CN103952970B CN201410151773.XA CN201410151773A CN103952970B CN 103952970 B CN103952970 B CN 103952970B CN 201410151773 A CN201410151773 A CN 201410151773A CN 103952970 B CN103952970 B CN 103952970B
Authority
CN
China
Prior art keywords
bridge
pull rod
pull bar
pier
side span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410151773.XA
Other languages
Chinese (zh)
Other versions
CN103952970A (en
Inventor
韩振勇
张振学
崔志刚
仇高山
李杲
洪全
郭会国
汤洪雁
陈占良
陈惟珍
马玉洲
徐建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Urban Construction Design Institute Co ltd
Original Assignee
Tianjin Urban Construction Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Urban Construction Design Institute Co ltd filed Critical Tianjin Urban Construction Design Institute Co ltd
Priority to CN201410151773.XA priority Critical patent/CN103952970B/en
Publication of CN103952970A publication Critical patent/CN103952970A/en
Application granted granted Critical
Publication of CN103952970B publication Critical patent/CN103952970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to an oversized pier-position pull rod and foundation structure, comprising a pull rod, a pull rod upper lifting lug, a pull rod lower lifting lug, a pull rod cross beam, a reinforcing rib and a pull rod foundation, wherein the upper lifting lug is connected with a main beam, the lower lifting lug is connected with a lower bearing platform, a pile foundation is arranged below the lower bearing platform, and the pull rod is connected with the upper part and the lower part of a bridge through dowels. The pull rod and the foundation are arranged at a side span of an arch bridge, so that vertical counter forces of the side span are directly balanced, and the negative counter forces of abutment piers are avoided. An abutment pier support is changed into a common compression support from a tensile support, so that subsequent support replacement is facilitated, and the time and the expense for replacing the support are reduced. Through adopting the oversized pier-position pull rod and foundation structure, the span of the side span is reduced, the bending moment and the shearing force of the side span are lowered, the design difficulty of the side span is lowered, and the engineering cost of the side span and the main beam is reduced. The oversized pier-position pull rod is arranged in the transverse direction of the bridge according to the overall width of the bridge, so that the restriction force of the bridge in the transverse direction of the bridge is stronger, the distribution of a natural vibration mode of the bridge is changed, and the occurrence of a torsional mode is retarded.

Description

Super large pier position pull bar and base structure
Technical field
The present invention relates to a kind of super large pier position pull bar and base structure.
Background technology
In bridge construction, arch bridge, as one of most basic structural system, has the glamour of uniqueness.In modern arch bridge In, winged swallow arch receives the favor of people more and more.By landform, neighboring buildings condition or building demand attractive in appearance, winged swallow arch The general main span of bridge is very big, and end bay is relatively small, to reach good architectural effect.This makes the span setting ratio of arch bridge lose Adjust, negative reaction easily occurs at end bay buttress.Negative reaction in abutment pier is that Bridge Design is reluctant.Occur negative in end bay Counter-force, if adopting stretching resistance bearing scheme, because bearing service life is much smaller than the design period of bridge, with rear support more Change and be difficult to realize, pulling force bearing is not a kind of good solution.In end bay, negative reaction occurs, routine is using ballast Form is solving, but because end bay is relatively short, deck-molding is limited, and under least favorable load case, ballast is difficult to solve end bay The problem of negative reaction.
Content of the invention
It is an object of the invention to provide a kind of super large pier position pull bar and base structure, above-mentioned prior art can be overcome Deficiency, this super large pier position pull bar and base structure solve the problems, such as abutment pier negative reaction, reduce the across footpath of end bay simultaneously, reduce The moment of flexure of end bay and shearing.The present invention passes through to arrange powerful pull bar at arch bridge end bay, and under pull bar setting cushion cap and Pile foundation, forms powerful tension system, solves the technical problem of winged swallow arch bridge abutment pier negative reaction.Present invention reduces end bay Across footpath, reduce moment of flexure and the shearing of end bay, reduce the design difficulty of end bay, reduce end bay girder construction costs.Super large Pier position pull bar presses bridge overall with arrangement so that bridge is more powerful in direction across bridge constraint in direction across bridge arrangement, changes bridge certainly The distribution of mode of shaking, has delayed the appearance of torsion mode.
The present invention provide super large pier position pull bar and base structure mainly include pull bar, upper hanger, pin, pull bar, under hang Ear, pin, infrastructure cushion cap and pile foundation.Upper hanger is connected with girder, and lower hanger is connected with bottom cushion cap, arranges stake under cushion cap Base, the top and the bottom of bridge are coupled together by pull bar by pin.
The super large pier position pull bar that the present invention provides and base structure directly balances the vertical counter-force of end bay, it is to avoid abutment pier is born The appearance of counter-force.Abutment pier bearing is changed into general resistance to compression bearing from mode tensile supporting seat, facilitates later bearing replacement, and reduces replacing The time of bearing and expense, in addition resistance to compression bearing compared with mode tensile supporting seat, will get well by cost and service life.By super large pier position Pull bar and basis, reduce the across footpath of end bay, reduce moment of flexure and the shearing of end bay, reduce the design difficulty of end bay, reduce End bay girder construction costs.Super large pier position pull bar presses bridge overall with arrangement so that bridge constrains in direction across bridge in direction across bridge arrangement More powerful, change the distribution of bridge static mode, delay the appearance of torsion mode.
Brief description
Fig. 1 is the bridge overall structure diagram of the present invention.
Fig. 2 is each position connection diagram of the present invention.
Fig. 3 is the pull bar of the present invention.
Fig. 4 is the upper hanger of the present invention.
Fig. 5 is the lower hanger of the present invention.
Fig. 6 is the pin of the present invention.
Fig. 7 is the infrastructure cushion cap of the present invention.
Specific embodiment
The present invention is explained in detail with reference to the accompanying drawings as follows, it should be noted that accessory is not especially indicated used in the present invention In the case of be commercially available prod.There is no the structure indicating all using known element structure and manufacture material.The present embodiment is description Property, it is not determinate it is impossible to thus limit protection scope of the present invention.
As shown in the figure: 1, main arch, 2, girder, 3, pull bar, 4, upper hanger, 5, lower hanger, 6, pin, 7, infrastructure holds Platform, 8, abutment pier bearing (tension/resistance to compression).
The present invention provide super large pier position pull bar and base structure specifically include that main arch 1, girder 2, pull bar 3, upper hanger 4, Lower hanger 5, pin 6, cushion cap 7.
As shown in figure 1, arranging a kind of super large pier position Tiebar structure between the reverse diagonal brace of end bay span centre and abutment pier, in order to drop Low end bay internal force, realizes balance on support reaction for the bridge structure, increases the constraint in direction across bridge for the bridge simultaneously, realizes bridge knot The lateral stability of structure.
As shown in Fig. 2 a kind of super large pier position Tiebar structure, including pull bar 3, upper hanger 4, lower hanger 5, pin 6, under Portion's foundation platform 7.Upper hanger 4 is connected with girder 1, and lower hanger 5 is connected with infrastructure cushion cap 7,7 times setting pile foundations of cushion cap, draws The top and the bottom of bridge are coupled together by bar 3 by pin 6.
The super large pier position pull bar that the present invention provides and hanger need to press design drawing and universal method in steel construction processing factory Machine, transport job site.Because pull bar needs to bear the pulling force of Bridge Design load generation, the installation of pull bar be Install before girder and main arch carrying.It is the construction of main bridge infrastructure first, including pull bar basis, and install and hang under pull bar Ear built-in fitting.Set up main arch and girder full framing, the gravity load of bridge should be born by support.The upper hanger of pull bar top girder Complete in engineering welding in advance, girder of constructing in order, and pull bar and main arch are installed.After all bridge members install, from Main span span centre order tears frame open so that pull bar progressively bears bridge load.
The invention provides a kind of super large pier position pull bar and base structure, hang including under hanger on pull bar, pull bar, pull bar Ear, pull bar crossbeam, ribbed stiffener and pull bar basis;Upper hanger is connected with girder, and lower hanger is connected with bottom cushion cap, arranges under cushion cap Pile foundation, pull bar passes through pin and connects the top and the bottom of bridge.
The present invention passes through setting pull bar and basis at arch bridge end bay, directly the vertical counter-force of balance end bay, it is to avoid side The appearance of pier negative reaction.Abutment pier bearing is changed into general resistance to compression bearing from mode tensile supporting seat, facilitates later bearing replacement, and reduces The time of replacing time and expense, in addition resistance to compression bearing compared with mode tensile supporting seat, will get well by cost and service life.By super large Pier position pull bar and basis, reduce the across footpath of end bay, reduce moment of flexure and the shearing of end bay, reduce the design difficulty of end bay, Reduce end bay girder construction costs.Super large pier position pull bar is pressed bridge overall with direction across bridge arrangement and is arranged so that bridge is in direction across bridge Constraint is more powerful, changes the distribution of bridge static mode, has delayed the appearance of torsion mode.

Claims (1)

1. a kind of super large pier position pull bar and base structure, specifically include that main arch, girder, pull bar, upper hanger, lower hanger, pin, Cushion cap;A kind of super large pier position Tiebar structure is set between the reverse diagonal brace of end bay span centre and abutment pier;Described super large pier position pull bar knot Structure is made up of pull bar, upper hanger, lower hanger, pin, infrastructure cushion cap;Upper hanger is connected with girder, lower hanger and bottom base Plinth cushion cap is connected, and arranges pile foundation under cushion cap, and the top and the bottom of bridge are coupled together by pull bar by pin.
CN201410151773.XA 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure Active CN103952970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410151773.XA CN103952970B (en) 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410151773.XA CN103952970B (en) 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure

Publications (2)

Publication Number Publication Date
CN103952970A CN103952970A (en) 2014-07-30
CN103952970B true CN103952970B (en) 2017-02-01

Family

ID=51330307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410151773.XA Active CN103952970B (en) 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure

Country Status (1)

Country Link
CN (1) CN103952970B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120658B (en) * 2014-08-01 2016-04-13 武船重型工程股份有限公司 A kind of spatial warping bridge processing method and spatial warping bridge
CN106065562A (en) * 2016-07-06 2016-11-02 中铁二院工程集团有限责任公司 Bridge rigid pulling force is put
CN113605232B (en) * 2021-08-03 2023-06-16 中铁大桥勘测设计院集团有限公司 Inhaul cable pressing reconstruction and design method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1363498A (en) * 1970-08-13 1974-08-14 Schaeffler W Device for and method of assembling universal joints
US4094517A (en) * 1975-12-17 1978-06-13 Lohr & Bromkamp Gmbh Seal for a universal joint
CN201151874Y (en) * 2008-01-22 2008-11-19 中交第二公路勘察设计研究院有限公司 Rope-suspension bridge suspending rod type support device
CN103132462A (en) * 2013-03-08 2013-06-05 中国建筑第六工程局有限公司 Combination tool for controlling down-warping of components and installation and usage method of combination tool
CN103614966A (en) * 2013-11-21 2014-03-05 中交第二航务工程局有限公司 Suspension bridge steel box beam hoisting sling
CN204112210U (en) * 2014-04-16 2015-01-21 天津城建设计院有限公司 Super large pier position pull bar and foundation structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1363498A (en) * 1970-08-13 1974-08-14 Schaeffler W Device for and method of assembling universal joints
US4094517A (en) * 1975-12-17 1978-06-13 Lohr & Bromkamp Gmbh Seal for a universal joint
CN201151874Y (en) * 2008-01-22 2008-11-19 中交第二公路勘察设计研究院有限公司 Rope-suspension bridge suspending rod type support device
CN103132462A (en) * 2013-03-08 2013-06-05 中国建筑第六工程局有限公司 Combination tool for controlling down-warping of components and installation and usage method of combination tool
CN103614966A (en) * 2013-11-21 2014-03-05 中交第二航务工程局有限公司 Suspension bridge steel box beam hoisting sling
CN204112210U (en) * 2014-04-16 2015-01-21 天津城建设计院有限公司 Super large pier position pull bar and foundation structure

Also Published As

Publication number Publication date
CN103952970A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN104695341B (en) Non-self-balanced beam string structure for reinforcing large-span continuous beam bridge
CN205501791U (en) Two recessed arch integrated configurations of steel binder - entity jib -
CN103952970B (en) Oversized pier-position pull rod and foundation structure
CN201933419U (en) Arch bridge arch rib cast-in-situ bracket
CN109024298A (en) Construction method of bent cap
CN204960368U (en) String formula bearing structure is opened in space
CN202787047U (en) Deck type triangular steel truss composite beam
CN102425099B (en) Large cantilever wave-purlin combined PC bridge and manufacture method thereof
CN107268422A (en) Across the self-anchored type suspension cable arched girder co-operative system bridge such as one kind
CN201953059U (en) Supporting system for large-span assembly type cantilevered scaffold
CN106906750B (en) Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method
CN203546599U (en) Pier-side bracket
CN104695317A (en) Multi-span rigid frame bowstring arch bridge
CN208718334U (en) A kind of support frame of assembled architecture cantilevered plate
CN204112210U (en) Super large pier position pull bar and foundation structure
CN204475179U (en) Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support
CN208167493U (en) A kind of cast-in-place Continuous Box arch bridge of Long-span
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN105839912A (en) Molding bracket for shear wall of building
CN104562937A (en) Temporary hinged structure for arched continuous beam bridge, as well as construction method thereof
CN205531026U (en) Basic unit's framework of steel reinforcement lip block
CN105220609B (en) Combined beam self-anchored suspension bridge and construction process thereof
CN105648911B (en) Bridge construction Cast-in-situ Beam, bent cap, binder concrete adhesion type prestressed girder support
CN203403362U (en) Pretensioned prestressed pedestal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant