CN104018515A - 一种沙漠地区输电线路装配式钢结构沙箱重力式基础 - Google Patents

一种沙漠地区输电线路装配式钢结构沙箱重力式基础 Download PDF

Info

Publication number
CN104018515A
CN104018515A CN201410262265.9A CN201410262265A CN104018515A CN 104018515 A CN104018515 A CN 104018515A CN 201410262265 A CN201410262265 A CN 201410262265A CN 104018515 A CN104018515 A CN 104018515A
Authority
CN
China
Prior art keywords
transmission line
cylindrical shell
top board
steel pipe
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410262265.9A
Other languages
English (en)
Other versions
CN104018515B (zh
Inventor
谈磊
陶青松
李宁
周昊
战龙龙
张大长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Electric Power Design Institute
Original Assignee
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Electric Power Design Institute filed Critical Jiangsu Electric Power Design Institute
Priority to CN201410262265.9A priority Critical patent/CN104018515B/zh
Publication of CN104018515A publication Critical patent/CN104018515A/zh
Application granted granted Critical
Publication of CN104018515B publication Critical patent/CN104018515B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本发明公开了一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,包括底板、筒体、顶板和钢管,所述的底板、筒体、顶板依次连接形成“工”字形结构,所述的筒体内填充有沙子,而所述的钢管则固定于顶板的上部,且所述的钢管的轴线和筒体的轴线重合,所述的钢管的上部内腔内还固定有混凝土隔板,而在混凝土隔板上部的钢管内腔内则通过混凝土浇筑埋设有一用于与铁塔连接的地脚螺栓。本发明构造简单,结构稳定,安装方便,施工周期短,对环境影响小,便于模块化设计和机械化施工。

Description

一种沙漠地区输电线路装配式钢结构沙箱重力式基础
技术领域
本发明涉及一种沙漠半移动沙丘地区输变电线路工程的新型基础形式,尤其是涉及一种沙漠地区输电线路装配式钢结构沙箱重力式基础,适用于沙漠地区各种电压等级的输变电线路工程基础,属于电力输送领域。
背景技术
基础在输电线路的设计和施工中占有很重要的地位,它对整个线路的投资、安全和正常使用有很大的影响。由于线路工程距离长、施工场地分散、交通条件差,线路基础的设计、施工、检测水平和其他行业相比,在几个方面都有一定差距,因此,尽可能在基础设计中做到安全可靠、重视环保、节省土地资源、低材料消耗和施工方便显得尤为重要。在安全、可靠的前提下,兼顾经济与环保,减少施工过程对环境的破坏。
考虑沙漠地区地质条件的特殊性,工程对位于半流动沙丘,岩性为中细砂、粉砂、粉土等区域的基础塔位,沙丘移动的程度不可预估。本着安全第一的原则,宜采用重力式基础,该基础形式安全、可靠。但是传统的重力式刚性基础混凝土工程量较大。沙漠地区缺乏混凝土拌制所需的砂石料,无水源,因此将减少混凝土用量作为主要目标。
沙漠地区大量覆盖以风积成因为主的细砂,褐黄色,干燥,稍密,石英长石为主,云母次之,颗粒组成均匀。干燥时密度可达到18.6kN/m3。适宜填充密闭的空间起到配重的作用,且就地取材,无购买、运输的费用。
发明内容
本发明所要解决的技术问题是提供一种沙漠地区输电线路装配式钢结构沙箱重力式基础,以在安全、可靠的前提下,兼顾经济与环保,减少材料的运输及如何降低施工过程中对环境的破坏。
为解决上述技术问题,本发明采用的技术方案为:
一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,包括底板、筒体、顶板和钢管,所述的底板、筒体、顶板依次连接形成“工”字形结构,所述的筒体内填充有沙子,而所述的钢管则固定于顶板的上部,且所述的钢管的轴线和筒体的轴线重合,所述的钢管的上部内腔内还固定有混凝土隔板,而在混凝土隔板上部的钢管内腔内则通过混凝土浇筑埋设有一用于与铁塔连接的地脚螺栓。
其中,所述顶板上还设置有灌沙孔,且所述的灌沙孔与筒体的内部连通。钢管的底部还连接有一法兰,所述的法兰与所述的顶板通过螺栓固定连接。
进一步,所述的法兰和钢管的连接端还设置有第一加强筋板;所述的筒体和顶板的连接端沿筒体的外周面设置有第二加强筋板;所述的筒体和底板的连接处沿筒体的外周面设置有第三加强筋板;所述的顶板的边沿和底板的边沿之间还设置有形成骨架结构的第四加强筋板。
更进一步,所述的第四加强筋板与顶板和顶板之间均通过连接脚连接,所述的筒体与底板和顶板之间均通过连接脚连接
本发明的有益效果为:
(1)、因地制宜、就地取材,直接取用沙漠地区的细砂进行砂芯填充,减少购买、运输费用。
(2)、形式构造简单,结构稳定,安装方便,施工周期短。
(3)、便于模块化设计和机械化施工。
附图说明
下面结合附图和具体实施例对本发明进行详细的说明。
图1为本发明的整体结构示意图;
图2为本发明钢管底部连接法兰俯视图;
图3为本发明钢管底部连接法兰侧视图;
图4为本发明顶板俯视图;
图5为本发明顶板侧视图;
图6为本发明底板俯视图;
图7为本发明底板侧视图。
图中主要附图标记含义如下:
1、底板   2、筒体   3、顶板   4、钢管    5、沙子、 6、混凝土隔板
7、混凝土  8、地脚螺栓   9、灌沙孔  10、法兰  11、第一加强筋板
12、第二加强筋板  13、第三加强筋板  14、第四加强筋板  15、连接角
具体实施方式:
下面结合附图对本发明做具体的介绍。
图1为本发明的整体结构示意图;
由图1所示:一种沙漠地区输电线路装配式钢结构沙箱重力式基础,包括底板1、筒体2、顶板3和钢管4,所述的底板1、筒体2、顶板3依次连接形成“工”字形结构,具体为,所述的筒体2与底板1和顶板3之间均通过连接脚15连接,所述的筒体2内填充有沙子5,而所述的钢管4则固定于顶板3的上部,且所述的钢管4的轴线和筒体2的轴线重合,所述的钢管4的上部内腔内还固定有混凝土隔板6,而在混凝土隔板6上部的钢管4内腔内则通过混凝土7浇筑埋设有一用于与铁塔连接的地脚螺栓8。
图2为本发明钢管底部连接法兰俯视图;图3为本发明钢管底部连接法兰侧视图;图4为本发明顶板俯视图;图5为本发明顶板侧视图;图6为本发明底板俯视图;图7为本发明底板侧视图;
由图2—图7所示:所述顶板3上还设置有灌沙孔9,且所述的灌沙孔9与筒体2的内部连通。钢管4的底部连接有一法兰10,所述的法兰10与所述的顶板3通过螺栓固定连接。
所述的法兰10和钢管4的连接端还设置有第一加强筋板11;所述的筒体2和顶板3的连接端沿筒体2的外周面设置有第二加强筋板12;所述的筒体2和底板1的连接处沿筒体2的外周面设置有第三加强筋板13;而所述的顶板3的边沿和底板1的边沿之间则还设置有形成骨架结构的第四加强筋板14,所述的第四加强筋板14与底板1和顶板3之间均通过连接脚15连接。
 
上述的沙漠地区输电线路装配式钢结构沙箱重力式基础的施工步骤如下:
1)基坑开挖;
2)基础装配; 
将底板1、筒体2、顶板3及第四加强筋板14通过连接脚15组装起来,其中底板1、筒体2、顶板3可由工厂加工后形成组装构件,用于现场组装。以形成模块化设计,工厂标准化生产,成套运输,现场按图纸要求组装即可。
3)沙子填充;
顶板3上设置有灌沙孔9,将施工周边采集的沙子5从顶板3上的灌沙孔9灌装进筒体2内,沙子5颗粒极小,很容易填充筒体2内的空间。
4)安装钢管;
沙子5填充完成后,用螺栓将与钢管4底部连接在一起的法兰10固定到顶板3上。
5)混凝土浇筑地脚螺栓; 
钢管4的上部内腔内固定有混凝土隔板6,用预制好的混凝土7将地脚螺栓8下部浇筑在混凝土隔板6上部的钢管4内腔内,地脚螺栓10上部裸露在基础表面,用于与铁塔连接。
本发明的传力路径为:基础的作用力→ 地脚螺栓8(按照机械锚固考虑)→ 顶部的钢管4 → 钢管的法兰10 → 顶板 3→ 筒体2的筒壁及加强筋板→ 底板1。而第四加强筋板14的设置可大大减少筒体2的筒臂的厚度,使得受力更加合理,可靠。
本发明基础形式构造简单,结构稳定,安装方便,施工周期短,对环境影响小,便于模块化设计,依靠合理的机械化装备施工,进度可大大提前,适用于沙漠地区各种电压等级的输变电线路工程基础。
以上所述仅是本发明专利的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明专利原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明专利的保护范围。

Claims (9)

1.一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,包括底板、筒体、顶板和钢管,所述的底板、筒体、顶板依次连接形成“工”字形结构,所述的筒体内填充有沙子,而所述的钢管则固定于顶板的上部,且所述的钢管的轴线和筒体的轴线重合,所述的钢管的上部内腔内还固定有混凝土隔板,而在混凝土隔板上部的钢管内腔内则通过混凝土浇筑埋设有一用于与铁塔连接的地脚螺栓。
2.根据权利要求1所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的顶板上还设置有灌沙孔,且所述的灌沙孔与筒体的内部连通。
3.根据权利要求1所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的钢管的底部还连接有一法兰,所述的法兰与所述的顶板通过螺栓固定连接。
4.根据权利要求3所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的法兰和钢管的连接端还设置有第一加强筋板。
5.根据权利要求1所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的筒体和顶板的连接端沿筒体的外周面设置有第二加强筋板。
6.根据权利要求1所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的筒体和底板的连接处沿筒体的外周面设置有第三加强筋板。
7.根据权利要求1所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的顶板的边沿和底板的边沿之间还设置有形成骨架结构的第四加强筋板。
8.根据权利要求7所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的第四加强筋板与顶板和顶板之间均通过连接脚连接。
9.根据权利要求7所述的一种沙漠地区输电线路装配式钢结构沙箱重力式基础,其特征在于,所述的筒体与底板和顶板之间均通过连接脚连接。
CN201410262265.9A 2014-06-13 2014-06-13 一种沙漠地区输电线路装配式钢结构沙箱重力式基础 Active CN104018515B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410262265.9A CN104018515B (zh) 2014-06-13 2014-06-13 一种沙漠地区输电线路装配式钢结构沙箱重力式基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410262265.9A CN104018515B (zh) 2014-06-13 2014-06-13 一种沙漠地区输电线路装配式钢结构沙箱重力式基础

Publications (2)

Publication Number Publication Date
CN104018515A true CN104018515A (zh) 2014-09-03
CN104018515B CN104018515B (zh) 2015-12-23

Family

ID=51435488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410262265.9A Active CN104018515B (zh) 2014-06-13 2014-06-13 一种沙漠地区输电线路装配式钢结构沙箱重力式基础

Country Status (1)

Country Link
CN (1) CN104018515B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869158A (zh) * 2017-01-10 2017-06-20 中国电力技术装备有限公司郑州电力设计院 一种输电线路装配式碎石芯重力基础及其施工方法
CN108661411A (zh) * 2018-06-22 2018-10-16 广州杰赛科技股份有限公司 一种通信设备支架
CN110359480A (zh) * 2019-07-17 2019-10-22 湖南长高高压开关集团股份公司 一种隔离开关预埋基础支架

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU600254A1 (ru) * 1975-09-08 1978-03-30 Одесский Филиал Всесоюзного Института По Проектированию Организации Энергетического Строительства "Оргэнергострой" Фундамент под опору линии электопередачи
JPH11350425A (ja) * 1998-06-11 1999-12-21 Sumitomo Metal Ind Ltd 複合柱脚構造物およびその構築方法
CN201077991Y (zh) * 2007-07-31 2008-06-25 中国水电顾问集团华东勘测设计研究院 用于滩涂地区的风力发电机基础结构
CN201546234U (zh) * 2009-12-04 2010-08-11 中国水电顾问集团北京勘测设计研究院 用于大厚度自重湿陷性黄土地区风力发电机地基基础结构
CN201746848U (zh) * 2010-06-24 2011-02-16 上海勘测设计研究院 滩涂风电场风机基础结构
CN102162256A (zh) * 2010-08-06 2011-08-24 天津道达渤海新能源开发有限公司 海上地基基础
CN203007967U (zh) * 2013-01-05 2013-06-19 葛洲坝集团电力有限责任公司 一种高原戈壁沙土地区光伏电站组件支架基础
CN103290858A (zh) * 2013-05-31 2013-09-11 天津大学 一种拉索式带翼缘多桩筒型基础复合结构及其施工方法
CN103290857A (zh) * 2013-05-22 2013-09-11 国家电网公司 一种用于沙漠地区输电铁塔基础现浇混凝土养护方法
CN203924095U (zh) * 2014-06-13 2014-11-05 江苏省电力设计院 一种沙漠地区输电线路装配式钢结构沙箱重力式基础

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU600254A1 (ru) * 1975-09-08 1978-03-30 Одесский Филиал Всесоюзного Института По Проектированию Организации Энергетического Строительства "Оргэнергострой" Фундамент под опору линии электопередачи
JPH11350425A (ja) * 1998-06-11 1999-12-21 Sumitomo Metal Ind Ltd 複合柱脚構造物およびその構築方法
CN201077991Y (zh) * 2007-07-31 2008-06-25 中国水电顾问集团华东勘测设计研究院 用于滩涂地区的风力发电机基础结构
CN201546234U (zh) * 2009-12-04 2010-08-11 中国水电顾问集团北京勘测设计研究院 用于大厚度自重湿陷性黄土地区风力发电机地基基础结构
CN201746848U (zh) * 2010-06-24 2011-02-16 上海勘测设计研究院 滩涂风电场风机基础结构
CN102162256A (zh) * 2010-08-06 2011-08-24 天津道达渤海新能源开发有限公司 海上地基基础
CN203007967U (zh) * 2013-01-05 2013-06-19 葛洲坝集团电力有限责任公司 一种高原戈壁沙土地区光伏电站组件支架基础
CN103290857A (zh) * 2013-05-22 2013-09-11 国家电网公司 一种用于沙漠地区输电铁塔基础现浇混凝土养护方法
CN103290858A (zh) * 2013-05-31 2013-09-11 天津大学 一种拉索式带翼缘多桩筒型基础复合结构及其施工方法
CN203924095U (zh) * 2014-06-13 2014-11-05 江苏省电力设计院 一种沙漠地区输电线路装配式钢结构沙箱重力式基础

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869158A (zh) * 2017-01-10 2017-06-20 中国电力技术装备有限公司郑州电力设计院 一种输电线路装配式碎石芯重力基础及其施工方法
CN108661411A (zh) * 2018-06-22 2018-10-16 广州杰赛科技股份有限公司 一种通信设备支架
CN110359480A (zh) * 2019-07-17 2019-10-22 湖南长高高压开关集团股份公司 一种隔离开关预埋基础支架

Also Published As

Publication number Publication date
CN104018515B (zh) 2015-12-23

Similar Documents

Publication Publication Date Title
CN203924095U (zh) 一种沙漠地区输电线路装配式钢结构沙箱重力式基础
CN104018515B (zh) 一种沙漠地区输电线路装配式钢结构沙箱重力式基础
CN104196048A (zh) 混合式地连墙与重力式锚碇共同受力的复合锚碇基础
CN207079626U (zh) 一种装配式地下管廊
CN203546752U (zh) 一种球形混凝土检查井及其浇筑成型模具
CN204004780U (zh) 可插接混凝土排水管及用于该排水管的插口钢环
CN201817819U (zh) 预制拼装钢筋混凝土矩形检查井室
CN206035045U (zh) 一种内包塑料预制装配式地下粮仓
CN204491567U (zh) 预制钢管桩风力发电平台
CN204662506U (zh) 一种电缆通信井
CN204080750U (zh) 箱筒型基础水闸结构
CN203701145U (zh) 一种地下管网检查井混凝土组件
CN207633358U (zh) 一种预制装配式综合管廊连接接头构造
CN206815278U (zh) 一种软土地基上的装配整体式驳岸结构
CN207392241U (zh) 一种超高性能混凝土预制拼装综合管廊
CN202401469U (zh) 连接式预制通信塔基础
CN206035044U (zh) 一种外包塑料阶梯状预制装配式地下粮仓
CN206189972U (zh) 一种外包钢板阶梯状预制装配式圆形地下粮仓
CN201665851U (zh) 一种复合防渗墙
CN209509172U (zh) 一种装配式混凝土柱及连接节点
CN204510861U (zh) 建筑物整体移动路径地基抗沉降结构
CN201908303U (zh) 方框形钢腔混凝土现浇沉井护壁
CN206204985U (zh) 一种环保型装配式后注浆钢筒桩基础
CN104018516A (zh) 一种沙漠地区输电线路混凝土现浇沙芯重力式基础
CN206035046U (zh) 一种内外均包塑料阶梯状预制装配式地下粮仓

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Applicant after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd

Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Applicant before: Jiangsu Electric Power Designing Institute

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: JIANGSU ELECTRIC POWER DESIGNING INST. TO: CHINA ENERGY ENGINEERING GROUPJIANGSU ELECTRIC POWER DESIGN INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant