CN103953009B - 深厚软基高水头多功能坝的布置结构 - Google Patents
深厚软基高水头多功能坝的布置结构 Download PDFInfo
- Publication number
- CN103953009B CN103953009B CN201410183852.9A CN201410183852A CN103953009B CN 103953009 B CN103953009 B CN 103953009B CN 201410183852 A CN201410183852 A CN 201410183852A CN 103953009 B CN103953009 B CN 103953009B
- Authority
- CN
- China
- Prior art keywords
- dam
- downstream
- open type
- gravity
- lock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/30—Flood prevention; Flood or storm water management, e.g. using flood barriers
Landscapes
- Revetment (AREA)
Abstract
本发明公开了一种深厚软基高水头多功能坝的布置结构,包括布置在河床上的坝体,所述坝体为闸室结构,在闸室底板上沿垂直水流方向布置有开敞式溢流坝和重力坝;位于所述开敞式溢流坝、重力坝上游侧的闸室底板顺水流长度大于闸室底板顺水流整体长度的2/5-1/2;开敞式溢流坝堰面下游通过反弧段与消能设施衔接;在重力坝体内自上游侧至下游侧设置有泄水排沙底孔和发电引水管;泄水排沙底孔下游与消能设施衔接,发电引水管下游与坝后水轮机连通。本发明优点体现在充分利用了开敞式溢流坝的超泄能力,同时泄水排沙底孔可满足水库放空、排沙和清水发电要求,从而保证了闸室结构坝体的安全和综合开发任务的实现。
Description
技术领域
本发明涉及深厚软基高水头多功能坝,尤其是涉及深厚软基高水头多功能坝的布置结构。
背景技术
在深厚软基上修建高水头水工建筑物,存在的主要问题是承载力不足和沉降变形过大,从而影响工程安全。因此,深厚软基上筑坝高度超过30m时通常采用土石坝坝型,并在岸边合适位置单独设置溢洪道保证足够的泄洪能力。在目前适宜修建溢洪道的地形和地质条件日益减少的情况下,迫切需要在满足深厚软基高水头条件下,能够将挡水、泄水、发电、洪水控制等多种功能集于一体的综合坝型体。
发明内容
本发明目的在于提供一种深厚软基高水头多功能坝的布置结构。
为实现上述目的,本发明采取下述技术方案:
本发明所述深厚软基高水头多功能坝的布置结构,包括布置在河床上的坝体,所述坝体两侧分别通过岸墙与布置在所述河床两岸上的土石坝连接;所述坝体为闸室结构,所述闸室底板基础为钻孔灌注桩结构,在闸室底板上沿垂直水流方向布置有开敞式溢流坝和重力坝;位于所述开敞式溢流坝、重力坝上游侧的闸室底板顺水流长度大于闸室底板顺水流整体长度的2/5-1/2;在所述开敞式溢流坝、重力坝上游两侧的闸室底板上沿顺水流方向分别布置有边墩;所述开敞式溢流坝堰面下游通过反弧段与消能设施衔接;在所述重力坝体内自上游侧至下游侧设置有泄水排沙底孔和发电引水管;所述泄水排沙底孔下游与消能设施衔接,所述发电引水管下游与坝后水轮机连通。
位于所述坝体上游分别布置有翼墙和铺盖。
本发明优点主要体现在以下几方面:
1、所述闸室结构的坝体两侧分别通过岸墙与布置在河床两岸的土石坝连接,不仅保证泄洪时水流顺畅,开挖工程量少,而且充分利用了开敞式溢流坝的超泄能力,同时所述泄水排沙底孔可满足水库放空、排沙和清水发电要求,从而保证了闸室结构坝体的安全和综合开发任务的实现。
2、所述坝体采用水闸结构体型,通过布置在所述闸室底板上的重力坝挡水,充分利用位于开敞式溢流坝、重力坝上游侧闸室底板上部的水重来满足坝体整体稳定要求,达到大幅度节省混凝土工程量目的。
3、通过调整所述重力坝基本三角形重心位置,达到满足坝体运行期地基承载力和不均匀沉降要求;同时,沿顺水流方向分别布置在开敞式溢流坝、重力坝上游两侧闸室底板上的边墩可将水流平稳引入闸室,泄水和排沙不受干扰,确保了排沙效果。
4、所述闸室底板在施工期设置后浇带,通过布置在所述闸室底板基础的钻孔灌注桩承担施工期坝体垂直荷载,达到满足坝体施工期地基承载力和不均匀沉降要求;同时大幅度节省钻孔灌注桩工程量。
附图说明
图1是本发明的平面布置结构示意图。
图2是本发明的上游立面结构示意图。
图3是图1的A-A向剖面结构示意图。
图4是图1的B-B向剖面结构示意图。
图5是图1的C-C向剖面结构示意图。
具体实施方式
如图1-5所示,本发明所述的深厚软基高水头多功能坝的布置结构,包括布置在河床上的坝体,所述坝体两侧分别通过岸墙1与布置在所述河床两岸上的土石坝2连接;所述坝体上游分别布置有翼墙3和铺盖4;所述坝体为闸室结构,所述闸室底板5基础为钻孔灌注桩6结构,在闸室底板5上沿垂直水流方向布置有开敞式溢流坝7和重力坝8;位于所述开敞式溢流坝7、重力坝8上游侧的闸室底板5顺水流长度大于闸室底板5顺水流整体长度的2/5(水头高度30米)-1/2(水头高度40米);在所述开敞式溢流坝7、重力坝8上游两侧的闸室底板5上沿顺水流方向分别布置有边墩9;所述开敞式溢流坝7堰面10下游通过反弧段11与消能设施12衔接;在所述重力坝8的坝体内自上游侧至下游侧设置有泄水排沙底孔13和发电引水管14;所述泄水排沙底孔13下游与消能设施12衔接,所述发电引水管14下游与坝后水轮机连通。
Claims (2)
1.一种深厚软基高水头多功能坝的布置结构,包括布置在河床上的坝体,所述坝体两侧分别通过岸墙与布置在所述河床两岸上的土石坝连接;其特征在于:所述坝体为闸室结构,所述闸室底板基础为钻孔灌注桩结构,在闸室底板上沿垂直水流方向布置有开敞式溢流坝和重力坝;位于所述开敞式溢流坝、重力坝上游侧的闸室底板顺水流长度大于闸室底板顺水流整体长度的2/5-1/2;在所述开敞式溢流坝、重力坝上游两侧的闸室底板上沿顺水流方向分别布置有边墩;所述开敞式溢流坝堰面下游通过反弧段与消能设施衔接;在所述重力坝体内自上游侧至下游侧设置有泄水排沙底孔和发电引水管;所述泄水排沙底孔下游与消能设施衔接,所述发电引水管下游与坝后水轮机连通。
2.根据权利要求1所述的深厚软基高水头多功能坝的布置结构,其特征在于:位于所述坝体上游分别布置有翼墙和铺盖。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410183852.9A CN103953009B (zh) | 2014-05-05 | 2014-05-05 | 深厚软基高水头多功能坝的布置结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410183852.9A CN103953009B (zh) | 2014-05-05 | 2014-05-05 | 深厚软基高水头多功能坝的布置结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103953009A CN103953009A (zh) | 2014-07-30 |
CN103953009B true CN103953009B (zh) | 2016-03-09 |
Family
ID=51330346
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410183852.9A Active CN103953009B (zh) | 2014-05-05 | 2014-05-05 | 深厚软基高水头多功能坝的布置结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103953009B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098160B (zh) * | 2018-10-23 | 2023-12-15 | 扬州大学 | 一种基于单功能水闸改造的多功能水闸及其施工方法和使用方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201406678Y (zh) * | 2009-05-12 | 2010-02-17 | 中国水电顾问集团华东勘测设计研究院 | 一种重力坝与不良地质岸坡的联接结构 |
CN201485840U (zh) * | 2009-08-11 | 2010-05-26 | 中国水电顾问集团华东勘测设计研究院 | 一种l型单侧闸墙结构 |
CN203361095U (zh) * | 2013-07-10 | 2013-12-25 | 贵州省水利水电勘测设计研究院 | 一种组合挡水坝结构 |
CN203808019U (zh) * | 2014-05-05 | 2014-09-03 | 黄河勘测规划设计有限公司 | 深厚软基高水头多功能坝的布置结构 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02101214A (ja) * | 1988-10-11 | 1990-04-13 | Toru Fujii | 堤防ダム内の垂直分割室構造 |
-
2014
- 2014-05-05 CN CN201410183852.9A patent/CN103953009B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201406678Y (zh) * | 2009-05-12 | 2010-02-17 | 中国水电顾问集团华东勘测设计研究院 | 一种重力坝与不良地质岸坡的联接结构 |
CN201485840U (zh) * | 2009-08-11 | 2010-05-26 | 中国水电顾问集团华东勘测设计研究院 | 一种l型单侧闸墙结构 |
CN203361095U (zh) * | 2013-07-10 | 2013-12-25 | 贵州省水利水电勘测设计研究院 | 一种组合挡水坝结构 |
CN203808019U (zh) * | 2014-05-05 | 2014-09-03 | 黄河勘测规划设计有限公司 | 深厚软基高水头多功能坝的布置结构 |
Non-Patent Citations (1)
Title |
---|
海彬.深厚软基上土石坝坝体溢洪道泄槽末端反弧段的稳定分析.《万方学位论文数据库》.2009,第7-37页. * |
Also Published As
Publication number | Publication date |
---|---|
CN103953009A (zh) | 2014-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202298556U (zh) | 滑坡转化型泥石流的新型防治结构 | |
CN203514273U (zh) | 一种大入射角扩散式跌坎底流消能结构 | |
CN104695380A (zh) | 一种塑钢板桩与混凝土组合的护岸结构 | |
CN202323895U (zh) | 用于阶梯式水利枢纽的尾水渠结构 | |
CN203782664U (zh) | 一种砂性土地基水闸的防冲结构 | |
CN203429606U (zh) | 一种临时围堰改建而成的拦沙坎 | |
CN102912762B (zh) | 桩群透水框架坝及其施工方法 | |
CN203808019U (zh) | 深厚软基高水头多功能坝的布置结构 | |
CN104452682A (zh) | 一种自控式钢面板坝 | |
CN203530926U (zh) | 水利工程用边坡防护结构 | |
CN103953009B (zh) | 深厚软基高水头多功能坝的布置结构 | |
CN202039321U (zh) | 可移可调江河自流冲淤导流板 | |
CN103526732A (zh) | 一种大坝泄水结构 | |
CN203361095U (zh) | 一种组合挡水坝结构 | |
CN105421305B (zh) | 一种桩板平面与立面交错组合的辅助消能工 | |
CN203795388U (zh) | 土坝+重力坝混合坝型的布置结构 | |
CN103938585A (zh) | 土坝+重力坝混合坝型的布置结构 | |
CN203559405U (zh) | 一种大坝泄水结构 | |
CN205444124U (zh) | 一种水泥块式防水坝 | |
CN204455987U (zh) | 一种塑钢板桩与混凝土组合的护岸结构 | |
CN204000796U (zh) | 河床式水电站结构 | |
Pinchard et al. | Spillway capacity upgrade at Malarce dam: Design of an additional Piano Key Weir spillway | |
CN204385687U (zh) | 无翼墙水闸布置形式 | |
CN203096696U (zh) | 一种高低复合型壅水堰 | |
CN203129094U (zh) | 一种矿山沟道用地表水防渗结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd. Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee before: Yellow River Engineering Consulting Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |