CN103981994B - A kind of arched ceiling structure - Google Patents

A kind of arched ceiling structure Download PDF

Info

Publication number
CN103981994B
CN103981994B CN201410222461.3A CN201410222461A CN103981994B CN 103981994 B CN103981994 B CN 103981994B CN 201410222461 A CN201410222461 A CN 201410222461A CN 103981994 B CN103981994 B CN 103981994B
Authority
CN
China
Prior art keywords
draconis
framework
ceiling structure
steel construction
arched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410222461.3A
Other languages
Chinese (zh)
Other versions
CN103981994A (en
Inventor
徐剑锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Design group Limited by Share Ltd
Original Assignee
SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd filed Critical SUZHOU INSTITUTE OF ARCHITECTURAL DESIGN Co Ltd
Priority to CN201410222461.3A priority Critical patent/CN103981994B/en
Publication of CN103981994A publication Critical patent/CN103981994A/en
Application granted granted Critical
Publication of CN103981994B publication Critical patent/CN103981994B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

<b>the invention discloses a kind of arched ceiling structure, described arched ceiling structure include steel construction conversion layer (</b><b>1</b><b>), Os Draconis suspended ceiling framework system (</b><b>2</b><b>), illuminator (</b><b>3</b><b>) and blank arch framework (</b><b>4</b><b>), described steel construction conversion layer (</b><b>1</b><b>) be connected with top of building, described Os Draconis suspended ceiling framework system (</b><b>2</b><b>) upper end and described steel construction conversion layer (</b><b>1</b><b>) fixing connection, described illuminator (</b><b>3</b><b>) be fixedly installed on described Os Draconis suspended ceiling framework system (</b><b>2</b><b>) lower section, described blank arch framework (</b><b>4</b><b>) be arranged on described illuminator (</b><b>3</b><b>) lower section。Arched ceiling structure provided by the invention, simple in construction, brief attractive in appearance, steel construction consumption can be reduced, reduce trimming cost。</b>

Description

A kind of arched ceiling structure
Technical field
The present invention relates to building decoration technology field, particularly to a kind of arched ceiling structure。
Background technology
At performance center or performance hall, arched ceiling is set, not only attractive in appearance but also facilitate Background control lighting effects, if using merely generally steel construction mode to implement, package decoration is carried out again through decoration, so whole arch top just seems stiff, and steel using amount is relatively big, increases trimming cost。
Summary of the invention
It is an object of the present invention to provide a kind of arched ceiling structure, its simple in construction, cost is low, both meets the user demand playing occasion, can reduce again trimming cost。
Based on the problems referred to above, present invention provide the technical scheme that
A kind of arched ceiling structure, it is characterised in that: described arched ceiling structure includes steel construction conversion layer, Os Draconis suspended ceiling framework system, illuminator and blank arch framework;
Described steel construction conversion layer is connected with building ceiling, and described steel construction conversion layer is fenestral fabric;
Described Os Draconis suspended ceiling framework system upper end is fixing with described steel construction conversion layer to be connected, and it includes several suspension rods and Os Draconis suspended ceiling framework structure, and described Os Draconis suspended ceiling framework structure is hung and is located on described suspension rod;
Described illuminator is fixedly installed on below described Os Draconis suspended ceiling framework system, and it includes several lighting units, and described lighting unit includes lampshade and light source, and described light source is arranged in described lampshade;
Described blank arch framework is arranged on the lower section of described illuminator, and it is latticed domes, and the grid hollow out of described domes is arranged, and described lighting unit is positioned at described grid。
Further, described steel construction conversion layer includes the angle steel of laterally arrangement and longitudinally arrangement。
Further, described suspension rod is screw thread suspension rod。
Further, described Os Draconis ceiling structure is lightgage steel joist, it arranges several and has contact with, described in have contact with and be bolted on described downrod lower end。
Further, described lampshade includes cover plate and cover body, described cover plate passes through rivet interlacement in described Os Draconis suspended ceiling framework structure, the cross section of described cover plate is inverted U, described cover plate is arranged around hook, described cover body top arranges barb, and described barb is overlapped on described hook, and described cover body bottom is undercut grooved。
Further, described lampshade is aluminium material。
Further, described light source is Surface-mount LED lamp, and it is arranged on described cover body bottom, described light source be arranged below light transmission piece。
Further, described blank arch framework is aluminium section bar。
Further, the grid of described domes assumes diamond in shape。
The invention have the advantage that
(1) present invention adopts the mode of hierarchical design, replace all-in-one-piece steel construction arch top, by the arch top stress check calculation of steel construction for by arrange steel construction conversion layer and under steel joist suspended ceiling system stress is set, then aluminium profile blank arch framework is adopted, simple in construction, greatly reduce the consumption of steel construction, reduce trimming cost;
(2) present invention utilizes aluminium section bar facing, effectively improves the precision of technique, improves persistency and stability that end face uses, effectively alleviates the weight of whole decoration element;
(3) adopt technical scheme, arched ceiling is used for various performance center or concert hall, brief attractive in appearance, good lighting effects can be obtained;
(4) present invention on-the-spot Fast Installation easy rapidly after can carrying out producer's processing, be effectively increased installation effectiveness and construction period。
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, below the accompanying drawing used required during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings。
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is the structural representation of lighting unit of the present invention;
The structural representation of Fig. 3 blank arch framework of the present invention。
Wherein: 1, steel construction conversion layer;2, Os Draconis suspended ceiling framework system;21, suspension rod;22, Os Draconis suspended ceiling framework structure;3, illuminator;31, lampshade;311, cover plate;312, cover body;313, hook;314, barb;32, light source;33, light transmission piece;4, blank arch framework。
Detailed description of the invention
Below in conjunction with specific embodiment, such scheme is described further。Should be understood that these embodiments to be an illustration for the present invention and be not limited to restriction the scope of the present invention。The implementation condition adopted in embodiment can do further adjustment according to the condition of concrete producer, and not marked implementation condition is generally the condition in normal experiment。
Referring to Fig. 1, for the structural representation of the embodiment of a kind of arched ceiling structure of the present invention, this arched ceiling includes steel construction conversion layer 1, Os Draconis suspended ceiling framework system 2, illuminator 3 and blank arch framework 4。
Wherein, steel construction conversion layer 1 is connected with top of building, and steel construction conversion layer 1 is latticed steel frame construction, and it includes the angle steel of laterally arrangement and longitudinally arrangement, adopts latticed steel frame construction to arched ceiling structure stress, keeps structural stability。
Referring to Fig. 1, Os Draconis suspended ceiling framework system 2 includes several suspension rods 21 and Os Draconis suspended ceiling framework structure 22, suspension rod 21 is screw thread suspension rod, the upper end of suspension rod 21 is fixing with steel construction conversion layer 1 to be connected, Os Draconis suspended ceiling framework structure 22 hangs the lower end being located at suspension rod 21, Os Draconis suspended ceiling framework structure 22 is lightgage steel joist, it arranges several and has contact with, and this has contact with, by bolt, Os Draconis suspended ceiling framework structure 22 is fixed on suspension rod 21 lower end。
Referring to Fig. 1 and Fig. 2, illuminator 3 is fixedly installed on below Os Draconis suspended ceiling framework system 2, and it includes several lighting units;Lighting unit includes lampshade 31 and light source 32, and wherein, lampshade 31 includes cover plate 311 and cover body 312, and cover plate 311 is fixedly connected in Os Draconis suspended ceiling framework structure 22 by rivet, and the cross section of cover plate 311 is inverted U, cover plate 311 be arranged around hook 313;The top of cover body 312 arranges barb 314, and this barb 314 is overlapped on the hook 313 of cover plate 311, and the bottom of cover body 312 is undercut grooved;Light source 32 is Surface-mount LED lamp, and this Surface-mount LED lamp is arranged in the groove of cover body 312 bottom, in order to reach lighting effects more preferably, also sets up light transmission piece 33 below Surface-mount LED lamp。Lampshade 31 adopts aluminium material to make。
Referring to Fig. 1 and Fig. 3, blank arch framework 4 is arranged on the lower section of illuminator 3, it is latticed domes, wherein, grid is set to the rhombus of hollow out, and lighting unit is arranged in grid, so that blank arch framework light and flexible more, this blank arch framework adopts light metal material to make, and is wherein preferably aluminium section bar。
In sum, the method have the advantages that
(1) present invention adopts the mode of hierarchical design, replace all-in-one-piece steel construction arch top, by the arch top stress check calculation of steel construction for by arrange steel construction conversion layer and under steel joist suspended ceiling system stress is set, then aluminium profile blank arch framework is adopted, simple in construction, greatly reduce the consumption of steel construction, reduce trimming cost;
(2) present invention utilizes aluminium section bar facing, effectively improves the precision of technique, improves persistency and stability that end face uses, effectively alleviates the weight of whole decoration element;
(3) adopt technical scheme, arched ceiling is used for various performance center or concert hall, brief attractive in appearance, good lighting effects can be obtained;
(4) present invention on-the-spot Fast Installation easy rapidly after can carrying out producer's processing, be effectively increased installation effectiveness and construction period。
Examples detailed above only for technology design and the feature of the present invention are described, its object is to allow person skilled in the art be able to understand present disclosure and implement according to this, can not limit the scope of the invention with this。All equivalent transformations done according to spirit of the invention or modification, all should be encompassed within protection scope of the present invention。

Claims (8)

1. an arched ceiling structure, it is characterised in that: described arched ceiling structure includes steel construction conversion layer (1), Os Draconis suspended ceiling framework system (2), illuminator (3) and blank arch framework (4);
Described steel construction conversion layer (1) is connected with top of building, and described steel construction conversion layer (1) is fenestral fabric;
Described Os Draconis suspended ceiling framework system (2) upper end is fixing with described steel construction conversion layer (1) to be connected, it includes several suspension rods (21) and Os Draconis suspended ceiling framework structure (22), and described Os Draconis suspended ceiling framework structure (22) is hung and is located on described suspension rod (21);
Described illuminator (3) is fixedly installed on described Os Draconis suspended ceiling framework system (2) lower section, it includes several lighting units, described lighting unit includes lampshade (31) and light source (32), described light source (32) is arranged in described lampshade (31), described lampshade (31) includes cover plate (311) and cover body (312), described cover plate (311) by rivet interlacement on described Os Draconis suspended ceiling framework structure (22), the cross section of described cover plate (311) is inverted U, described cover plate (311) is arranged around hook (313), described cover body (312) top arranges barb (314), described barb (314) is overlapped on described hook (313), described cover body (312) bottom is undercut grooved;
Described blank arch framework (4) is arranged on the lower section of described illuminator (3), and it is latticed domes, and the grid hollow out of described domes is arranged, and described lighting unit is positioned at described grid。
2. arched ceiling structure according to claim 1, it is characterised in that: described steel construction conversion layer (1) includes the angle steel of laterally arrangement and longitudinally arrangement。
3. arched ceiling structure according to claim 2, it is characterised in that: described suspension rod (21) is screw thread suspension rod。
4. arched ceiling structure according to claim 3, it is characterised in that: described Os Draconis ceiling structure (22) is lightgage steel joist, it arranges several and has contact with, described in have contact with and be bolted on described suspension rod (21) lower end。
5. arched ceiling structure according to claim 1, it is characterised in that: described lampshade (31) is aluminium material。
6. arched ceiling structure according to claim 5, it is characterised in that: described light source (32) is Surface-mount LED lamp, and it is arranged on described cover body bottom, described light source (32) be arranged below light transmission piece (33)。
7. arched ceiling structure according to claim 6, it is characterised in that: described blank arch framework (4) is aluminium section bar。
8. arched ceiling structure according to claim 7, it is characterised in that: the grid of described blank arch framework (4) assumes diamond in shape。
CN201410222461.3A 2014-05-26 2014-05-26 A kind of arched ceiling structure Active CN103981994B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410222461.3A CN103981994B (en) 2014-05-26 2014-05-26 A kind of arched ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410222461.3A CN103981994B (en) 2014-05-26 2014-05-26 A kind of arched ceiling structure

Publications (2)

Publication Number Publication Date
CN103981994A CN103981994A (en) 2014-08-13
CN103981994B true CN103981994B (en) 2016-06-22

Family

ID=51274142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410222461.3A Active CN103981994B (en) 2014-05-26 2014-05-26 A kind of arched ceiling structure

Country Status (1)

Country Link
CN (1) CN103981994B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763090B (en) * 2015-03-18 2017-12-26 上海市建筑装饰工程集团有限公司 The netted furred ceiling of large span and its installation method
CN104763091B (en) * 2015-03-18 2017-07-07 上海市建筑装饰工程集团有限公司 The netted ceiling system of large span and its installation method
CN106812237A (en) * 2017-02-21 2017-06-09 东莞市鹏翼自动化科技有限公司 A kind of honeycomb fashion lighting ceiling
CN107044186B (en) * 2017-06-13 2023-05-12 四川盛邦建设股份有限公司 Suspended ceiling system and entrance structure
CN113089836B (en) * 2021-03-25 2022-08-23 苏州金螳螂建筑装饰股份有限公司 Metal otter board domes of assembled superelevation corridor
CN113338516B (en) * 2021-05-17 2022-03-11 浙江众安建设集团有限公司 Novel metal suspended ceiling structure of mountain type roof and installation method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2068115U (en) * 1990-01-24 1990-12-26 北京市建筑轻钢结构厂 Acoustic hanging network body
WO2003008728A1 (en) * 2001-07-19 2003-01-30 Armstrong World Industries, Inc. Decorative structure and ceiling system
CN201050130Y (en) * 2007-04-18 2008-04-23 北新集团建材股份有限公司 Openable decoration belt dedicated suspension member and its ceiling system
CN101575892A (en) * 2009-03-26 2009-11-11 北京市建筑工程装饰有限公司 Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof
CN201416816Y (en) * 2009-03-23 2010-03-03 徐蕴慧 Simply-structured rider keel lamp
CN201649404U (en) * 2010-03-19 2010-11-24 陈晓锋 Hanging piece type ceiling with decorative and luminous effects
CN102493616A (en) * 2011-11-16 2012-06-13 广州市设计院 Arc cold radiation ceiling integrated device with high-efficiency lighting structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2068115U (en) * 1990-01-24 1990-12-26 北京市建筑轻钢结构厂 Acoustic hanging network body
WO2003008728A1 (en) * 2001-07-19 2003-01-30 Armstrong World Industries, Inc. Decorative structure and ceiling system
CN201050130Y (en) * 2007-04-18 2008-04-23 北新集团建材股份有限公司 Openable decoration belt dedicated suspension member and its ceiling system
CN201416816Y (en) * 2009-03-23 2010-03-03 徐蕴慧 Simply-structured rider keel lamp
CN101575892A (en) * 2009-03-26 2009-11-11 北京市建筑工程装饰有限公司 Large-area lower edge nested aluminum plate curved hung ceiling with high punching rate and construction method thereof
CN201649404U (en) * 2010-03-19 2010-11-24 陈晓锋 Hanging piece type ceiling with decorative and luminous effects
CN102493616A (en) * 2011-11-16 2012-06-13 广州市设计院 Arc cold radiation ceiling integrated device with high-efficiency lighting structure

Also Published As

Publication number Publication date
CN103981994A (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN103981994B (en) A kind of arched ceiling structure
CN104088391A (en) Hanging piece used for low-rise high-integration suspended ceiling
CN201087496Y (en) Keel structure of ceiling lamp strap
CN205174273U (en) Jib formula surface fluorescent fixture system
CN109235739B (en) Flower petal suspension modeling large-span suspended ceiling
CN202884268U (en) Bag type air pipe support hanging bracket in long-span space
CN203270906U (en) Buckle type aluminum section staggered-layer suspended ceiling structure
CN206496094U (en) A kind of green energy conservation small pipe-line hanger system
CN206396974U (en) A kind of light bar keel
CN104763091A (en) Large-span net ceiling system and mounting method thereof
CN101775866B (en) Suspended ceiling
CN211523732U (en) Be applied to subway station and pre-buried spout adjustable fitment gallows of being connected
CN203626108U (en) Double modeling ceiling with inclined faces
CN205153253U (en) Ceiling furred ceiling mount
CN203684489U (en) Multi-point adjusting disc
CN207146315U (en) A kind of mounting structure of light fixture
CN206607739U (en) A kind of V-type hang type furred ceiling
CN104675001B (en) A kind of furred ceiling mounts Os Draconis
CN204254435U (en) A kind of mounting structure of LED wall wash lamp
CN211779419U (en) Palm pipeline fixing frame
CN208817317U (en) A kind of flexible street lamp mounting structure
CN104631729B (en) Breakage-proof structure of gypsum board ceiling lamp hole
CN207553418U (en) A kind of assembled Integral ceiling hook makes system
CN203940324U (en) A kind of suspension desk lamp
CN203514609U (en) Ceiling stone pendant and ceiling stone hanging system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9

Patentee after: Design group Limited by Share Ltd

Address before: 215021 Suzhou Industrial Park, Jiangsu Xinghai street, No. 9

Patentee before: Suzhou Institute of Architectural Design Co., Ltd.

CP01 Change in the name or title of a patent holder