CN103954909A - 一种高压开关智能组件现场测试方法 - Google Patents
一种高压开关智能组件现场测试方法 Download PDFInfo
- Publication number
- CN103954909A CN103954909A CN201410165221.4A CN201410165221A CN103954909A CN 103954909 A CN103954909 A CN 103954909A CN 201410165221 A CN201410165221 A CN 201410165221A CN 103954909 A CN103954909 A CN 103954909A
- Authority
- CN
- China
- Prior art keywords
- spot test
- ied
- intelligent
- pressure switch
- intelligent high
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
本发明属于智能高压设备测试技术领域,尤其涉及一种高压开关智能组件现场测试方法。包括测量IED、开关设备控制IED、机械状态监测IED、局部放电监测IED、监测主IED和合并单元;所述的测试方法分为单体现场测试和集成现场测试。本发明提供的高压开关智能组件现场测试方法,能够有效地改善智能高压开关现场测试的流程,使一次设备的检修达到充分、彻底的理想效果,大大提高高压开关智能组件现场测试的效率和质量。填补了高压开关智能组件现场测试领域的空白。
Description
技术领域
本发明属于智能高压设备测试技术领域,尤其涉及一种高压开关智能组件现场测试方法。
背景技术
随着智能变电站建设的不断深入,大量的智能高压开关已经在现场投入运行。智能高压开关由高压开关本体、传感器及智能组件组成,其中传感器与本体一体化设计。智能组件实现对本体的测量、监测、控制等功能,通过电缆或光纤与高压开关中的传感器和执行器连接,连接可以是模拟信号,也可以是数字信号。
现今,在智能变电站中,二次设备取消了模拟回路,交流采样以及开入开出,完全采用数字量,这对运维检修工作提出了更高的要求,同时,高压开关中的智能组件在形式上符合二次设备,但与一次本体关联紧密,属于新生事物,运捡人员不能简单采用对数字化二次设备进行测试的经验和方法,容易造成一次设备检修不充分、不彻底的情况。
发明内容
为了解决上述现有技术中存在的问题,本发明提供一种高压开关智能组件现场测试方法。目的在于有效地改善智能高压开关现场测试的流程,提高高压开关智能组件现场测试的效率和质量。
本发明通过以下技术方案来实现:
一种高压开关智能组件现场测试方法,包括测量IED、开关设备控制IED、机械状态监测IED、局部放电监测IED、监测主IED和合并单元;所述的测试方法分为单体现场测试和集成现场测试。
所述的单体现场测试设备是由继电保护测试仪与被测IED用电缆连接;智能高压开关现场测试平台和被测IED用光纤连接;所述的单体现场测试包括以下步骤:
1)测试人员根据智能电子设备的类型和测试工作要求,在智能高压开关现场测试平台上选取该设备的全部或者部分功能,读取相关配置文件,生成测试方案。
2)利用继电保护测试仪,作为电压和电流信号标准源,模拟气室气体压力、温湿度等4-20mA变送后的信号源和分合闸线圈电压、电流值,对所测智能电子设备加载信号;利用继电保护测试仪,模拟合并单元的SV报文、测控装置的GOOSE报文和各监测IED的MMS报文,送入被测IED;
3)在智能高压开关现场测试平台上加载测试方案,启动测试。
4)测量和监测值的校对,智能高压开关现场测试平台通过对IEC 61850报文的解析,与信号源的标准值进行比对;
5)监测主IED综合分析功能校对,通过智能高压开关现场测试平台,对监测主IED的报文进行解析,对监测主IED的综合分析功能进行评估;
6)控制信号的执行,开关设备控制器解析来自智能高压开关现场测试平台的GOOSE报文,观察本体是否动作;
7)在智能高压开关现场测试平台上生成测试报告,单体现场测试流程到此结束。
所述的集成现场测试设备是由智能高压开关现场测试平台和监测主IED用光纤连接;所述的集成现场测试步骤如下:
1)测试人员在智能高压开关现场测试平台上选取集成测试功能,读取定值以及相关配置文件,生成测试方案;
2)按照现场实际情况,把智能组件与本体上的气室温度传感器、压力传感器、湿度传感器和分合闸线圈电流、电压传感器等设备连接;并将智能组件接入网络交换机,同时将智能高压开关现场测试平台也接入到交换机中;
3)在智能高压开关现场测试平台上加载测试方案,启动测试;
4)测量和监测值的校对,智能高压开关现场测试平台通过对IEC 61850报文的解析,得出结论与就地仪表显示值进行比对;
5)控制策略的校准,根据控制策略调整继保测试仪的信号源,达到阈值后,观察本体是否动作。
6)在智能高压开关现场测试平台上生成测试报告,集成现场测试流程到此结束。
所述的本体包括断路器、隔离开关或接地开关。
本发明提供的高压开关智能组件现场测试方法,能够有效地改善智能高压开关现场测试的流程,使一次设备的检修达到充分、彻底的理想效果,大大提高高压开关智能组件现场测试的效率和质量。填补了高压开关智能组件现场测试领域的空白。
附图说明
下面结合附图和具体实施例对本发明作进一步详细的说明。
图1是高压开关智能组件单体现场测试结构示意图;
图2是高压开关智能组件集成现场测试结构示意图。
具体实施方式
本发明是一种高压开关智能组件现场测试方法,其智能组件包括测量IED、开关设备控制IED、机械状态监测IED、局部放电监测IED、监测主IED和合并单元;测试方法分为单体现场测试和集成现场测试。
所述的单体现场测试包括以下步骤:
1)测试人员根据智能电子设备的类型和测试工作要求,在智能高压开关现场测试平台上选取该设备的全部或者部分功能,读取相关配置文件,生成测试方案。
2)利用继电保护测试仪,作为电压和电流信号标准源,模拟气室气体压力、温湿度等4-20mA变送后的信号源和分合闸线圈电压、电流值,对所测智能电子设备加载信号;利用继电保护测试仪,模拟合并单元的SV报文、测控装置的GOOSE报文和各监测IED的MMS报文,送入被测IED。
3)在智能高压开关现场测试平台上加载测试方案,启动测试。
4)测量和监测值的校对,智能高压开关现场测试平台通过对IEC 61850报文的解析,与信号源的标准值进行比对。
5)监测主IED综合分析功能校对,通过智能高压开关现场测试平台,对监测主IED的报文进行解析,对监测主IED的综合分析功能进行评估。
6)控制信号的执行,开关设备控制器解析来自智能高压开关现场测试平台的GOOSE报文;观察本体,包括断路器、隔离开关或者接地开关是否动作。
7)在智能高压开关现场测试平台上生成测试报告,单体现场测试流程到此结束。
实施例1:
如图1所示,一种高压开关智能组件现场测试方法,单体现场测试包括:继电保护测试仪、智能高压开关现场测试平台和被测IED。继电保护测试仪与被测IED用电缆连接;智能高压开关现场测试平台和被测IED用光纤连接。以被测IED是机械状态监测IED为例,其测试步骤为:
1)测试人员在智能高压开关现场测试平台上选取高压开关机械状态监测IED的全部功能,读取相关配置文件,生成测试方案。
2)利用继电保护测试仪,作为电压、电流信号标准源,模拟分合闸线圈电压和电流,加载到机械状态监测IED上;利用继电保护测试仪,模拟采集系统电压、电流合并单元的SV报文,送入机械状态监测IED。
3)在智能高压开关现场测试平台上加载测试方案,启动测试。
4)对监测值结果进行校对,智能高压开关现场测试平台通过对MMS报文的解析,与信号源的标准值进行比对。
5)在智能高压开关现场测试平台上生成测试报告,单体现场测试流程到此结束。
实施例2:
如图2所示,一种高压开关智能组件现场测试方法,集成现场测试包括:高压开关本体、测量IED、开关设备控制器、机械状态监测IED、局部放电监测IED、监测主IED、合并单元、网络交换机和智能高压开关现场测试平台。智能高压开关现场测试平台和监测主IED用光纤连接。其测试步骤为:
1)测试人员在智能高压开关现场测试平台上选取集成测试功能,读取定值以及相关配置文件,生成测试方案。
2)按照现场实际情况,把智能组件与本体上的气室温度传感器、压力传感器、湿度传感器和分合闸线圈电流、电压传感器等设备连接。并将智能组件接入网络交换机,同时将智能高压开关现场测试平台也接入到交换机中。
3)在智能高压开关现场测试平台上加载测试方案,启动测试。
4)测量和监测值的校对,智能高压开关现场测试平台通过对IEC 61850报文的解析,得出结论与就地仪表显示值进行比对。
5)控制策略的校准,根据控制策略调整继保测试仪的信号源,达到阈值后;观察本体,包括断路器、隔离开关或者接地开关是否动作。
6)在智能高压开关现场测试平台上生成测试报告,集成现场测试流程到此结束。
Claims (4)
1.一种高压开关智能组件现场测试方法,其特征在于:所述的智能组件包括测量IED、开关设备控制IED、机械状态监测IED、局部放电监测IED、监测主IED和合并单元;
所述的测试方法分为单体现场测试和集成现场测试。
2.根据权利要求1所述的一种高压开关智能组件现场测试方法,其特征在于:所述的单体现场测试设备是由继电保护测试仪与被测IED用电缆连接;智能高压开关现场测试平台和被测IED用光纤连接;
所述的单体现场测试包括以下步骤:
1)测试人员根据智能电子设备的类型和测试工作要求,在智能高压开关现场测试平台上选取该设备的全部或者部分功能,读取相关配置文件,生成测试方案;
2)利用继电保护测试仪,作为电压和电流信号标准源,模拟气室气体压力、温湿度等4-20mA变送后的信号源和分合闸线圈电压、电流值,对所测智能电子设备加载信号;利用继电保护测试仪,模拟合并单元的SV报文、测控装置的GOOSE报文和各监测IED的MMS报文,送入被测IED;
3)在智能高压开关现场测试平台上加载测试方案,启动测试;
4)测量和监测值的校对,智能高压开关现场测试平台通过对IEC 61850报文的解析,与信号源的标准值进行比对;
5)监测主IED综合分析功能校对,通过智能高压开关现场测试平台,对监测主IED的报文进行解析,对监测主IED的综合分析功能进行评估;
6)控制信号的执行,开关设备控制器解析来自智能高压开关现场测试平台的GOOSE报文,观察本体是否动作;
7)在智能高压开关现场测试平台上生成测试报告,单体现场测试流程到此结束。
3.根据权利要求1所述的一种高压开关智能组件现场测试方法,其特征在于:所述的集成现场测试设备是由智能高压开关现场测试平台和监测主IED用光纤连接;
所述的集成现场测试步骤如下:
1)测试人员在智能高压开关现场测试平台上选取集成测试功能,读取定值以及相关配置文件,生成测试方案;
2)按照现场实际情况,把智能组件与本体上的气室温度传感器、压力传感器、湿度传感器和分合闸线圈电流、电压传感器等设备连接;并将智能组件接入网络交换机,同时将智能高压开关现场测试平台也接入到交换机中;
3)在智能高压开关现场测试平台上加载测试方案,启动测试;
4)测量和监测值的校对,智能高压开关现场测试平台通过对IEC 61850报文的解析,得出结论与就地仪表显示值进行比对;
5)控制策略的校准,根据控制策略调整继保测试仪的信号源,达到阈值后,观察本体是否动作;
6)在智能高压开关现场测试平台上生成测试报告,集成现场测试流程到此结束。
4.根据权利要求1所述的一种高压开关智能组件现场测试方法,其特征在于:所述的本体包括断路器、隔离开关或接地开关。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410165221.4A CN103954909B (zh) | 2014-04-23 | 2014-04-23 | 一种高压开关智能组件现场测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410165221.4A CN103954909B (zh) | 2014-04-23 | 2014-04-23 | 一种高压开关智能组件现场测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103954909A true CN103954909A (zh) | 2014-07-30 |
CN103954909B CN103954909B (zh) | 2017-02-15 |
Family
ID=51332207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410165221.4A Active CN103954909B (zh) | 2014-04-23 | 2014-04-23 | 一种高压开关智能组件现场测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103954909B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107907825A (zh) * | 2017-10-31 | 2018-04-13 | 云南电网有限责任公司保山供电局 | 一种敞开式高压隔离开关在线监测装置及方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102291277A (zh) * | 2011-08-09 | 2011-12-21 | 上海思源弘瑞自动化有限公司 | 智能变电站间隔装置的自动测试系统及方法 |
CN102323499A (zh) * | 2011-06-15 | 2012-01-18 | 北京四方继保自动化股份有限公司 | 一种继电保护设备实现自动化测试的方法 |
CN102608450A (zh) * | 2012-02-24 | 2012-07-25 | 江苏凌创电气自动化股份有限公司 | 适用于智能变电站的测试校验系统及校验方法 |
CN103105550A (zh) * | 2013-01-14 | 2013-05-15 | 湖北省电力公司电力科学研究院 | 一种智能化继电保护装置检测方法及系统 |
CN103176084A (zh) * | 2013-03-07 | 2013-06-26 | 江苏省电力公司电力科学研究院 | 全景取代模式的智能变电站模拟系统及其集成测试方法 |
CN103312037A (zh) * | 2013-06-09 | 2013-09-18 | 国家电网公司 | 智能变电站压力测试装置及方法 |
CN103439612A (zh) * | 2013-09-02 | 2013-12-11 | 上海毅昊自动化有限公司 | 基于scd的智能变电站自动测试系统 |
CN103439592A (zh) * | 2013-06-27 | 2013-12-11 | 国家电网公司 | 一种智能变电站现场智能测试方法 |
CN104090194A (zh) * | 2014-07-31 | 2014-10-08 | 上海毅昊自动化有限公司 | 智能变电站继电保护非侵入式测试系统及方法 |
-
2014
- 2014-04-23 CN CN201410165221.4A patent/CN103954909B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102323499A (zh) * | 2011-06-15 | 2012-01-18 | 北京四方继保自动化股份有限公司 | 一种继电保护设备实现自动化测试的方法 |
CN102291277A (zh) * | 2011-08-09 | 2011-12-21 | 上海思源弘瑞自动化有限公司 | 智能变电站间隔装置的自动测试系统及方法 |
CN102608450A (zh) * | 2012-02-24 | 2012-07-25 | 江苏凌创电气自动化股份有限公司 | 适用于智能变电站的测试校验系统及校验方法 |
CN103105550A (zh) * | 2013-01-14 | 2013-05-15 | 湖北省电力公司电力科学研究院 | 一种智能化继电保护装置检测方法及系统 |
CN103176084A (zh) * | 2013-03-07 | 2013-06-26 | 江苏省电力公司电力科学研究院 | 全景取代模式的智能变电站模拟系统及其集成测试方法 |
CN103312037A (zh) * | 2013-06-09 | 2013-09-18 | 国家电网公司 | 智能变电站压力测试装置及方法 |
CN103439592A (zh) * | 2013-06-27 | 2013-12-11 | 国家电网公司 | 一种智能变电站现场智能测试方法 |
CN103439612A (zh) * | 2013-09-02 | 2013-12-11 | 上海毅昊自动化有限公司 | 基于scd的智能变电站自动测试系统 |
CN104090194A (zh) * | 2014-07-31 | 2014-10-08 | 上海毅昊自动化有限公司 | 智能变电站继电保护非侵入式测试系统及方法 |
Non-Patent Citations (9)
Title |
---|
丁晓辉: "智能变电站二次设备测试系统研究", 《万方学位论文数据库》, 8 October 2013 (2013-10-08) * |
刘有为 等: "智能高压开关设备信息流方案设计", 《高压电器》, vol. 47, no. 1, 31 January 2011 (2011-01-31), pages 1 - 4 * |
宋杰 等: "基于协同测试系统的智能变电站GOOSE虚端子关联检测研究", 《电力系统保护与控制》 * |
廖小君 等: "《现场运行人员继电保护实用技术》", 31 August 2011, article "数字式继电保护测试仪", pages: 42-45 * |
张全元: "《变电运行现场技术问答》", 28 February 2013, article "智能断路器", pages: 299-301 * |
张宏涛 等: "GWl6-126型高压隔离开关的技术改造与智能化探讨", 《电工技术》, no. 7, 31 December 2013 (2013-12-31), pages 5 - 6 * |
李坚: "《变电站运维检修技术问答》", 28 February 2014, article "基于IEC61850体系的智能变电站", pages: 440-443 * |
赵智俊: "基于IEC61850的数字化保护装置测试系统的研究", 《万方学位论文数据库》, 30 November 2011 (2011-11-30) * |
韩月 等: "智能变电站变电设备在线监测系统研究", 《东北电力技术》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107907825A (zh) * | 2017-10-31 | 2018-04-13 | 云南电网有限责任公司保山供电局 | 一种敞开式高压隔离开关在线监测装置及方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103954909B (zh) | 2017-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103091609B (zh) | 一种gis局部放电在线监测装置性能检测系统及其方法 | |
CN101858958A (zh) | 智能型真空断路器在线监测装置及方法 | |
CN105092058A (zh) | 一种高压开关柜的温度在线监测系统及其监测方法 | |
CN102798782B (zh) | 一种高压绝缘电阻监测报警仪 | |
CN104391498A (zh) | 继电保护装置非侵入测试系统及其测试方法 | |
CN103454520A (zh) | 基于在线频率响应法的变压器绕组变形在线监测方法 | |
CN104793170A (zh) | 绝缘在线监测装置现场计量标准装置及校验方式 | |
CN103513132A (zh) | 输变电系统设备状态仿真装置 | |
CN107247247A (zh) | 一种故障指示器检测平台 | |
CN203688734U (zh) | 一种矿用高压电网的绝缘性监测系统 | |
CN104330730A (zh) | 接触器的接通和分断试验监测保护装置及其运行方式 | |
CN104111434A (zh) | 一种物理仿真模型的故障指示器检测方法 | |
CN203502513U (zh) | 一种输变电系统设备状态仿真装置 | |
CN104297682A (zh) | 断路器电气寿命试验保护装置及其运行方式 | |
CN103954909A (zh) | 一种高压开关智能组件现场测试方法 | |
CN207074818U (zh) | 一种智能gis和智能组件柜 | |
CN103743977B (zh) | 等电位测温装置的高电压大电流联合温升验证平台 | |
CN102565614B (zh) | 交流电压回路检验方法 | |
CN103518245A (zh) | 受控开关的电路断路器操作时间的自动获取 | |
CN103954862A (zh) | 一种电力变压器智能组件现场测试方法 | |
CN105551858B (zh) | 一种真空泡工频老练测控系统及控制方法 | |
CN201697974U (zh) | 有线、无线一体化核相仪 | |
CN204758750U (zh) | 一种电流互感器抗短路能力动态评估仿真模型装置 | |
CN205564583U (zh) | 一种真空泡工频老练测控系统 | |
CN201993928U (zh) | 一种模拟高压电气设备发热故障缺陷的装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |