Mounting bracket assembly tooling
Technical field
The present invention relates to crane gear technical field, particularly a kind of mounting bracket assembly tooling.
Background technology
Electric block in use needs to be arranged on electric block mounting bracket, and electric block is installedSupport comprises that being arranged on electric block two ends supports for the first gripper shoe and second that supports electric blockPlate, the first gripper shoe is relative with the second gripper shoe and be arranged in parallel, and also comprises and the first gripper shoe and secondThe vertically arranged crossbeam of gripper shoe. In the first gripper shoe and the second gripper shoe, be provided with for electronic calabash is installedThe installing hole of reed needs to ensure the first gripper shoe and second in the manufacture process of electric block mounting bracketThe axiality of installing hole in gripper shoe, to ensure the equipment quality of electric block and the use longevity of electric blockLife. In prior art, the installation of bracket of electric hoist generally adopts the connected mode of welding, common welding sideThere is the problems such as welding deformation in formula, in the first gripper shoe and the second gripper shoe, the axiality of installing hole can not be protectedCard, causes the assembly quality of electric block mounting bracket not ensure, and then affects the use of electric block.
Therefore, how to improve the assembly quality of electric block mounting bracket, become those skilled in the art urgentlyTechnical problem to be solved.
Summary of the invention
In view of this, the invention provides a kind of mounting bracket assembly tooling, install to improve electric blockThe assembly quality of support.
For achieving the above object, the invention provides following technical scheme:
A kind of mounting bracket assembly tooling, comprising:
Base plate, is provided with the first line slideway and the second line slideway that are arranged in parallel on described base plate;
Be arranged vertically with described the first line slideway and lead with described the first line slideway and described the second straight lineThe first installing plate that slide block on rail all connects, is provided with for locating described peace on described the first installing plateThe first alignment pin of the first gripper shoe of dress support;
Be arranged vertically with described the second line slideway and lead with described the first line slideway and described the second straight lineThe second installing plate that slide block on rail all connects, is provided with for locating described peace on described the second installing plateThe second alignment pin of the second gripper shoe of dress support, described the first alignment pin and described the second alignment pin are coaxialArrange;
Described the first line slideway and described the second line slideway are provided with described the first installing plate of restriction and instituteState the stopping means that the second installing plate moves;
Be arranged on described base plate the 3rd installing plate of the crossbeam for supporting described mounting bracket, describedOn three installing plates, be provided with the 3rd alignment pin for locating described crossbeam;
In above-mentioned mounting bracket assembly tooling, on described the first installing plate, be provided with three described first and determinePosition pin, three described the first alignment pins are along the direction linear arrangement perpendicular to described base plate, and described second pacifiesDress is provided with three described the second alignment pins on plate, three described the second alignment pins with three described first calmlyPin position, position is corresponding respectively;
In above-mentioned mounting bracket assembly tooling, on described the 3rd installing plate, be provided with two the described the 3rd and determinePosition pin; In above-mentioned mounting bracket assembly tooling, described the 3rd installing plate is arranged on described the first line slidewayAnd between described the second line slideway.
Preferably, in above-mentioned mounting bracket assembly tooling, described base plate is steel plate.
Preferably, in above-mentioned mounting bracket assembly tooling, described the 3rd installing plate and the welding of described base plateConnect.
Can find out from technique scheme, mounting bracket assembly tooling provided by the invention, establishes on base plateBe equipped with the first line slideway and the second line slideway, the first installing plate and the first line slideway and described secondLine slideway all connects, and the second installing plate is all connected with the first line slideway and the second line slideway, installsThe first gripper shoe of support is arranged on the first installing plate by the first alignment pin, and the second gripper shoe is by secondOn the second installing plate that alignment pin is arranged on, crossbeam is arranged on the 3rd installing plate by the 3rd alignment pin.The first gripper shoe, the second gripper shoe and crossbeam are arranged on respectively to the first installing plate, the second installing plate andOn three installing plates, realize the Primary Location to mounting bracket all parts, user pacifies by hand propelled firstDress plate and the motion of the second installing plate, realize the tune of position between the first installing plate and the second installing plate and crossbeamJoint, is connected crossbeam respectively with the first gripper shoe and the second gripper shoe. The device that this programme provides,The first alignment pin and the second alignment pin are coaxially arranged, have ensured to install in the first gripper shoe and the second gripper shoeThe axiality in hole, drives the first installing plate and the second installing plate at the first line slideway and the second line slidewayPosition between upper motor adjustment the first gripper shoe and the second gripper shoe and crossbeam, after having regulated, byOne gripper shoe and the second gripper shoe and crossbeam are welded to connect, and welding process is also to assemble at mounting bracketIn frock, complete, under the positioning action of the first installing plate and the second installing plate, ensure welding process in firstThe relative position of gripper shoe and the second gripper shoe can not change, and has ensured the assembly quality of mounting bracket.
Brief description of the drawings
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, below will be to realityThe accompanying drawing of executing required use in example or description of the Prior Art is briefly described, apparently, belowAccompanying drawing in description is only some embodiments of the present invention, for those of ordinary skill in the art,Do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The front view of the mounting bracket assembly tooling that Fig. 1 provides for the embodiment of the present invention;
The mounting bracket assembly tooling top view that Fig. 2 provides for the embodiment of the present invention.
1, base plate, 2, the first installing plate, 3, the second installing plate, 4, the 3rd installing plate, 5, first fixedPosition pin, 6, the second alignment pin, 7, the 3rd alignment pin, 8, the first line slideway, 9, the second straight line leadsRail.
Detailed description of the invention
The invention discloses a kind of mounting bracket assembly tooling, to improve the assembling of electric block mounting bracketQuality.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried outDescribe clearly and completely, obviously, described embodiment is only the present invention's part embodiment, andNot whole embodiment. Based on the embodiment in the present invention, those of ordinary skill in the art are not doingGo out the every other embodiment obtaining under creative work prerequisite, all belong to the scope of protection of the invention.
Refer to Fig. 1 and Fig. 2, Fig. 1 looks for the master of the mounting bracket assembly tooling that the embodiment of the present invention providesFigure; The mounting bracket assembly tooling top view that Fig. 2 provides for the embodiment of the present invention.
A kind of mounting bracket assembly tooling, comprising:
Base plate 1, is provided with the first line slideway 8 and the second line slideway 9 that are arranged in parallel on base plate 1;
Be arranged vertically with the first line slideway 8 and with the first line slideway 8 and the second line slideway 9 onOn the first installing plate 2, the first installing plates 2 that slide block all connects, be provided with for first of location and installation supportThe first alignment pin 5 of gripper shoe;
Be arranged vertically with the second line slideway 9 and with the first line slideway 8 and the second line slideway 9 onOn the second installing plate 3, the second installing plates 3 that slide block all connects, be provided with for second of location and installation supportThe second alignment pin 6, the first alignment pins 5 and second alignment pin 6 of gripper shoe are coaxially arranged;
Be arranged on base plate 1 the 3rd installing plate 4, the three installing plates 4 of the crossbeam for supporting mounting bracketOn be provided with the 3rd alignment pin 7 for locating crossbeam.
The mounting bracket assembly tooling that this programme provides, installs the first gripper shoe by the first alignment pin 5On the first installing plate 2, the second gripper shoe is arranged on the second installing plate 3 by the second alignment pin 6,The first alignment pin 5 and the second alignment pin 6 are coaxially arranged, can ensure the first gripper shoe and the second gripper shoeThe axiality of upper installing hole, crossbeam is fixed on the 3rd installing plate 4 by the 3rd alignment pin 7, preferred,The 3rd installing plate 4 is arranged vertically with base plate 1, and user installs with hand propelled the first installing plate 2 and secondPlate 3, the first installing plates 2 and the second installing plate 3 are transported along the first line slideway 8 and the second line slideway 9Moving, drive respectively the first gripper shoe and the motion of the second gripper shoe, regulate the first gripper shoe and the second gripper shoeAnd the position between crossbeam, is connected with the second gripper shoe the first gripper shoe with beam welding, weldingCheng Zhong, because the first gripper shoe and the second gripper shoe are subject to respectively the first installing plate 2 and the second installing plate 3Support and positioning action, ensure the first gripper shoe and the second gripper shoe with the welding process meta of crossbeamDo not put and can change, the device that this programme provides has ensured that by mounting bracket assembly tooling first supportsThe axiality of installing hole in plate and the second gripper shoe, has also ensured the first gripper shoe and second in welding processMutual alignment between gripper shoe and crossbeam, has ensured the assembly quality of mounting bracket assembly tooling.
The device that this programme provides, the first line slideway 8 and the second line slideway 9 can be respectively to firstThe position of installing plate 2 and the second installing plate 3 regulates, can be separately in adjustment process to a sideInstalling plate carries out position adjustments, also can carry out position adjustments to the installing plate of both sides, and this programme providesDevice can assemble for the mounting bracket of different size, has improved the logical of mounting bracket assembly toolingThe property used.
In order further to ensure the axiality of installing hole in the first gripper shoe and the second gripper shoe, first installsOn plate 2, be provided with 5, three the first alignment pins 5 of three the first alignment pins along the direction line perpendicular to base plate 1Property is arranged, is provided with 6, three the second alignment pins 6 of three the second alignment pins and three on the second installing plate 3The first alignment pin 5 positions are corresponding respectively, 6 points of the first alignment pin 5 that position is corresponding and the second alignment pinsNot coaxially arranged, ensure that the first gripper shoe and the second gripper shoe, after fixing, relative motion can not occur, and enters oneStep has improved the assembly quality of mounting bracket, and the first gripper shoe is by two first on the first installing plate 2Alignment pin 5 is located, and the second gripper shoe locates by two the second alignment pins 6 on the second installing plate 2,The number of the first alignment pin 5 and the second alignment pin 6 is three, can be according to concrete the first gripper shoe andIn the second gripper shoe, the first alignment pin 5 and second alignment pin of height need to be selected to be applicable in the position of installing hole6。
In order to prevent rotating at welding process middle cross beam, ensure the welding quality of mounting bracket, simultaneouslyAvoid because the hand steered labour's who causes of staff waste, on the 3rd installing plate 4, be provided with two theThree 7, two of alignment pins the 3rd alignment pins 7 can play to the 3rd installing plate 4 effect of stable position, protectDemonstrate,prove welding quality.
In order further to optimize technique scheme, can be at the first line slideway 8 and the second line slideway 9On stopping means is set, further ensure welding process in the first installing plate 2 and the second installing plate 3Can not change by occurrence positions, ensure welding quality.
For the working strength of assurance device, increase the service life, base plate 1 is steel plate.
In order further to optimize technique scheme, in a specific embodiment of the present invention, the 3rd installsPlate 4 is welded to connect with base plate 1, ensures the bonding strength between the 3rd installing plate 4 and base plate 1. The 3rdConnected mode that also can be with bolts between installing plate 4 and base plate 1, base plate 1 can be dismantled,The position of regulating base board 1 as required.
In order further to optimize technique scheme, in a specific embodiment of the present invention, the 3rd installsPlate 4 is arranged between the first line slideway 8 and the second line slideway 9.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field can be realized or useThe present invention. To be aobvious and easy for those skilled in the art to the multiple amendment of these embodimentSee, General Principle as defined herein can be in the situation that not departing from the spirit or scope of the present invention,Realize in other embodiments. Therefore, the present invention will can not be restricted to these embodiment shown in this article,But to meet the widest scope consistent with principle disclosed herein and features of novelty.