improve Locking Device for Hoisting 9 managerial skills.
The above is only the preferred embodiment of this patent; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the art of this patent principle; can also make some improvement and replacement, these improvement and replacement also should be considered as the protection domain of this patent.

Claims (4)

1. a steel wire hang rack, is characterized in that: comprise two bottoms standing with base for supporting
Post, between two column tops, be connected with crossbeam, the both sides of described crossbeam are vertically arranged with some isometric and suspension struts that end is upturned, hang strut end and be provided with horizontal sleeve pipe, sleeve pipe on the some suspension struts of homonymy is installed with bearing pin jointly, and the bearing pin of every side is comprised of two sections of short pin shaft docking, and two sections of short pin shaft outer ends are vertically installed with gag lever post, two sections of short pin shaft the inners are provided with the lock ring connecting, and on described lock ring, are provided with lockset.
2. steel wire hang rack according to claim 1, is characterized in that: described column bottom vertical is connected to longitudinally in the middle of base for supporting, is connected with reinforcement diagonal brace between base for supporting both sides and column.
3. steel wire hang rack according to claim 1, is characterized in that: described crossbeam top is provided with hoisting ring.
4. steel wire hang rack according to claim 1, is characterized in that: described column below is provided with a circle safe fence.
CN201410280511.3A 2014-06-23 2014-06-23 Steel wire rope suspension and placement frame Pending CN104029189A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410280511.3A CN104029189A (en) 2014-06-23 2014-06-23 Steel wire rope suspension and placement frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410280511.3A CN104029189A (en) 2014-06-23 2014-06-23 Steel wire rope suspension and placement frame

Publications (1)

Publication Number Publication Date
CN104029189A true CN104029189A (en) 2014-09-10

Family

ID=51460301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410280511.3A Pending CN104029189A (en) 2014-06-23 2014-06-23 Steel wire rope suspension and placement frame

Country Status (1)

Country Link
CN (1) CN104029189A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181941A (en) * 2015-04-30 2016-12-07 贵州盘江矿山机械有限公司 A kind of cable hanger
CN109866994A (en) * 2019-03-12 2019-06-11 中建三局第二建设工程有限责任公司 Cable stores anti-losing device
CN114013786A (en) * 2021-11-26 2022-02-08 昌河飞机工业(集团)有限责任公司 Flexible supporting and placing device for helicopter frame

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63171778A (en) * 1988-01-11 1988-07-15 Howa Mach Ltd Bobbin for roving
CN201752260U (en) * 2010-05-24 2011-03-02 张毅 Core-shaped keychain
CN202785096U (en) * 2012-09-23 2013-03-13 衡阳中钢衡重铸锻有限公司 Storage rack for steel wire ropes
CN103240723A (en) * 2012-02-10 2013-08-14 沃德(天津)传动有限公司 Tool rack
CN203409755U (en) * 2013-07-24 2014-01-29 泉州市福格电力设备有限公司 Mold baffle hanger
CN203890528U (en) * 2014-06-19 2014-10-22 浙江恒百华化纤有限公司 Spinning support
CN203919024U (en) * 2014-06-23 2014-11-05 山东电力建设第一工程公司 Steel wire hang rack

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63171778A (en) * 1988-01-11 1988-07-15 Howa Mach Ltd Bobbin for roving
CN201752260U (en) * 2010-05-24 2011-03-02 张毅 Core-shaped keychain
CN103240723A (en) * 2012-02-10 2013-08-14 沃德(天津)传动有限公司 Tool rack
CN202785096U (en) * 2012-09-23 2013-03-13 衡阳中钢衡重铸锻有限公司 Storage rack for steel wire ropes
CN203409755U (en) * 2013-07-24 2014-01-29 泉州市福格电力设备有限公司 Mold baffle hanger
CN203890528U (en) * 2014-06-19 2014-10-22 浙江恒百华化纤有限公司 Spinning support
CN203919024U (en) * 2014-06-23 2014-11-05 山东电力建设第一工程公司 Steel wire hang rack

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106181941A (en) * 2015-04-30 2016-12-07 贵州盘江矿山机械有限公司 A kind of cable hanger
CN109866994A (en) * 2019-03-12 2019-06-11 中建三局第二建设工程有限责任公司 Cable stores anti-losing device
CN114013786A (en) * 2021-11-26 2022-02-08 昌河飞机工业(集团)有限责任公司 Flexible supporting and placing device for helicopter frame
CN114013786B (en) * 2021-11-26 2023-12-15 昌河飞机工业(集团)有限责任公司 Helicopter frame-adding flexible supporting device

Similar Documents

Publication Publication Date Title
CN203919024U (en) Steel wire hang rack
CN102828697A (en) Telescopic overall hoisting derrick device and hoisting method thereof
CN210944502U (en) Prefabricated pier stud lifting and turning device and device group
US7337738B2 (en) Gate type vertical elevated mast
JP7241154B2 (en) MOVEMENT SYSTEMS, METHODS FOR MOVEMENT OF ARTICLES, AND RELATED COMPONENTS
CN104029189A (en) Steel wire rope suspension and placement frame
CN104234636B (en) Jack-up unit derrick installation method
CN101016827A (en) 18 m hydraulic pressure rise and fall retractable drill tower
CN105822132A (en) Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN206088905U (en) Guide tracked lift
CN102794592A (en) Adjustable automatic displacement device for steel member
CN107618999B (en) Hoisting tool and hoisting method for narrow space of bridge beam bottom and pier stud
CN113716483B (en) Beam maintenance combined tool and maintenance method of pumping unit
CN104386593A (en) Crane capable of being flexibly assembled and disassembled
CN212668989U (en) Movable gantry crane suitable for maintenance of petrochemical equipment
CN104098018A (en) Reusable multistage balance beam combination system
CN210992701U (en) Operation safety device
CN204265302U (en) One can dismounting loop wheel machine flexibly
CN204281030U (en) A kind of special hanger lifting section bar
CN102730577A (en) Detachable propeller strut for crane
CN208166512U (en) A kind of descending frame for the installation of great diameter and long steel reinforcement cage
CN202297035U (en) Glass box hoisting device for forklift
CN204702404U (en) Portable suspender
CN105060124A (en) Intra-frame portal crane system and hoisting use method thereof
CN203699556U (en) Hoisting steel wire rope suspending and placing mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140910