CN104014977B - Bottom outlet restorative procedure before the power shovel underframe longitudinal axis - Google Patents
Bottom outlet restorative procedure before the power shovel underframe longitudinal axis Download PDFInfo
- Publication number
- CN104014977B CN104014977B CN201310614745.2A CN201310614745A CN104014977B CN 104014977 B CN104014977 B CN 104014977B CN 201310614745 A CN201310614745 A CN 201310614745A CN 104014977 B CN104014977 B CN 104014977B
- Authority
- CN
- China
- Prior art keywords
- longitudinal axis
- bottom outlet
- copper sheathing
- power shovel
- underframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P6/00—Restoring or reconditioning objects
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses bottom outlet restorative procedure before a kind of power shovel underframe longitudinal axis, relate to power shovel maintenance technique field, comprising the following steps: the longitudinal axis and the front bottom outlet copper sheathing of power shovel underframe are pulled down, whether the interstitial hole copper sheathing of detection power shovel underframe weares and teares, and then replaces interstitial hole copper sheathing if any abrasion;One end of the described longitudinal axis being loaded in interstitial hole copper sheathing, make axially axial consistent with interstitial hole jacket casing of the longitudinal axis, the other end of the longitudinal axis stretches in the front bottom outlet of power shovel underframe;Being set with copper sheathing on the longitudinal axis, be placed in by copper sheathing between the longitudinal axis and front bottom outlet, the gap portion formed between copper sheathing and front bottom outlet is the wearing part of front bottom outlet;Inject metal repairing agent towards described gap portion, make metal repairing agent fill up described gap portion;After metal repairing agent solidifies 2 hours, i.e. complete to repair.The present invention is compared to prior art, repairs simple to operate, substantially increases the work efficiency of maintenance, reduces the labor intensity of service worker, repairs precision high.
Description
Technical field
The present invention relates to power shovel maintenance technique field, a kind of renovation technique before the large-scale power shovel underframe longitudinal axis after bottom outlet abrasion.
Background technology
Power shovel is one of main extractive equipment of ten-million-ton scale surface mine, and it is high that it has productivity ratio, and operating rate is high, the advantages such as running cost is low, is the type generally acknowledged of current mining industry, is widely used in the industry surface mine exploitations such as domestic limestone, colliery, iron mine.Before the daily power shovel underframe longitudinal axis, the renovation technique after bottom outlet abrasion has two kinds: a kind of is according to greatest wear amount car circle bottom outlet position before the power shovel underframe longitudinal axis of abrasion, is equipped with copper sheathing according still further to hole size after processing;Another kind is that bottom outlet abrading section before the power shovel underframe longitudinal axis is carried out built-up welding, with grinder buffing, carries out equipped copper sheathing according still further to actual hole size and size.There is following technical problem in above two renovation technique: 1, power shovel underframe weighs 11.634 tons, after complete machine all being taken apart, power shovel underframe is delivered to machine shop processing endoporus, labor intensity is big, repair time needs about 60 days, and whole power shovel dismounting quantities is relatively big, transport is wasted time and energy back and forth;If 2 build the boring machine processing power shovel underframe bottom outlet when zero at the scene, the bottom outlet position of abrasion according to greatest wear amount boring circle, can be because of reasons such as on-the-spot place out-of-flatnesses, machining accuracy is greatly affected, the roughness of bottom outlet and the most very poor with circularity before the power shovel underframe longitudinal axis, the copper sheathing faying face of assembling is less, the most concentric phenomenon easily occurs when installing the longitudinal axis;3, bottom outlet abrading section before the power shovel underframe longitudinal axis being carried out built-up welding, with grinder buffing, carry out equipped copper sheathing according still further to actual hole size and size, the method there will be axiality and the most very poor with circularity, and equipment easily goes wrong after installing and using.
Summary of the invention
It is an object of the invention to provide bottom outlet restorative procedure before a kind of power shovel underframe longitudinal axis, this method can solve the existing power shovel underframe longitudinal axis before the labor intensity that exists of bottom outlet reparation is big, overhaul efficiency is low and repairs the problem that precision is low.
In order to solve the problems referred to above, the technical solution used in the present invention is: before this power shovel underframe longitudinal axis, bottom outlet restorative procedure comprises the following steps:
A, the longitudinal axis and the front bottom outlet copper sheathing of power shovel underframe being pulled down, whether the interstitial hole copper sheathing of detection power shovel underframe weares and teares, and then replaces interstitial hole copper sheathing if any abrasion;
B, one end of the described longitudinal axis being loaded in interstitial hole copper sheathing, make axially axial consistent with described interstitial hole of the described longitudinal axis, the other end of the described longitudinal axis stretches in the front bottom outlet of described power shovel underframe;
D, towards described gap portion inject metal repairing agent, make described metal repairing agent fill up described gap portion;
E, solidify after 2 hours until described metal repairing agent, i.e. complete to repair.
Before the above-mentioned power shovel underframe longitudinal axis in the technical scheme of bottom outlet restorative procedure, before more specifically technical scheme is it may also is that load interstitial hole by the longitudinal axis in step B, between described front bottom outlet and interstitial hole, a spacing adjusting apparatus is placed in power shovel underframe, described spacing adjusting apparatus includes adjustment block, jack and plain cushion, described plain cushion is arranged at described jack lower end, and described adjustment block is connected to the push rod external part of described jack;Regulate the height of described adjustment block with described jack, make the top of described adjustment block align with the bottom of the bore area of described interstitial hole copper sheathing.
Further, described metal repairing agent uses and can match the super metal repairing agent of new TS2111.
The above-mentioned super metal repairing agent of new TS2111 of matching is with the compound double combination patching materials of metal and the alloy polymer/metallic as aggregate.
Owing to have employed technique scheme, the present invention compared with prior art has the advantages that without dismounting whole power shovel, it is only necessary to dismounting parts thereof, repairs simple to operate, front and back dismount, fill up the reparation shared 4 day time, substantially increase the work efficiency of maintenance;Reduce the labor intensity of service worker, save nearly ten thousand maintenance cost more than 10;Accurate positioning, repairs precision high.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that the prosthetic device that the present invention uses is installed on power shovel underframe.
Fig. 2 is the left view of Fig. 1.
Detailed description of the invention
The invention will be further described for embodiment below in conjunction with the accompanying drawings:
Embodiment 1
Prosthetic device shown in Fig. 1 mainly includes interstitial hole copper sheathing 2, the longitudinal axis 3, the copper sheathing 1 repairing front bottom outlet and spacing adjusting apparatus, spacing adjusting apparatus includes adjustment block 4, jack 5 and the plain cushion 6 that thickness is 10 millimeters, plain cushion 6 is arranged at jack 5 lower end, and adjustment block 4 is connected to the push rod external part of jack 5.
In practical condition, the abrasion of the front bottom outlet copper sheathing of power shovel underframe and front bottom outlet itself is the most serious, and wear phenomenon did not occur in the interstitial hole of power shovel underframe, utilizing this feature, before using above-mentioned prosthetic device to carry out the power shovel underframe longitudinal axis, bottom outlet restorative procedure comprises the following steps:
A, the longitudinal axis 3 and the front bottom outlet copper sheathing of power shovel underframe being pulled down, whether the interstitial hole copper sheathing 2 of detection power shovel underframe weares and teares, and then replaces interstitial hole copper sheathing 2 if any abrasion;
B, in power shovel underframe, between front bottom outlet and interstitial hole, place spacing adjusting apparatus, adjustment block 4 height is adjusted with the jack 5 of spacing adjusting apparatus, align formation horizontal line with copper sheathing 2 endoporus bottom surface on the top making adjustment block 4, again one end of the longitudinal axis 3 is inserted in copper sheathing 2, adjustment block 4 abuts against with the longitudinal axis 3, the axis making the longitudinal axis 3 is consistent with axially bored line in copper sheathing 2, the other end of the longitudinal axis 3 then stretches in the front bottom outlet of the power shovel underframe longitudinal axis, such that it is able to easily found the center of front bottom outlet by the longitudinal axis 3;
C, being set with copper sheathing 1 on the longitudinal axis 3, be placed between the longitudinal axis 3 and front bottom outlet by copper sheathing 1, the gap portion 7 formed between copper sheathing 1 and front bottom outlet is the wearing part of front bottom outlet;
D, can match new TS2111 super metal healant A, B two component put together and be in harmonious proportion rapidly, load in applying glue cylinder after being in harmonious proportion uniformly, inject metal repairing agent by applying glue cylinder towards gap portion 7, make metal repairing agent fill up gap portion 7;
E, solidify after 2 hours until metal repairing agent, i.e. complete to repair.
Embodiment 2
In the present embodiment, the hardening time of the metal repairing agent injecting gap portion 7 is 2 hours, and remaining feature is same as in Example 1.
Claims (3)
1. bottom outlet restorative procedure before a power shovel underframe longitudinal axis, it is characterised in that comprise the following steps:
A, the longitudinal axis and the front bottom outlet copper sheathing of power shovel underframe being pulled down, whether the interstitial hole copper sheathing of detection power shovel underframe weares and teares, and then replaces interstitial hole copper sheathing if any abrasion;
B, one end of the described longitudinal axis being loaded in interstitial hole copper sheathing, make axially axial consistent with described interstitial hole of the described longitudinal axis, the other end of the described longitudinal axis stretches in the front bottom outlet of described power shovel underframe;
C, being set with copper sheathing on the described longitudinal axis, be placed in by described copper sheathing between the described longitudinal axis and described front bottom outlet, the gap portion formed between described copper sheathing and described front bottom outlet is the wearing part of front bottom outlet;
D, towards described gap portion inject metal repairing agent, make described metal repairing agent fill up described gap portion;
E, solidify after 2 hours until described metal repairing agent, i.e. complete to repair.
Bottom outlet restorative procedure before the power shovel underframe longitudinal axis the most according to claim 1, it is characterized in that: before the longitudinal axis is loaded interstitial hole by step B, between described front bottom outlet and interstitial hole, a spacing adjusting apparatus is placed in power shovel underframe, described spacing adjusting apparatus includes adjustment block, jack and plain cushion, described plain cushion is arranged at described jack lower end, and described adjustment block is connected to the push rod external part of described jack;Regulate the height of described adjustment block with described jack, make the top of described adjustment block align with the bottom of the bore area of described interstitial hole copper sheathing.
Bottom outlet restorative procedure before the power shovel underframe longitudinal axis the most according to claim 1 and 2, it is characterised in that: described metal repairing agent uses can match the super metal repairing agent of new TS2111.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310614745.2A CN104014977B (en) | 2013-11-28 | 2013-11-28 | Bottom outlet restorative procedure before the power shovel underframe longitudinal axis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310614745.2A CN104014977B (en) | 2013-11-28 | 2013-11-28 | Bottom outlet restorative procedure before the power shovel underframe longitudinal axis |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104014977A CN104014977A (en) | 2014-09-03 |
CN104014977B true CN104014977B (en) | 2017-01-04 |
Family
ID=51432131
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310614745.2A Active CN104014977B (en) | 2013-11-28 | 2013-11-28 | Bottom outlet restorative procedure before the power shovel underframe longitudinal axis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104014977B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105834668A (en) * | 2016-05-31 | 2016-08-10 | 上海祥贸实业有限公司 | Wear and corrosion resisting repair method for draught fan |
CN114643453A (en) * | 2020-12-17 | 2022-06-21 | 国家电投集团黄河上游水电开发有限责任公司 | Repairing method suitable for deformation of anode guide rod lifting hole |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5299215B2 (en) * | 2009-10-20 | 2013-09-25 | 新日鐵住金株式会社 | Bolt hole repair method and repair device for shaft coupling |
CN101850490B (en) * | 2010-05-31 | 2012-04-18 | 南通中远船务工程有限公司 | Rudder pintle bearing body repairing process based on metal repairing agent casting |
CN201922258U (en) * | 2010-12-20 | 2011-08-10 | 浙江赛豪实业有限公司 | Processing worktable for three-dimensional cavity of mould of car lamp |
CN202240253U (en) * | 2011-06-03 | 2012-05-30 | 浙江精工钢结构有限公司 | Chain steel pipe butt joint device |
-
2013
- 2013-11-28 CN CN201310614745.2A patent/CN104014977B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104014977A (en) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104014977B (en) | Bottom outlet restorative procedure before the power shovel underframe longitudinal axis | |
CN107626998B (en) | 200 Mm caliber equal wall thickness screw drill stator internal spiral electrolytic machining cathode | |
CN110814635A (en) | Method for repairing wear of sliding shoe of ball mill | |
CN202283477U (en) | End face protection device of roller sleeve of high pressure roller grinder with column nail roller surface | |
CN105798548A (en) | Machining process for mine car font suspension oil cylinder guide sleeve | |
CN109352009A (en) | A kind of digital control drilling machine | |
CN104353964B (en) | Cold pressing device conducting cold pressing treatment on piston rod after surface composite repair | |
CN103801894B (en) | Adopt method and the device thereof of the spindle nose of polymer composite reparation wearing and tearing | |
CN207015469U (en) | A kind of convenience is in the quick maintenance of equipment of crawler belt that building-site assembles | |
CN114472763A (en) | Construction method for connecting main reinforcement straight threaded sleeves of underground continuous wall | |
CN203726079U (en) | Device for repairing abraded shaft heads by polymer composite material | |
CN203648602U (en) | Embedded wear-resistant member of breaker roll | |
CN108788951A (en) | A kind of diameter of axle grinding apparatus | |
CN111331446A (en) | Method for controlling grinding deformation of outer diameter of guide cylinder of automatic inclinator of helicopter | |
CN204308506U (en) | Piston rod after effects on surface complex repairation carries out the cold press device of cold pressing treatment | |
CN104384640A (en) | Method for removing damaged blade of stator component of aero-engine | |
CN109676176A (en) | The repairing and boring machine of hydraulic support shield beam | |
CN109773405A (en) | Slideway docks restorative procedure | |
CN104259734B (en) | A kind of wedge-shaped copper piece renovation technique of uncoiler | |
CN104148875B (en) | A kind of deviation correcting device and its manufacture method for articulation bolt hole | |
CN105485147A (en) | Rotating shaft and motor | |
CN204436305U (en) | A kind of novel oil well casing fix tool | |
CN103624615B (en) | Perpendicular to the leading screw installation method of lathe bed longitudinal direction in machining apparatus | |
CN105728782B (en) | Digger pin hole repair machine | |
CN103285969B (en) | A kind of side insert of roller sleeve of high pressure roller grinder and replacing options |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |