CN103971173B - 主动配电网变电站容量控制方法与系统 - Google Patents
主动配电网变电站容量控制方法与系统 Download PDFInfo
- Publication number
- CN103971173B CN103971173B CN201410175716.5A CN201410175716A CN103971173B CN 103971173 B CN103971173 B CN 103971173B CN 201410175716 A CN201410175716 A CN 201410175716A CN 103971173 B CN103971173 B CN 103971173B
- Authority
- CN
- China
- Prior art keywords
- load
- power network
- power
- planning
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410175716.5A CN103971173B (zh) | 2014-04-28 | 2014-04-28 | 主动配电网变电站容量控制方法与系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410175716.5A CN103971173B (zh) | 2014-04-28 | 2014-04-28 | 主动配电网变电站容量控制方法与系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103971173A CN103971173A (zh) | 2014-08-06 |
CN103971173B true CN103971173B (zh) | 2017-06-16 |
Family
ID=51240638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410175716.5A Active CN103971173B (zh) | 2014-04-28 | 2014-04-28 | 主动配电网变电站容量控制方法与系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103971173B (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104239966B (zh) * | 2014-08-28 | 2017-04-12 | 广东电网公司电力科学研究院 | 一种主动配电网基于用电成本差异化的运营方法 |
CN104680340A (zh) * | 2015-03-30 | 2015-06-03 | 国家电网公司 | 配电网规划方法及系统 |
CN105139291B (zh) * | 2015-09-11 | 2018-07-03 | 广东电网有限责任公司电网规划研究中心 | 一种含分布式电源配电网设备利用率的计算方法 |
CN107977772A (zh) * | 2017-11-09 | 2018-05-01 | 国网山东省电力公司青岛供电公司 | 一种考虑分布式能源不确定性的配电网规划方法及系统 |
CN107767074B (zh) * | 2017-11-09 | 2021-08-10 | 东南大学 | 一种计及综合需求响应资源的能源枢纽规划方法 |
CN109624781B (zh) * | 2018-12-11 | 2021-02-12 | 华北电力大学 | 一种基于电动汽车能量响应能力预测的储能容量配置方法 |
CN109658285A (zh) * | 2018-12-21 | 2019-04-19 | 深圳供电局有限公司 | 一种区域配电网变电容量需求的评估方法及系统 |
CN110299705A (zh) * | 2019-02-01 | 2019-10-01 | 国网浙江省电力有限公司金华供电公司 | 主动配电网电能质量治理方法 |
CN110782165B (zh) * | 2019-10-25 | 2022-05-13 | 深圳供电局有限公司 | 一种网格化的配电网剩余供电容量监控系统 |
CN112865114B (zh) * | 2019-11-28 | 2022-07-26 | 中车株洲电力机车研究所有限公司 | 一种基于分时电价的负荷用电管理控制方法 |
CN111723974B (zh) * | 2020-05-18 | 2024-05-28 | 国网新疆电力有限公司经济技术研究院 | 一种基于电力紧平衡的主动配电网规划方法 |
CN112101654A (zh) * | 2020-09-11 | 2020-12-18 | 国网新疆电力有限公司经济技术研究院 | 一种配电网规划适应性的优选方法和装置 |
CN112699562B (zh) * | 2021-01-04 | 2022-09-13 | 国网福建省电力有限公司尤溪县供电公司 | 一种构建配电网架构的方法及终端 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003007120A3 (en) * | 2001-07-11 | 2003-11-27 | Joseph R Mazzarella | A system and method for creating and operating an enhanced distributed energy network or virtual power plant |
US7105946B2 (en) * | 2001-03-27 | 2006-09-12 | Sanyo Electric Co., Ltd. | Distributed power generation system, and power supply system and power supply method utilizing the same |
CN102005771A (zh) * | 2010-12-23 | 2011-04-06 | 天津电力设计院 | 风、光、储微电网系统的储能容量选取方法 |
CN103490410A (zh) * | 2013-08-30 | 2014-01-01 | 江苏省电力设计院 | 一种基于多目标优化的微电网规划和容量配置方法 |
-
2014
- 2014-04-28 CN CN201410175716.5A patent/CN103971173B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7105946B2 (en) * | 2001-03-27 | 2006-09-12 | Sanyo Electric Co., Ltd. | Distributed power generation system, and power supply system and power supply method utilizing the same |
WO2003007120A3 (en) * | 2001-07-11 | 2003-11-27 | Joseph R Mazzarella | A system and method for creating and operating an enhanced distributed energy network or virtual power plant |
CN102005771A (zh) * | 2010-12-23 | 2011-04-06 | 天津电力设计院 | 风、光、储微电网系统的储能容量选取方法 |
CN103490410A (zh) * | 2013-08-30 | 2014-01-01 | 江苏省电力设计院 | 一种基于多目标优化的微电网规划和容量配置方法 |
Non-Patent Citations (1)
Title |
---|
基于经济调度的微电网蓄电池容量优化;许丹 等;《电力系统保护与控制》;20110901;第39卷(第17期);55-59 * |
Also Published As
Publication number | Publication date |
---|---|
CN103971173A (zh) | 2014-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103971173B (zh) | 主动配电网变电站容量控制方法与系统 | |
Mazzola et al. | Assessing the value of forecast-based dispatch in the operation of off-grid rural microgrids | |
Jiang et al. | Runoff forecast uncertainty considered load adjustment model of cascade hydropower stations and its application | |
Balasubramaniam et al. | Energy management system for enhanced resiliency of microgrids during islanded operation | |
Yan et al. | Uncertainty analysis for day ahead power reserve quantification in an urban microgrid including PV generators | |
CN103545832B (zh) | 一种基于发电预测误差的光伏系统储能容量配置方法 | |
Sardi et al. | Strategic allocation of community energy storage in a residential system with rooftop PV units | |
EP2610986A1 (en) | A method for determining a power outage probability of an electrical power grid, a method for an adaptation of a power generation capacity and a method for determining an energy storage unit size | |
Ye et al. | Study of assessment on capability of wind power accommodation in regional power grids | |
CN110247426B (zh) | 一种基于多频段不确定集合的鲁棒机组组合方法 | |
Guo et al. | Evaluating effects of battery storage on day-ahead generation scheduling of large hydro–wind–photovoltaic complementary systems | |
Sarmiento et al. | Increasing the PV hosting capacity with OLTC technology and PV VAr absorption in a MV/LV rural Brazilian distribution system | |
Lannoye et al. | Assessing Power System Flexibility for Variable Renewable Integration: A Flexibility Metric | |
Ameli et al. | Profit-based DG planning considering environmental and operational issues: A multiobjective approach | |
CN102904248B (zh) | 基于风电出力不确定性集合的电力系统调度方法 | |
Yang et al. | Multi-Objective optimal scheduling of island microgrids considering the uncertainty of renewable energy output | |
CN104239966A (zh) | 一种主动配电网基于用电成本差异化的运营方法 | |
WO2018132638A1 (en) | Methods and systems for a renewable electricity system | |
Sperstad et al. | Cost-benefit analysis of battery energy storage in electric power grids: Research and practices | |
Yuan et al. | Bess aided renewable energy supply using deep reinforcement learning for 5g and beyond | |
US20180197252A1 (en) | Methods And Systems For A Renewable Electricity System | |
Rascon et al. | Techno-economic comparison of a schedule-based and a forecast-based control strategy for residential photovoltaic storage systems in Germany | |
CN105162173A (zh) | 一种接入风力发电的电力系统备用容量确定方法 | |
Chen et al. | Flexibility evaluation of distribution network with high penetration of variable generations | |
Meng et al. | Economic dispatch for power systems with wind and solar energy integration considering reserve risk |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhong Qing Inventor after: Song Xudong Inventor after: Sun Wen Inventor after: Liu Chunfang Inventor after: Zhao Hong Inventor after: Liang Tangjie Inventor after: Zhang Bin Inventor after: Peng Yinding Inventor after: Wang Chongbin Inventor after: Yu Nanhua Inventor before: Zhong Qing Inventor before: Song Xudong Inventor before: Sun Wen Inventor before: Liu Chunfang Inventor before: Zhao Hong Inventor before: Liang Tangjie Inventor before: Zhang Bin Inventor before: Peng Yinding Inventor before: Wang Chongbin Inventor before: Yu Nanhua |
|
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510080 water Donggang 8, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong. Co-patentee after: Foshan Electric Power Design Institute Co., Ltd. Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD. Address before: 510080 water Donggang 8, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong. Co-patentee before: Foshan Electric Power Design Institute Co., Ltd. Patentee before: Electrical Power Research Institute of Guangdong Power Grid Corporation |
|