CN103982078A - Power transmission line first-aid repair tower base - Google Patents

Power transmission line first-aid repair tower base Download PDF

Info

Publication number
CN103982078A
CN103982078A CN201410224768.7A CN201410224768A CN103982078A CN 103982078 A CN103982078 A CN 103982078A CN 201410224768 A CN201410224768 A CN 201410224768A CN 103982078 A CN103982078 A CN 103982078A
Authority
CN
China
Prior art keywords
transmission line
tower base
emergent repairing
repairing tower
basis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410224768.7A
Other languages
Chinese (zh)
Other versions
CN103982078B (en
Inventor
胡晓光
杨靖波
韩军科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Shanxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201410224768.7A priority Critical patent/CN103982078B/en
Publication of CN103982078A publication Critical patent/CN103982078A/en
Application granted granted Critical
Publication of CN103982078B publication Critical patent/CN103982078B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a power transmission line first-aid repair tower base. The power transmission line first-aid repair tower base comprises a foundation arranged horizontally; the top surface and the bottom surface of the foundation are parallel to each other and connected together by use of a vertically arranged upright column. The power transmission line first-aid repair tower base is improved so that a folding plate is arranged on the top surface of the foundation, matched horizontal pin holes are formed in the folding plate and at a side edge of the top surface of the foundation, and a shaft pin is arranged in the pin holes. Compared with the prior art, the power transmission line first-aid repair tower base has the advantages that the overall structure is simplified, the number of components is reduced and the reliability of the overall structure is improved, and further has better bearing capacity.

Description

A kind of transmission line of electricity emergent repairing tower base
Technical field
The present invention relates to a kind of emergent repairing tower base, specifically relate to a kind of transmission line of electricity emergent repairing tower base.
Background technology
Electric power is the important energy source involving the interests of the state and the people, and has the characteristic of instantaneity, once transmission line of electricity destroys, transmission of electricity is interrupted, and can cause huge economic loss and serious social influence.When transmission tower, under extreme weather, collapse occurs, or circuit needs transformation, or in the situations such as line crossing area roadbuilding construction, for reducing economic loss, need to pass through temporary support structure, emergent repairing tower, supports transmission line of electricity, guarantee to restore electricity as early as possible at short notice or keep uninterrupted power supply, as shown in Fig. 1 signal.In order to meet, orographic condition is changeable, differing heights and short requirement of engineering time, and emergent repairing tower adopts the aluminum alloy material of lighter weight more, and component dies blocking can transport the scene of falling tower rapid-assembling to fast with assurance equipment.Conventionally, on ground, place after basis and base, at the tower body of ground level assembling certain altitude, and itself and base are connected and fixed, then establish, then fix by bracing wire.Therefore, this structure, generally by the form of pivoting support, realizes the tower body of level assembling and establishes on basis.
Transmission of electricity emergent repairing tower is conventionally highly very high, generally up to tens meters, even may reach more than 100 meter.Modular tower body connects continuously by bolt, until meet requirement for height, and by bracing wire, emergent repairing tower is fixed.This long fine texture bears larger pressure load, requires emergent repairing tower to have enough bending resistance geometric attributes, possesses large as far as possible Critical Load, just can possess large as far as possible supporting capacity.
The emergent repairing tower base adopting at present all belongs to pivoting support substantially, in the lower end of emergent repairing tower, is similar to hinged constraint.The building block number of this kind of base is more, and binding effect is bad, affects the supporting capacity of emergent repairing tower integral body under Structure Under Axial Compression.
Summary of the invention
In order to address the above problem, the invention provides a kind of transmission line of electricity emergent repairing tower base, simplified overall structure, reduced number of components, improved integrally-built reliability, there are more excellent load-carrying properties.
The object of the invention is to adopt following technical proposals to realize:
A kind of transmission line of electricity emergent repairing tower base provided by the invention, comprise horizontally disposed basic 2, described basic 2 end face is parallel to each other with bottom surface and the column by vertical setting is connected, four jiaos of described foundation bed are provided with fixing hole, its improvements are: described basic 2 end faces are provided with flap 1, described flap 1 are provided with the side of basic 2 end faces the horizontal pin-and-hole matching, and pivot pin 3 is set in described pin-and-hole.
Wherein, described flap 1 around pivot pin 3 rotate and with the angle that basic 2 end faces form be 0 °~90 °.
Wherein, described basic 2 end face and bottom surface are square, and the area of described basic 2 end faces is less than the area of bottom surface.
Wherein, remaining three sides of described basic 2 end faces are provided with vertical circular hole.
Wherein, described flap 1 are provided with the vertical circular hole corresponding with basic 2 end faces.
Wherein, in the vertical circular hole of described flap 1 and basic 2 end faces, be provided with bolt 5.
Wherein, described flap 1 are provided with pedestal and are connected with emergent repairing tower tower body 4.
Wherein, described pedestal is respectively equipped with the mutual vertical through hole mating with emergent repairing tower tower body 4, in described vertical through hole, is provided with bolt.
Wherein, prepare described submount material and be by weight percentage, Si :≤0.38%, Cu :≤0.12%, Mg:3.2~4.1%, Zn :≤0.27%, Mn:0.18~0.66%, Ti :≤0.14%, Cr:0.05~0.23%, Fe:0.000~0.400%, surplus is Al.
Wherein, prepare described submount material and be by weight percentage, Si:0.35%, Cu:0.10%, Mg:3.8%, Zn:0.22%, Mn:0.47%, Ti:0.08%, Cr:0.15%, Fe:0.250%, surplus is Al.
Compared with the prior art, the beneficial effect that the present invention reaches is:
1, not affecting under the prerequisite of function, simplified overall structure.Upper undersetting and the ribs structure of comparing articulated structure, structure provided by the invention is directly reduced to tabular, and ball pivot is reduced to pivot pin, processing cost, architecture quality and reliability are all significantly improved.
2, reduce number of components, improved integrally-built reliability.Basis provided by the invention adds basic function in conjunction with having substituted traditional hinged undersetting, has reduced number of components.
3, the structure lower end after having assembled is constrained to fixed end constraint, for long thin bearing structure, has more excellent load-carrying properties.
4, adopt the height of aspect ratio traditional structure carrying of emergent repairing tower of structural bearing provided by the invention higher.
5, the material mixture ratio adopting, sturdy and durable, improve the load-carrying properties of base, and extended application life.
Accompanying drawing explanation
Fig. 1 is: the application schematic diagram of emergent repairing tower;
Fig. 2 is: the structural representation under transmission line of electricity emergent repairing tower base open mode provided by the invention;
Fig. 3 is: the structural representation under transmission line of electricity emergent repairing tower base closure state provided by the invention;
Wherein: 1, flap; 2, basis; 3, pivot pin; 4, tower body; 5, bolt.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in further detail.
It is example that the present embodiment be take transmission line of electricity emergent repairing tower base, and as shown in Figure 2 to Figure 3, the transmission line of electricity emergent repairing tower base point that the embodiment of the present invention provides comprises: flap 1, basis 2, pivot pin 3, tower body 4, bolt 5.Basic 2 levels are arranged on to ground, fixing hole by four jiaos of basic 2 bottom surfaces is fixed, after being docked with the pin-and-hole of basic 2 end faces, insert flap 1 pivot pin 3, open flap 1, make flap 1 and the angle of basic 2 end faces remain on 90 °, after being docked with the pedestal of flap 1, the emergent repairing tower tower body 4 of horizontal positioned is bolted to connection, establish emergent repairing tower tower body 4, flap 1 rotate around pivot pin 3 until fit with basic 2 end faces, now flap 1 are 0 ° with the angle of basic 2 end faces, erection bolt 5 fastening in the corresponding through hole of flap 1 and basic 2 end faces, so far emergent repairing tower tower body 4 is established on base.
Emergent repairing tower base folding paper syndeton provided by the invention is with the difference that tradition is articulated and connected, folding paper structure meet establish and the functional requirement of the tower body that fell in, greatly simplified the form of structure of parts, and, reduce the quantity of parts, improved the unfailing performance of structure.On the other hand, after emergent repairing tower has been established, the lower end the way of restraint of whole tower structure is different, traditional be articulated and connected to be similar to be articulated and connected, and folding paper syndeton provided by the invention is fixed by connecting bolt, for fixed constraint connects, for the feature of long fine texture pressure-bearing, folding paper syndeton provided by the invention is more conducive to improve integrally-built pressure-bearing critical load.
Application Euler's formula represents the critical load of elongated compressed structure:
Fcr = π 2 EI ( μ 1 ) 2
In formula, π is constant, and E is relevant to material properties, and I is the geometric attribute relevant to tower body cross section, the height that l is tower, and μ is the length factor relevant to end restraint condition.
Under material and the measure-alike condition of emergent repairing tower, emergent repairing tower top is fixed by bracing wire, belongs to hinged.Traditional emergent repairing tower tower body lower hinge bearing is hinged, μ value 1.0; And folding paper of the present invention connects, emergent repairing tower tower body bottom and base are clamped, μ value 0.7; Hence one can see that, and the traditional base of critical bearing capacity ratio of the emergent repairing tower base that the embodiment of the present invention provides has improved about 2 times.
Wherein, preparation submount material be by weight percentage, Si :≤0.38%, Cu :≤0.12%, Mg:3.2~4.1%, Zn :≤0.27%, Mn:0.18~0.66%, Ti :≤0.14%, Cr:0.05~0.23%, Fe:0.000~0.400%, surplus is Al.
In the present embodiment, preparing submount material is by weight percentage, Si:0.35%, and Cu:0.10%, Mg:3.8%, Zn:0.22%, Mn:0.47%, Ti:0.08%, Cr:0.15%, Fe:0.250%, surplus is Al.Adopt the base of above-mentioned material durable, load-carrying properties have improved 3.8% than common product, and also greatly extend application life.
Finally should be noted that: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although the present invention is had been described in detail with reference to above-described embodiment, those of ordinary skill in the field are to be understood that: still can modify or be equal to replacement the specific embodiment of the present invention, and do not depart from any modification of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of claim scope of the present invention.

Claims (10)

1. a transmission line of electricity emergent repairing tower base, comprise horizontally disposed basis (2), the end face on described basis (2) is parallel to each other with bottom surface and the column by vertical setting is connected, it is characterized in that: described basis (2) end face is provided with flap (1), described flap (1) are provided with the side of basis (2) end face the horizontal pin-and-hole matching, and pivot pin (3) is set in described pin-and-hole.
2. transmission line of electricity emergent repairing tower base as claimed in claim 1, is characterized in that, described flap (1) around pivot pin (3) rotate and with the angle that basis (2) end face forms be 0 °~90 °.
3. transmission line of electricity emergent repairing tower base as claimed in claim 2, is characterized in that, end face and the bottom surface of described basis (2) are square, and the area of described basis (2) end face is less than the area of bottom surface.
4. transmission line of electricity emergent repairing tower base as claimed in claim 3, is characterized in that, end face remaining three sides in described basis (2) are provided with vertical circular hole.
5. transmission line of electricity emergent repairing tower base as claimed in claim 4, is characterized in that, described flap (1) are provided with the vertical circular hole corresponding with basis (2) end face.
6. transmission line of electricity emergent repairing tower base as claimed in claim 5, is characterized in that, in the vertical circular hole of described flap (1) and basis (2) end face, is provided with bolt (5).
7. transmission line of electricity emergent repairing tower base as claimed in claim 1, is characterized in that, described flap (1) are provided with pedestal and are connected with emergent repairing tower tower body (4).
8. transmission line of electricity emergent repairing tower base as claimed in claim 7, is characterized in that, described pedestal is respectively equipped with the mutual vertical through hole mating with emergent repairing tower tower body (4), in described vertical through hole, is provided with bolt.
9. transmission line of electricity emergent repairing tower base as claimed in claim 1, it is characterized in that, prepare described submount material and be by weight percentage, Si :≤0.38%, Cu :≤0.12%, Mg:3.2~4.1%, Zn :≤0.27%, Mn:0.18~0.66%, Ti :≤0.14%, Cr:0.05~0.23%, Fe:0.000~0.400%, surplus is Al.
10. transmission line of electricity emergent repairing tower base as claimed in claim 9, it is characterized in that, prepare described submount material and be by weight percentage, Si:0.35%, Cu:0.10%, Mg:3.8%, Zn:0.22%, Mn:0.47%, Ti:0.08%, Cr:0.15%, Fe:0.250%, surplus is Al.
CN201410224768.7A 2014-05-26 2014-05-26 A kind of transmission line of electricity emergent repairing tower base Active CN103982078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410224768.7A CN103982078B (en) 2014-05-26 2014-05-26 A kind of transmission line of electricity emergent repairing tower base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410224768.7A CN103982078B (en) 2014-05-26 2014-05-26 A kind of transmission line of electricity emergent repairing tower base

Publications (2)

Publication Number Publication Date
CN103982078A true CN103982078A (en) 2014-08-13
CN103982078B CN103982078B (en) 2016-05-25

Family

ID=51274225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410224768.7A Active CN103982078B (en) 2014-05-26 2014-05-26 A kind of transmission line of electricity emergent repairing tower base

Country Status (1)

Country Link
CN (1) CN103982078B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6216414B1 (en) * 1998-02-27 2001-04-17 Valmont-Lexington Corp Hinge base construction for light poles
CN2705536Y (en) * 2004-04-27 2005-06-22 刘荣波 Hinged communication rod
CN201501761U (en) * 2009-06-26 2010-06-09 无锡市卡迪诺风电科技有限公司 Mounting mechanism for hydraulic system of wind-driven generator
CA2736718A1 (en) * 2010-04-09 2011-10-09 Electro Mechanical Industries, Inc. Tower structure
CN102661077A (en) * 2012-05-10 2012-09-12 深圳市泰玛风光能源科技有限公司 Method for erecting fulcrum bar

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6216414B1 (en) * 1998-02-27 2001-04-17 Valmont-Lexington Corp Hinge base construction for light poles
CN2705536Y (en) * 2004-04-27 2005-06-22 刘荣波 Hinged communication rod
CN201501761U (en) * 2009-06-26 2010-06-09 无锡市卡迪诺风电科技有限公司 Mounting mechanism for hydraulic system of wind-driven generator
CA2736718A1 (en) * 2010-04-09 2011-10-09 Electro Mechanical Industries, Inc. Tower structure
CN102661077A (en) * 2012-05-10 2012-09-12 深圳市泰玛风光能源科技有限公司 Method for erecting fulcrum bar

Also Published As

Publication number Publication date
CN103982078B (en) 2016-05-25

Similar Documents

Publication Publication Date Title
CN206230200U (en) Slab element welding reversely deformed jig frame
AT12037U1 (en) WIND TURBINE
CN203856263U (en) Repair tower base for power transmission lines
CN103967317B (en) A kind of transmission line of electricity emergent repairing tower tower body
CN103982078A (en) Power transmission line first-aid repair tower base
CN106294917A (en) A kind of adjustment method of the column foot plate of power transmission tower
CN201113230Y (en) Folding field variable discharging lightning rod
CN204645793U (en) A kind of emergent repairing tower of transmission line of electricity
CN106448453A (en) Guideboard capable of achieving turning pressure relief
CN205046911U (en) Triangle -shaped section steel pylons
CN203959699U (en) The compound type attached-frame device of tower crane
CN110847402A (en) Workshop steel construction takes precautions against earthquakes
CN206174583U (en) Integration ready -package integrated communication tower
CN214570298U (en) Wind power hoisting tower crane truss type chassis suitable for all-terrain weak earth pressure anti-inclination
CN102745602B (en) Double-layer vertically-crossed steel beam arrangement structure of internally climbing tower crane
CN204850645U (en) Special high -tension transmission tower
DK202170441A1 (en) Transition piece for wind turbine tower
CN203193187U (en) Simple combined tower type high-altitude insulation work platform
CN112551396A (en) Wind power hoisting tower crane truss type chassis suitable for all-terrain weak earth pressure anti-inclination
CN206491022U (en) It is a kind of that cutting mill sunshade easy to adjust is installed
CN203983987U (en) ± 800kV ultra high voltage double tower suspension type DC filter capacitors device
CN206076822U (en) A kind of loop-network switch cabinet
CN207553718U (en) A kind of wind resistance electric power tower
CN208684287U (en) A kind of efficiently big stroke jacking apparatus
CN105064906B (en) Plane working ladder and plane maintenance device adopting same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160219

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: China Electric Power Research Institute

Applicant after: STATE GRID SHANXI ELECTRIC POWER CO., LTD.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model