CN104018512A - Open caisson sinking construction method slightly disturbing environment - Google Patents

Open caisson sinking construction method slightly disturbing environment Download PDF

Info

Publication number
CN104018512A
CN104018512A CN201410261230.3A CN201410261230A CN104018512A CN 104018512 A CN104018512 A CN 104018512A CN 201410261230 A CN201410261230 A CN 201410261230A CN 104018512 A CN104018512 A CN 104018512A
Authority
CN
China
Prior art keywords
open caisson
sinking
pressure
construction
caisson
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410261230.3A
Other languages
Chinese (zh)
Other versions
CN104018512B (en
Inventor
李耀良
张海锋
罗云峰
王涛
徐玉夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201410261230.3A priority Critical patent/CN104018512B/en
Publication of CN104018512A publication Critical patent/CN104018512A/en
Application granted granted Critical
Publication of CN104018512B publication Critical patent/CN104018512B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to an open caisson sinking construction method slightly disturbing environment. The construction method comprises the specific steps of 1, cast-in-place pile counter-force ground anchor construction, 2, preparation work before an open caisson is sunk, 3, counter-force pull rod installation, 4, adjustment of pressure of a center hole jack, 5, soil excavating after the open caisson is pressed to be sunk, 6, press-sinking construction, and 7, dismounting of a press-sinking device after the open caisson is pressed to be sunk to a designed elevation, and subsequent construction after open caisson sinking. According to the novel open caisson sinking construction method, compared with a traditional open caisson sinking mode, jack deviation correction and soil excavating are combined, the overall stability and safety of the open caisson are improved, the sinking state of the open caisson can be effectively controlled, sinking of the open caisson is uniform and stable, and precision is higher; a counter-force device is used for adjusting sinking coefficient of the open caisson, open caisson sinking speed can be greatly increased, the construction period is shortened, work efficiency is improved, and cost is saved; soil plugs are reserved in the open caisson, disturbance of sinking of the open caisson to surrounding soil can be reduced, and the surrounding environment is effectively protected.

Description

The caisson sinking construction method moving to environment micro-turbulence
Technical field
The present invention relates to a kind of caisson sinking construction method that building operations is used, especially a kind of to the efficient sinking construction method of the moving open caisson of environment micro-turbulence.
Background technology
The features such as open caisson is due to its Stability Analysis of Structures, and cost is lower have been widely applied to municipal administration, the industrial circles such as water supply, draining, electric power.On the one hand, along with the progressively raising of caisson sinking construction technique, the underground space of open caisson application becomes increasingly complex, the unconventional field of passing through is more and more broader etc.On the other hand, because caisson sinking construction not can solve the excessive problem of surrounding enviroment disturbance always, limited its application under responsive location or complicated soil layer external condition.In addition the enhancing of people to environmental protection consciousness, existing well sinking technology is more and more difficult to meet the construction requirement day by day improving.Therefore well sinking technique will be reformed to some extent.Current caisson sinking construction technique is super dark and reduce aspect disturbance and exist larger defect, and the reason of generation is just the deficiency of subsidence factor.If at drainage sink not and retain well sinking under certain soil plug thickness condition still there is enough subsidence factors in well, can greatly improve efficiency of construction, reduce costs and reduce the disturbance to the outside soil body.In addition, traditional caisson sinking construction technique easily produces and is prominent heavy, and the sinking construction duration is longer, and efficiency of construction is not high.Under this background, be badly in need of the new-type caisson sinking construction method of research and development, make open caisson there is enough subsidence factors, this downforce is enough to eliminate all adverse effect of soil layer to its generation, can dominate the sinking of open caisson, accelerate efficiency of construction, and reduce the impact on environment.
Summary of the invention
The present invention will solve existing well sinking technology to be more and more difficult to meet the construction requirement day by day improving, easily produce and prominent sinking, the sinking construction duration is longer, and efficiency of construction is not high, the problem such as have greater environmental impacts, and a kind of caisson sinking construction method moving to environment micro-turbulence is provided.
For achieving the above object, technical scheme of the present invention is:
A caisson sinking construction method moving to environment micro-turbulence, Specific construction step is:
1) castinplace pile counter-force earth anchor construction
Construction drill castinplace pile forms counter-force earth anchor, and guarantees that the position at Zhuan center overlaps with punching jack center;
2) open caisson starts the preparation before sinking
Before open caisson starts to sink, device therefor and system are in place, and punching jack hydraulic system is debugged;
3) counter-force pull bar is installed
According to well sinking level configurations counter-force pull bar, from surface drilling castinplace pile top, be connected to mutually open caisson pressure-bearing " bracket ", when counter-force pull bar is installed, counter member upper end should and open caisson wall on the distance of reserved 10cm between pressure-bearing " bracket ", make open caisson when starting to draw brick fetal membrane, can have certain degree of depth of drowning oneself;
4) adjust the pressure size of punching jack
According to the measurement result of the open caisson discrepancy in elevation and inclination, adjust the pressure size of the jack of each point, slowly to the open caisson operation of rectifying a deviation;
5) first pressure fetches earth after sinking
Punching jack starts slowly open caisson to be exerted pressure, and when top power to predetermined value cannot be sunk, starts suction mud in well; During construction, feeler lever utilizes big nut to be anchored at jack cylinder upper end through after punching jack in jack upper end; When needs pressure is heavy, jack cylinder protrudes upward and withstands nut, after feeler lever tension, makes pressure-bearing on the jack pair borehole wall " bracket " produce a downward pressure, impels well sinking;
6) press heavy construction
(1) in pressing heavy process, jack cylinder upwards withstands upper end anchoring nut, counter-force pull bar transmission of pressure is to uplift pile, go up pressure-bearing " bracket " and be subject to downward pressure simultaneously, impel well sinking, after oil cylinder stroke of caisson sinking, jack cylinder is retracted, by upper end nut backspin 20cm, and so forth;
(2) after the about 1.7m degree of depth of every sinking, need to remove a joint and replace pull bar, the top pull bar of working is connected with next section of replacement pull bar, start next press to sink circulate, until be sink to design elevation.In sinking construction process, and splash the height of measurement.
7) pressure is removed the heavy equipment of pressure after being sink to design elevation, carries out the follow-up construction of open caisson.
Above-mentioned open caisson presses sinking construction method also can improve the adhesion strength of pile body pile body and the soil body by slip casting is carried out in drilled pile pile body outside, thereby significantly improves the uplift resistance of stake.
In the heavy well construction method of above-mentioned pressure, in order to make open caisson possess higher subsidence factor, regulate space, by increasing soil plug, reach anti-object of gushing, the pressure of the inside and outside soil body of balance well, prevents the outer soil body of open caisson and pours in the phenomenon in well.
In the heavy well construction method of above-mentioned pressure, adopt thixotropic slurry to help heavy method, by peripheral mud sleeve is set, plays a part to reduce frictional force and safeguard soil wall stability.
The invention has the beneficial effects as follows: the invention provides a kind of new-type caisson sinking construction method, the present invention compares with traditional well sinking mode, jack correction and the combination of being unearthed, resistance to overturning and the safety of open caisson have been improved, can effectively control well sinking attitude, well sinking uniform and stable, and precision is higher; By counterforce device, regulate the subsidence factor of open caisson, can significantly improve well sinking speed, reduction of erection time, increase work efficiency, save the duration and save cost; Can realize the inner reserved soil plug of open caisson, can reduce the disturbance of well sinking to the periphery soil body, effectively protect surrounding enviroment.
Accompanying drawing explanation
Fig. 1 is that open caisson of the present invention is pressed heavy each Plant arrangement schematic diagram of construction.
The specific embodiment
Below in conjunction with accompanying drawing and concrete embodiment, further set forth the present invention.
As shown in Figure 1, of the present invention to the efficient sinking construction method of the moving open caisson of environment micro-turbulence, concrete construction method and step are:
(1) construction drill castinplace pile 6 forms counter-force earth anchor, must strictly control the verticality of stake, guarantees that the position at Zhuan center overlaps with punching jack 1 center.
(2) before open caisson starts to sink, each system should be in place, and jack hydraulic system is carried out to corresponding equipment debugging.
(3), according to well sinking level configurations counter-force pull bar, from surface drilling castinplace pile top, be connected to mutually open caisson pressure-bearing " bracket ".When counter-force pull bar is installed, rod member upper end should and open caisson wall 7 on the distance of reserved 10cm left and right between pressure-bearing " bracket ", make open caisson when starting to draw brick fetal membrane, can have certain degree of depth of drowning oneself.
(4), according to the measurement result of the open caisson discrepancy in elevation and inclination, adjust the pressure size of the punching jack 1 of each point, slowly to the open caisson operation of rectifying a deviation.
(5) first pressure fetches earth after sinking.Punching jack 1 starts slowly open caisson to be exerted pressure, and when top power to predetermined value cannot be sunk, starts suction mud in well.During construction, feeler lever utilizes big nut to be anchored at jack cylinder upper end through after punching jack 1 in jack upper end.When needs pressure is heavy, jack cylinder protrudes upward and withstands nut, after feeler lever tension, makes the pressure-bearing " bracket " on 1 pair of borehole wall 7 of punching jack produce a downward pressure, impels well sinking.
(6) in pressing heavy process, jack cylinder upwards withstands upper end anchoring nut, and counter-force pull bar transmission of pressure is to uplift pile.Pressure-bearing " bracket " is subject to downward pressure simultaneously, impels well sinking.After oil cylinder stroke of caisson sinking (about 20cm), jack cylinder is retracted, by the about 20cm of upper end nut backspin, and so forth.
(7) the attaching nut's size between upper and lower pull bar is larger, can not pass the pull bar preformed hole of pressure-bearing " bracket ", after the about 1.7m degree of depth of every sinking, need to remove a joint and replace pull bar 3(length 1.7m), by the top pull bar 2(length 3.7m that works) be connected with next section of replacement pull bar 3, start the next heavy circulation of pressing, until be sink to design elevation.In sinking construction process, should splash the height of measurement.
(8) pressure is removed the heavy equipment of pressure after being sink to design elevation, carries out the follow-up construction of open caisson.
Above-mentioned open caisson presses sinking construction method also can significantly improve the adhesion strength of pile body pile body and the soil body by slip casting is carried out in drilled pile pile body outside, thereby significantly improves the uplift resistance of stake; Take to press heavy well construction technique, open caisson possesses higher subsidence factor and regulates space, can fill in to reach anti-object of gushing by increasing suitable soil, and the pressure of the inside and outside soil body of balance well, pours in the phenomenon in well thereby prevent the outer soil body of open caisson; It is a kind of heavy drag reduction method that helps preferably that thixotropic slurry helps heavy method, by peripheral mud sleeve is set, plays a part to reduce frictional force and safeguards soil wall stability.
Application implementation example of the present invention:
Three active wells of Shanghai ultra-large type pipe-jacking project, the reinforced concrete circular open caisson of external diameter Φ 24m, is highly 18.68m; External diameter is the reinforced concrete circular open caisson of Φ 19.8m, is highly 18.59m; Planar dimension is the rectangle reinforced concrete open caisson of 18.2 * 11.2m, is highly 18.52m.Three open caissons are all to make for three times, once sink, and are the forced sinking construction technique of domestic first Application open caisson.
Apply of the present invention to the efficient sinking construction method of the moving open caisson of environment micro-turbulence, control open caisson attitude easily and precision very high, the eventually heavy discrepancy in elevation is less than 3/1000ths; Subsidence velocity is fast, by pressure sinking device, increases the subsidence factor of open caisson, has significantly improved well sinking speed, has reached in actual applications the fastest one day speed of three meters; Little to outside soil disturbance, by counter force system, make the degree of depth of caisson cutting edge injection soil layer darker, thereby make the inherent soil plug while that keeps higher of open caisson still there is enough subsidence factors, in case, the important pipe settlement at distance open caisson 7m place is only 4mm.Application the present invention has not only completed sinking construction task, and has improved greatly efficiency of construction and quality, for later super dark, complicated geological and the higher sinking well engineering of environmental protection requirement have been opened up invaluable experience.

Claims (4)

1. a caisson sinking construction method moving to environment micro-turbulence, is characterized in that, Specific construction step is:
1) castinplace pile counter-force earth anchor construction
Construction drill castinplace pile forms counter-force earth anchor, and guarantees that the position at Zhuan center overlaps with punching jack center;
2) open caisson starts the preparation before sinking
Before open caisson starts to sink, device therefor and system are in place, and punching jack hydraulic system is debugged;
3) counter-force pull bar is installed
According to well sinking level configurations counter-force pull bar, from surface drilling castinplace pile top, be connected to mutually open caisson pressure-bearing " bracket ", when counter-force pull bar is installed, counter member upper end should and open caisson wall on the distance of reserved 10cm between pressure-bearing " bracket ", make open caisson when starting to draw brick fetal membrane, can have certain degree of depth of drowning oneself;
4) adjust the pressure size of punching jack
According to the measurement result of the open caisson discrepancy in elevation and inclination, adjust the pressure size of the punching jack of each point, slowly to the open caisson operation of rectifying a deviation;
5) first pressure fetches earth after sinking
Punching jack starts slowly open caisson to be exerted pressure, and when top power to predetermined value cannot be sunk, starts suction mud in well; During construction, feeler lever utilizes big nut to be anchored at jack cylinder upper end through after punching jack in jack upper end; When needs pressure is heavy, jack cylinder protrudes upward and withstands nut, after feeler lever tension, makes pressure-bearing on the jack pair borehole wall " bracket " produce a downward pressure, impels well sinking;
6) press heavy work progress
(1) in pressing heavy process, jack cylinder upwards withstands upper end anchoring nut, counter-force pull bar transmission of pressure is to uplift pile, go up pressure-bearing " bracket " and be subject to downward pressure simultaneously, impel well sinking, after oil cylinder stroke of caisson sinking, jack cylinder is retracted, by upper end nut backspin 20cm, and so forth;
(2) after the about 1.7m degree of depth of every sinking, need to remove a joint and replace pull bar, the top pull bar of working is connected with next section of replacement pull bar, start next press to sink circulate, until be sink to design elevation;
In sinking construction process, and splash the height of measurement;
7) pressure is removed the heavy equipment of pressure after being sink to design elevation, carries out the follow-up construction of open caisson.
2. the caisson sinking construction method moving to environment micro-turbulence according to claim 1, it is characterized in that: above-mentioned open caisson pressure sinking construction method also can be by carrying out slip casting to drilled pile pile body outside, improve the adhesion strength of pile body pile body and the soil body, thereby significantly improve the uplift resistance of stake.
3. the caisson sinking construction method moving to environment micro-turbulence according to claim 1, it is characterized in that: in the heavy well construction method of above-mentioned pressure, in order to make open caisson possess higher subsidence factor, regulate space, by increasing soil plug, reach anti-object of gushing, the pressure of the inside and outside soil body of balance well, prevents the outer soil body of open caisson and pours in the phenomenon in well.
4. the caisson sinking construction method moving to environment micro-turbulence according to claim 1, it is characterized in that: in the heavy well construction method of above-mentioned pressure, adopt thixotropic slurry to help heavy method, by peripheral mud sleeve is set, plays a part to reduce frictional force and safeguard soil wall stability.
CN201410261230.3A 2014-06-13 2014-06-13 The caisson sinking construction method dynamic to environment micro-turbulence Active CN104018512B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410261230.3A CN104018512B (en) 2014-06-13 2014-06-13 The caisson sinking construction method dynamic to environment micro-turbulence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410261230.3A CN104018512B (en) 2014-06-13 2014-06-13 The caisson sinking construction method dynamic to environment micro-turbulence

Publications (2)

Publication Number Publication Date
CN104018512A true CN104018512A (en) 2014-09-03
CN104018512B CN104018512B (en) 2015-12-30

Family

ID=51435485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410261230.3A Active CN104018512B (en) 2014-06-13 2014-06-13 The caisson sinking construction method dynamic to environment micro-turbulence

Country Status (1)

Country Link
CN (1) CN104018512B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105201003A (en) * 2015-10-15 2015-12-30 北京中岩大地科技股份有限公司 Sunk well construction method and sunk well dismantling method
JP2016075126A (en) * 2014-10-09 2016-05-12 英昭 山岸 Jack system and immersion method of skeleton
CN105970985A (en) * 2016-05-27 2016-09-28 广州中国科学院工业技术研究院 Sunk well for muddy water mud flat and mounting method thereof
CN106759417A (en) * 2016-11-10 2017-05-31 上海城建市政工程(集团)有限公司 A kind of construction method of forced open caisson
CN107165182A (en) * 2017-05-31 2017-09-15 上海市政建设有限公司 Heavy stage deviation-rectifying system and its application method at the beginning of a kind of open caisson
CN107288140A (en) * 2017-08-01 2017-10-24 中交武汉港湾工程设计研究院有限公司 The steel cofferdam constructing device that actively sinking is rectified a deviation and construction method
CN107620313A (en) * 2017-11-15 2018-01-23 扬州市江都永坚有限公司 Static pressure open caisson device
CN109235477A (en) * 2018-10-26 2019-01-18 中铁工程装备集团有限公司 A kind of section of jurisdiction pressure-raising device and its pressure-raising method suitable for open caisson construction method
CN111549885A (en) * 2020-05-15 2020-08-18 矿冶科技集团有限公司 Pipe head, and immersed pipe construction device and method in fine grain tailing pond
CN111945764A (en) * 2020-06-30 2020-11-17 中国二十冶集团有限公司 Ground anchor press-in type well sinking method
CN114319405A (en) * 2021-12-10 2022-04-12 上海市基础工程集团有限公司 Construction method for micro-disturbance vertical press-in type thin-wall open caisson in complex environment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2710739A (en) * 1949-06-10 1955-06-14 Frankignoul Pieux Armes Device for excavating wells in the ground
DE3807008C1 (en) * 1988-03-04 1989-10-05 E. Heitkamp Gmbh, 4690 Herne, De Method of constructing a shaft, in particular for mining
CN1110753A (en) * 1994-07-30 1995-10-25 海勃湾矿务局基本建设第一工程处 Open caisson method of inclined shaft
US5944453A (en) * 1997-04-16 1999-08-31 998492 Ontario Inc. Undercut excavation with protection against seismic events or excessive ground movement
CN101684653A (en) * 2008-09-25 2010-03-31 李柏生 Dry method pit sinking construction technique

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2710739A (en) * 1949-06-10 1955-06-14 Frankignoul Pieux Armes Device for excavating wells in the ground
DE3807008C1 (en) * 1988-03-04 1989-10-05 E. Heitkamp Gmbh, 4690 Herne, De Method of constructing a shaft, in particular for mining
CN1110753A (en) * 1994-07-30 1995-10-25 海勃湾矿务局基本建设第一工程处 Open caisson method of inclined shaft
US5944453A (en) * 1997-04-16 1999-08-31 998492 Ontario Inc. Undercut excavation with protection against seismic events or excessive ground movement
CN101684653A (en) * 2008-09-25 2010-03-31 李柏生 Dry method pit sinking construction technique

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
徐鹏飞等: "压入式沉井施工对环境影响的现场监测研究", 《岩土力学》, vol. 35, no. 4, 30 April 2014 (2014-04-30), pages 1084 - 1094 *
黄丁等: "压入式沉井侧摩阻力的监测及分析", 《地基基础》, 31 October 2012 (2012-10-31), pages 980 - 983 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016075126A (en) * 2014-10-09 2016-05-12 英昭 山岸 Jack system and immersion method of skeleton
CN105201003B (en) * 2015-10-15 2018-04-20 北京中岩大地科技股份有限公司 A kind of open caisson construction method and method for dismounting
CN105201003A (en) * 2015-10-15 2015-12-30 北京中岩大地科技股份有限公司 Sunk well construction method and sunk well dismantling method
CN105970985A (en) * 2016-05-27 2016-09-28 广州中国科学院工业技术研究院 Sunk well for muddy water mud flat and mounting method thereof
CN106759417A (en) * 2016-11-10 2017-05-31 上海城建市政工程(集团)有限公司 A kind of construction method of forced open caisson
CN107165182A (en) * 2017-05-31 2017-09-15 上海市政建设有限公司 Heavy stage deviation-rectifying system and its application method at the beginning of a kind of open caisson
CN107288140A (en) * 2017-08-01 2017-10-24 中交武汉港湾工程设计研究院有限公司 The steel cofferdam constructing device that actively sinking is rectified a deviation and construction method
CN107620313A (en) * 2017-11-15 2018-01-23 扬州市江都永坚有限公司 Static pressure open caisson device
CN107620313B (en) * 2017-11-15 2022-12-23 扬州市江都永坚有限公司 Static pressure open caisson device
CN109235477A (en) * 2018-10-26 2019-01-18 中铁工程装备集团有限公司 A kind of section of jurisdiction pressure-raising device and its pressure-raising method suitable for open caisson construction method
CN111549885A (en) * 2020-05-15 2020-08-18 矿冶科技集团有限公司 Pipe head, and immersed pipe construction device and method in fine grain tailing pond
CN111945764A (en) * 2020-06-30 2020-11-17 中国二十冶集团有限公司 Ground anchor press-in type well sinking method
CN114319405A (en) * 2021-12-10 2022-04-12 上海市基础工程集团有限公司 Construction method for micro-disturbance vertical press-in type thin-wall open caisson in complex environment

Also Published As

Publication number Publication date
CN104018512B (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN104018512B (en) The caisson sinking construction method dynamic to environment micro-turbulence
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN204456104U (en) A kind of paddle type mill ground anchorage burying sleeve pipe for geotechnical engineering deep layer drill underground
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN108487280A (en) A kind of counter-force static pressure type caisson sinking construction method
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN104032764A (en) Press-in type sunk well reaction system
CN209066468U (en) A kind of base pit dewatering device
CN109577322A (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN103343534A (en) Closed precipitation method for foundation pit construction
CN204401612U (en) A kind of super-large diameter all steel casing does operation pore-creating filling pile construction equipment
CN102134861B (en) Method for testing precast pile in soil body
CN207582471U (en) A kind of Retaining Structure with Double-row Piles equipped with deep layer prestress anchorage cable
CN206220101U (en) A kind of support reinforcement structure of deep basal pit
CN110331735A (en) A kind of tower crane mounting structure for coastal region soft layer
CN201078234Y (en) Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed
CN106337418A (en) Supporting structure and supporting method of deep foundation pit in narrow area
CN103790148A (en) Combined treatment construction method for collapsible loess foundation
CN108396728A (en) Constructing device and construction method for the multi-functional pile pile that the islands Tian Haizhu can drain
CN209703493U (en) A kind of constructing device for inside soil body existing pile foundation pile extension
CN208486286U (en) A kind of well foundation
CN208604615U (en) A kind of pressurization sinking device for open caisson construction
CN108277813B (en) Hollow anti-slide pile with drainage structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant