CN104019362B - Asphalt delivery method and induction system - Google Patents

Asphalt delivery method and induction system Download PDF

Info

Publication number
CN104019362B
CN104019362B CN201410256258.8A CN201410256258A CN104019362B CN 104019362 B CN104019362 B CN 104019362B CN 201410256258 A CN201410256258 A CN 201410256258A CN 104019362 B CN104019362 B CN 104019362B
Authority
CN
China
Prior art keywords
holding vessel
colophonium
stop valve
asphalt delivery
treatment device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410256258.8A
Other languages
Chinese (zh)
Other versions
CN104019362A (en
Inventor
周秀山
陈学伟
胡风山
张振兵
靳小鱼
高守
柳兴正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INNER MONGOLIA QINGHUA GROUP Co Ltd
CHINA KINGHO ENERGY GROUP Co Ltd
Original Assignee
INNER MONGOLIA QINGHUA GROUP Co Ltd
CHINA KINGHO ENERGY GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INNER MONGOLIA QINGHUA GROUP Co Ltd, CHINA KINGHO ENERGY GROUP Co Ltd filed Critical INNER MONGOLIA QINGHUA GROUP Co Ltd
Priority to CN201410256258.8A priority Critical patent/CN104019362B/en
Publication of CN104019362A publication Critical patent/CN104019362A/en
Application granted granted Critical
Publication of CN104019362B publication Critical patent/CN104019362B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working-Up Tar And Pitch (AREA)

Abstract

The invention discloses a kind of asphalt delivery method and induction system, wherein, the method includes: step a, tar oil treatment device carry Colophonium in the first holding vessel;Step b, when the bitumen level in the first holding vessel reaches the first setting value, stop to the first holding vessel conveying Colophonium, now tar oil treatment device carry Colophonium in the second holding vessel, and makes the first holding vessel to Colophonium prilling granulator conveying Colophonium;Step c, when the bitumen level in the second holding vessel reaches the second setting value, stop to the second holding vessel conveying Colophonium, now tar oil treatment device carry Colophonium in the first holding vessel, and makes the second holding vessel to Colophonium prilling granulator conveying Colophonium.The asphalt delivery method of present invention offer and induction system are by arranging the first holding vessel and the second holding vessel and multiple stop valve, two holding vessels are made alternately to store Colophonium and alternately carry Colophonium to Colophonium prilling granulator, eliminate centrifugal pump of the prior art or screw pump, it is to avoid mechanical breakdown.

Description

Asphalt delivery method and induction system
Technical field
The present invention relates to asphalt delivery technology, particularly relate to a kind of asphalt delivery method and induction system.
Background technology
Coal tar pitch is the black thing remaining in distillating still after the side-product of coking, i.e. tar distillation Matter, in coal tar hydrogenating unit, the high softening point bitumen produced is carried out conveying is hydrogenation plant The difficult problem faced.
In prior art, majority is the conveying being carried out Colophonium by centrifugal pump or screw pump, i.e. Centrifugal pump or screw pump, and conveying pipe are set between tar oil treatment device and Colophonium prilling granulator Road, is sent to Colophonium prilling granulator by the Colophonium of output in tar oil treatment device.
But, owing to asphalt viscosity is big, softening point is high, as easy as rolling off a log mechanical seal or the screw rod of causing Damage, thus cause pump fault, make Colophonium to carry, even result in Colophonium blocking conveying pipe Road.
Summary of the invention
The present invention provides a kind of asphalt delivery method and induction system, to solve of the prior art asking Topic, reduces the asphalt delivery difficulty caused because of mechanical breakdown, improves quantity-produced ability.
The invention provides a kind of asphalt delivery method, wherein, preferred thing, comprise the steps:
Step a, tar oil treatment device carry Colophonium in the first holding vessel;
Step b, when the bitumen level in described first holding vessel reaches the first setting value, at tar Reason device stops to the first holding vessel conveying Colophonium, and now tar oil treatment device is in the second holding vessel Conveying Colophonium, and make described first holding vessel carry Colophonium to Colophonium prilling granulator;
Step c, when the bitumen level in described second holding vessel reaches the second setting value, at tar Reason device stops to the second holding vessel conveying Colophonium, and now tar oil treatment device is in the first holding vessel Conveying Colophonium, and make described second holding vessel carry Colophonium to Colophonium prilling granulator.
Asphalt delivery method as above, these, it is preferred to, described step a specifically includes:
Step a1, open the first stop valve, make tar oil treatment device carry drip in the first holding vessel Blue or green;
If obtaining air pressure in step a2 the first holding vessel to be more than setting value, then open the second stop valve, The first holding vessel is made to communicate with air.
Asphalt delivery method as above, these, it is preferred to, described step b specifically includes:
Step b1, when the bitumen level in described first holding vessel reaches the first setting value, close First stop valve, makes tar oil treatment device stop, to the first holding vessel conveying Colophonium, now opening the Three stop valves, tar oil treatment device carries Colophonium in the second holding vessel, and opens the 4th stop valve, The first holding vessel is made to carry Colophonium to Colophonium prilling granulator;
Step b2, when the first holding vessel to Colophonium prilling granulator conveying Colophonium after, open second Stop valve, is in normal pressure in making the first holding vessel;
Step b3, close the second stop valve, make the first holding vessel stand by.
Asphalt delivery method as above, these, it is preferred to, described step c specifically includes:
Step c1, when the bitumen level in described second holding vessel reaches the second setting value, close 3rd stop valve, makes tar oil treatment device stop, to the second holding vessel conveying Colophonium, now opening the One stop valve, tar oil treatment device carries Colophonium in the first holding vessel, and opens the 5th stop valve, Described second holding vessel is made to carry Colophonium to Colophonium prilling granulator;
Step c2, when the second holding vessel to Colophonium prilling granulator conveying Colophonium after, open the 6th Stop valve, is in normal pressure in making the second holding vessel;
Step c3, closedown the 6th stop valve, make the second holding vessel stand by.
Asphalt delivery method as above, these, it is preferred to, also include: adjust first-class Control valve, carries Colophonium to the first holding vessel or the second holding vessel controlling tar oil treatment device Flow velocity.
Asphalt delivery method as above, these, it is preferred to, also include: adjust second Control valve, to control the first holding vessel or the second holding vessel to Colophonium prilling granulator conveying Colophonium Flow velocity.
Present invention also offers a kind of asphalt delivery system, including tar oil treatment device and Colophonium pelletize Device, wherein, described induction system includes: the first holding vessel and the second holding vessel, described first Holding vessel and the second holding vessel are respectively by the first stop valve and the 3rd stop valve and tar oil treatment device It is connected, and described first holding vessel and the second holding vessel are respectively by the 4th stop valve and the 5th cut-off Valve is connected with Colophonium prilling granulator.
Asphalt delivery system as above, these, it is preferred to, also include: the second stop valve With the 6th stop valve, described second stop valve is connected with described first holding vessel, is used for controlling described The connection of the first holding vessel and air and cut-off, described 6th stop valve and described second holding vessel phase Even, for controlling connection and the cut-off of described second holding vessel and air.
Asphalt delivery system as above, these, it is preferred to, also include: first flow control Valve processed and second flow control valve, described first flow control valve be arranged on described first holding vessel and Between second holding vessel and tar oil treatment device, described second flow control valve is arranged on described first Between holding vessel and the second holding vessel and Colophonium prilling granulator.
Asphalt delivery system as above, these, it is preferred to, also include: nitrogen power source, Described nitrogen power source is connected with described first holding vessel by the 7th stop valve, described nitrogen power Source is connected with described second holding vessel by the 8th stop valve.
Asphalt delivery system as above, these, it is preferred to: described first holding vessel and the It is provided with liquidometer on two holding vessels.
Asphalt delivery system as above, these, it is preferred to: the nitrogen of described nitrogen power source Atmospheric pressure is 0.7MPa.
Asphalt delivery system as above, these, it is preferred to: described first holding vessel and the The material of two holding vessels is all 15CrMo.
Asphalt delivery system as above, these, it is preferred to: described first holding vessel and the It is provided with heat-insulation layer in two holding vessels.
The asphalt delivery method of present invention offer and induction system are by arranging the first holding vessel and second Holding vessel and multiple stop valve, make two holding vessels alternately store Colophonium and alternately to Colophonium pelletize Device conveying Colophonium, eliminates centrifugal pump of the prior art or screw pump, it is to avoid mechanical breakdown, Ensure that the seriality of production.
Accompanying drawing explanation
The asphalt delivery method flow diagram that Fig. 1 provides for the embodiment of the present invention;
The asphalt delivery system structural representation that Fig. 2 provides for the embodiment of the present invention.
Detailed description of the invention
The asphalt delivery method flow diagram that Fig. 1 provides for the embodiment of the present invention, the embodiment of the present invention carries Having supplied a kind of asphalt delivery method, the asphalt delivery system provided by the embodiment of the present invention is realized, The asphalt delivery system structural representation that Fig. 2 provides for the embodiment of the present invention.Refer to Fig. 1 and Fig. 2, Embodiments providing a kind of asphalt delivery method, the method comprises the following steps:
Step a, tar oil treatment device carry Colophonium in the first holding vessel.
In the present embodiment, Colophonium conveying rely on be nitrogen as power, at the first holding vessel 1 Before coming into operation with the second holding vessel 2, first two holding vessels are carried out nitrogen displacement, and make two It is in atmospheric pressure state inside individual holding vessel normally producing.
Wherein, step a specifically includes:
Step a1, open the first stop valve 3, make tar oil treatment device 4 in the first holding vessel 1 Conveying Colophonium;
If the air pressure in step a2 the first holding vessel 1 is more than setting value, then open the second stop valve 5, make the first holding vessel 1 communicate with air.
Step b, when the bitumen level in described first holding vessel reaches the first setting value, at tar Reason device stops to the first holding vessel conveying Colophonium, and now tar oil treatment device is in the second holding vessel Conveying Colophonium, and make described first holding vessel carry Colophonium to Colophonium prilling granulator.
Wherein, above-mentioned first setting value can be the 50% of the first holding vessel 1 volume, art technology Personnel can also according to the production capacity of the flow velocity of Colophonium and Colophonium prilling granulator 6 adjust this One setting value.
Step b specifically includes:
Step b1, when the bitumen level in described first holding vessel 1 reaches the first setting value, close Close the first stop valve 3, make tar oil treatment device 4 stop to the first holding vessel 1 and carry Colophonium, now Opening the 3rd stop valve 7, tar oil treatment device 4 carries Colophonium in the second holding vessel 2, and opens 4th stop valve 8, makes the first holding vessel 1 carry Colophonium to Colophonium prilling granulator 6;
Step b2, when the first holding vessel 1 is after Colophonium prilling granulator 6 carries Colophonium, open Second stop valve 5, makes the first holding vessel 1 communicate with air, thus is in normal pressure;
Step b3, close the second stop valve 5, make the first holding vessel 1 stand by.
Step c, when the bitumen level in described second holding vessel 2 reaches the second setting value, tar Processing means 4 stops carrying Colophonium to the second holding vessel 2, and now tar oil treatment device 4 stores to first Tank 1 carries Colophonium, and makes described second holding vessel 2 carry Colophonium to Colophonium prilling granulator 6.
Selecting of second setting value is identical with the system of selection of the first setting value, can be according to Colophonium The production capacity of flow velocity and Colophonium prilling granulator 6 adjusts.In the present embodiment, the second setting value is The 50% of second holding vessel 2 volume.
Step c specifically includes:
Step c1, when the bitumen level in described second holding vessel 2 reaches the second setting value, close Close the 3rd stop valve 7, make tar oil treatment device 4 stop to the second holding vessel 2 and carry Colophonium, now Opening the first stop valve 3, tar oil treatment device 4 carries Colophonium in the first holding vessel 1, and opens 5th stop valve 9, makes described second holding vessel 2 carry Colophonium to Colophonium prilling granulator 6;
Step c2, when the second holding vessel 2 is after Colophonium prilling granulator 6 carries Colophonium, open 6th stop valve 10, makes the second holding vessel 2 communicate with air, thus is in normal pressure;
Step c3, closedown the 6th stop valve 10, make the second holding vessel 2 stand by.
Preferably, the method also includes adjusting first flow control valve 11, to control tar processing Device 4 carries the step of the flow velocity of Colophonium to the first holding vessel 1 or the second holding vessel 2, and adjusts the Two flow control valves 12, defeated to Colophonium prilling granulator 6 to control the first holding vessel 1 or the second holding vessel 2 Send the step of the flow velocity of Colophonium.
The embodiment of the present invention additionally provides a kind of asphalt delivery system, for from tar oil treatment device 4 to Colophonium prilling granulator 6 carries Colophonium, including tar oil treatment device 4 and Colophonium prilling granulator 6, wherein, Described induction system includes: the first holding vessel 1 and the second holding vessel 2, described first holding vessel 1 and Two holding vessels 2 are connected with tar oil treatment device 4 with the 3rd stop valve 7 by the first stop valve 3 respectively, And described first holding vessel 1 and the second holding vessel 2 are respectively by the 4th stop valve 8 and the 5th stop valve 9 It is connected with Colophonium prilling granulator.
Preferably, this induction system also includes the second stop valve 5 and the 6th stop valve 10, described Two stop valves 5 for controlling connection and the cut-off of described first holding vessel 1 and air, described 6th section Only valve 10 is for controlling described second holding vessel 2 and the connection of air and cut-off.
Further, this induction system also includes: first flow control valve 11 and second flow control Valve 12, described first flow control valve 11 be arranged on described first holding vessel 1 and the second holding vessel 2 with Between tar oil treatment device 4, described second flow control valve 12 is arranged on described first holding vessel 1 He Between second holding vessel 2 and Colophonium prilling granulator 6.
The most just it is discussed in detail and applies this asphalt delivery system to carry out the work process of asphalt delivery:
First stop valve the 3, second stop valve the 5, the 3rd cut-off was closed before the bituminous pitch storing tank that comes into operation Valve the 7, the 6th stop valve 10, first flow control valve 11, open the 7th stop valve the 13, the 4th cut-off Bituminous pitch storing tank is entered by valve the 8, the 8th stop valve the 14, the 5th stop valve 9, second flow control valve 12 Row nitrogen replace, to be replaced qualified after close nitrogen gas control valve, the i.e. the 7th stop valve 13 and the 8th section Only valve 14, opens the second stop valve 5 and the 6th stop valve 10, makes two holding vessels be in atmospheric pressure state After.When device normally produces, the jacket hot tracing of each Colophonium pipeline that first comes into operation, the first holding vessel 1 He It is provided with heat-insulation layer in second holding vessel 2, internal Colophonium to be played the effect of insulation, prevents Colophonium cooling is too fast.
If first selecting the first holding vessel 1 to run, Colophonium is first-class from flowing to from tar oil treatment device 4 Before control valve 11, close the 7th stop valve the 13, the 4th stop valve the 8, second stop valve the 5, the 3rd Stop valve the 7, the 8th stop valve the 14, the 5th stop valve the 9, the 6th stop valve 10 and second flow control Valve 12, opens the first stop valve 3, slightly opens first flow control valve, it is ensured that device is properly functioning.Phase Between, if there is the air pressure in the first holding vessel more than certain setting value, say, that if first Holding vessel builds the pressure phenomenon, can slightly open the second stop valve 5, be passed through a small amount of air.
When the liquid level of the first holding vessel reaches 50%, close the first stop valve 3, open the 3rd cut-off Valve 7, Colophonium suspends and feeds to the first holding vessel 1, changes into feeding to the second holding vessel 2, now except the Flow control valve 11 is slightly opened, outside the 3rd stop valve 7 standard-sized sheet, other valves are in closed mode. Now can carry Colophonium to Colophonium prilling granulator 6, standard-sized sheet the 7th stop valve 13 and the 4th stop valve 8, Slightly open second flow control valve 12, be used for controlling Colophonium flow velocity, it is ensured that Colophonium granulation outcome.
After treating the asphalt delivery of the first holding vessel 1, close the 7th stop valve 13 and the 4th stop valve 8, open the second stop valve 5, when making the first holding vessel 1 be in atmospheric pressure state, close the second stop valve 5, the first holding vessel 1 stands by.
When the liquid level of the second holding vessel 2 reaches 50%, close the 3rd stop valve 7, open the first cut-off Valve 3, Colophonium changes into feeding to the first holding vessel 1 to the second holding vessel 2.Period, if there is second The phenomenon that builds the pressure of holding vessel 2, can slightly open the 6th stop valve 10.The Colophonium of the second holding vessel 2 can be to It is delivered to outward Colophonium prilling granulator 6, now valve first flow control valve 11 and second flow control valve 12 Slightly opening, the first stop valve 3 standard-sized sheet, other valves are in closed mode, standard-sized sheet the 8th stop valve 14 With the 5th stop valve 9, control Colophonium flow velocity by second flow control valve 12, it is ensured that pelletize is normal.
The 8th stop valve 14 and the 5th stop valve is closed after treating the asphalt delivery of the second holding vessel 2 9, open the 6th stop valve 10, when the second holding vessel 2 is in atmospheric pressure state, close the 6th stop valve 10, the second holding vessel 2 stands by.By that analogy, two holding vessel alternations are made.This Skilled person is it is understood that the quantity of holding vessel can also arrange multiple, and it replaces work The principle made is identical with the alternation principle of two holding vessels.
In the above-described embodiments, nitrogen power source is by the 7th stop valve 13 and described first holding vessel 1 Being connected, described nitrogen power source is connected with described second holding vessel 2 by the 8th stop valve 14.Preferably , the nitrogen pressure of nitrogen power source is 0.7MPa, and this force value can make Colophonium make to Colophonium The speed of grain device flowing is the most reasonable.
Further, the material of the first holding vessel 1 and the second holding vessel 2 is all 15CrMo, its corrosion resistant Erosion, the life-span is long.
Last it is noted that above example is only in order to illustrate technical scheme, rather than It is limited;Although the present invention being described in detail with reference to previous embodiment, this area Those of ordinary skill is it is understood that it still can be to the technical scheme described in foregoing embodiments Modify, or wherein portion of techniques feature is carried out equivalent;And these are revised or replace Change, do not make the essence of appropriate technical solution depart from the scope of various embodiments of the present invention technical scheme.

Claims (14)

1. an asphalt delivery method, it is characterised in that comprise the steps:
Step a, tar oil treatment device carry Colophonium in the first holding vessel;
Step b, when the bitumen level in described first holding vessel reaches the first setting value, at tar Reason device stops to the first holding vessel conveying Colophonium, and now tar oil treatment device is in the second holding vessel Conveying Colophonium, and make described first holding vessel carry Colophonium to Colophonium prilling granulator;
Step c, when the bitumen level in described second holding vessel reaches the second setting value, at tar Reason device stops to the second holding vessel conveying Colophonium, and now tar oil treatment device is in the first holding vessel Conveying Colophonium, and make described second holding vessel carry Colophonium to Colophonium prilling granulator.
Asphalt delivery method the most according to claim 1, it is characterised in that described step a Specifically include:
Step a1, open the first stop valve, make tar oil treatment device carry drip in the first holding vessel Blue or green;
If the air pressure in step a2 the first holding vessel is more than setting value, then open the second stop valve, The first holding vessel is made to communicate with air.
Asphalt delivery method the most according to claim 2, it is characterised in that described step b Specifically include:
Step b1, when the bitumen level in described first holding vessel reaches the first setting value, close First stop valve, makes tar oil treatment device stop, to the first holding vessel conveying Colophonium, now opening the Three stop valves, tar oil treatment device carries Colophonium in the second holding vessel, and opens the 4th stop valve, The first holding vessel is made to carry Colophonium to Colophonium prilling granulator;
Step b2, when the first holding vessel to Colophonium prilling granulator conveying Colophonium after, open second Stop valve, is in normal pressure in making the first holding vessel;
Step b3, close the second stop valve, make the first holding vessel stand by.
Asphalt delivery method the most according to claim 3, it is characterised in that described step c Specifically include:
Step c1, when the bitumen level in described second holding vessel reaches the second setting value, close 3rd stop valve, makes tar oil treatment device stop, to the second holding vessel conveying Colophonium, now opening the One stop valve, tar oil treatment device carries Colophonium in the first holding vessel, and opens the 5th stop valve, Described second holding vessel is made to carry Colophonium to Colophonium prilling granulator;
Step c2, when the second holding vessel to Colophonium prilling granulator conveying Colophonium after, open the 6th Stop valve, is in normal pressure in making the second holding vessel;
Step c3, closedown the 6th stop valve, make the second holding vessel stand by.
5. according to the arbitrary described asphalt delivery method of claim 1-4, it is characterised in that also wrap Include: adjust first flow control valve, to control tar oil treatment device to the first holding vessel or the second storage Deposit the flow velocity of tank conveying Colophonium.
6. according to the arbitrary described asphalt delivery method of claim 1-4, it is characterised in that also wrap Include: adjust second flow control valve, to control the first holding vessel or the second holding vessel to Colophonium pelletize The flow velocity of device conveying Colophonium.
7. an asphalt delivery system, including tar oil treatment device and Colophonium prilling granulator, its feature Being, described asphalt delivery system is for realizing the asphalt delivery method described in claim 1, institute State induction system to include: the first holding vessel and the second holding vessel, described first holding vessel and the second storage Deposit tank to be connected with tar oil treatment device by the first stop valve and the 3rd stop valve respectively, and described the One holding vessel and the second holding vessel are filled with Colophonium pelletize by the 4th stop valve and the 5th stop valve respectively Put connected.
Asphalt delivery system the most according to claim 7, it is characterised in that also include: the Two stop valves and the 6th stop valve, described second stop valve is connected with described first holding vessel, is used for Control described first holding vessel and the connection of air and cut-off, described 6th stop valve and described second Holding vessel is connected, for controlling connection and the cut-off of described second holding vessel and air.
9. according to the asphalt delivery system described in claim 7 or 8, it is characterised in that also include: First flow control valve and second flow control valve, described first flow control valve is arranged on described Between one holding vessel and the second holding vessel and tar oil treatment device, described second flow control valve is arranged Between described first holding vessel and the second holding vessel and Colophonium prilling granulator.
Asphalt delivery system the most according to claim 9, it is characterised in that also include: Nitrogen power source, described nitrogen power source is connected with described first holding vessel by the 7th stop valve, Described nitrogen power source is connected with described second holding vessel by the 8th stop valve.
11. asphalt delivery system according to claim 9, it is characterised in that: described first It is provided with liquidometer on holding vessel and the second holding vessel.
12. asphalt delivery system according to claim 10, it is characterised in that: described nitrogen The nitrogen pressure of power source is 0.7MPa.
13. asphalt delivery system according to claim 9, it is characterised in that: described first The material of holding vessel and the second holding vessel is all 15CrMo.
14. asphalt delivery system according to claim 13, it is characterised in that: described first It is provided with heat-insulation layer in holding vessel and the second holding vessel.
CN201410256258.8A 2014-06-10 2014-06-10 Asphalt delivery method and induction system Active CN104019362B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410256258.8A CN104019362B (en) 2014-06-10 2014-06-10 Asphalt delivery method and induction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410256258.8A CN104019362B (en) 2014-06-10 2014-06-10 Asphalt delivery method and induction system

Publications (2)

Publication Number Publication Date
CN104019362A CN104019362A (en) 2014-09-03
CN104019362B true CN104019362B (en) 2016-11-23

Family

ID=51436264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410256258.8A Active CN104019362B (en) 2014-06-10 2014-06-10 Asphalt delivery method and induction system

Country Status (1)

Country Link
CN (1) CN104019362B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108268061A (en) * 2017-12-29 2018-07-10 三汽车制造有限公司 Control method, system and the bituminous mixing plant of pitch injection holding vessel
CN108755344B (en) * 2018-06-05 2020-09-11 上海公路桥梁(集团)有限公司 Intelligent asphalt road construction system
CN108762216A (en) * 2018-06-05 2018-11-06 上海公路桥梁(集团)有限公司 Intelligence drips road managing and control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2623690Y (en) * 2003-06-01 2004-07-07 杨周洪 Apparatus for producing hybrid modified asphalt
JP2004225251A (en) * 2003-01-20 2004-08-12 Nikko Co Ltd Asphalt equipment for asphalt plant
CN202598131U (en) * 2012-04-13 2012-12-12 中国石油天然气股份有限公司 Oil-gas mixing transportation device of crude oil and oil field gas in oil field
CN103194252A (en) * 2013-03-28 2013-07-10 中国矿业大学 Complete set of equipment and method for separating high-temperature coal tar components via low-temperature rapid extraction method
CN203907226U (en) * 2014-06-10 2014-10-29 中国庆华能源集团有限公司 Asphalt conveying system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004225251A (en) * 2003-01-20 2004-08-12 Nikko Co Ltd Asphalt equipment for asphalt plant
CN2623690Y (en) * 2003-06-01 2004-07-07 杨周洪 Apparatus for producing hybrid modified asphalt
CN202598131U (en) * 2012-04-13 2012-12-12 中国石油天然气股份有限公司 Oil-gas mixing transportation device of crude oil and oil field gas in oil field
CN103194252A (en) * 2013-03-28 2013-07-10 中国矿业大学 Complete set of equipment and method for separating high-temperature coal tar components via low-temperature rapid extraction method
CN203907226U (en) * 2014-06-10 2014-10-29 中国庆华能源集团有限公司 Asphalt conveying system

Also Published As

Publication number Publication date
CN104019362A (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN104019362B (en) Asphalt delivery method and induction system
CN104449824B (en) A kind of slurry-bed hydrocracking product separation decompression group assembly system
RU2015105948A (en) SYSTEM AND METHOD FOR MANAGING A MULTI-THREAD COMPRESSOR
CN203907226U (en) Asphalt conveying system
CN107056882B (en) Full-automatic ethanol adding system for blood product production
CN104019370B (en) Booster station carries the slurry pipeline steel system and method for material to multi-site simultaneously
CN202700129U (en) System for purifying naphthalin by crystalizing
CN203248911U (en) Heat preservation system for spinning production line flux pipeline
CN204846930U (en) Heating device is stored to industry wax
CN204356070U (en) A kind of long-range feed apparatus
CN204563706U (en) A kind of iundustrial oil cartridge filter
CN106693430A (en) Online water washing fractioning tower top cycle system
US20080234868A1 (en) Method and apparatus for decoking tubes in an oil refinery furnace
CN106275915A (en) A kind of oil storage tank device for cooling
CN205708216U (en) The chemical products storage tank stored for hot environment
CN104728593A (en) Gas cabinet position adjusting system
RU2503804C1 (en) Method for maintaining formation pressure and device for its implementation
CN207016720U (en) A kind of control valve group suitable for delayed coking unit
CN203012549U (en) Apparatus for controlling temperature of chemical liquid
CN208579153U (en) A kind of heat medium system improvement structure
CN208995415U (en) Butanediol Product Collection System
CN112521971B (en) Adsorption tower start-up heating system
CN107270017A (en) A kind of bringing-up section oil pipeline
US2242110A (en) Method and apparatus for treating hydrocarbons
CN203360359U (en) Carbon black and oil gas mixing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhou Xiushan

Inventor after: Chen Xuewei

Inventor after: Hu Fengshan

Inventor after: Zhang Zhenbing

Inventor after: Jin Xiaoyu

Inventor after: Gao Shou

Inventor after: Liu Xingzheng

Inventor before: Hu Fengshan

Inventor before: Zhang Zhenbing

Inventor before: Jin Xiaoyu

Inventor before: Gao Shou

Inventor before: Liu Xingzheng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HU FENGSHAN ZHANG ZHENBING JIN XIAOYU GAO SHOU LIU XINGZHENG TO: ZHOU XIUSHAN CHEN XUEWEI HU FENGSHAN ZHANG ZHENBING JIN XIAOYU GAO SHOU LIU XINGZHENG

C14 Grant of patent or utility model
GR01 Patent grant