CN104005431A - 斜直交替群桩-承台-上部结构相似模型制作模板 - Google Patents

斜直交替群桩-承台-上部结构相似模型制作模板 Download PDF

Info

Publication number
CN104005431A
CN104005431A CN201410266188.4A CN201410266188A CN104005431A CN 104005431 A CN104005431 A CN 104005431A CN 201410266188 A CN201410266188 A CN 201410266188A CN 104005431 A CN104005431 A CN 104005431A
Authority
CN
China
Prior art keywords
pile
superstructure
template
formwork
oblique
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410266188.4A
Other languages
English (en)
Other versions
CN104005431B (zh
Inventor
孔德森
赵志民
王安水
王晓敏
王士权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201410266188.4A priority Critical patent/CN104005431B/zh
Publication of CN104005431A publication Critical patent/CN104005431A/zh
Application granted granted Critical
Publication of CN104005431B publication Critical patent/CN104005431B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种斜直交替群桩-承台-上部结构相似模型制作模板,属试验设备技术领域,为解决斜直交替群桩-承台-上部结构相似模型制作困难的问题而设计。本发明由斜直交替群桩模板、承台模板和上部结构模板组成;所述的斜直交替群桩模板由底部封闭的倾斜PVC圆管和垂直PVC圆管组成;所述的承台模板采用有机玻璃制成,为一个没有顶盖且底板有预留孔的空心立方盒,承台模板与斜直交替群桩模板在预留孔处通过玻璃胶粘合在一起;所述的上部结构模板由PVC圆管和承台盖板组成,承台盖板采用有机玻璃制成,中心处预留孔洞,PVC圆管与承台盖板在预留孔处通过玻璃胶粘合在一起。本发明制作方便、成本低廉、工程实用性强。

Description

斜直交替群桩-承台-上部结构相似模型制作模板
技术领域
本发明属于试验仪器设备技术领域,具体涉及一种相似模拟试验模型制作模板,尤其涉及斜直交替群桩-承台-上部结构相似模型制作模板。
背景技术
目前,斜直交替群桩被广泛应用于公路桥梁、港口码头、海上钻井平台、高填方路堤、高塔结构、超高层建筑、基坑支护、地基处理、大型输电线路杆塔以及机场、体育场馆、文体活动中心、展览馆等大跨度屋盖结构公共建筑基础中。为了分析斜直交替群桩-承台-上部结构体系的相互作用特性,在国家自然科学基金项目(编号:41372288)的资助下,采用相似模拟试验来进行研究。在开展相似模拟试验时需要根据确定的相似比制作斜直交替群桩-承台-上部结构的相似模型,但目前国内外还没有一种十分有效的专门制作斜直交替群桩-承台-上部结构相似模型的模板,因此,需要发明一种斜直交替群桩-承台-上部结构相似模型制作模板。
发明内容
本发明的目的是提供一种斜直交替群桩-承台-上部结构相似模型制作模板,该模板不但可以一次成型的高质量制作斜直交替群桩-承台-上部结构相似模型,有效缩短模型制作时间,而且结构简单、成本低廉、操作方便、技术经济可行。
本发明所采取的技术方案是:斜直交替群桩-承台-上部结构相似模型制作模板,它由斜直交替群桩模板、承台模板和上部结构模板组成;所述的斜直交替群桩模板由底部封闭的倾斜PVC圆管和垂直PVC圆管组成;所述的承台模板采用有机玻璃制成,为一个没有顶盖且底板有预留孔的空心立方盒,承台模板与斜直交替群桩模板在预留孔处通过玻璃胶粘合在一起;所述的上部结构模板由PVC圆管和承台盖板组成,承台盖板采用有机玻璃制成,中心处预留孔洞,PVC圆管与承台盖板在预留孔处通过玻璃胶粘合在一起。
本发明的施工使用方法是:斜直交替群桩-承台-上部结构相似模型制作模板,使用时,首先将斜直交替群桩模板与承台模板固定好,然后将制作好的群桩、承台和上部结构的整体钢筋笼下放到斜直交替群桩模板与承台模板中,接着向斜直交替群桩模板与承台模板中浇灌混凝土,直到承台模板顶面,而后将上部结构模板固定在承台模板上,同时使上部结构钢筋笼放置在上部结构PVC圆管中,最后从上部结构PVC圆管中继续浇灌混凝土,直至上部结构PVC圆管的顶面,模型制作完成。
本发明的工作原理是:斜直交替群桩-承台-上部结构相似模型制作模板,将斜直交替群桩模板与承台模板粘合在一起,且与上部结构模板分离,便于桩、承台和上部结构的整体钢筋笼安放,也利于混凝土的浇灌,便于斜直交替群桩-承台-上部结构相似模型的一次浇筑成型,制作的相似模型的整体性好。
本发明的有益效果是:斜直交替群桩-承台-上部结构相似模型制作模板结构简单、制作方便、成本低廉、实用性强、技术经济可行,且能够使斜直交替群桩-承台-上部结构相似模型一次浇筑成型,从而保证了相似模型的制作质量。
附图说明
图1为本发明斜直交替群桩-承台-上部结构相似模型制作模板整体示意图。
图例说明:1-承台模板;2-倾斜PVC圆管;3-垂直PVC圆管;4-承台底板预留孔;5-上部结构PVC圆管;6-承台盖板;7-承台盖板预留孔。
具体实施方式
下面结合附图对本发明做进一步说明。
如图1所示,本发明斜直交替群桩-承台-上部结构相似模型制作模板,它由斜直交替群桩模板、承台模板1和上部结构模板组成;所述的斜直交替群桩模板由底部封闭的倾斜PVC圆管2和垂直PVC圆管3组成;所述的承台模板1采用有机玻璃制成,为一个没有顶盖且底板有预留孔4的空心立方盒,承台模板1与斜直交替群桩模板在预留孔4处通过玻璃胶粘合在一起;所述的上部结构模板由PVC圆管5和承台盖板6组成,承台盖板6采用有机玻璃制成,中心处预留孔洞7,PVC圆管5与承台盖板6在预留孔7处通过玻璃胶粘合在一起。
使用时,首先将斜直交替群桩模板与承台模板1固定好,然后将制作好的桩、承台和上部结构的整体钢筋笼下放到斜直交替群桩模板与承台模板1中,接着向斜直交替群桩模板与承台模板1中浇灌混凝土,直到承台模板1顶面,而后将上部结构模板固定在承台模板1上,同时使上部结构钢筋笼放置在上部结构PVC圆管5中,最后从上部结构PVC圆管5中继续浇灌混凝土,直至上部结构PVC圆管5的顶面,模型制作完成。

Claims (1)

1.一种斜直交替群桩-承台-上部结构相似模型制作模板,其特征在于,它由斜直交替群桩模板、承台模板和上部结构模板组成;所述的斜直交替群桩模板由底部封闭的倾斜PVC圆管和垂直PVC圆管组成;所述的承台模板采用有机玻璃制成,为一个没有顶盖且底板有预留孔的空心立方盒,承台模板与斜直交替群桩模板在预留孔处通过玻璃胶粘合在一起;所述的上部结构模板由PVC圆管和承台盖板组成,承台盖板采用有机玻璃制成,中心处预留孔洞,PVC圆管与承台盖板在预留孔处通过玻璃胶粘合在一起。
CN201410266188.4A 2014-06-16 2014-06-16 斜直交替群桩-承台-上部结构相似模型制作模板 Expired - Fee Related CN104005431B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410266188.4A CN104005431B (zh) 2014-06-16 2014-06-16 斜直交替群桩-承台-上部结构相似模型制作模板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410266188.4A CN104005431B (zh) 2014-06-16 2014-06-16 斜直交替群桩-承台-上部结构相似模型制作模板

Publications (2)

Publication Number Publication Date
CN104005431A true CN104005431A (zh) 2014-08-27
CN104005431B CN104005431B (zh) 2015-12-02

Family

ID=51366320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410266188.4A Expired - Fee Related CN104005431B (zh) 2014-06-16 2014-06-16 斜直交替群桩-承台-上部结构相似模型制作模板

Country Status (1)

Country Link
CN (1) CN104005431B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104834830A (zh) * 2015-06-05 2015-08-12 山东科技大学 液化场地斜直交替群桩-土-结构数值计算模型
CN104878786A (zh) * 2015-06-05 2015-09-02 山东科技大学 斜直交替群桩-土-结构相互作用实验模型
CN108060654A (zh) * 2017-12-13 2018-05-22 河海大学 一种混凝土梁板式高桩码头试验模型的制作方法及应用
CN114263222A (zh) * 2021-11-24 2022-04-01 浙江大学 砂土中倾斜偏心荷载下测定群桩极限承载力的模型试验装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193487A (ja) * 2001-12-27 2003-07-09 Ohbayashi Corp 柱基礎構造
CN202969421U (zh) * 2012-12-24 2013-06-05 太原理工大学 室内测试桩基抗液化效果的装置
CN203145066U (zh) * 2013-02-28 2013-08-21 中国水电顾问集团华东勘测设计研究院 近海单桩基础水平承载力加载装置
CN203613569U (zh) * 2013-11-15 2014-05-28 中交天航港湾建设工程有限公司 一种基于浅海吹填区海底管线的监测装置
CN203878630U (zh) * 2014-06-16 2014-10-15 山东科技大学 斜直交替群桩-承台-上部结构相似模型制作模板

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003193487A (ja) * 2001-12-27 2003-07-09 Ohbayashi Corp 柱基礎構造
CN202969421U (zh) * 2012-12-24 2013-06-05 太原理工大学 室内测试桩基抗液化效果的装置
CN203145066U (zh) * 2013-02-28 2013-08-21 中国水电顾问集团华东勘测设计研究院 近海单桩基础水平承载力加载装置
CN203613569U (zh) * 2013-11-15 2014-05-28 中交天航港湾建设工程有限公司 一种基于浅海吹填区海底管线的监测装置
CN203878630U (zh) * 2014-06-16 2014-10-15 山东科技大学 斜直交替群桩-承台-上部结构相似模型制作模板

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孔德森等: "考虑桩-土相互作用效应的桩基结构地震响应数值分析", 《岩石力学与工程学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104834830A (zh) * 2015-06-05 2015-08-12 山东科技大学 液化场地斜直交替群桩-土-结构数值计算模型
CN104878786A (zh) * 2015-06-05 2015-09-02 山东科技大学 斜直交替群桩-土-结构相互作用实验模型
CN104878786B (zh) * 2015-06-05 2016-08-31 山东科技大学 斜直交替群桩-土-结构相互作用实验模型
CN108060654A (zh) * 2017-12-13 2018-05-22 河海大学 一种混凝土梁板式高桩码头试验模型的制作方法及应用
CN114263222A (zh) * 2021-11-24 2022-04-01 浙江大学 砂土中倾斜偏心荷载下测定群桩极限承载力的模型试验装置及方法
CN114263222B (zh) * 2021-11-24 2022-09-13 浙江大学 砂土中倾斜偏心荷载下测定群桩极限承载力的模型试验装置及方法

Also Published As

Publication number Publication date
CN104005431B (zh) 2015-12-02

Similar Documents

Publication Publication Date Title
CN104005431B (zh) 斜直交替群桩-承台-上部结构相似模型制作模板
CN108149703A (zh) 输电线路工程基础预制施工方法
CN105970993B (zh) 预制桩与预制承台的水下连接结构的施工方法
CN103104102A (zh) 一种地下增层改造施工方法
CN203878630U (zh) 斜直交替群桩-承台-上部结构相似模型制作模板
CN103774685B (zh) 航标混凝土承台的制作方法
CN204282399U (zh) 一种地铁围护结构
CN103911989B (zh) 一种带有护壁的水下浇筑根式基础及其施工方法
CN103216102A (zh) 钢管柱内混凝土导管导入浇筑的施工方法
CN107299640A (zh) 一种变截面井筒式地下连续墙基础及其施工方法
CN204753656U (zh) 斜直交替群桩-土-结构相互作用实验模型
CN205975995U (zh) 现浇混凝土楼板压槽钢管支撑架
CN105625184B (zh) 桥、站合建模式的地铁站修建方法
CN207775920U (zh) 一种山区输电铁塔基础加固装置
CN205093378U (zh) 一种生态鱼池结构
CN203429557U (zh) 应用在顶进地道桥施工中的锚杆后背梁
CN208501694U (zh) 一种针对紧邻型基坑的预制式构件
CN207776228U (zh) 一种适用于夯土墙阳角的空心砌块结构
CN204662486U (zh) 可供大小塔吊转换的共用基础
CN103362123A (zh) 倒y形灌注桩及其施工方法
CN206736743U (zh) 铺设装配式钢桥的简易结构
CN107190764A (zh) 一种升压站建筑物基础施工方法
CN205934971U (zh) 一种具有超滤排水槽的沉管隧道干坞坞底起浮层结构
CN206815279U (zh) 一种装配式高桩承台驳岸结构
CN202492916U (zh) 一种混凝土排水沟

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20200616