Background technology
The water supply pipe system in Building Trade in China building house generally adopts metal material as coating steel pipe, stainless steel tube at present, plastic material adopts as aluminium-plastic pipe, PPR are managed etc. hard pipeline and carried out installation, when construction, pipeline is arranged installation pipeline along body of wall, overwhelming majority building is substantially all to adopt exposed tube " exposed type " line arrangement outside, and the pipeline of " exposed type " affects the use of the interior space and attractive in appearance; Most of building all can be carried out rebuilding construction again to " exposed type " tap water pipe line in the time of fitting-out work, allows " exposed type " pipeline ornament materials hide; Or take at metope fluting, the mode that " exposed type " pipeline is nuzzled in body of wall hides pipeline.Tend to like this expend a lot of time, material, cost of labor.Meanwhile, what adopt due to " exposed type " is hard pipeline, and whenever turning, corner all needs to allow pipeline turning by pipe fitting, and As time goes on pipeline tie point can cause the aging generation pipeline drainage of material.In addition, substantially fixing specification due to the length of hard pipeline is 4 meters, whenever being greater than the pipeline distance of 4 meters of length, just must carrying out pipeline with pipe fitting and extend connection.The basic connected mode of pipeline and pipe fitting is at present domestic generally to be adopted: sweat soldering formula, screw connected, glue is adhered, clamp-press type etc. mode; The attended operation technique of these modes, all require operation installation personnel to have certain operating experience and technology, otherwise the connection work of pipeline can not normally carry out, and pipeline junction will produce the phenomenon of the failure such as leak, come off; When pipeline attended operation, need special tool to carry out, operational sequence is various, consuming time longer simultaneously, sometimes even can produce hazardous substances, and pipeline is caused to secondary pollution.If pipe-line system is nuzzled in body of wall, floor in advance, once there is piping failure, the phenomenon of leaking etc., maintenance is very inconvenient, necessarily body of wall, floor must be knocked open, the pipeline that just can place under repair and leak, does like this, destructiveness to building is very big, and maintenance cost is very high.The uncertain ideal of maintenance effect, there will be the situation of again leaking after often keeping in repair a period of time.
On the whole, domestic building water supply pipeline system at present, in decades, never have the phenomenon that good technology solves pipe leakage, the material of feedwater piping, construction technology, system are all relatively backward, have a strong impact on the overall development level of Building Trade in China, be not equipped with very much with high-tech architecture demand for development with rapid changepl. never-ending changes and improvements.
Summary of the invention
The object of the invention is to solve the problem of above-mentioned proposition, jointless building water supply pipeline system and device in the middle of a kind of replaceable pipeline, pre-buried type, pipeline is provided, simple in structure, easy to use, can repeatedly dismantle, install.
The object of the invention is to realize as follows: the pre-buried replaceable pipe-line system of a kind of novel building feedwater, there is laminated type pipe joint, described high tenacity flexible pipe directly inserts in laminated type pipe joint, and described corrugated bushing directly inserts and is connected with the sleeve pipe socket of wall connector; In corrugated bushing, insert high tenacity flexible pipe, two ends of high tenacity flexible pipe are connected with pipeline distributor and wall connector in pipeline distributor respectively; Pipeline distributor is arranged in pipeline control cabinet; One side of described pipeline distributor has the box-like pipe joint of a row pressure, and 2-4 pipeline distributor is set in described pipeline control cabinet; Four sides up and down of described pipeline control cabinet all can arrange sleeve pipe socket.
The above-mentioned pre-buried replaceable pipe-line system of a kind of novel building feedwater, described sleeve pipe socket is connected with corrugated bushing.
The above-mentioned pre-buried replaceable pipe-line system of a kind of novel building feedwater, high tenacity flexible pipe is directly inserted in described laminated type pipe joint.
The above-mentioned pre-buried replaceable pipe-line system of a kind of novel building feedwater, within the scope of the length 1-300 rice of described high tenacity flexible pipe and sleeve pipe socket.
The pre-buried replaceable pipe-line system of above-mentioned a kind of novel building feedwater, the corrugated bushing between described wall connector and pipeline control cabinet and high tenacity flexible pipe, its length can be at 1-300 rice, and centre is without any jointing.
The above-mentioned pre-buried replaceable pipe-line system of a kind of novel building feedwater, described pipeline distributor comprises eight paths of three-way to ten.
The above-mentioned pre-buried replaceable pipe-line system of a kind of novel building feedwater, can arrange the pipeline distributor of minimum two in described pipeline control cabinet, is respectively used to the transmission of cold water and hot water.
The pre-buried replaceable pipe-line system of above-mentioned a kind of novel building feedwater, described pipeline control cabinet is pre-buried is installed in body of wall also pre-buried being installed in floor, also can be installed on below the outer or floor of body of wall simultaneously.
The pre-buried replaceable pipe-line system of above-mentioned a kind of novel building feedwater, described wall connector is by built-in laminated type pipe joint, realizes being connected of high tenacity flexible pipe and water tap, and while pipeline is also card edge type connected mode.
Advantage of the present invention: 1, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, mainly by corrugated bushing, pipeline distributor and wall connector are interconnected, corrugated bushing length between pipeline distributor and wall connector can regulate arbitrarily within the scope of 1-300 rice and centre is embedded in body of wall or floor in advance without any pipe joint, in the insertion of high tenacity flexible pipe and corrugated bushing, when insert high tenacity flexible pipe generation water leakage fault time, the pipeline leaking can be extracted out in corrugated bushing, insert again new high tenacity flexible pipe, thereby reach the work object that easily completes pipeline maintenance.Like this, in the time of building water supply pipe system generation water leakage fault, again need not realize work that pipeline is keeped in repair by striking wall, greatly improve application life and the operating efficiency of building water supply pipeline system, reduce the maintenance cost of water supply piping system.
2, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, mainly by corrugated bushing, pipeline control cabinet and wall connector are interconnected, corrugated bushing between pipeline control cabinet and wall connector can regulate arbitrarily within the scope of 1-300 rice and centre is embedded in body of wall or floor in advance without any pipe joint, in the insertion of high tenacity water supply pipe and corrugated bushing, described corrugated bushing and high tenacity water supply pipe all can be bending, bear high pressure, when installation without relying on pipe fitting to realize the bending of pipeline as hard pipeline, can be by being deployed directly into the specified installation site of architectural design drawing with a pipeline, material and cost of labor that pipeline construction is installed are greatly reduced, easily complete pipeline mounting construction work.
3, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, mainly by corrugated bushing, pipeline control cabinet and wall connector are interconnected, corrugated bushing between pipeline control cabinet and wall connector can regulate arbitrarily within the scope of 1-300 rice and centre is embedded in body of wall or floor in advance without any pipe joint, in the insertion of high tenacity flexible pipe and corrugated bushing, when installation, extend the length of pipeline without realizing reaching by the connection of pipe fitting as hard pipeline, can directly reach the required length of architectural design drawing with a pipeline, material and cost of labor that pipeline construction is installed are greatly reduced, easily complete pipeline mounting construction work.
4, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, mainly by corrugated bushing, pipeline control cabinet and wall connector are interconnected, corrugated bushing between pipeline control cabinet and wall connector can regulate arbitrarily within the scope of 1-300 rice and centre is embedded in body of wall or floor in advance without any pipe joint, in the insertion of high tenacity flexible pipe and corrugated bushing, all pipelines and pipeline control cabinet are all secretly embedded in construction wall or floor, do not affect use and the aesthetics in architecture indoor space, without again pipe-line system being carried out to secondary transformation, more without covering in pipeline by decorative engineering, pipe-line system settles at one go, greatly reduce the integrated cost of building, quality and the life-span of building are improved.
5, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, mainly by corrugated bushing, pipeline control cabinet and wall connector are interconnected, corrugated bushing between pipeline control cabinet and wall connector can regulate arbitrarily within the scope of 1-300 rice and centre is embedded in body of wall or floor in advance without any pipe joint, in the insertion of high tenacity flexible pipe and corrugated bushing, in described control cabinet, be provided with pipeline distributor, on each road pipeline of pipeline distributor, by-pass valve control all can be set, in the time of pipeline generation water leakage fault, the pipeline valve breaking down can be closed, just can prevent leaking of this road pipeline, other pipelines are work as usual.Once and occur leaking without somewhere pipeline in system as existing pipe-line system, just need to close pipe-line system total valve and block water source and prevent and leak.Greatly improve the pipe-line system of building.
6, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, mainly by corrugated bushing, pipeline control cabinet and wall connector are interconnected, sleeve pipe can regulate arbitrarily within the scope of 1-300 rice and centre is embedded in body of wall or floor in advance without any pipe joint, in the insertion of high tenacity flexible pipe and corrugated bushing, all pipelines are secretly embedded in body of wall and floor, pipeline and outside contacting are reduced, reduce pipeline winter by the risk of bursting by freezing, improved the application life of pipe-line system.
7, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, mainly by corrugated bushing, pipeline control cabinet and wall connector are interconnected, sleeve pipe can regulate arbitrarily within the scope of 1-300 rice and centre is embedded in body of wall or floor in advance without any pipe joint, in the insertion of high tenacity flexible pipe and corrugated bushing, the connection of all pipe joints is all directly to insert connection by laminated type pipe joint, without just complete operation smoothly of special technician, without special tool, pipeline directly inserts pipe fitting, just can be quick, easily completing pipeline connects, pipe-line system after connection can be born the pressure of 1-20Mpa, guarantee that junction can not leak simultaneously, can not come off.And without needing various special tools as the connected mode of existing pipe-line system, needing to complete pipeline mounting construction through the professional technique workman of training, greatly reduced the work human cost of building pipe construction works.
8, the pre-buried replaceable pipe-line system of a kind of novel building feedwater of the present invention, can also complete being connected between solar water heater and indoor water spot by the hot water pipeline of solar water heater with the form that the hot water pipeline in building is delivered directly to position with a pipeline by the mode of secretly burying non junction sleeve pipe.Solve domestic current solar water supply exposed tube problem outside, service efficiency and the life-span of having improved solar water heater, reduced the installation cost of solar energy water heater pipe.
Detailed description of the invention:
As shown in Figure 1, the pre-buried replaceable pipe-line system of a kind of novel building feedwater, there is corrugated bushing 5, described corrugated bushing 5 surfaces have corrugated reinforced rib, described sleeve pipe socket 3 is connected with the sleeve pipe socket 3 of pipeline control cabinet 7, wall connector 2, described pipeline control cabinet 7 compositions are built-in with at least two pipeline distributors 6, and described pipeline distributor 6, at least has three above laminated type pipe joints 1.Described sleeve pipe socket 3 is connected with pipeline control cabinet 7.Described laminated type pipe joint 1 is inserted and is placed in the draw-in groove of wall connector 2, and high tenacity flexible pipe 4 can directly be inserted in described laminated type pipe joint 1 one end, and one end has screw thread in addition, can be connected with water tap (as shown in Figure 2).On described pipeline distributor 6, have the box-like pipe joint 1 of a row pressure at least, every row is no less than at least three laminated type pipe joints 1.Interior can the storing of described pipeline control cabinet 7 is no less than two above pipeline distributors 6, is respectively hot water and cold water dispenser (as shown in Figure 3); Described pipeline control cabinet 7 is embedded in advance in body of wall or floor and fixes by curing after concreting, while being placed in body of wall or floor outside, adopts screw to be fixed by the screwed hole on control cabinet.Pipe-line system by: laminated type pipe joint, wall connector, sleeve pipe socket, high tenacity flexible pipe, corrugated bushing, pipeline distributor, pipeline control cabinet form.
Pipe-line system is synchronizeed and is carried out with the construction of building structure layer in the time of the construction of building building, all pipelines are all embedded in body of wall or floor in advance, distance how long no matter between the water outlet place-wall connector 2 of pipeline and pipeline control cabinet 7, middle without any one pipe joint; Between the water outlet place-wall connector 2 of pipeline and pipeline control cabinet 7, be connected pipeline generation water leakage fault time, leaking pipe can be extracted out in sleeve pipe, reinsert new pipeline, thereby reach quick-replaceable pipeline, get rid of the object of water leakage fault, and do not need the mode by striking wall to carry out the maintenance of leaking pipe.Described corrugated bushing 5 external surfaces have screw thread, and two ends of described corrugated bushing 5 can directly insert sleeve pipe socket 3, and sleeve pipe socket 3 place's corrugated bushings 5 are without just can directly inserting by other instruments and material.High tenacity flexible pipe 4 of the present invention is connected with laminated type pipe joint 1, is also the connected mode of pipeline card edge type, and pipeline, without just can directly inserting laminated type pipe joint 1 by other materials and instrument, completes the connection operation of pipeline.All connected modes of pipe-line system of the present invention have overcome the disposable shortcoming that is welded to connect, can not repeatedly removes and installs of PPR pipeline, pipe fitting of existing market sale main flow, all pipe connector lug places can pass through pipe connector quick-detachment and replacing, just can complete fast, like a cork the attended operation of pipeline without special technician and special instrument.Pipe-line system after connection can be born the pressure of 5-40Mpa, guarantees that junction can not leak, can not come off simultaneously.Water supply piping system of the present invention, all pipelines are realized control and management respectively along separate routes by pipeline control cabinet 7, when Dang Yi road pipeline generation water leakage fault, only the pipe valve leaking need to be closed, just can temporarily prevent to the leaking of pipeline, and leak and will close whole water system without there is a place as current pipe-line system.In pipeline control cabinet 7 of the present invention, carry out distribution circuit again by hot and cold water pipeline, pipeline control cabinet 7 is interior arranges two pipeline distributors 6, and cold hot water piping control and management respectively, facilitates the maintenance of pipe-line system and the final-period management of system.Its advantage is: feedwater piping is embedded in building structure in advance; When feedwater piping generation water leakage fault, pipeline just can be changed without striking wall; Water supply system adopts pipeline control cabinet, facilitates supply line system management; Pipeline connected mode advanced person, connects fast, and junction can not produce drainage simultaneously;
Building water supply pipeline is synchronizeed and is carried out with building operations, significantly reduces the construction cost of pipe works; Later maintenance, the maintenance cost of building water supply pipeline system significantly reduce.Pipe-line system in the time of architectural design, can carry out freely configuring design according to building designers' requirement.The duration of pipeline mounting construction shortens widely.
Above-described specific embodiment; object of the present invention, technical scheme and beneficial effect are further described; institute is understood that; the foregoing is only specific embodiments of the invention; be not limited to the present invention; within the spirit and principles in the present invention all, any amendment of making, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.