CN103967040B - Tower-crane foundation structure and construction method thereof - Google Patents

Tower-crane foundation structure and construction method thereof Download PDF

Info

Publication number
CN103967040B
CN103967040B CN201410210961.5A CN201410210961A CN103967040B CN 103967040 B CN103967040 B CN 103967040B CN 201410210961 A CN201410210961 A CN 201410210961A CN 103967040 B CN103967040 B CN 103967040B
Authority
CN
China
Prior art keywords
foundation
tower crane
positioning
steel bars
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410210961.5A
Other languages
Chinese (zh)
Other versions
CN103967040A (en
Inventor
韩佩
肖林林
杨世昱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201410210961.5A priority Critical patent/CN103967040B/en
Publication of CN103967040A publication Critical patent/CN103967040A/en
Application granted granted Critical
Publication of CN103967040B publication Critical patent/CN103967040B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本发明提供了一种塔吊基础结构及其施工方法,其中,施工方法包括:混凝土植筋过程;找平过程;以及承台的设定过程。塔吊基础结构包括:混凝土基础、定位钢筋、基础底板以及承台。本发明解决了现有塔吊基础不能同时保证高稳定性和高效率定位拆装的问题,并极大地提高了塔吊施工的工作效率,且进一步减少施工所造成的环境污染,达到绿色施工要求。

The invention provides a tower crane foundation structure and a construction method thereof, wherein the construction method includes: a process of planting concrete bars; a leveling process; and a setting process of a cap. The basic structure of the tower crane includes: concrete foundation, positioning steel bars, foundation floor and cap. The invention solves the problem that the existing tower crane foundation cannot guarantee high stability and high efficiency positioning and disassembly at the same time, greatly improves the work efficiency of tower crane construction, further reduces environmental pollution caused by construction, and meets the requirements of green construction.

Description

塔吊基础结构及其施工方法Tower crane foundation structure and its construction method

技术领域technical field

本发明属于建筑施工领域,具体涉及一种塔吊基础结构及其施工方法。The invention belongs to the field of building construction, and in particular relates to a tower crane foundation structure and a construction method thereof.

背景技术Background technique

目前,塔吊已被广泛地运用于建筑领域中。由于塔吊所起吊物体时的平稳性及安全性与塔吊基础有着直接的关系,因而,保证塔吊基础的牢固稳定一直是安装塔吊施工时尤为重视的一环。At present, tower cranes have been widely used in the field of construction. Since the stability and safety of the objects lifted by the tower crane are directly related to the foundation of the tower crane, ensuring the firmness and stability of the foundation of the tower crane has always been a particularly important part of the installation of the tower crane.

现有十分普遍的做法是浇筑混凝土块以作为塔吊基础,然而,利用现有做法进行施工时,所浇筑混凝土块的体积普遍较大,施工时还需要经过绑钢筋、支模板和浇筑混凝土等工序,这就在一定程度上造成在混凝土振捣过程中很难保证地脚的水平度,并且,在塔吊拆除之后,混凝土基础还需另行爆破拆除。显然,此种做法存在施工效率低下且污染环境等缺陷。。The current very common method is to pour concrete blocks as the foundation of the tower crane. However, when using the existing methods for construction, the volume of the poured concrete blocks is generally large, and the construction also needs to go through processes such as binding steel bars, supporting formwork, and pouring concrete. , which to a certain extent makes it difficult to ensure the levelness of the foundation during the concrete vibration process, and, after the tower crane is removed, the concrete foundation needs to be demolished by blasting. Obviously, this kind of practice has defects such as low construction efficiency and environmental pollution. .

发明内容Contents of the invention

为克服现有技术所存在的缺陷,现提供一种塔吊基础结构及其施工方法,以解决现有塔吊基础不能同时保证高稳定性和高效率定位拆装的问题,并极大地提高了塔吊施工的工作效率,且进一步减少施工所造成的环境污染,达到绿色施工要求。In order to overcome the defects of the existing technology, a tower crane foundation structure and its construction method are provided to solve the problem that the existing tower crane foundation cannot ensure high stability and high efficiency positioning and disassembly at the same time, and greatly improve the tower crane construction. The work efficiency is improved, and the environmental pollution caused by construction is further reduced to meet the requirements of green construction.

为实现上述目的,本发明首先提供一种塔吊基础结构施工方法,包括:In order to achieve the above object, the present invention firstly provides a construction method of tower crane foundation structure, comprising:

混凝土植筋过程,包括在混凝土基础上植入多根定位钢筋以形成与塔吊地脚相对应的多个植筋区域,植筋区域中的多根定位钢筋凸出于混凝土基础之上;The concrete reinforcement process includes implanting a plurality of positioning steel bars on the concrete foundation to form multiple reinforcement areas corresponding to the foundation of the tower crane. The multiple positioning steel bars in the reinforcement area protrude from the concrete foundation;

找平过程,包括在每个植筋区域内利用定位钢筋对应设置一基础底板并对基础底板进行找平,当多个植筋区域内的所有基础底板均处于同一预设高度后,通过所述定位钢筋将每个植筋区域的基础底板固定并填充灌浆基础底板与混凝土基础之间的空隙;The leveling process includes setting a foundation base plate correspondingly with positioning steel bars in each rebar planting area and leveling the base base plate. Fix the base plate of each reinforcement area and fill the gap between the base plate of the grouted base and the concrete foundation;

承台的设定过程,包括在每个基础底板上固接一承台,以供将塔吊地脚分别固定于各个承台上。The setting process of the bearing platform includes fixing a bearing platform on each base plate, so as to fix the tower crane feet on each bearing platform respectively.

本发明塔吊基础结构施工方法的有益效果在于,The beneficial effect of the tower crane foundation structure construction method of the present invention is that,

1)通过运用定位钢筋,将基础底板临时隔空定位;1) Temporarily locate the foundation floor by using positioning reinforcement;

2)通过检测水平度的仪器保证基础底板的高水平度以逐步实现找平;2) Ensure the high levelness of the foundation floor through the levelness detection instrument to gradually achieve leveling;

3)通过对隔空的基础底板进行填充灌浆以提高其找平后的稳固度;3) To improve the stability after leveling by filling and grouting the empty base plate;

4)通过将塔吊地脚固定于承台上以实现定位拆装的高稳定和高效率。4) The high stability and high efficiency of positioning and disassembly can be achieved by fixing the tower crane foot on the bearing platform.

本发明塔吊基础结构施工方法的进一步改进在于,形成单个植筋区域包括:将多根定位钢筋规律排布并分别植入于混凝土基础内,以在混凝土基础之上形成凸出的多根定位钢筋。The further improvement of the construction method of the tower crane foundation structure of the present invention is that the formation of a single bar planting area includes: arranging a plurality of positioning steel bars regularly and implanting them in the concrete foundation respectively, so as to form a plurality of protruding positioning steel bars on the concrete foundation .

本发明塔吊基础结构施工方法的进一步改进在于,基础底板上设有规律排布的多个定位孔,找平过程包括:将定位钢筋的顶部分别对应穿设于定位孔内,并在基础底板与混凝土基础之间形成所述间隙。The further improvement of the construction method of the tower crane foundation structure of the present invention is that a plurality of positioning holes arranged regularly are arranged on the foundation floor, and the leveling process includes: correspondingly piercing the tops of the positioning steel bars in the positioning holes, The gap is formed between the foundations.

本发明塔吊基础结构施工方法的进一步改进在于,找平过程包括:对每个植筋区域内的基础底板进行水平度检测及实时调整,直至多个植筋区域内的所有基础底板均处于同一预设高度。The further improvement of the construction method of the tower crane foundation structure of the present invention lies in that the leveling process includes: performing levelness detection and real-time adjustment on the foundation floor in each reinforcement area, until all foundation floors in multiple reinforcement areas are in the same preset high.

本发明塔吊基础结构施工方法的进一步改进在于,找平过程包括:待多个所述植筋区域内的所有所述基础底板均处于同一预设高度后,对任意一个基础底板,先分别将定位钢筋的顶部与基础底板固接,再对间隙进行所述填充灌浆。The further improvement of the construction method of the tower crane foundation structure of the present invention lies in that the leveling process includes: after all the foundation bottom plates in the plurality of said planting reinforcement areas are at the same preset height, for any one foundation bottom plate, first place the positioning steel bars respectively The top of the base is fixed to the base plate, and then the gap is filled with grout.

本发明塔吊基础结构施工方法的进一步改进在于,承台的设定过程包括:待填充灌浆完成后,将承台焊接于基础底板上。The further improvement of the construction method of the tower crane foundation structure of the present invention lies in that the setting process of the cap includes: after the filling and grouting is completed, the cap is welded to the base plate of the foundation.

本发明塔吊基础结构施工方法的进一步改进在于,承台的设定过程还包括:在承台的上表面设置定位轮廓线,以供塔吊地脚依据定位轮廓线固定于承台上。The further improvement of the construction method of the tower crane foundation structure of the present invention lies in that the setting process of the bearing platform also includes: setting a positioning contour line on the upper surface of the bearing platform, so that the foundation feet of the tower crane are fixed on the bearing platform according to the positioning contour line.

为更好地实现上述目的,本发明还提供一种塔吊基础结构,包括:In order to better achieve the above purpose, the present invention also provides a tower crane infrastructure, including:

形成于混凝土基础上并与塔吊地脚个数相对应的多个植筋区域,每个植筋区域中设置有凸出的多根定位钢筋;A plurality of rebar planting areas formed on the concrete foundation and corresponding to the number of tower crane feet, and each rebar planting area is provided with a plurality of protruding positioning steel bars;

设置于每个植筋区域内且位于定位钢筋顶部的基础底板,多个植筋区域内的所有基础底板均处于同一预设高度;以及a foundation slab disposed within each rebar area and positioned on top of the locating reinforcement, all of the foundation slabs in the plurality of rebar areas being at the same predetermined height; and

设置于基础底板上以供塔吊地脚固定的承台。The cap set on the foundation floor for the fixing of tower crane feet.

本发明塔吊基础结构的有益效果在于,The beneficial effect of the tower crane foundation structure of the present invention is that,

1)通过定位钢筋配合基础底板的结构设置以在施工中实现找平;1) Leveling is achieved during construction by positioning steel bars to match the structural settings of the foundation floor;

2)通过基础底板配合承台的结构设置以在施工中实现灵活且稳定的定位拆装。2) Flexible and stable positioning and disassembly can be achieved during construction through the structural setting of the base plate and the bearing platform.

本发明塔吊基础结构的进一步改进在于,还包括形成于混凝土与基础底板之间的找平层。The further improvement of the foundation structure of the tower crane of the present invention is that it also includes a leveling layer formed between the concrete and the base plate.

本发明塔吊基础结构的进一步改进在于,多根定位钢筋规律排布,基础底板上设有规律排布的多个定位孔,定位钢筋与定位孔一一对应并焊接连接;承台焊接于基础底板上,承台的顶面具有定位轮廓线,以供塔吊地脚依据定位轮廓线与承台的顶面固定连接。The further improvement of the foundation structure of the tower crane of the present invention lies in that a plurality of positioning steel bars are regularly arranged, and a plurality of positioning holes are arranged regularly on the foundation bottom plate, and the positioning steel bars correspond to the positioning holes one by one and are connected by welding; the cap is welded to the foundation bottom plate Above, the top surface of the cap has a positioning contour line for the tower crane to be fixedly connected to the top surface of the cap according to the positioning contour line.

附图说明Description of drawings

图1为本发明塔吊基础结构施工方法的流程示意图;Fig. 1 is the schematic flow sheet of tower crane foundation structure construction method of the present invention;

图2为本发明定位钢筋锚固于混凝土基础上的剖视结构示意图;Fig. 2 is the cross-sectional structure schematic diagram of the anchorage of the positioning steel bar of the present invention on the concrete foundation;

图3为本发明形成四个植筋区域的俯视结构示意图;Fig. 3 is the top view structure schematic diagram that the present invention forms four rebar areas;

图4为本发明基础底板的俯视结构示意图;Fig. 4 is a top view structural schematic diagram of the foundation base plate of the present invention;

图5为本发明在图3和图4的基础上固定基础底板的剖视结构示意图;Fig. 5 is a schematic sectional structural view of the fixed base plate of the present invention on the basis of Fig. 3 and Fig. 4;

图6为本发明在图5的基础上填充灌浆以形成找平层的剖视结构示意图;Fig. 6 is a schematic cross-sectional structure diagram of the present invention filling grout on the basis of Fig. 5 to form a leveling layer;

图7为本发明在图6基础上固定承台的剖视结构示意图;Fig. 7 is a schematic cross-sectional structure diagram of the present invention fixing the platform on the basis of Fig. 6;

图8为本发明承台顶面的俯视结构示意图;Fig. 8 is a top view structural schematic diagram of the top surface of the platform of the present invention;

图9为本发明在图7和图8基础上固定塔吊地脚的剖视结构示意图。Fig. 9 is a schematic cross-sectional structure diagram of fixing the tower crane foot on the basis of Fig. 7 and Fig. 8 according to the present invention.

具体实施方式Detailed ways

为利于对本发明的结构的了解,以下结合附图及实施例进行说明。In order to facilitate the understanding of the structure of the present invention, the following description will be made in conjunction with the accompanying drawings and embodiments.

参照图1,为本发明塔吊基础结构施工方法的流程示意图,如图1所示,本发明首先提供一种塔吊基础结构施工方法,包括以下几个主要的过程:With reference to Fig. 1, be the schematic flow sheet of tower crane foundation structure construction method of the present invention, as shown in Fig. 1, the present invention at first provides a kind of tower crane foundation structure construction method, comprises following several main processes:

a.混凝土植筋过程a. Concrete reinforcement process

可参照图2,为本发明定位钢筋2锚固于混凝土基础1的剖视示意图,如图2所示,施工时应首先执行步骤S1:需事先根据塔吊的所受荷载需要,计算所需定位钢筋2的截面、数量及其锚固深度。待计算完成后,便可在一次灌浆成型的混凝土基础1上,开设多个以矩阵形式排布的钢筋孔(当然钢筋孔也可按其他规律形式排布,例如,米字型排布),钢筋孔的深度需达到锚固深度的计算设定值。而后,按施工要求,将多根定位钢筋2分别植入于每个钢筋孔内,待定位钢筋2到达钢筋孔的锚固深度时,锚固定位钢筋2使其自然凸出显露于混凝土基础1之上。依此方式,形成一个矩形的植筋区域8。Referring to Fig. 2, it is a schematic cross-sectional view of the positioning steel bar 2 anchored on the concrete foundation 1 of the present invention. As shown in Fig. 2, step S1 should be performed first during construction: the required positioning steel bar needs to be calculated in advance according to the load requirements of the tower crane 2 section, quantity and anchorage depth. After the calculation is completed, a plurality of reinforcement holes arranged in a matrix form can be opened on the concrete foundation 1 formed by one-time grouting (of course, the reinforcement holes can also be arranged in other regular forms, for example, in a rice-shaped arrangement), The depth of the reinforcement hole needs to reach the calculated set value of the anchorage depth. Then, according to the construction requirements, a plurality of positioning steel bars 2 are respectively implanted in each steel bar hole, and when the positioning steel bars 2 reach the anchoring depth of the steel bar holes, the anchoring positioning steel bars 2 are naturally protruded and exposed on the concrete foundation 1 . In this manner, a rectangular bar planting area 8 is formed.

需要注意的是,由于现有塔吊普遍具有四个地脚,因此,参照图3,为本发明形成四个植筋区域8的俯视结构示意图,如图3所示,重复上述过程,形成前后左右四个植筋区域,以此,完成步骤S1。It should be noted that since the existing tower cranes generally have four feet, therefore, referring to Fig. 3, it is a schematic diagram of the top view of the four planting bar regions 8 according to the present invention, as shown in Fig. The four areas for planting bars are thus completed to complete step S1.

b.基础底板3的定位过程b. The positioning process of the base plate 3

可参照图4,为本发明基础底板3的俯视结构示意图,结合图3和图4所示,对于每个植筋区域8,施工时应待步骤S1完成后再执行步骤S2:事先准备一块钢板作为基础底板3,该基础底板3上需开设有能与定位钢筋2相对应的多个定位孔30。在实施时,可在基础底板3下表面四周设置支撑垫块,以使得基础底板3被临时隔空支撑,并保证每个定位孔30内对应有一根定位钢筋2,以此,完成步骤S2,实现基础底板3的隔空定位。Refer to Fig. 4, which is a schematic diagram of the top view structure of the foundation base plate 3 of the present invention, as shown in Fig. 3 and Fig. 4, for each bar planting area 8, step S2 should be performed after step S1 is completed during construction: prepare a steel plate in advance As the foundation base plate 3 , a plurality of positioning holes 30 corresponding to the positioning reinforcement bars 2 need to be opened on the base base plate 3 . During implementation, support pads can be set around the lower surface of the foundation base plate 3, so that the base base plate 3 is temporarily supported in space, and ensure that each positioning hole 30 corresponds to a positioning steel bar 2, thereby completing step S2, Realize the spaced positioning of the foundation base plate 3 .

c.基础底板3的找平过程c. The leveling process of the base plate 3

可参照图5,为本发明在图3和图4的基础上固定基础底板3的剖视结构示意图,如图5所示,对于每个植筋区域8,施工时应待步骤S2完成后再执行步骤S3:由于步骤S2中的基础底板3是被临时隔空支撑的,因而,在基础底板3与混凝土基础1之间自然形成隔空空间4,借此,可对基础底板3进行水平度的精确调整。具体地,在实施时,可利用水平仪对基础底板3不断地进行水平度的检测并实时调整,直至基四个植筋区域8内的所有基础底板3均处于同一预设高度,以此,完成步骤S3,实现基础底板3较高精度的找平。Referring to Fig. 5, it is a schematic cross-sectional structure diagram of fixing the base plate 3 of the present invention on the basis of Fig. 3 and Fig. 4. As shown in Fig. 5, for each bar planting area 8, the construction should be completed after step S2 is completed. Execute step S3: Since the base plate 3 in step S2 is temporarily supported by the space, a space 4 is naturally formed between the base plate 3 and the concrete foundation 1, whereby the base plate 3 can be leveled precise adjustment. Specifically, during implementation, a spirit level can be used to continuously detect the levelness of the foundation base plate 3 and adjust it in real time until all base base plates 3 in the four rebar planting areas 8 are at the same preset height, thereby completing In step S3, higher precision leveling of the base plate 3 is realized.

d.基础底板3的固定过程d. The fixing process of the base plate 3

可参照图6,为本发明在图5的基础上填充灌浆以形成找平层5的剖视结构示意图,如图5所示,对于每个植筋区域8,施工时应待步骤S3完成后再执行步骤S4:待基础底板3的水平度达到施工精度要求后,最为理想的状况是,基础底板3的上表面与定位钢筋2的顶端齐平,此时,便可先将定位孔30与定位钢筋2的顶部焊接固定起来,再将支撑于基础底板3下表面四周的垫块移除,之后,便可对所形成的隔空空间4进行二次灌浆,以将隔空空间4填充充实。之后,在基础底板3与混凝土基础1之间便形成了一层找平层5,以此使得基础底板3的稳固度得到大幅度提升Referring to Fig. 6, it is a schematic diagram of the sectional structure of filling grouting on the basis of Fig. 5 to form a leveling layer 5 according to the present invention. Execute step S4: After the levelness of the foundation base plate 3 meets the construction accuracy requirements, the most ideal situation is that the upper surface of the base base plate 3 is flush with the top of the positioning reinforcement bar 2. At this time, the positioning hole 30 can be aligned with the positioning The top of the steel bar 2 is welded and fixed, and the pads supported around the lower surface of the base plate 3 are removed, and then secondary grouting can be performed on the formed empty space 4 to fill the empty space 4 fully. After that, a leveling layer 5 is formed between the base plate 3 and the concrete foundation 1, so that the stability of the base plate 3 is greatly improved

e.承台6的设定过程e. The setting process of platform 6

可参照图7,为本发明在图6基础上固定承台6的剖视结构示意图,如图7所示,对于每个植筋区域8,施工时应待步骤S4完成后再执行步骤S5:待找平层5彻底凝固后,便可在基础底板3上固定承台6,较为理想地,承台6被焊接固定于基础底板3的正中心。Refer to Fig. 7, which is a schematic cross-sectional structural view of the fixed cap 6 based on Fig. 6 of the present invention. As shown in Fig. 7, for each bar planting area 8, step S5 should be executed after step S4 is completed during construction: After the leveling layer 5 is completely solidified, the platform 6 can be fixed on the base plate 3 , and ideally, the platform 6 is welded and fixed on the center of the base plate 3 .

f.塔吊地脚7的设定过程f. The setting process of tower crane foot 7

可参照图8和图9,图8为本发明承台6顶面的俯视结构示意图,图9为本发明在图7和图8基础上固定塔吊地脚7的剖视结构示意图,结合图8和图9所示,对于每个植筋区域8,施工时应待步骤S5完成后再执行步骤S6:由于每个承台6的上表面均具有定位轮廓线60,待承台6焊接固定后,塔吊地脚7需借助承台6上表面的这些定位轮廓线60来尽可能精确塔吊地脚7与承台6的相对固定位置。Can refer to Fig. 8 and Fig. 9, Fig. 8 is the top view structure schematic diagram of the cap platform 6 top surface of the present invention, Fig. 9 is the cross-sectional structural schematic diagram of the present invention fixing tower crane foot 7 on the basis of Fig. 7 and Fig. 8, in conjunction with Fig. 8 As shown in Figure 9, for each rebar planting area 8, step S6 should be executed after step S5 is completed during construction: since the upper surface of each cap 6 has a positioning contour line 60, after the cap 6 is welded and fixed Therefore, the tower crane foot 7 needs to use these positioning contour lines 60 on the upper surface of the cap 6 to make the relative fixed position of the tower crane foot 7 and the cap 6 as precise as possible.

待以上步骤S1至步骤S6完成后,四个塔吊地脚7应能稳固且精确地与塔吊基础结构连接。After the above steps S1 to S6 are completed, the four tower crane feet 7 should be able to be stably and accurately connected to the foundation structure of the tower crane.

以下介绍应用上述塔吊基础结构施工方法可形成的其中一种塔吊基础结构(应用本发明塔吊基础结构施工方法应不局限于下述的这种塔吊基础结构):The following introduces one of the tower crane foundation structures that can be formed by applying the above-mentioned tower crane foundation structure construction method (the application tower crane foundation structure construction method of the present invention should not be limited to the following this tower crane foundation structure):

参照图7,为本发明在图6基础上固定承台的剖视结构示意图,同时也是本发明塔吊基础结构的剖视结构示意图,如图7所示,本发明还提供一种塔吊基础结构,包括:一次灌浆所形成的混凝土基础1;固定于混凝土基础1上的多根定位钢筋2;设置于定位钢筋2顶部的基础底板3;以及设置于基础底板3上的承台6。Referring to Fig. 7, it is a schematic sectional structure diagram of the fixed cap of the present invention on the basis of Fig. 6, and it is also a schematic sectional structural diagram of the tower crane foundation structure of the present invention. As shown in Fig. 7, the present invention also provides a tower crane foundation structure, It includes: a concrete foundation 1 formed by one-time grouting; a plurality of positioning steel bars 2 fixed on the concrete foundation 1; a foundation bottom plate 3 arranged on the top of the positioning steel bars 2;

结合图8和图9所示,在本实施例中,混凝土基础1形成于施工现场地面所挖掘的凹坑内;可选用圆钢筋作为定位钢筋2,待所有定位钢筋2固定于混凝土基础1后,需形成如图3所示的四个植筋区域8,并且,每个植筋区域8内均具有如图7所示本发明塔吊基础结构所包括的上述结构特征;选用方形钢板作为基础底板3,为对应于圆钢筋,基础底板3上开设有圆形的定位孔30,定位钢筋2与定位孔30均矩阵排布且焊接连接;并且,基础底板3与混凝土基础1之间经二次灌浆以填充形成有一层找平层5;梯型的承台6焊接固定于基础底板3的上表面中心位置,而承台6的上表面则布设有多条定位轮廓线60,以供塔吊地脚7精确固定于承台6的上表面。As shown in Figure 8 and Figure 9, in this embodiment, the concrete foundation 1 is formed in the pit excavated on the ground of the construction site; round steel bars can be selected as the positioning reinforcement 2, and after all the positioning reinforcement 2 is fixed on the concrete foundation 1, It is necessary to form four bar-planting areas 8 as shown in Figure 3, and each bar-planting area 8 has the above-mentioned structural features included in the tower crane foundation structure of the present invention as shown in Figure 7; the square steel plate is selected as the base plate 3 , in order to correspond to the round steel bar, a circular positioning hole 30 is provided on the base plate 3, and the positioning steel bars 2 and the positioning holes 30 are arranged in a matrix and connected by welding; and, the base plate 3 and the concrete foundation 1 are grouted twice A leveling layer 5 is formed by filling; the trapezoidal cap 6 is welded and fixed on the center of the upper surface of the base plate 3, and the upper surface of the cap 6 is provided with a plurality of positioning contour lines 60 for the tower crane foundation 7 Accurately fixed on the upper surface of platform 6.

完成上述实施过程后,应能体现出本发明塔吊基础结构及其施工方法的以下特点:After completing the above-mentioned implementation process, it should be able to reflect the following characteristics of the tower crane foundation structure of the present invention and its construction method:

1)实现高效率结构施工,并便于拆除;1) Realize high-efficiency structural construction and facilitate demolition;

2)利用常见的钢筋及钢板解决找平难题;2) Use common steel bars and steel plates to solve leveling problems;

3)通过二次灌浆形成找平层的方式得到稳固基础结构。3) A stable foundation structure is obtained by forming a leveling layer through secondary grouting.

以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为保护范围。The present invention has been described in detail above with reference to the embodiments of the accompanying drawings, and those skilled in the art can make various changes to the present invention according to the above description. Therefore, some details in the embodiments should not be construed as limiting the present invention, and the scope of the present invention will be defined by the appended claims as the scope of protection.

Claims (9)

1.一种塔吊基础结构施工方法,其特征在于,包括:1. A tower crane foundation structure construction method, is characterized in that, comprises: 混凝土植筋过程,包括在混凝土基础上植入定位钢筋以形成与塔吊地脚相对应的多个植筋区域,所述植筋区域中的多根所述定位钢筋凸出于所述混凝土基础之上;The process of planting concrete bars includes implanting positioning steel bars on the concrete foundation to form multiple planting bar areas corresponding to the feet of the tower crane, and multiple positioning steel bars in the planting bar areas protrude from the concrete foundation superior; 找平过程,包括在每个所述植筋区域内,利用所述定位钢筋对应设置一基础底板并对所述基础底板进行找平,当多个所述植筋区域内的所有所述基础底板均处于同一预设高度后,通过所述定位钢筋将每个所述植筋区域内的所述基础底板固定并填充灌浆所述基础底板与所述混凝土基础之间的空隙;The leveling process includes, in each of the bar planting areas, using the positioning steel bars to set a base plate correspondingly and leveling the base plate. When all the base plates in the multiple bar planting areas are in the After the same preset height, fix the foundation bottom plate in each of the planting reinforcement areas through the positioning steel bars and fill the gap between the foundation bottom plate and the concrete foundation for grouting; 承台的设定过程,包括在每个所述基础底板上固接一承台,以供将所述塔吊地脚分别固定于各个所述承台上。The setting process of the bearing platform includes fixing a bearing platform on each of the foundation base plates, so as to fix the tower crane feet on each of the bearing platforms respectively. 2.根据权利要求1所述的塔吊基础结构施工方法,其特征在于,2. tower crane foundation structure construction method according to claim 1, is characterized in that, 形成单个所述植筋区域的过程包括:将多根所述定位钢筋规律排布并分别植入于所述混凝土基础内,以在所述混凝土基础之上形成凸出的多根所述定位钢筋。The process of forming a single bar-planting area includes: arranging a plurality of positioning steel bars regularly and respectively implanting them in the concrete foundation, so as to form a plurality of positioning steel bars protruding above the concrete foundation . 3.根据权利要求2所述的塔吊基础结构施工方法,其特征在于,3. tower crane foundation structure construction method according to claim 2, is characterized in that, 所述基础底板上设有规律排布的多个定位孔;The foundation base plate is provided with a plurality of positioning holes regularly arranged; 所述找平过程包括:将所述定位钢筋的顶部分别对应穿设于所述定位孔内,并在所述基础底板与所述混凝土基础之间形成所述空隙。The leveling process includes: piercing the tops of the positioning steel bars in the positioning holes respectively, and forming the gap between the base plate and the concrete foundation. 4.根据权利要求3所述的塔吊基础结构施工方法,其特征在于,4. tower crane foundation structure construction method according to claim 3, is characterized in that, 所述找平过程包括:对每个所述植筋区域内的所述基础底板进行水平度检测及实时调整,直至多个所述植筋区域内的所有所述基础底板均处于同一预设高度。The leveling process includes: performing levelness detection and real-time adjustment on the foundation baseplates in each of the rebar planting areas until all the base baseplates in multiple rebar planting areas are at the same preset height. 5.根据权利要求4所述的塔吊基础结构施工方法,其特征在于,5. tower crane foundation structure construction method according to claim 4, is characterized in that, 所述找平过程包括:待多个所述植筋区域内的所有所述基础底板均处于同一预设高度后,对任意一个所述基础底板,先分别将所述定位钢筋的顶部与所述基础底板固接,再对所述空隙进行所述填充灌浆。The leveling process includes: after all the base plates in the plurality of bar planting areas are at the same preset height, for any one of the base plates, first respectively align the top of the positioning reinforcement with the base The bottom plate is fixed, and then the gap is filled with grout. 6.根据权利要求1或5所述的塔吊基础结构施工方法,其特征在于,6. The tower crane foundation structure construction method according to claim 1 or 5, characterized in that, 所述承台的设定过程包括:待所述填充灌浆完成后,将所述承台焊接于所述基础底板上。The setting process of the platform includes: after the filling and grouting is completed, welding the platform to the base plate. 7.根据权利要求6所述的塔吊基础结构施工方法,其特征在于,7. the construction method of tower crane foundation structure according to claim 6, is characterized in that, 所述承台的设定过程还包括:在所述承台的上表面设置定位轮廓线,以供所述塔吊地脚依据所述定位轮廓线固定于所述承台上。The setting process of the platform further includes: setting a positioning contour line on the upper surface of the platform, so that the tower crane foot is fixed on the platform according to the positioning contour line. 8.一种塔吊基础结构,其特征在于,包括:8. A tower crane foundation structure, characterized in that it comprises: 形成于混凝土基础上并与塔吊地脚相对应的多个植筋区域,每个所述植筋区域中设置有凸出的多根定位钢筋;A plurality of rebar planting areas formed on the concrete foundation and corresponding to the foundation of the tower crane, each of the rebar planting areas is provided with a plurality of protruding positioning steel bars; 设置于每个所述植筋区域内且位于所述定位钢筋顶部的基础底板,多个所述植筋区域内的所有所述基础底板均处于同一预设高度;以及a foundation base plate arranged in each of the rebar planting areas and positioned on top of the positioning reinforcement, and all the base base plates in the plurality of rebar planting areas are at the same preset height; and 设置于每个所述基础底板上以供所述塔吊地脚固定的承台;a cap set on each of the base plates for fixing the tower crane feet; 多根所述定位钢筋规律排布,所述基础底板上设有规律排布的多个定位孔,所述定位钢筋与所述定位孔一一对应并焊接连接;A plurality of positioning steel bars are regularly arranged, and a plurality of positioning holes are regularly arranged on the foundation base plate, and the positioning steel bars correspond to the positioning holes one by one and are connected by welding; 所述承台焊接于所述基础底板上,所述承台的顶面具有定位轮廓线,以供所述塔吊地脚依据所述定位轮廓线与所述承台的顶面固定连接。The cap is welded to the base plate, and the top surface of the cap has a positioning contour line for the tower crane foot to be fixedly connected to the top surface of the cap according to the positioning contour line. 9.根据权利要求8所述的塔吊基础结构,其特征在于,9. The tower crane foundation structure according to claim 8, characterized in that, 还包括形成于所述混凝土与所述基础底板之间的找平层。A screed formed between the concrete and the foundation slab is also included.
CN201410210961.5A 2014-05-19 2014-05-19 Tower-crane foundation structure and construction method thereof Expired - Fee Related CN103967040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410210961.5A CN103967040B (en) 2014-05-19 2014-05-19 Tower-crane foundation structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410210961.5A CN103967040B (en) 2014-05-19 2014-05-19 Tower-crane foundation structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN103967040A CN103967040A (en) 2014-08-06
CN103967040B true CN103967040B (en) 2015-12-02

Family

ID=51237009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410210961.5A Expired - Fee Related CN103967040B (en) 2014-05-19 2014-05-19 Tower-crane foundation structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN103967040B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021077370A1 (en) * 2019-10-24 2021-04-29 广州建筑股份有限公司 Multiple tower crane arrangement method for building construction
CN111894031B (en) * 2020-08-10 2021-08-10 中国建筑第八工程局有限公司 Tower crane foundation and construction method thereof
CN114753400A (en) * 2022-05-31 2022-07-15 国网陕西省电力有限公司西安供电公司 Submerged-welding type power transmission tower spiral anchor foundation steel bearing platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2751072Y (en) * 2004-11-29 2006-01-11 北京城建五建设工程有限公司 Positioning frame for tower crane footing
CN201620422U (en) * 2009-12-24 2010-11-03 赵正义 Vertical connecting and positioning construction of tower structure and foundation concrete
CN102561384A (en) * 2012-01-31 2012-07-11 中天建设集团有限公司天津分公司 Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN202913420U (en) * 2012-11-20 2013-05-01 中国十七冶集团有限公司 Reusable positioning device for installing foundation bolts
CN203878601U (en) * 2014-05-19 2014-10-15 中国建筑第八工程局有限公司 Tower crane foundation structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009167660A (en) * 2008-01-15 2009-07-30 Takenaka Komuten Co Ltd Tower crane foundation structure and method of constructing the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2751072Y (en) * 2004-11-29 2006-01-11 北京城建五建设工程有限公司 Positioning frame for tower crane footing
CN201620422U (en) * 2009-12-24 2010-11-03 赵正义 Vertical connecting and positioning construction of tower structure and foundation concrete
CN102561384A (en) * 2012-01-31 2012-07-11 中天建设集团有限公司天津分公司 Steel hoop truss type elevated pile cap tower crane foundation construction method and structure
CN202913420U (en) * 2012-11-20 2013-05-01 中国十七冶集团有限公司 Reusable positioning device for installing foundation bolts
CN203878601U (en) * 2014-05-19 2014-10-15 中国建筑第八工程局有限公司 Tower crane foundation structure

Also Published As

Publication number Publication date
CN103967040A (en) 2014-08-06

Similar Documents

Publication Publication Date Title
CN111305082A (en) Cover beam installation method for mutual restraint between adjacent piers and columns in prefabricated bridges
CN103195085B (en) Downward story-adding basement and construction method thereof
CN203878601U (en) Tower crane foundation structure
CN102864796B (en) Construction spreading foundation adaptive to filled ground settlement and construction method
CN209227580U (en) The tower-crane foundation structure of raft foundation is placed under a kind of
CN102561721B (en) Building jacking deviation rectifying method
CN102587410A (en) Design and construction method of reinforced concrete retaining wall
CN107740345A (en) A kind of monoblock type welds steel anchor box and its mounting process entirely
CN104727339B (en) Power equipment basis two-step construction method
CN103967040B (en) Tower-crane foundation structure and construction method thereof
CN104179191B (en) Construction method of foundation of large equipment in nuclear power plant
CN105839786B (en) Air bearing membrane building concrete anchor pre-buried structure and its construction method
CN113293790B (en) Pre-leveling tower foundation and leveling construction method thereof
CN103061249A (en) Quick positioning construction device and construction method for steel-pipe column of bridge
CN106032704A (en) A construction method for the structure on both sides of the post-cast belt with concrete columns supporting the roof
CN106164380A (en) Wind-driven generator fabricated base
CN106638329A (en) Assembling type bridge girder lower structure
CN110453729A (en) Steel form partition assembly and construction method for construction of flexible granular waterproof protective layer
CN115341475A (en) Steel anchor box positioning and mounting method
CN110158602A (en) A kind of Soft Clay deep foundation pit support excavation construction structure and construction method
CN214883824U (en) Pre-leveling tower foundation
CN110512665A (en) Synchronous lifting and rectifying structure and construction method of existing sinking old buildings
CN104763005A (en) Large steel spherical tank inclination rectification method
RU2379424C1 (en) Method for erection of foundation slab of framed structure
CN210439159U (en) Double-layer foundation structure of steel pipe pile support suitable for weak geological conditions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202