CN103982169B - Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid - Google Patents

Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid Download PDF

Info

Publication number
CN103982169B
CN103982169B CN201410177405.2A CN201410177405A CN103982169B CN 103982169 B CN103982169 B CN 103982169B CN 201410177405 A CN201410177405 A CN 201410177405A CN 103982169 B CN103982169 B CN 103982169B
Authority
CN
China
Prior art keywords
acid
liquid nitrogen
sides
polyprotic
agent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410177405.2A
Other languages
Chinese (zh)
Other versions
CN103982169A (en
Inventor
惠建龙
杨勇
武建义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410177405.2A priority Critical patent/CN103982169B/en
Publication of CN103982169A publication Critical patent/CN103982169A/en
Application granted granted Critical
Publication of CN103982169B publication Critical patent/CN103982169B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid disclosed by the invention, first prepares polyprotic acid, preposition acid, then injects control seam agent and preposition acid to Oil/gas Well target zone simultaneously;Then polyprotic acid, liquid nitrogen and cross-linking agent it are injected simultaneously into;Then liquid nitrogen is reinjected;Then liquid nitrogen, polyprotic acid, cross-linking agent, ceramsite sand it are injected simultaneously into;Finally all liq injecting well head is discharged in clean-up pit.The method of the present invention utilizes polyprotic acid to make slit, cross-linking agent is taken sand and kept seam length, liquid nitrogen to supplement stratum energy, by slug formula, polyprotic acid, cross-linking agent, liquid nitrogen are injected stratum, improve fracture length, the communication capability of microcrack and quick fluid-discharge, be finally reached crack and keep for a long time.

Description

Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid
Technical field
The invention belongs to oil-gas mining technical field, relate to a kind of polynary frozen glue acid and take the acidifying of sand adjustable slit height Fracturing process.
Background technology
Carbonate reservoir acid fracturing well stimulation, its control acid fracturing chief factors of success and have three: one be The effective length in final acid fracturing crack;Two is the ability linking up microcrack;Three is acid-etched fracture after acid fracturing Flow conductivity.Effective crack length is by acid liquid loss, acid-rock reaction speed and acid stream in seam The impact of speed, acid solution type etc..Linking up microcrack is the effective means improving gas testing yield, splits in guarantee While seam length, the communication capability improving microcrack is most important.The flow conductivity of acid-etched fracture is closed Conjunction, the dissolving power of acid, the acid etching kenel of acid-rock reaction, the acid impact on the absolute meltage etc. of rock. Therefore carbonate reservoir acidfracturing treatment is for improving acidizing effect, and three main targets of pursuit are exactly longer Acid-etched fracture length, microcrack communication capability and higher acid corrosion fracture, thus reach to split Seam can keep for a long time.
Summary of the invention
It is an object of the invention to provide a kind of polynary frozen glue acid and take sand adjustable slit height acidifying fracturing process, reach The effect that crack keeps for a long time.
The technical solution adopted in the present invention is, sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid, Comprise the following steps:
Step 1: prepare polyprotic acid
According to mass percent, weigh following raw material: hydrochloric acid: 65%-80%, formic acid: 8%-12%, Acidification corrosion inhibitor: 1%-2%, thickening agent: 0.4%-0.8%, ferrous stability: 1%-2%, the row of helping Agent: 0.2%-0.4%, clear water: 2.8%-24.4%, the mass percent sum of above each component is 100%, Add raw materials into the first acid tank in above ratio, then mixed by pump truck, obtain polyprotic acid;
Step 2: prepare preposition acid
According to mass percent, weigh following raw material: hydrochloric acid: 55%-70%, acidification corrosion inhibitor: 1%-2%, Ferrous stability: 1%-2%, cleanup additive: 0.2%-0.4%, clear water: 25.6%-42.8%, above respectively The mass percent sum of component is 100%, adds raw materials into the second acid tank in above ratio, then Mixed by pump truck, obtain preposition acid;
Step 3: enforcement acid fracturing:
First inject control seam agent and 10 side-30 measured step rapid 2 of 20 side-50 sides to Oil/gas Well target zone simultaneously In the preposition acid made;Then polyprotic acid, 5 sides made it are injected simultaneously in 100 side-400 measured step rapid 1 The liquid nitrogen of-20 sides and the cross-linking agent of 1 side-4 side;Then the liquid nitrogen of 5 side-10 sides is reinjected;Then simultaneously Inject polyprotic acid, 0.5 side-2 side made in the liquid nitrogen of 5 side-10 sides, 50 side-200 measured step rapid 1 Cross-linking agent and the ceramsite sand of 4 side-16 sides;After 1-8 hour, all liq row of well head will be injected In clean-up pit, i.e. complete acid fracturing.
The feature of the present invention also resides in,
In step 3, when last discharge opeing, 5 side-15 side's liquid nitrogen and 3-10 root bubble rod row is utilized also to penetrate The hole section thoroughly row of returning.
Hydrochloric acid be mass concentration be the technical hydrochloric acid of 31%.
Formic acid is the formic acid that mass concentration is not less than 85%.
The invention has the beneficial effects as follows: the multiple-limb while regulation seam height, polyprotic acid formed to acid fracturing Acid-etched fracture combine with adding the ceramsite sand crack of higher flow conductivity that sand formed, reached crack The effect kept for a long time.
Accompanying drawing explanation
Fig. 1 is that the process implementing acid fracturing in sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid.
Detailed description of the invention
The present invention is described in detail with detailed description of the invention below in conjunction with the accompanying drawings.
Sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, comprises the following steps:
Step 1: prepare polyprotic acid
According to mass percent, weigh following raw material: hydrochloric acid: 65%-80%, formic acid: 8%-12%, Acidification corrosion inhibitor: 1%-2%, thickening agent: 0.4%-0.8%, ferrous stability: 1%-2%, the row of helping Agent: 0.2%-0.4%, clear water: 2.8%-24.4%, the mass percent sum of above each component is 100%, Add raw materials into the first acid tank in above ratio, then mixed by pump truck, obtain polyprotic acid;
Step 2: prepare preposition acid
According to mass percent, weigh following raw material: hydrochloric acid: 55%-70%, acidification corrosion inhibitor: 1%-2%, Ferrous stability: 1%-2%, cleanup additive: 0.2%-0.4%, clear water: 25.6%-42.8%, above respectively The mass percent sum of component is 100%, adds raw materials into the second acid tank in above ratio, then Mixed by pump truck, obtain preposition acid;
Step 3: implement acid fracturing, as shown in Figure 1:
First inject control seam agent and 10 side-30 measured step rapid 2 of 20 side-50 sides to Oil/gas Well target zone simultaneously In the preposition acid made;Then polyprotic acid, 5 sides made it are injected simultaneously in 100 side-400 measured step rapid 1 The liquid nitrogen of-20 sides and the cross-linking agent of 1 side-4 side;Then the liquid nitrogen of 5 side-10 sides is reinjected;Then simultaneously Inject polyprotic acid, 0.5 side-2 side made in the liquid nitrogen of 5 side-10 sides, 50 side-200 measured step rapid 1 Cross-linking agent and the ceramsite sand of 4 side-16 sides;After 1-8 hour, all liq row of well head will be injected In clean-up pit, i.e. complete acid fracturing.
In step 3, when last discharge opeing, 5 side-15 side's liquid nitrogen and 3-10 root bubble rod row is utilized also to penetrate The hole section thoroughly row of returning.
Step 1, hydrochloric acid described in 2 be mass concentration be the technical hydrochloric acid of 31%.
Formic acid described in step 1 is the formic acid that mass concentration is not less than 85%.
Wherein, acidification corrosion inhibitor is the CHS-5 acidifying height provided by Chengdu Jian Xiang Shu Guan Science and Technology Ltd. Temperature corrosion inhibiter;
Thickening agent is the CDC-10 frozen glue acid thickening agent provided by Chengdu Jian Xiang Shu Guan Science and Technology Ltd.;
Ferrous stability is acidified iron ion for the TWJ provided by Chengdu Jian Xiang Shu Guan Science and Technology Ltd. Stabilizer;
Cleanup additive is the SZJ-3 acid fracturing cleanup additive provided by Chengdu Jian Xiang Shu Guan Science and Technology Ltd.;
Control seam agent is used for the FRK-KFJ fracture acidizing provided by Beijing FRAC Technology Development Co., Ltd. Control seam agent;
Cross-linking agent is the CDS-10 frozen glue acid crosslinking agent provided by Chengdu Jian Xiang Shu Guan Science and Technology Ltd.;
The high intensity of the ceramsite sand 69MPa for being provided by Shanxi Feng Shuo petroleum fracturing propping agent company limited Ceramsite sand petroleum fracturing propping agent.
Below by the impact on the inventive method of each factor of experimental analysis:
(1) polynary frozen glue acid rheological characteristic
The polyprotic acid placed 120 hours cross-links in agitator with cross-linking agent, obtains the acid of polynary frozen glue, Polynary frozen glue acid being sheared 60 minutes, the viscosity recording the acid of polynary frozen glue is as shown in table 1, it can be seen that When 60 minutes, the viscosity of polynary frozen glue acid is 119.35mPa s, it is possible to meet site operation requirement (on-the-spot Construction requirement is: viscosity is not less than 100mPa s).
The viscosity of 60 minutes is sheared in more than 1 yuan of frozen glue acid of table
Time (min) Viscosity (mPa s)
0 475
5 300
10 260
15 240
20 200
30 200
40 140
50 130
55 125
60 119.35
(2) the polynary frozen glue acidleach property lost
It is right that the evaluation of polynary frozen glue acid filtration property uses identical rock core to carry out the static filtrations of different acid Ratio, contrast finds, the filter loss of conventional common acids is much larger than viscous acid and the acid of polynary frozen glue, and rock core pair Little, as shown in table 2 more than viscous acid and common acids of the leak-off of polynary frozen glue acid.
Summary result of the test, polynary frozen glue acid has the advantage that
(1) polynary frozen glue acid has low filtration property.
(2) utilize polynary frozen glue acid to take sand acid fracturing, high-viscous liquid is taken sand frac-pack and is laminated with on ground Under power and formation temperature, acid fluid system acidization after breaking gel combines, and leads finally realizing height Acid etching-the support of stream ability is combined crack, expands oil and gas flow passage, reaches what crack kept for a long time Effect.
Embodiment one
The polyprotic acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 70% of 31%, and mass concentration is the first of 85% Acid 10%, CHS-5 acidification high temperature inhibiter 1.5%, CDC-10 frozen glue acid thickening agent 0.6%, TWJ Acidifying ferrous stability 1.5%, SZJ-3 acid fracturing cleanup additive 0.3%, clear water 16.1%, above group The content summation divided is 100%, is added by the above-mentioned raw material weighed to the first acid tank, then passes through pump truck Mix;
The preposition acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 65% of 31%, CHS-5 acidification high temperature inhibition Agent 1.5%, TWJ is acidified ferrous stability 1.5%, SZJ-3 acid fracturing cleanup additive 0.3%, clear water 31.7%, the content summation of above component is 100%, is added by the above-mentioned raw material weighed to the second acid tank, Mixed by pump truck again;
Enforcement acid fracturing:
First inject the FRK-KFJ fracture acidizing control seam agent and 20 of 35 sides to Oil/gas Well target zone simultaneously The preposition acid that side prepares;Then polyprotic acid, the liquid nitrogen of 15 sides and 2 sides that 200 sides prepare it are injected simultaneously into CDS-10 frozen glue acid crosslinking agent;Then the liquid nitrogen of 8 sides is reinjected;Then be injected simultaneously into 8 sides liquid nitrogen, The height of the 69MPa of polyprotic acid, the CDS-10 frozen glue acid crosslinking agent of 1.2 sides and 10 sides that 120 sides prepare Intensity ceramsite sand petroleum fracturing propping agent;After 2 hours, all liq injecting well head is discharged to clean-up pit In, when discharge opeing is weak, utilize 10 side's liquid nitrogen and 6 bubble rod rows going back the perforated interval thoroughly row of returning.
Embodiment two
The polyprotic acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 67% of 31%, and mass concentration is the first of 85% Acid 9%, CHS-5 acidification high temperature inhibiter 1.25%, CDC-10 frozen glue acid thickening agent 0.5%, TWJ Acidifying ferrous stability 1.25%, SZJ-3 acid fracturing cleanup additive 0.25%, clear water 20.75%, with The content summation of upper component is 100%, is added by the above-mentioned raw material weighed to the first acid tank, then passes through Pump truck mixes;
The preposition acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 60% of 31%, CHS-5 acidification high temperature inhibition Agent 1.25%, TWJ is acidified ferrous stability 1.25%, SZJ-3 acid fracturing cleanup additive 0.25%, Clear water 37.25%, the content summation of above component is 100%, adds the above-mentioned raw material weighed to second In acid tank, then mixed by pump truck;
Enforcement acid fracturing:
First inject the FRK-KFJ fracture acidizing control seam agent and 15 of 25 sides to Oil/gas Well target zone simultaneously The preposition acid that side prepares;Then polyprotic acid, the liquid nitrogen of 10 sides and 1.5 sides that 150 sides prepare it are injected simultaneously into CDS-10 frozen glue acid crosslinking agent;Then the liquid nitrogen of 7 sides is reinjected;Then the liquid of 7 sides it is injected simultaneously into The 69MPa's of polyprotic acid, the CDS-10 frozen glue acid crosslinking agent of 0.8 side and 7 sides that nitrogen, 80 sides prepare High-strength ceramsite sand petroleum fracturing propping agent;After 4 hours, all liq injecting well head is discharged to discharge opeing Chi Zhong, when discharge opeing is weak, utilizes 8 side's liquid nitrogen and 4 bubble rod rows going back the perforated interval thoroughly row of returning.
Embodiment three
The polyprotic acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 72% of 31%, and mass concentration is the first of 85% Acid 11%, CHS-5 acidification high temperature inhibiter 1.75%, CDC-10 frozen glue acid thickening agent 0.7%, TWJ Acidifying ferrous stability 1.75%, SZJ-3 acid fracturing cleanup additive 0.35%, clear water 12.45%, with The content summation of upper component is 100%, is added by the above-mentioned raw material weighed to the first acid tank, then passes through Pump truck mixes;
The preposition acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 67% of 31%, CHS-5 acidification high temperature inhibition Agent 1.75%, TWJ is acidified ferrous stability 1.75%, SZJ-3 acid fracturing cleanup additive 0.35%, Clear water 29.15%, the content summation of above component is 100%, adds the above-mentioned raw material weighed to second In acid tank, then mixed by pump truck;
Enforcement acid fracturing:
First inject the FRK-KFJ fracture acidizing control seam agent and 25 of 40 sides to Oil/gas Well target zone simultaneously The preposition acid that side prepares;Then polyprotic acid, the liquid nitrogen of 17 sides and 3 sides that 300 sides prepare it are injected simultaneously into CDS-10 frozen glue acid crosslinking agent;Then the liquid nitrogen of 9 sides is reinjected;Then be injected simultaneously into 9 sides liquid nitrogen, The height of the 69MPa of polyprotic acid, the CDS-10 frozen glue acid crosslinking agent of 1.6 sides and 13 sides that 160 sides prepare Intensity ceramsite sand petroleum fracturing propping agent;After 6 hours, all liq injecting well head is discharged to clean-up pit In, when discharge opeing is weak, utilize 12 side's liquid nitrogen and 8 bubble rod rows going back the perforated interval thoroughly row of returning.
Embodiment four
The polyprotic acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 65% of 31%, and mass concentration is the first of 85% Acid 8%, CHS-5 acidification high temperature inhibiter 1%, CDC-10 frozen glue acid thickening agent 0.4%, TWJ acid Change ferrous stability 1%, SZJ-3 acid fracturing cleanup additive 0.2%, clear water 24.4%, above component Content summation be 100%, the above-mentioned raw material weighed is added to the first acid tank, then is entered by pump truck Row mixing;
The preposition acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 55% of 31%, CHS-5 acidification high temperature inhibition Agent 1%, TWJ is acidified ferrous stability 1%, SZJ-3 acid fracturing cleanup additive 0.2%, clear water 42.8%, The content summation of above component is 100%, is added by the above-mentioned raw material weighed to the second acid tank, then leads to Cross pump truck to mix;
Enforcement acid fracturing:
First inject the FRK-KFJ fracture acidizing control seam agent and 10 of 20 sides to Oil/gas Well target zone simultaneously The preposition acid that side prepares;Then polyprotic acid, the liquid nitrogen of 5 sides and 1 side that 100 sides prepare it are injected simultaneously into CDS-10 frozen glue acid crosslinking agent;Then the liquid nitrogen of 5 sides is reinjected;Then be injected simultaneously into 5 sides liquid nitrogen, The 69MPa's of polyprotic acid, the CDS-10 frozen glue acid crosslinking agent of 0.5 side and 4 sides that 50 sides prepare is high-strength Degree ceramsite sand petroleum fracturing propping agent;After 1 hour, all liq injecting well head is discharged in clean-up pit, When discharge opeing is weak, 5 side's liquid nitrogen and 3 bubble rod rows are utilized to go back the perforated interval thoroughly row of returning.
Embodiment five
The polyprotic acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 80% of 31%, and mass concentration is the first of 85% Acid 12%, CHS-5 acidification high temperature inhibiter 2%, CDC-10 frozen glue acid thickening agent 0.8%, TWJ acid Change ferrous stability 2%, SZJ-3 acid fracturing cleanup additive 0.4%, clear water 2.8%, above component Content summation is 100%, is added by the above-mentioned raw material weighed to the first acid tank, then is carried out by pump truck Mixing;
The preposition acid in sand adjustable slit height acidifying fracturing process is taken in the polynary frozen glue acid of the present invention, by quality hundred Proportion by subtraction weighs following raw material: mass concentration is the technical hydrochloric acid 70% of 31%, CHS-5 acidification high temperature inhibition Agent 2%, TWJ is acidified ferrous stability 2%, SZJ-3 acid fracturing cleanup additive 0.4%, clear water 25.6%, The content summation of above component is 100%, is added by the above-mentioned raw material weighed to the second acid tank, then leads to Cross pump truck to mix;
Enforcement acid fracturing:
First inject the FRK-KFJ fracture acidizing control seam agent and 30 of 50 sides to Oil/gas Well target zone simultaneously The preposition acid that side prepares;Then polyprotic acid, the liquid nitrogen of 20 sides and 4 sides that 400 sides prepare it are injected simultaneously into CDS-10 frozen glue acid crosslinking agent;Then the liquid nitrogen of 10 sides is reinjected;Then the liquid of 10 sides it is injected simultaneously into Polyprotic acid, the CDS-10 frozen glue acid crosslinking agent of 2 sides and the 69MPa of 16 sides that nitrogen, 200 sides prepare High-strength ceramsite sand petroleum fracturing propping agent;After 8 hours, all liq injecting well head is discharged to In liquid pool, when discharge opeing is weak, 15 side's liquid nitrogen and 10 bubble rod rows are utilized to go back the perforated interval thoroughly row of returning.

Claims (1)

  1. Sand adjustable slit height acidifying fracturing process is taken in the most yuan of frozen glue acid, it is characterised in that comprise the following steps:
    Step 1: prepare polyprotic acid
    According to mass percent, weigh following raw material: hydrochloric acid: 65%-80%, formic acid: 8%-12%, Acidification corrosion inhibitor: 1%-2%, thickening agent: 0.4%-0.8%, ferrous stability: 1%-2%, the row of helping Agent: 0.2%-0.4%, clear water: 2.8%-24.4%, the mass percent sum of above each component is 100%, Add raw materials into the first acid tank in above ratio, then mixed by pump truck, obtain polyprotic acid;
    Step 2: prepare preposition acid
    According to mass percent, weigh following raw material: hydrochloric acid: 55%-70%, acidification corrosion inhibitor: 1%-2%, Ferrous stability: 1%-2%, cleanup additive: 0.2%-0.4%, clear water: 25.6%-42.8%, above respectively The mass percent sum of component is 100%, adds raw materials into the second acid tank in above ratio, then Mixed by pump truck, obtain preposition acid;
    Step 3: enforcement acid fracturing:
    First inject control seam agent and 10 side-30 measured step rapid 2 of 20 side-50 sides to Oil/gas Well target zone simultaneously In the preposition acid made;Then polyprotic acid, 5 sides made it are injected simultaneously in 100 side-400 measured step rapid 1 The liquid nitrogen of-20 sides and the cross-linking agent of 1 side-4 side;Then the liquid nitrogen of 5 side-10 sides is reinjected;Then simultaneously Inject polyprotic acid, 0.5 side-2 side made in the liquid nitrogen of 5 side-10 sides, 50 side-200 measured step rapid 1 Cross-linking agent and the ceramsite sand of 4 side-16 sides;After 1-8 hour, all liq row of well head will be injected In clean-up pit, i.e. complete acid fracturing;
    In described step 3, when last discharge opeing, 5 side-15 side's liquid nitrogen and 3-10 root bubble rod row is utilized to exist The perforated interval thoroughly row of returning;
    Described step 1, hydrochloric acid described in 2 be mass concentration be the technical hydrochloric acid of 31%;
    Formic acid described in described step 1 is the formic acid that mass concentration is not less than 85%.
CN201410177405.2A 2014-04-29 2014-04-29 Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid Expired - Fee Related CN103982169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410177405.2A CN103982169B (en) 2014-04-29 2014-04-29 Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410177405.2A CN103982169B (en) 2014-04-29 2014-04-29 Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid

Publications (2)

Publication Number Publication Date
CN103982169A CN103982169A (en) 2014-08-13
CN103982169B true CN103982169B (en) 2016-08-31

Family

ID=51274311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410177405.2A Expired - Fee Related CN103982169B (en) 2014-04-29 2014-04-29 Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid

Country Status (1)

Country Link
CN (1) CN103982169B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114437706A (en) * 2020-11-03 2022-05-06 中国石油化工股份有限公司 Polyhydrogen cross-linked acid liquid and preparation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101265406A (en) * 2008-05-09 2008-09-17 中国石油天然气股份有限公司 Pad acid liquid and pad acid sand fracturing method
CN101353958A (en) * 2007-07-25 2009-01-28 中国石油天然气股份有限公司 Acid fracturing process of oil gas well mining temperature control various mucic acid
CN102392627A (en) * 2011-11-16 2012-03-28 中国石油天然气股份有限公司 Method for improving oil field recovery rate
CN103726819A (en) * 2013-12-27 2014-04-16 中国石油大学(华东) Method of low-temperature gas-assisted coalbed methane fracturing technology

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7584791B2 (en) * 2007-02-08 2009-09-08 Halliburton Energy Services, Inc. Methods for reducing the viscosity of treatment fluids comprising diutan

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101353958A (en) * 2007-07-25 2009-01-28 中国石油天然气股份有限公司 Acid fracturing process of oil gas well mining temperature control various mucic acid
CN101265406A (en) * 2008-05-09 2008-09-17 中国石油天然气股份有限公司 Pad acid liquid and pad acid sand fracturing method
CN102392627A (en) * 2011-11-16 2012-03-28 中国石油天然气股份有限公司 Method for improving oil field recovery rate
CN103726819A (en) * 2013-12-27 2014-04-16 中国石油大学(华东) Method of low-temperature gas-assisted coalbed methane fracturing technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
控缝高压裂技术在瓦窑堡油田的应用研究;闫海建等;《中国科技信息》;20120531;41-42页 *

Also Published As

Publication number Publication date
CN103982169A (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN106050213B (en) A kind of sandstone reservoir low damage distributary acid method
CN102757778B (en) Fracturing fluid capable of resisting high salinity water quality
CN109751029B (en) Deep shale gas fracturing method
CN103074049B (en) Fracturing fluid prepared by recovery waste water of crude oil and preparation method of fracturing fluid
CN102996107A (en) Fracturing process for online continuous preparation based on liquid polymer
CN104031625A (en) Blocking remover used for hypotonic inhomogeneous sandstone reservoir and using method of blocking remover
CN103666437A (en) Fracturing fluid
CN103321606A (en) Low-permeability fractured reservoir oil well water-plugging and screening method
CN106479477B (en) Encapsulated solid acid and preparation and application thereof
CN105683330A (en) Carbonate-based slurry fracturing with solid acid for unconventional reservoir
CN103953324B (en) Polynary turn to acid adjustable slit height acidifying fracturing process
CN102926701B (en) A kind of mixed matching water-plugging technology method continuously
CN104312570A (en) Low-corrosion chemical themogenic pressurizing gel breaker and preparation method thereof
WO2015074588A1 (en) Zirconium dispersed-particle gel combination flooding system and preparation method thereof
CN105086990A (en) Composite acid fracturing working fluid and preparation method thereof
CN102757776B (en) Low-temperature rubber crushing accelerator for well fracturing
CN105860951A (en) Acidic polymer fracturing fluid and preparation method thereof
CN103982169B (en) Sand adjustable slit height acidifying fracturing process is taken in polynary frozen glue acid
CN103468237A (en) Clean fracturing fluid and preparation method thereof
CN102352235A (en) Crosslinked acid fracturing fluid and preparation method thereof
US20200362231A1 (en) Low-phosphorus and non-phosphorus gelled hydrocarbon well treatment fluids
CN113150764A (en) Solid acid acidized fracturing fluid for tight sandstone, preparation method thereof and fracturing method
RU2494246C1 (en) Treatment method of bore-hole zone
RU2490444C1 (en) Method for near well-bore treatment with acid
CN110791279A (en) High-viscosity strong-corrosion acid liquor system for low-permeability sandstone oil reservoir

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20170429

CF01 Termination of patent right due to non-payment of annual fee