CN103967287B - The pre-buried exposed steel bar Rustproofing apparatus of construction work - Google Patents
The pre-buried exposed steel bar Rustproofing apparatus of construction work Download PDFInfo
- Publication number
- CN103967287B CN103967287B CN201410228064.7A CN201410228064A CN103967287B CN 103967287 B CN103967287 B CN 103967287B CN 201410228064 A CN201410228064 A CN 201410228064A CN 103967287 B CN103967287 B CN 103967287B
- Authority
- CN
- China
- Prior art keywords
- steel bar
- exposed steel
- closing device
- construction work
- antirust sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The invention discloses the pre-buried exposed steel bar Rustproofing apparatus of a kind of construction work, comprise antirust sleeve, closing device and aspirating hole, antirust sleeve one end is provided with the mouth of pipe and is placed on exposed steel bar outer wall by this mouth of pipe, extract opening is located at antirust sleeve sidewall and is only allowed gas to flow out antirust sleeve by this extract opening, and closing device is the Flexible pipe fitting of both ends open and this closing device two ends are placed on antirust sleeve and exposed steel bar outer wall respectively and form sealing contact surface.Instant invention overcomes existing construction work concrete joint embedded bar exposed parts, because exposing in atmosphere, drenched with rain, the impact of Exposure to Sunlight and moisture laden air, very easily get rusty, slacken the problems such as building durability, there is provided a kind of rainwater and wet damp air of blocking on the impact of reinforcing bar, the reinforced steel bar rust preventing device of the slow pre-buried exposed steel bar corrosion of construction work of resistance.
Description
Technical field
The invention belongs to the device field of construction work, be specifically related to the pre-buried exposed steel bar Rustproofing apparatus of a kind of construction work.
Background technology
When construction work design of reinforced concrete structure and construction, the problems such as structure crack are caused for eliminating shrinkage strain in course of hardening, how in reinforced concrete structure, deformation joint and rear pouring concrete band to be set every certain length, need embedded bar at seam crossing, to ensure the globality of concrete structure more.Deformation joint embedded bar exposes the aerial time, determines according to the deformation requirements of structural concrete and construction technology, and be not generally 30d ~ 90d not etc., what have is even longer, more than 1 year, interval.These exposed steel bars get rusty in atmosphere very soon, and along with the lengthening of time, corrosion will be there is, slacken the cross section of reinforcing bar, after causing seam crossing concrete construction, overall structure will form weak link at seam crossing, even cause structural deterioration accident, and not carry out antirust special purpose device for the pre-buried exposed steel bar of construction work in prior art.
Therefore, for overcoming the above problems, need a kind ofly to carry out the pre-buried exposed steel bar Rustproofing apparatus of antirust construction work to the pre-buried exposed steel bar of construction work easily and effectively.
Summary of the invention
In view of this, the object of the invention is to expose the problems such as corrosion in atmosphere for the pre-buried exposed steel bar of existing construction work, provide a kind of construction work pre-buried exposed steel bar Rustproofing apparatus.
The pre-buried exposed steel bar Rustproofing apparatus of construction work of the present invention, comprise antirust sleeve, closing device and aspirating hole, antirust sleeve one end is provided with the mouth of pipe and is placed on exposed steel bar outer wall by this mouth of pipe, extract opening is located at antirust sleeve sidewall and is only allowed gas to flow out antirust sleeve by this extract opening, and closing device is the Flexible pipe fitting of both ends open and this closing device two ends are placed on antirust sleeve and exposed steel bar outer wall respectively and form sealing contact surface;
Further, described antirust sleeve comprises pipe shaft section and and the mouth of pipe section that insert in closing device in one-body molded with pipe shaft section;
Further, described closing device comprises soft cotton layer and is sheathed on the rubber layer outside soft cotton layer;
Further, described closing device two ends are wound with adhesive type sealing restraint zone;
Further, described antirust sleeve adopts durable rubber to be made;
Further, described mouth of pipe section outer circumference surface is provided with sealing external screw thread;
Further, described closing device inner tubal wall is provided with the sealing internal thread coordinated with described sealing external screw thread;
Further, described closing device is bellows;
The invention also discloses a kind of construction work pre-buried exposed steel bar Rustproofing apparatus that utilizes and carry out the antirust method of pre-buried exposed steel bar, comprise the following steps:
A, antirust sleeve is placed on the pre-buried exposed steel bar of building;
B, antirust sleeve mouth of pipe section to be inserted in closing device;
C, utilize existing exhaust plant to extract air in antirust sleeve out, make to form vacuum in antirust sleeve.
The invention has the beneficial effects as follows: the pre-buried exposed steel bar Rustproofing apparatus of construction work of the present invention, after exposed steel bar wraps up by antirust sleeve, by closing device, the antirust sleeve mouth of pipe is shut, by existing exhaust plant, the gas in antirust sleeve is extracted out from extract opening again, antirust sleeve is made closely to be wrapped in exposed steel bar surface and to form a vacuum wall body in antirust sleeve, thus block the contact of reinforcing bar and air, slow down the corrosion of reinforcing bar, the pre-buried exposed steel bar Rustproofing apparatus of construction work of the present invention effectively can slow down the corrosion of exposed steel bar, after avoiding the concrete construction of steel and concrete structure seam crossing, seam crossing is recurring structure malicious event because of strength deficiency, instant invention overcomes existing construction work concrete joint embedded bar exposed parts, because exposing in atmosphere, drenched with rain, the impact of Exposure to Sunlight and moisture laden air, very easily get rusty, expose in atmosphere if long-time, even there is corrosion of steel bar, bottom structure bearing capacity falls, affect structural safety, slacken the problems such as building durability, effectively can block rainwater and wet damp air to the impact of reinforcing bar.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, technical solution of the present invention is further illustrated:
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Fig. 1 is structural representation of the present invention, as shown in the figure, construction work in the present embodiment pre-buried exposed steel bar 5 Rustproofing apparatus, comprise antirust sleeve 4, closing device 2 and aspirating hole, antirust sleeve 4 one end is provided with the mouth of pipe and is placed on exposed steel bar 5 outer wall by this mouth of pipe, extract opening 9 is located at antirust sleeve 4 sidewall and is only allowed gas to flow out antirust sleeve 4 by this extract opening 9, and closing device 2 be the Flexible pipe fitting of both ends open and this closing device 2 two ends are placed on antirust sleeve 4 and exposed steel bar 5 outer wall respectively and form sealing contact surface.
In the present embodiment, described antirust sleeve 4 comprises pipe shaft section 3 and and the mouth of pipe section 6 that insert in closing device 2 in one-body molded with pipe shaft section 3, closing device 2 two ends form sealing contact surface with mouth of pipe section 6 and exposed steel bar 5 surface respectively, thus make to form seal chamber in antirust sleeve 4.
In the present embodiment, the rubber layer 8 that described closing device 2 comprises soft cotton layer 7 and is sheathed on outside soft cotton layer 7, the flexible thin-walled rubber of closing device 2 can compress rebar surface, and the space between the further filling thin-walled rubber of soft cotton material and reinforcing bar, and then significantly promote the sealing performance in antirust sleeve 4.
In the present embodiment, described closing device 2 two ends are wound with adhesive type sealing restraint zone 1, when operating personnel with closing device 2 by antirust sleeve 4 ferrule after, adhesive type can be adopted to seal restraint zone 1 and to be wound around closing device 2 two ends, make it promote further the sealing performance of closing device 2.
In the present embodiment, described antirust sleeve 4 adopts durable rubber to be made, because durable rubber has good elasticity, therefore by existing exhaust plant by after the extraction of antirust sleeve 4 internal gas, can be there is elastic deformation and closely be wrapped in rebar surface in antirust sleeve 4, when before concrete construction, after taking off antirust sleeve 4, antirust sleeve 4 can return to initial configuration, is convenient to use next time.
In the present embodiment, described mouth of pipe section 6 outer circumference surface is provided with sealing external screw thread, for promoting connection reliability and the sealing effectiveness of closing device 2 and mouth of pipe section 6, sealed tube can be adopted to be threaded closing device 2 and antirust sleeve 4 mouth of pipe section 6.
In the present embodiment, described closing device 2 inner tubal wall is provided with the sealing internal thread coordinated with described sealing external screw thread, adopts sealed tube to be threaded closing device 2 and antirust sleeve 4 mouth of pipe section 6, can promote connection reliability and the sealing effectiveness of closing device 2 and mouth of pipe section 6.
Further, described closing device 2 is bellows, and when needing to carry out antirust to the exposed steel bar 5 of bending, the bending that closing device 2 also should be able to adapt to exposed steel bar 5 bends, and bellows is easy to bending and toughness is better, the exposed steel bar 5 of differently curved degree can be used.
A kind of construction work pre-buried exposed steel bar 5 Rustproofing apparatus that utilizes of the present embodiment carries out the antirust method of pre-buried exposed steel bar 5, comprises the following steps:
A, antirust sleeve 4 is placed on the pre-buried exposed steel bar 5 of building;
B, antirust sleeve 4 mouth of pipe section 6 is inserted in closing device 2;
C, utilize existing exhaust plant to extract air in antirust sleeve 4 out, make to form vacuum in antirust sleeve 4
Adopt the pre-buried exposed steel bar 5 of this method architecture protection engineering, antirust sleeve 4 can be made closely to be wrapped in exposed steel bar 5 surface and to form a vacuum wall body in antirust sleeve 4, thus block the contact of reinforcing bar and air, slow down the corrosion of reinforcing bar.
What finally illustrate is, above embodiment is only in order to illustrate the technical solution of the utility model and unrestricted, although be described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify to the technical solution of the utility model or equivalent replacement, and not departing from the spirit and scope of technical solutions of the utility model, it all should be encompassed in the middle of right of the present utility model.
Claims (9)
1. the pre-buried exposed steel bar Rustproofing apparatus of construction work, is characterized in that: comprise antirust sleeve, closing device and aspirating hole; Described antirust sleeve one end is provided with the mouth of pipe and is placed on exposed steel bar outer wall by this mouth of pipe; Described extract opening is located at antirust sleeve sidewall and is only allowed gas to flow out antirust sleeve by this extract opening; Described closing device is the Flexible pipe fitting of both ends open and this closing device two ends are placed on antirust sleeve and exposed steel bar outer wall respectively and form sealing contact surface.
2. the pre-buried exposed steel bar Rustproofing apparatus of construction work according to claim 1, is characterized in that: described antirust sleeve comprises pipe shaft section and and the mouth of pipe section that insert in closing device in one-body molded with pipe shaft section.
3. the pre-buried exposed steel bar Rustproofing apparatus of construction work according to claim 2, is characterized in that: described closing device comprises soft cotton layer and is sheathed on the rubber layer outside soft cotton layer.
4. the pre-buried exposed steel bar Rustproofing apparatus of construction work according to claim 3, is characterized in that: described closing device two ends are wound with adhesive type sealing restraint zone.
5. the pre-buried exposed steel bar Rustproofing apparatus of construction work according to claim 4, is characterized in that: described antirust sleeve adopts durable rubber to be made.
6. the pre-buried exposed steel bar Rustproofing apparatus of construction work according to claim 5, is characterized in that: described mouth of pipe section outer circumference surface is provided with sealing external screw thread.
7. the pre-buried exposed steel bar Rustproofing apparatus of construction work according to claim 6, is characterized in that: described closing device inner tubal wall is provided with the sealing internal thread coordinated with described sealing external screw thread.
8. the pre-buried exposed steel bar Rustproofing apparatus of construction work according to claim 7, is characterized in that: described closing device is bellows.
9. utilize the construction work pre-buried exposed steel bar Rustproofing apparatus described in the arbitrary claim of claim 1-8 to carry out the antirust method of pre-buried exposed steel bar, it is characterized in that: comprise the following steps:
A, described antirust sleeve is placed on the pre-buried exposed steel bar of building;
B, described antirust sleeve mouth of pipe section is inserted in closing device;
C, utilize existing exhaust plant to extract air in antirust sleeve out, make to form vacuum in antirust sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410228064.7A CN103967287B (en) | 2014-05-27 | 2014-05-27 | The pre-buried exposed steel bar Rustproofing apparatus of construction work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410228064.7A CN103967287B (en) | 2014-05-27 | 2014-05-27 | The pre-buried exposed steel bar Rustproofing apparatus of construction work |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103967287A CN103967287A (en) | 2014-08-06 |
CN103967287B true CN103967287B (en) | 2016-03-23 |
Family
ID=51237252
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410228064.7A Active CN103967287B (en) | 2014-05-27 | 2014-05-27 | The pre-buried exposed steel bar Rustproofing apparatus of construction work |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103967287B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105970817A (en) * | 2016-05-30 | 2016-09-28 | 中国铁建大桥工程局集团有限公司 | Rust preventing method of embedded bars of pier body under complex sea area conditions |
CN109930849B (en) * | 2019-04-16 | 2021-02-23 | 北京颐和工程监理有限责任公司 | Building engineering is with exposing rust-resistant device of reinforcing bar |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2324285Y (en) * | 1997-12-30 | 1999-06-16 | 贾继献 | Rust-proof reinforced anchor bolt |
JP2002061393A (en) * | 2000-08-24 | 2002-02-28 | Ohbayashi Corp | Roof for raining countermeasure at time of construction of steel pipe concrete composite structure, and raining countermeasure method |
CN201068648Y (en) * | 2007-07-14 | 2008-06-04 | 莱西市建筑总公司 | Reinforcing steel bar anti-rust cap |
CN101603369A (en) * | 2009-07-02 | 2009-12-16 | 中天建设集团有限公司 | Antirust protection method of reserved steel bar |
CN202850493U (en) * | 2012-10-18 | 2013-04-03 | 苏州嘉盛建设工程有限公司 | Concrete wall template brace steel bar antirust cap |
CN203834958U (en) * | 2014-05-27 | 2014-09-17 | 重庆工商职业学院 | Rust prevention device for constructional engineering embedded exposed reinforcement |
-
2014
- 2014-05-27 CN CN201410228064.7A patent/CN103967287B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2324285Y (en) * | 1997-12-30 | 1999-06-16 | 贾继献 | Rust-proof reinforced anchor bolt |
JP2002061393A (en) * | 2000-08-24 | 2002-02-28 | Ohbayashi Corp | Roof for raining countermeasure at time of construction of steel pipe concrete composite structure, and raining countermeasure method |
CN201068648Y (en) * | 2007-07-14 | 2008-06-04 | 莱西市建筑总公司 | Reinforcing steel bar anti-rust cap |
CN101603369A (en) * | 2009-07-02 | 2009-12-16 | 中天建设集团有限公司 | Antirust protection method of reserved steel bar |
CN202850493U (en) * | 2012-10-18 | 2013-04-03 | 苏州嘉盛建设工程有限公司 | Concrete wall template brace steel bar antirust cap |
CN203834958U (en) * | 2014-05-27 | 2014-09-17 | 重庆工商职业学院 | Rust prevention device for constructional engineering embedded exposed reinforcement |
Also Published As
Publication number | Publication date |
---|---|
CN103967287A (en) | 2014-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204645688U (en) | The pre-buried exposed steel bar Rustproofing apparatus of vacuum-pumping type | |
CN203834958U (en) | Rust prevention device for constructional engineering embedded exposed reinforcement | |
CN103967287B (en) | The pre-buried exposed steel bar Rustproofing apparatus of construction work | |
CN204000838U (en) | The anti-Flow Structure Around of diaphragm wall capsule-type | |
CN206697872U (en) | A kind of circuit pipe laying | |
CN204609334U (en) | Exposed steel bar Rustproofing apparatus | |
CN203442411U (en) | Tube cover for tube plugging | |
CN102995894A (en) | Air bag type concrete hole pre-burying device and manufacturing method thereof | |
CN204645687U (en) | Adjustable pre-buried exposed steel bar Rustproofing apparatus | |
CN203421228U (en) | Condensate water drainage water seal for air-conditioner | |
CN202474788U (en) | Cable pipe orifice sealing device | |
CN203979674U (en) | A kind of circulating water pipeline that is lined with Glass Steel Tube | |
CN205244731U (en) | Inside reinforcing means that restores of pipeline leak | |
CN207032902U (en) | A kind of pre-buried exposed steel bar Rustproofing apparatus of architectural engineering | |
CN202969926U (en) | Air bag type concrete hole pre-burying device | |
CN201474301U (en) | Template lacing wire component | |
CN201027746Y (en) | Expansion tube with sealing ring | |
CN204420313U (en) | A kind of relay well adapter sleeve being exclusively used in RC pipejacking | |
CN207436108U (en) | It is a kind of at basement home-in-pipe can turnover type temporary plugging | |
CN203663314U (en) | Draining structure of fire hydrant | |
CN205534637U (en) | Can have enough to meet need outer wall pre buried pipeline plugging device | |
CN107100284B (en) | Prevent iron tower of power transmission line bottom column material from corroding device | |
CN204876108U (en) | Assembled wall body preformed hole is from sealing waterproof cover | |
CN202546024U (en) | Reinforced wall-through pipeline | |
CN103527867A (en) | Pre-stressed steel cylinder concrete pipe for jacking construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |