CN103968153A - Buried pipe ground source heat pump horizontal pipe construction method based on pond slag stratum - Google Patents
Buried pipe ground source heat pump horizontal pipe construction method based on pond slag stratum Download PDFInfo
- Publication number
- CN103968153A CN103968153A CN201410205674.5A CN201410205674A CN103968153A CN 103968153 A CN103968153 A CN 103968153A CN 201410205674 A CN201410205674 A CN 201410205674A CN 103968153 A CN103968153 A CN 103968153A
- Authority
- CN
- China
- Prior art keywords
- pipe
- horizontal
- horizontal pipe
- heat pump
- source heat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/028—Laying or reclaiming pipes on land, e.g. above the ground in the ground
Abstract
The invention discloses a buried pipe ground source heat pump horizontal pipe construction method based on a pond slag stratum. The relative elevation of the outdoor ground is designed into -0.4 m, the relative ground elevation is -1.2 m, the thickness of a pond slag layer is about 2.6 m, the bottom elevation of the pond slag is about -3.8 m, the designed burial depth of a horizontal pipe is 2 m below the ground, the center elevation of the horizontal pipe is -2.4 m, large area 1.2-meter depth pond slag layer is dug, a buried pipe is drilled and positioned for a casing pipe to be positioned and buried 2 meters away from the ground, a vertical pipe is constructed through a drilling machine, after the vertical pipe is constructed, a horizontal ditch with the 0.6-meter depth, the 1:1 slope releasing coefficient and the 1-meter bottom width is dug, the shaped cohesive soil with the 0.4-meter thickness is refilled, the yellow sand with the 0.4-meter thickness is refilled, the horizontal pipe is constructed and placed in the middle of the yellow sand, the yellow sand is covered with the shaped cohesive soil with the 0.4-meter thickness and wrapped by geotechnical cloth. According to the horizontal buried pipe ground source heat pump construction method, the safety of the horizontal pipe is protected, a certain bearing capacity is guaranteed, and land subsidence is prevented.
Description
Technical field
The present invention relates to ground source heat pump imbedded pipe method of construction, especially a kind of underground pipe earth source heat pump horizontal pipe construction method based on quarrel stratum, the pool.
Background technique
As everyone knows, energy and environment are two hang-ups of 21 century facing mankind, and are in the China of Rapid development stage, and its problem is especially outstanding.In order to address this problem, the earth-source hot-pump system of energy-conserving and environment-protective is progressively promoted at home, wherein buried pipe ground-source heat pump system is one of most widely used mode of geothermal heat pump air-conditioning system, be characterized in by buried in rock-soil layer the circulatory mediator in PE pipe and rock-soil layer complete heat exchange,, there is not the geological problem causing because of groundwater abstraction in the not direct exploiting groundwater of which.But because China is vast in territory, geological condition complexity, is greatly limited the construction quality of underground pipe and Economy.Especially for the quarrel stratum, the pool of the coastal south, the construction of underground pipe earth source heat pump horizontal pipe is greatly limited.For region following the line of the sea, in the time that pool quarrel layer thickness exceedes for 2.6m, often because of stratum settlement occurred level pipe fracture accident.
Summary of the invention
The object of the invention is to overcome above-mentioned the deficiencies in the prior art, a kind of underground pipe earth source heat pump horizontal pipe construction method based on quarrel stratum, the pool is provided, safety that can level of protection pipe, can ensure again certain bearing capacity, prevents land subsidence.
For achieving the above object, technological scheme of the present invention is: a kind of underground pipe earth source heat pump horizontal pipe construction method based on quarrel stratum, the pool, according to outdoor ground designing requirement, outdoor ground design relative elevation is-0.4m, terrain face relative elevation is-1.2m, the about 2.6m of pool thickness of slag layer, at the bottom of the slag of the pool, absolute altitude is-3.8m, the design buried depth of horizontal pipe is subsurface 2m, horizontal pipe center absolute altitude is-2.4m, first carry out the pool slag blanket excavation of the large size 1.2m degree of depth, then carry out the pre-lower 2m sleeve pipe in underground pipe boring location, sleeve pipe adopts bellows, after having holed, bellows is stayed in hole and can be played and ensure to return effect on mud, under sleeve pipe, pipe completes, carry out again the construction of rig vertical tube, after vertical tube has been constructed, first carry out the 0.6m degree of depth, put slope at 1: 1, the horizontal ditch excavation that bottom width is 1 meter, then the thick plastic shape cohesive soil of backfill 0.4m, the yellow sand that backfill 0.4m is thick, carry out again horizontal pipe construction and be placed in the middle of yellow sand, thereafter above yellow sand, carrying out the plastic shape cohesive soil that 0.4m is thick covers, and carry out the parcel of geotextiles.
Horizontal pipe comprises that a horizontal pipe water pipe, a horizontal pipe return pipe and a horizontal pipe backwater are with journey pipe, and 2m cannula tip and horizontal pipe center are contour, and 2m sleeve pipe is between horizontal pipe water pipe and horizontal pipe return pipe.
Vertical tube is high density polyethylene pipe, and two high density polyethylene pipe head ends connect respectively horizontal pipe water pipe and horizontal pipe return pipe, and end is connected and is connected by single U-shaped pipe, the outside backfill that covers of high density polyethylene pipe.
The invention has the beneficial effects as follows: safety that can level of protection pipe, can ensure again certain bearing capacity, prevent land subsidence.
Brief description of the drawings
Fig. 1 is vertical tube construction schematic diagram of the present invention;
Fig. 2 is horizontal pipe construction schematic diagram of the present invention;
Fig. 3 be in Fig. 2 A-A to sectional view.
Embodiment
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is described in further detail.
As shown in FIG. 1 to 3, a kind of underground pipe earth source heat pump horizontal pipe construction method based on quarrel stratum, the pool, according to outdoor ground designing requirement, outdoor ground design relative elevation is-0.4m, terrain face relative elevation is-1.2m, the about 2.6m of pool thickness of slag layer, at the bottom of the slag of the pool, absolute altitude is-3.8m, the design buried depth of horizontal pipe is subsurface 2m, horizontal pipe center absolute altitude is-2.4m, when underground pipe construction, first carry out the pool slag blanket excavation of the large size 1.2m degree of depth, excavate at absolute altitude place, horizontal pipe center, horizontal pipe comprises a horizontal pipe water pipe, a horizontal pipe return pipe and a horizontal pipe backwater are with journey pipe, then carry out the pre-lower 2m sleeve pipe in underground pipe boring location, sleeve pipe adopts bellows, after having holed, bellows is stayed in hole and can be played and ensure to return effect on mud, 2m cannula tip and horizontal pipe center are contour, 2m sleeve pipe is between horizontal pipe water pipe and horizontal pipe return pipe, under sleeve pipe, pipe completes, carry out again the construction of rig vertical tube, vertical tube is high density polyethylene pipe, two high density polyethylene pipe head ends connect respectively horizontal pipe water pipe and horizontal pipe return pipe, end is connected and is connected by single U-shaped pipe, the outside backfill that covers of high density polyethylene pipe, after vertical tube has been constructed, first carry out the 0.6m degree of depth, put slope at 1: 1, the horizontal ditch excavation that bottom width is 1 meter, then the thick plastic shape cohesive soil of backfill 0.4m, the yellow sand that backfill 0.4m is thick, carry out again horizontal pipe construction and be placed in the middle of yellow sand, thereafter above yellow sand, carrying out the plastic shape cohesive soil that 0.4m is thick covers, and carry out the parcel of geotextiles.This method of construction can level of protection pipe safety, can ensure again certain bearing capacity, prevent land subsidence.
Claims (3)
1. the underground pipe earth source heat pump horizontal pipe construction method based on quarrel stratum, the pool, according to outdoor ground designing requirement, outdoor ground design relative elevation is-0.4m, terrain face relative elevation is-1.2m, the about 2.6m of pool thickness of slag layer, at the bottom of the slag of the pool, absolute altitude is-3.8m, the design buried depth of horizontal pipe is subsurface 2m, horizontal pipe center absolute altitude is-2.4m, it is characterized in that: the pool slag blanket excavation that first carries out the large size 1.2m degree of depth, then carry out the pre-lower 2m sleeve pipe in underground pipe boring location, sleeve pipe adopts bellows, after having holed, bellows is stayed in hole and can be played and ensure to return effect on mud, under sleeve pipe, pipe completes, carry out again the construction of rig vertical tube, after vertical tube has been constructed, first carry out the 0.6m degree of depth, put slope at 1: 1, the horizontal ditch excavation that bottom width is 1 meter, then the thick plastic shape cohesive soil of backfill 0.4m, the yellow sand that backfill 0.4m is thick, carry out again horizontal pipe construction and be placed in the middle of yellow sand, thereafter above yellow sand, carrying out the plastic shape cohesive soil that 0.4m is thick covers, and carry out the parcel of geotextiles.
2. the underground pipe earth source heat pump horizontal pipe construction method based on quarrel stratum, the pool as claimed in claim 1, it is characterized in that: horizontal pipe comprises that a horizontal pipe water pipe, a horizontal pipe return pipe and a horizontal pipe backwater are with journey pipe, 2m cannula tip and horizontal pipe center are contour, and 2m sleeve pipe is between horizontal pipe water pipe and horizontal pipe return pipe.
3. the underground pipe earth source heat pump horizontal pipe construction method based on quarrel stratum, the pool as claimed in claim 1, it is characterized in that: vertical tube is high density polyethylene pipe, two high density polyethylene pipe head ends connect respectively horizontal pipe water pipe and horizontal pipe return pipe, end is connected and is connected by single U-shaped pipe, the outside backfill that covers of high density polyethylene pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410205674.5A CN103968153A (en) | 2014-05-14 | 2014-05-14 | Buried pipe ground source heat pump horizontal pipe construction method based on pond slag stratum |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410205674.5A CN103968153A (en) | 2014-05-14 | 2014-05-14 | Buried pipe ground source heat pump horizontal pipe construction method based on pond slag stratum |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103968153A true CN103968153A (en) | 2014-08-06 |
Family
ID=51237996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410205674.5A Pending CN103968153A (en) | 2014-05-14 | 2014-05-14 | Buried pipe ground source heat pump horizontal pipe construction method based on pond slag stratum |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103968153A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105443054A (en) * | 2015-12-12 | 2016-03-30 | 浙江陆特能源科技股份有限公司 | Vertical superconducting-buried-pipe construction system and construction method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1346950A (en) * | 2000-09-25 | 2002-05-01 | 株式会社韩美 | Method for filling protective layer of embedded tube |
US20060171781A1 (en) * | 2002-11-07 | 2006-08-03 | Bose Jon R | Pipeline trench system and method of construction |
CN101598475A (en) * | 2009-07-02 | 2009-12-09 | 同济大学 | Be embedded in the ground buried pipe of ground source heat pump system under the underground engineering structure base plate |
CN102052517A (en) * | 2009-11-05 | 2011-05-11 | 中国二十冶集团有限公司 | Horizontal connecting system for regional underground vertical pipes and connecting construction method thereof |
CN103016842A (en) * | 2012-12-13 | 2013-04-03 | 浙江环宇建设集团有限公司 | Reverse construction method for directly buried heat exchanger of ground source heat pump in mucky soft foundation |
CN103527847A (en) * | 2013-10-30 | 2014-01-22 | 重庆大学 | Pipe burying structure capable of reducing pipe top vertical loads and construction method for pipe burying structure |
-
2014
- 2014-05-14 CN CN201410205674.5A patent/CN103968153A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1346950A (en) * | 2000-09-25 | 2002-05-01 | 株式会社韩美 | Method for filling protective layer of embedded tube |
US20060171781A1 (en) * | 2002-11-07 | 2006-08-03 | Bose Jon R | Pipeline trench system and method of construction |
CN101598475A (en) * | 2009-07-02 | 2009-12-09 | 同济大学 | Be embedded in the ground buried pipe of ground source heat pump system under the underground engineering structure base plate |
CN102052517A (en) * | 2009-11-05 | 2011-05-11 | 中国二十冶集团有限公司 | Horizontal connecting system for regional underground vertical pipes and connecting construction method thereof |
CN103016842A (en) * | 2012-12-13 | 2013-04-03 | 浙江环宇建设集团有限公司 | Reverse construction method for directly buried heat exchanger of ground source heat pump in mucky soft foundation |
CN103527847A (en) * | 2013-10-30 | 2014-01-22 | 重庆大学 | Pipe burying structure capable of reducing pipe top vertical loads and construction method for pipe burying structure |
Non-Patent Citations (1)
Title |
---|
刘文正等: "地源热泵埋管施工技术", 《建筑施工》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105443054A (en) * | 2015-12-12 | 2016-03-30 | 浙江陆特能源科技股份有限公司 | Vertical superconducting-buried-pipe construction system and construction method thereof |
CN105443054B (en) * | 2015-12-12 | 2023-01-24 | 浙江陆特能源科技股份有限公司 | Vertical construction system of superconducting buried pipe and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100480475C (en) | Controllable one-well lamina precipitation construction method | |
CN103603342B (en) | Major diameter assembled casing super-long filling pile construction method | |
CN103643918B (en) | A kind of searching for Ordovician limestone mining area and the method preventing mine from seeping water | |
CN204312099U (en) | Tunnel Gushing based on environmental protection prevents and treats system | |
CN103075179A (en) | Entitative coal seam gas drainage drilling hole double-pipe drainage method | |
CN107524459A (en) | A kind of Underground Subway Station vertical shaft and transverse passage-way freeze water sealing structure and method | |
CN104455726A (en) | Pipe-jacking construction method for pipeline bottom grouting reinforcement | |
CN104633996A (en) | Water source heat pump recharging technical method | |
CN106837389A (en) | A kind of Underground Subway Station vertical shaft and transverse passage-way freeze water-stopping method | |
CN204940315U (en) | A kind of water-stopping system for the large-scale vertical shaft of region of FuShui | |
CN109026010A (en) | A kind of mine seepage well slip casting type sinking shaft construction method | |
CN106245621B (en) | A kind of electric osmose inverted well construction method | |
CN105951860A (en) | Slanting freezing bottom-making water stop structure for interior and side faces of underground excavated foundation pit and method | |
CN106120827A (en) | Freeze to make end water-bound and method inside a kind of sensitizing range, city tunneling foundation ditch | |
CN203925512U (en) | Submarine tunnel with submarine floating pipe anchored seabed frame | |
CN106351675A (en) | Total-depth curtain freezing and water stopping system of water and sand rich sandy gravel formation deeply-buried station excavated in concealed mode | |
CN103968153A (en) | Buried pipe ground source heat pump horizontal pipe construction method based on pond slag stratum | |
CN210768905U (en) | Coal mining bottom plate dredging water simulation device | |
CN205907697U (en) | City sensitizing range is secretly dug foundation ditch inside and is freezed to make end water structure | |
CN205907691U (en) | What end was looked for by mediation lower floor in upper strata secretly digs foundation ditch stagnant water structure | |
CN105064384A (en) | Vacuum tube well precipitation system under special geological conditions | |
CN206111219U (en) | Rich water sand cobble stratum buries complete dark curtain that secretly digs station deeply and freezes stagnant water system | |
CN206034466U (en) | Foundation ditch or basic groove precipitation system for construction | |
Lees et al. | The hydrogeology of the Central Highlands in Sri Lanka and its effect on tunnel construction | |
CN104389316A (en) | Pressure-proof structure of underground tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140806 |