China
Prior art keywords
pulley
housing
support body
fixed
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410262263.XA
Other languages
Chinese (zh)
Other versions
CN104005550B (en
Inventor
丁小建
傅明
管彦
潘华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Wujian Construction Engineering Co Ltd
Original Assignee
Nantong Wujian Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Wujian Construction Engineering Co Ltd filed Critical Nantong Wujian Construction Engineering Co Ltd
Priority to CN201410262263.XA priority Critical patent/CN104005550B/en
Publication of CN104005550A publication Critical patent/CN104005550A/en
Application granted granted Critical
Publication of CN104005550B publication Critical patent/CN104005550B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a lifting scaffold which comprises a scaffold body. An electric block is mounted on the scaffold body, a lifting rope driven by the electric block penetrates through a pulley block and then is fixed to an attachment supporting frame connected with a building above the pulley block, and the pulley block is assembled on the scaffold body and bellow the electric block. The pulley block is formed by two pulleys, one pulley is the fixed pulley, and the other pulley is the movable pulley capable of moving up and down. A steel pipe guide rail formed by a front vertical seamless steel pipe and a rear vertical seamless steel pipe is arranged on the scaffold body, an annular rail formed by a left set of nolinear arc rolling wheels and a right set of nolinear arc rolling wheels is arranged on the attachment supporting frame, and the steel pipe guide rail is located in the annular rail and matched with the annular rail. The lifting scaffold is reasonable in structure, convenient to ascend and descend and safe. The whole lifting scaffold is locked automatically and instantly through a steel ball gravity locking falling prevention device by relying on the gravity of the scaffold body, action flexibility is high, locking force is large, falling displacement is small, reliability is good, and safety is high.

Description

Lifting false work
Technical field
The present invention relates to a kind of scaffold.
Background technology
Existing building operations scaffold, generally cannot carry out automatic lifting, uses complexity, and without safe anti-falling measure.
Summary of the invention
The object of the present invention is to provide one rational in infrastructure, the lifting false work that lifting is convenient, safe.
Technical solution of the present invention is:
A kind of lifting false work, comprise support body, it is characterized in that: on support body, fill electric block, the lifting rope that electric block drives is through being fixed on after assembly pulley and adhering on bracing frame that assembly pulley top building is connected, and described assembly pulley is loaded on support body, the below of electric block; Described assembly pulley is made up of two pulleys, the fixed fixed pulley of one of them pulley, and another pulley is movable pulley moving up and down; The steel pipe guide rail being made up of the vertical seamless steel pipe in two of front and back is set on support body, is adhering to the ring ring that on bracing frame, setting is made up of the non-linear arc wheel in two groups of left and right, steel pipe guide rail is arranged in and ring ring, coordinates with ring ring.
Described movable pulley is fixedly connected with slide block lower end, and slide block is arranged in take-up housing, can slide up and down along the chute of take-up housing, and take-up housing is fixedly connected with support body; The upper end of slide block is connected with mobile stressed, and mobile stressed is connected with the lower end of push rod, and the upper end of push rod withstands on one end of linkage lever, and the other end of linkage lever is pressed on anti-falling lock; Described anti-falling lock comprises the pin contacting with linkage lever, and pin is connected with platen, and platen is sleeved on fixed leg, can move up and down along fixed leg; Fixed leg is loaded on housing, and housing is fixed on support body; Housing and platen central authorities all arrange the medium pore that installs suspension rod, and at least two inclined holes are set in housing, and the upper end of inclined hole communicates with the medium pore of housing, is placed with stage clip in inclined hole, and stage clip upper end fills the steel ball contacting with suspension rod; Inclined hole top arranges the thimble that can stretch in inclined hole; The upper end of suspension rod is fixed on to be adhered on bracing frame.
The present invention is rational in infrastructure, and lifting is convenient, safety.Integral lifting scaffold relies on support body gravity moment automatic locking with steel ball gravity locking falling proof device, and action sensitivity is high, and coupling mechanism force is large, and tenesmus displacement is little, good reliability, safe.Steel pipe guide rail is placed in ring ring, is multiple constraint point conduit guiding sleeve type connected mode, has realized 360 ° of full constraints of horizontal direction, connects reliable.In the time of lifting, support body kinematic accuracy is high, and guide rail rolls all the time in ring ring, frictional resistance is little, and lifting is light, and support body stationarity is good, and in lifting process, can bear the dynamic load of horizontal direction, overturn-preventing ability and anti-horizontal expanding ability are strong, support body stability and safe.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1 is the structural representation of one embodiment of the invention.
Fig. 2 is steel pipe guide rail position and ring ring structural representation.
Fig. 3 is assembly pulley and anti-falling lock structural relation schematic diagram.
Fig. 4 is the structural representation of anti-falling lock.
Fig. 5 is control principle drawing.
Detailed description of the invention
A kind of lifting false work, comprises support body 1, fills electric block 2 on support body, and the lifting rope 3 that electric block drives is through being fixed on after assembly pulley and adhering on bracing frame 4 that assembly pulley top building is connected, and described assembly pulley is loaded on support body, the below of electric block; Described assembly pulley is made up of two pulleys, the fixed fixed pulley 5 of one of them pulley, and another pulley is movable pulley 6 moving up and down; The steel pipe guide rail being made up of the vertical seamless steel pipe 7 in two of front and back is set on support body, is adhering to the ring ring that on bracing frame, setting is made up of the non-linear arc wheel 8 in two groups of left and right, steel pipe guide rail is arranged in and ring ring, coordinates with ring ring.
Described movable pulley is fixedly connected with slide block 9 lower ends, and slide block is arranged in take-up housing 10, can slide up and down along the chute of take-up housing, and take-up housing is fixedly connected with support body; The upper end of slide block is connected with mobile stressed 11, and mobile stressed is connected with the lower end of push rod 12, and the upper end of push rod withstands on one end of linkage lever 13, and the other end of linkage lever is pressed on anti-falling lock 14; Described anti-falling lock comprises the pin 15 contacting with linkage lever 13, and pin is connected with platen 16, and platen is sleeved on fixed leg 17, can move up and down along fixed leg; Fixed leg is loaded on housing 18, and housing is fixed on support body; Housing and platen central authorities all arrange the medium pore that installs suspension rod 19, and at least two inclined holes 20 are set in housing, and the upper end of inclined hole communicates with the medium pore of housing, is placed with stage clip 21 in inclined hole, and stage clip upper end fills the steel ball 22 contacting with suspension rod; Inclined hole top arranges the thimble that can stretch in inclined hole; The upper end of suspension rod is fixed on to be adhered on bracing frame, and the lower end of suspension rod is free or fixed form.In figure, also have housing cover 23, lever bearing pin 24.
Electric block is as power lift, and wire rope is as Force transmission parts, changes and is subject to force direction by being fixed on the assembly pulley of movable pulley on vertical main framework and fixed pulley composition, power is delivered to adhere on supporting beam support body is promoted.
Take-up housing is by several reserving hole erection bolts, take-up housing is fixed on to the bottom of scaffold, when lifting power plant starts to do the used time, wire rope starts to tighten up, and movable pulley is under wire rope effect, start to move up with respect to fixed pulley, slide block, along with mobile pulley axle, moves up in take-up housing guide rail, and it is applied to lifting force upwards, because take-up housing is secured by bolts on support body, support body starts to move up.
Lifting power plant drives in integral-scaffold rising and decline process, be that lifting power plant is to the support body application of force, the push rod being now connected with power set is also simultaneously stressed, push rod applies power upwards to the left end of lever arm, under the effect of rocking pin, the other end of lever arm presses to housing cover by pin by platen, platen presses down thimble simultaneously, steel ball is depressed in the inclined hole of housing, make steel ball and circular suspension rod in contact condition not, now, rise or decline construction integral-scaffold can enter rise or decline work condition state.
In the time of lifting power plant catastrophic failure, the lifting power that lifting power plant imposes support body lost efficacy suddenly together with the external force that interlock leverage is executed simultaneously, the power that the thimble being connected with lifting power plant applies lever arm also lost efficacy, the other end of lever arm also lost efficacy to the power of platen by pin, the power that thimble acts on steel ball lost efficacy in moment simultaneously, under spring action, steel ball is along inclined hole moment bullet to circular suspension rod, and along with moment the support body kinetic energy and the potential energy that fall, make steel ball effectively lock rapidly circular suspension rod, thereby the support body that locking is fallen downwards, and circular suspension rod upper end is fixed on and adheres in supporting, be linked together with major structure of construction, thereby realize the function of integral-scaffold fall arrest.
The present invention also can carry out intellectualized reconstruction, and its intelligent synchronization technology has adopted a kind of digital intelligent hoisting control device.Control device is mainly made up of central control cabinet and isochronous controller two parts.Central control cabinet is mainly made up of contactor 25 and line breaker (thermal relay 26), drives electric block operation, and realizes lifting motor crossed to thermal overload and power phase shortage protection; Isochronous controller is made up of programmable controller (PLC) 32, speed probe (being arranged in lifting appliance) 27, lifting motor contactor drive circuit 28 and control panel (touch-screen display) 29, mainly realize the start and stop of lifting motor 30, the automatic control of scaffold integral elevating height, and show in real time adjustable height and each seat in the plane electric block running status by display.Also have that intelligence is automatic, non intelligent automatically, any switching of unit independent operation mode, to adapt to various work condition states and emergent demand simultaneously.
Intelligent automatic control: when scaffold lifting, lifting motor driven gear mechanism 31 rotates, speed probe sends tacho-pulse, acquisition counter device collects this pulse signal, counts and send to PLC, and PLC receives after umber of pulse, according to the coefficient of setting, convert umber of pulse to adjustable height, and compare with setting height, after setting height, automatically control this seat in the plane lifting motor and stop when reaching.In lifting process, PLC compares the dynamic height of each seat in the plane, calculates the adjustable height difference between each seat in the plane, and in the time that maximum difference exceeds permissible value, PLC controls the seat in the plane lifting motor running status of maximum difference, realizes synchronization lifting between each seat in the plane.
Manually control: when scaffold need enter initial lifting work condition state, when each machine need link debugging with relevant apparatus, central control cabinet can switch to " unit independent operation mode ", to realize the manually debugging directly perceived of each machine and relevant apparatus.
Non intelligent automatic control: when scaffold is in intelligent automatic control synchronization lifting operating mode, because spy sends out reason, intelligent synchronization controller cisco unity malfunction and affect scaffold lifting, and cannot get rid of in the short time time, central control cabinet can switch to " non intelligent automatic control mode ".Now, scaffold still can continue automatic lifting, and switches in real time " unit independent operation mode ", and adopts unit leveling to remedy, until scaffold lifting puts in place.

Claims (2)

1. a lifting false work, comprise support body, it is characterized in that: on support body, fill electric block, the lifting rope that electric block drives is through being fixed on after assembly pulley and adhering on bracing frame that assembly pulley top building is connected, and described assembly pulley is loaded on support body, the below of electric block; Described assembly pulley is made up of two pulleys, the fixed fixed pulley of one of them pulley, and another pulley is movable pulley moving up and down; The steel pipe guide rail being made up of the vertical seamless steel pipe in two of front and back is set on support body, is adhering to the ring ring that on bracing frame, setting is made up of the non-linear arc wheel in two groups of left and right, steel pipe guide rail is arranged in and ring ring, coordinates with ring ring.
2. lifting false work according to claim 1, is characterized in that: described movable pulley is fixedly connected with slide block lower end, and slide block is arranged in take-up housing, can slide up and down along the chute of take-up housing, and take-up housing is fixedly connected with support body; The upper end of slide block is connected with mobile stressed, and mobile stressed is connected with the lower end of push rod, and the upper end of push rod withstands on one end of linkage lever, and the other end of linkage lever is pressed on anti-falling lock; Described anti-falling lock comprises the pin contacting with linkage lever, and pin is connected with platen, and platen is sleeved on fixed leg, can move up and down along fixed leg; Fixed leg is loaded on housing, and housing is fixed on support body; Housing and platen central authorities all arrange the medium pore that installs suspension rod, and at least two inclined holes are set in housing, and the upper end of inclined hole communicates with the medium pore of housing, is placed with stage clip in inclined hole, and stage clip upper end fills the steel ball contacting with suspension rod; Inclined hole top arranges the thimble that can stretch in inclined hole; The upper end of suspension rod is fixed on to be adhered on bracing frame.
CN201410262263.XA 2014-06-13 2014-06-13 Elevating scaffold Active CN104005550B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410262263.XA CN104005550B (en) 2014-06-13 2014-06-13 Elevating scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410262263.XA CN104005550B (en) 2014-06-13 2014-06-13 Elevating scaffold

Publications (2)

Publication Number Publication Date
CN104005550A true CN104005550A (en) 2014-08-27
CN104005550B CN104005550B (en) 2016-08-24

Family

ID=51366434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410262263.XA Active CN104005550B (en) 2014-06-13 2014-06-13 Elevating scaffold

Country Status (1)

Country Link
CN (1) CN104005550B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639284A (en) * 2016-10-21 2017-05-10 钟立朋 Lifting safety trolley for construction
CN112302325A (en) * 2020-11-17 2021-02-02 浙江铠甲建筑科技有限公司 Safe hydraulic attached climbing scaffold

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587633A (en) * 2012-03-16 2012-07-18 河南省安装集团有限责任公司 Space truss type attached lifting scaffold
CN102777024A (en) * 2012-08-14 2012-11-14 俞彬 Digital and intelligent lifting control device
CN202718381U (en) * 2012-07-27 2013-02-06 广州市达蒙建筑技术有限公司 Transfer-free lifting device
CN202990392U (en) * 2013-01-08 2013-06-12 俞彬 Steel tube guide rail and multifunctional ring rail combined mechanism for overall lifting scaffold
CN203129557U (en) * 2013-03-18 2013-08-14 俞彬 Steel-ball gravity-locking type fall-prevention device for integral lifting scaffold
KR20130121618A (en) * 2012-04-27 2013-11-06 주식회사 근하기공 Safety deck for construction and method thereof
US20130299276A1 (en) * 2005-06-29 2013-11-14 George Anasis Suspension platform system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130299276A1 (en) * 2005-06-29 2013-11-14 George Anasis Suspension platform system
CN102587633A (en) * 2012-03-16 2012-07-18 河南省安装集团有限责任公司 Space truss type attached lifting scaffold
KR20130121618A (en) * 2012-04-27 2013-11-06 주식회사 근하기공 Safety deck for construction and method thereof
CN202718381U (en) * 2012-07-27 2013-02-06 广州市达蒙建筑技术有限公司 Transfer-free lifting device
CN102777024A (en) * 2012-08-14 2012-11-14 俞彬 Digital and intelligent lifting control device
CN202990392U (en) * 2013-01-08 2013-06-12 俞彬 Steel tube guide rail and multifunctional ring rail combined mechanism for overall lifting scaffold
CN203129557U (en) * 2013-03-18 2013-08-14 俞彬 Steel-ball gravity-locking type fall-prevention device for integral lifting scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106639284A (en) * 2016-10-21 2017-05-10 钟立朋 Lifting safety trolley for construction
CN112302325A (en) * 2020-11-17 2021-02-02 浙江铠甲建筑科技有限公司 Safe hydraulic attached climbing scaffold

Also Published As

Publication number Publication date
CN104005550B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN101561071B (en) Electric automatic levelling brace
CN105293244A (en) Suspension type elevator anti-falling device
CN203461655U (en) Mechanical anti-dropping device
CN105277353A (en) A high-altitude lifting basket type machine safety lock testing experiment table and testing method
CN203222982U (en) Multifunctional falling protector of attached elevating scaffold
CN104005550A (en) Lifting scaffold
CN2931666Y (en) Lifting platform used in construction work
CN103175708B (en) Elevator descending testing system
CN202944970U (en) Automatic-reverse-type horizontal-alignment electric permanent magnet lifting equipment
CN103197651B (en) A kind of triplex redundance redundant computation machine observe and control system of elevator test
CN201914800U (en) Top-rushing prevention device of construction elevator
CN205676111U (en) A kind of safe and reliable crane
CN208603536U (en) A kind of detection device for accidental movement of elevator cage and hypervelocity
CN208454243U (en) Elevator counterweight safety device
CN202337623U (en) Lift load detector
CN110615380B (en) Stacker objective table overspeed protection device
CN205892400U (en) Overhaul anti -falling device at bottom of home use elevator sedan -chair
CN204873325U (en) Speed limiter
CN203961247U (en) Mobile pulley slide block combined mechanism in lifting false work
CN211310698U (en) Stacker objective table overspeed protection device
CN204064604U (en) A kind of Drop Shock Machine
CN203129557U (en) Steel-ball gravity-locking type fall-prevention device for integral lifting scaffold
CN104129694A (en) Process falling protector
CN204873321U (en) Device for preventing elevator car is unexpected to be removed
CN108328513B (en) Abnormal motion detection equipment for hydraulic platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant