CN104005551A - Method for assembling adjustable connecting components for scaffold - Google Patents

Method for assembling adjustable connecting components for scaffold Download PDF

Info

Publication number
CN104005551A
CN104005551A CN201410252470.7A CN201410252470A CN104005551A CN 104005551 A CN104005551 A CN 104005551A CN 201410252470 A CN201410252470 A CN 201410252470A CN 104005551 A CN104005551 A CN 104005551A
Authority
CN
China
Prior art keywords
scaffold
wall
middleware
post
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410252470.7A
Other languages
Chinese (zh)
Inventor
刘志宏
王建宏
王彦理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG DONGYANG THIRD CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
ZHEJIANG DONGYANG THIRD CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DONGYANG THIRD CONSTRUCTION ENGINEERING Co Ltd filed Critical ZHEJIANG DONGYANG THIRD CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201410252470.7A priority Critical patent/CN104005551A/en
Publication of CN104005551A publication Critical patent/CN104005551A/en
Pending legal-status Critical Current

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention relates to a method for assembling connecting components for a scaffold and in particular relates to a method for assembling connecting components for a steel tubular scaffold with couplers, and belongs to the technical field of building operations. The method is characterized in that the adjustable connecting component for the scaffold comprises an embedded part (or a post-buried part), a steerable middle part, a connecting rod and a coupler, the steerable middle part is connected with the main body structure of the building by virtue of the embedded part (or the post-buried part), one end of the connecting rod is provided with threads and connected with the steerable middle part, and the other end of the connecting rod can be connected with the appropriate part of the body of the scaffold according to the position deviation value of the embedded part (or the post-buried part) by rotating the steerable middle part to an appropriate position. The assembling method has the advantages of simple structure, convenient construction, the guarantee of the connection quality of the connecting component and the body of the scaffold in case of deviation of the embedded part (or the post-buried part), and the like.

Description

A kind of adjustable wall-connecting piece combined method for scaffold
Technical field
The present invention relates to a kind of combined method of scaffold wall connecting piece, relate in particular to the combined method of fastener type steel pipe scaffold wall-connecting piece, belong to technical field of building construction.
Background technology
Wall-connecting piece refers to scaffold support body is connected with major structure of construction, can transmit the member of pulling force and pressure.At present common have lacing wire and shore wall-connecting piece and two kinds of structural forms of rigid connecting tube of being used in conjunction with.Lacing wire with shore the wall-connecting piece being used in conjunction with by lacing wire, shore, the member such as fastener forms, its lacing wire can only bearing tension, pressure is by shoring transmission.This structural form because of rigidity poor, therefore it is restricted use.Rigid connecting tube is made up of wall connecting rod, fastener and built-in fitting (or post-install).Its wall connecting rod can bear again pressure by bearing tension, has larger rigidity, and under load action, distortion is very little.But built-in fitting (or post-install) positional accuracy is wayward, often affect the quality of connection of wall-connecting piece and scaffold support body.
Summary of the invention
Object of the present invention is exactly for fear of the weak point in background technology, propose a kind of simple structure, construct conveniently, and can in the situation that off normal appears in built-in fitting (or post-install), ensure the combined method of the adjustable wall-connecting piece of wall-connecting piece and scaffold support body quality of connection.
In order to achieve the above object, the present invention adopts following technical scheme:
A kind of adjustable wall-connecting piece combined method for scaffold, it is characterized in that, scaffold with adjustable wall-connecting piece by built-in fitting (or post-install), can turn to middleware, wall connecting rod, fastener to form, describedly turn to middleware to pass through built-in fitting (or post-install) to be connected with major structure of construction, described wall connecting rod one end arranges silk mouthful and is connected with the described middleware that turns to, and the other end is connected with fastener with scaffold support body.
The described middleware that turns to comprises backing plate, pipe, strap bolt hole, described backing plate middle part, and one-tenth inclined-plane, described pipe one end and described backing plate are affixed by less fixed angle, and the other end arranges silk mouthful and is connected with described wall connecting rod.
Described scaffold can turn to middleware to correct position to be connected with scaffold support body proper site by rotating with adjustable wall-connecting piece.
A kind of scaffold has following features by adjustable wall-connecting piece combined method:
1, simple structure, power transmission is clear and definite.
2, built-in fitting (or post-install) correct position or occur in the situation of off normal, all can turn to middleware to correct position to be connected with scaffold support body proper site by rotating, and guarantees the quality of connection of wall-connecting piece and scaffold support body.
3, simple installation, quick construction.
Brief description of the drawings
Fig. 1 is the adjustable wall-connecting piece of scaffold and scaffold support body drawknot schematic diagram;
Fig. 2 can turn to middleware schematic diagram described in Fig. 1;
Fig. 3 is wall connecting rod schematic diagram described in Fig. 1;
Fig. 4 can turn to middleware and major structure of construction connection diagram described in Fig. 1.
In figure, 1-can turn to middleware, 2-wall connecting rod, 3-fastener, the vertical rod of 4-scaffold support body, 5-major structure of construction, 6-built-in fitting (or post-install).
Detailed description of the invention
Below by embodiment, and by reference to the accompanying drawings, technical scheme of the present invention is done further and illustrated.
Embodiment: adjustable wall-connecting piece combined method for a kind of scaffold.
As shown in Figure 1, the adjustable wall-connecting piece of scaffold, comprise built-in fitting (or post-install), can turn to middleware, wall connecting rod, fastener, can turn to middleware to pass through built-in fitting (or post-install) is connected with major structure of construction, wall connecting rod one end arranges silk mouthful and is connected with turning to middleware, and the other end is connected with fastener with scaffold support body.
As described in Figure 2, the described middleware that turns to comprises backing plate, pipe, strap bolt hole, backing plate middle part, and one-tenth inclined-plane, pipe one end and described backing plate are affixed by less fixed angle, and the other end arranges silk mouthful and is connected with wall connecting rod.
As shown in Figure 3, described wall connecting rod one end arranges silk mouthful.
As shown in Figure 4, describedly turn to middleware to pass through built-in fitting (or post-install) to be connected with major structure of construction.
Described adjustable wall-connecting piece can turn to middleware to correct position to be connected with scaffold support body proper site by rotating according to the departure of the pre-buried position of built-in fitting (or post-install).
It is to be understood that: although above-mentioned example is to the present invention's detailed explanation of contrasting; but these explanations, just to simple declaration of the present invention, instead of limitation of the present invention; any innovation and creation that do not exceed in connotation of the present invention, all fall within the scope of protection of the present invention.

Claims (3)

1. an adjustable wall-connecting piece combined method for scaffold, it is characterized in that, scaffold with adjustable wall-connecting piece by built-in fitting (or post-install), can turn to middleware, wall connecting rod, fastener to form, describedly turn to middleware to pass through built-in fitting (or post-install) to be connected with major structure of construction, described wall connecting rod one end arranges silk mouthful and is connected with the described middleware that turns to, and the other end is connected with fastener with scaffold support body.
2. according to the adjustable wall-connecting piece of scaffold described in claims 1, it is characterized in that, the described middleware that turns to comprises backing plate, pipe, strap bolt hole, described backing plate middle part, one-tenth inclined-plane, described pipe one end and described backing plate are affixed by less fixed angle, and the other end arranges silk mouthful and is connected with described wall connecting rod.
3. according to the adjustable wall-connecting piece of scaffold described in claims 1, it is characterized in that, described scaffold can turn to middleware to correct position to be connected with scaffold support body proper site by rotating with adjustable wall-connecting piece.
CN201410252470.7A 2014-06-03 2014-06-03 Method for assembling adjustable connecting components for scaffold Pending CN104005551A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410252470.7A CN104005551A (en) 2014-06-03 2014-06-03 Method for assembling adjustable connecting components for scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410252470.7A CN104005551A (en) 2014-06-03 2014-06-03 Method for assembling adjustable connecting components for scaffold

Publications (1)

Publication Number Publication Date
CN104005551A true CN104005551A (en) 2014-08-27

Family

ID=51366435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410252470.7A Pending CN104005551A (en) 2014-06-03 2014-06-03 Method for assembling adjustable connecting components for scaffold

Country Status (1)

Country Link
CN (1) CN104005551A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018583A (en) * 1996-07-08 1998-01-20 Misawa Homes Co Ltd Tenporary scaffold structure for building
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN202945799U (en) * 2012-12-03 2013-05-22 张若美 Adjustable wall connecting rod of steel pipe scaffold
CN103243900A (en) * 2013-05-13 2013-08-14 蒙理明 Wall connecting assembly of steel pipe scaffold
CN203905442U (en) * 2014-06-03 2014-10-29 浙江省东阳第三建筑工程有限公司 Adjustable wall connecting piece for scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1018583A (en) * 1996-07-08 1998-01-20 Misawa Homes Co Ltd Tenporary scaffold structure for building
CN201103235Y (en) * 2007-10-26 2008-08-20 长业建设集团有限公司 Connection device between wall and scaffold
CN202945799U (en) * 2012-12-03 2013-05-22 张若美 Adjustable wall connecting rod of steel pipe scaffold
CN103243900A (en) * 2013-05-13 2013-08-14 蒙理明 Wall connecting assembly of steel pipe scaffold
CN203905442U (en) * 2014-06-03 2014-10-29 浙江省东阳第三建筑工程有限公司 Adjustable wall connecting piece for scaffold

Similar Documents

Publication Publication Date Title
CN204357104U (en) Scaffolding steel pipe connector
MX2018002313A (en) Cable anchorage system.
CN204612719U (en) A kind of settlement observer
CN204676781U (en) The mechanical quick-connect machanism of rod iron and nonprestressed reinforcement
CN203905442U (en) Adjustable wall connecting piece for scaffold
CN104005551A (en) Method for assembling adjustable connecting components for scaffold
CN203755663U (en) Split fixing device for wall column form
CN103410307A (en) Scaffolding cross bar allowing length to be adjusted in stepless mode
CN202945799U (en) Adjustable wall connecting rod of steel pipe scaffold
CN204163073U (en) Pile foundation steel bar cage sleeve reinforced bar joint structure
CN203855988U (en) Post-cast strip steel pipe supporting structure
CN204899038U (en) Overcoat straight thread connection structure in reinforcing bar
CN204326106U (en) A kind of manhole
CN204001715U (en) A kind of L-type tool-type column template bracing means
CN203383496U (en) Scaffold cross rod with steplessly-adjusted length
CN203324315U (en) Electric meter box fixation rack
CN206625253U (en) A kind of attachment structure of prefabricated piping lane
CN205063311U (en) A connecting piece for building scaffold
CN203961088U (en) For the scaffolding steel pipe linkage of multistory building
CN204194489U (en) Steel pipe brace
CN203432575U (en) Novel scalable adjustable settlement observation device
CN203247602U (en) Directly buried bolt installation device
CN201835443U (en) Steel reinforcement connection sleeve
CN207525899U (en) Prefabricated sleeper and prefabricated sleeper and prefabricated panel connection structure
CN202580351U (en) Oil pipe assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140827