CN103945355A CN201310023366.6A CN201310023366A CN103945355A CN 103945355 A CN103945355 A CN 103945355A CN 201310023366 A CN201310023366 A CN 201310023366A CN 103945355 A CN103945355 A CN 103945355A
Authority
CN
China
Prior art keywords
gprs support
serving gprs
authorization resources
support node
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310023366.6A
Other languages
Chinese (zh)
Other versions
CN103945355B (en
Inventor
史文胜
李洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201310023366.6A priority Critical patent/CN103945355B/en
Publication of CN103945355A publication Critical patent/CN103945355A/en
Application granted granted Critical
Publication of CN103945355B publication Critical patent/CN103945355B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to the technical field of communications, and provides a data service management method, apparatus and system, for solving the problems of reduced charging precision and increased charging errors at the same time which are caused by use of corresponding customization services by users. The specific steps comprise: a service control point receiving a charging application response message sent by a service supporting node; according to the charging application response message and current data services, configuring authorization resources for use next time for the service supporting node; and sending a charging application message to the service supporting node, the charging application message comprising the authorization resources for use next time and a release request which is used for indicating the service supporting node to release the current data services after all the authorization resources are used. The data service management method, apparatus and system can be applied to data service management.

Description

The methods, devices and systems of data traffic management
Technical field
The present invention relates to communication technical field, relate in particular to the methods, devices and systems of data traffic management.
Background technology
In prior art, intelligent network can pass through AC (Apply Charging GPRS ((the General Packet Radio Service of CAMEL protocol definition, general packet radio service technology), GPRS accounting request) flow and time of message and ACR (Apply Charging Report GPRS, GPRS charging response) message control user usage data business.
Concrete, SCP (Service Control Point, service control point) can be SGSN (the Serving GPRS SUPPORTNODE under user according to the customized network data service of user or user's remaining sum etc., GPRS serving GPRS support node) assigns authorized time and mandate flow, and by AC message, the mandate time distributing and mandate flow are sent to SGSN, mandate time that SGSN is used distribute and authorize flow and networking to carry out transfer of data, even if must user can be used customized data service; In addition, SGSN can also and authorize flow to be sent to SCP by ACR message by the mandate time having used, and making SCP can be the mandate time after SGSN distribution and mandate flow according to ACR message, user balance etc.
When user's remaining sum can only be for SCP again for it does while once authorizing flow or the business of mandate time, SCP issues last AC message to SGSN, user can continue usage data business, when SGSN detect authorize flow or mandate time to be finished after (without remaining sum), send ACR message to SCP, SCP can arrive user without remaining sum according to this ACR message detection, issue Release GPRS (data service release message) to SGSN, make SGSN finish this data service, after removing this data service, SGSN also notify SCP to remove this data service.
State in realization in the process of data traffic management, inventor finds that in prior art, at least there are the following problems: when the flow in the customized data service of user is finished, now user balance is 0, but SGSN can not finish this user's data service at once, but report ACR message to SCP, wait for after SCP issues ReleaseGRPS and just can finish this data service.During this period, user still can continue usage data business, but because user's account balance has been 0, therefore operator cannot collect the charges to user, like this, not only bring loss to operator, and the authorization resources that may cause SGSN and SCP to use user records inconsistent, reduce the charging precision to user, increased charging error.
Summary of the invention
Embodiments of the invention provide a kind of methods, devices and systems of data traffic management.Solve user and used respective subscription business and cause charging precision to reduce, the problem that the error of charging simultaneously increases.
For achieving the above object, embodiments of the invention adopt following technical scheme:
First aspect, provides a kind of method of data traffic management, comprising:
Service control point receives the charging application response message that serving GPRS support node sends, and described charging application response message comprises: the current authorization resources having been used of described serving GPRS support node;
According to described charging application response message and current data business, be the authorization resources of described serving GPRS support node configuration use next time, described current data business comprises: serving GPRS support node is allowed to all authorization resources that use;
Send charging solicitation message to described serving GPRS support node, described charging solicitation message comprises: authorization resources and the releasing request that used described next time, described releasing request is used to indicate described serving GPRS support node and after described all authorization resources are used up, discharges described current data business.
In the possible implementation of the first, describedly send charging solicitation message to described serving GPRS support node and comprise:
Judge that whether the authorization resources using described next time is identical with other authorization resources that do not used except the authorization resources having been used in described all authorization resources;
Send charging solicitation message to described serving GPRS support node, if the authorization resources that used described next time is identical with the described authorization resources that other are not used, described charging solicitation message comprises: authorization resources and the described releasing request that used described next time.
In conjunction with the possible implementation of the first of first aspect or first aspect, in the possible implementation of the second, after described serving GPRS support node discharges described current data business, described method also comprises:
Receive the release response that described serving GPRS support node sends, described release response is used to indicate described service control point and discharges described current data business;
Discharge described current data business.
In conjunction with the possible implementation of the first of first aspect or first aspect or the possible implementation of the second, in the third possible implementation, described authorization resources is: authorize flow or mandate time.
In conjunction with the third possible implementation of first aspect, in the 4th kind of possible implementation, if under charging methods of volume of flow, described authorization resources is: authorize flow.
In conjunction with the third possible implementation of first aspect, in the 5th kind of possible implementation, if under time-based charging pattern, described authorization resources is: the mandate time.
Second aspect, provides the method for another kind of data traffic management, comprising:
Serving GPRS support node receives the charging solicitation message that service control point sends, described charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used described next time is that described service control point is that described serving GPRS support node configures according to the current data business of the current authorization resources having been used of described serving GPRS support node and described serving GPRS support node, described current data business comprises: serving GPRS support node is allowed to all authorization resources that use, described releasing request is used to indicate described serving GPRS support node and after all authorization resources are used up, discharges described current data business,
Discharge described current data business according to described releasing request.
In the possible implementation of the first, describedly discharge described current data business according to described releasing request and comprise:
Judge whether described all authorization resources are used up;
If be used up, discharge described current data business;
Send and discharge response to described service control point, so that described service control point discharges described current data business according to described release response.
In conjunction with the possible implementation of the first of second aspect or second aspect, in the possible implementation of the second, described authorization resources is: authorize flow or mandate time.
In conjunction with the possible implementation of the second of second aspect, in the third possible implementation, if under charging methods of volume of flow, described authorization resources is: authorize flow.
In conjunction with the possible implementation of the second of second aspect, in the 4th kind of possible implementation, if under time-based charging pattern, the described mandate time is: the mandate time.
The third aspect, provides a kind of service control point, comprising:
Receiver, the charging application response message sending for receiving serving GPRS support node, described charging application response message comprises: the current authorization resources having been used of described serving GPRS support node;
Processor, for according to described charging application response message and current data business, is the authorization resources of described serving GPRS support node configuration use next time, and described current data business comprises: serving GPRS support node is allowed to all authorization resources that use;
Transmitter, for sending charging solicitation message to described serving GPRS support node, described charging solicitation message comprises: authorization resources and the releasing request that used described next time, described releasing request is used to indicate described serving GPRS support node and after described all authorization resources are used up, discharges described current data business.
Fourth aspect, provides a kind of serving GPRS support node, comprising:
Receiver, the charging solicitation message sending for receiving service control point, described charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used described next time is that described service control point is that described serving GPRS support node configures according to the current data business of the current authorization resources having been used of described serving GPRS support node and described serving GPRS support node, described current data business comprises: serving GPRS support node is allowed to all authorization resources that use, described releasing request is used to indicate described serving GPRS support node and after all authorization resources are used up, discharges described current data business,
Processor, for discharging described current data business according to described releasing request.
The 5th aspect, provides a kind of system of data traffic management, comprising:
The serving GPRS support node that the service control point that the third aspect provides and fourth aspect provide.
The methods, devices and systems of the data traffic management that the embodiment of the present invention provides, adopt after such scheme, service control point receives the charging application response message that serving GPRS support node sends, and charging application response message comprises: the current authorization resources having been used of serving GPRS support node; According to charging application response message and current data business, be the authorization resources of serving GPRS support node configuration use next time, current data business comprises: serving GPRS support node is allowed to all authorization resources that use; Send charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
Brief description of the drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the data interaction figure that in prior art, SGSN and SCP carry out traffic management;
The method flow diagram of a kind of data traffic management taking service control point as executive agent that Fig. 2 provides for the present embodiment;
The method flow diagram of a kind of data traffic management taking serving GPRS support node as executive agent that Fig. 3 provides for the present embodiment;
The method flow diagram of the another kind of data traffic management that Fig. 4 provides for the present embodiment;
Fig. 5 for provide a kind of in the method for the data traffic management shown in Fig. 4 serving GPRS support node and service control point carry out the interaction figure of transfer of data;
Fig. 6 carries out the interaction figure of transfer of data for the another kind that provides serving GPRS support node and service control point in the method for the data traffic management shown in Fig. 4;
The method flow diagram of another data traffic management that Fig. 7 provides for the present embodiment;
The structural representation of a kind of service control point that Fig. 8 provides for the present embodiment;
The structural representation of a kind of serving GPRS support node that Fig. 9 provides for the present embodiment;
The structural representation of the another kind of serving GPRS support node that Figure 10 provides for the present embodiment;
The structural representation of the system of a kind of data traffic management that Figure 11 provides for the present embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtaining under creative work prerequisite, belong to the scope of protection of the invention.
In order can clearer the embodiment providing below to be understood, first the method for traffic management in prior art is simply described.
As shown in Figure 1, for SGSN and SCP carry out the data interaction figure of traffic management, concrete data interaction step can comprise:
1, SGSN/SSF sends Initial DP GPRS message to SCP;
2, SCP sends Request Report GPRS Event message to SGSN/SSF, and this message is used for asking SSF to detect a certain event, and reports SCP when detecting after this event;
3, SCP sends Apply Charging GPRS message to SGSN/SSF, and this message, for send the control information about GPRS reply and context charging to SSF, for example, can comprise that SCP is user configured authorization resources etc.;
4, SCP sends Continue GPRS message to SGSN/SSF, and this message is used to indicate SSF and continues last time due to the processing for DP (Detection Point, test point) of waiting for that SCP instruction delays;
5, SGSN/SSF sends Apply Charging Report GPRS message to SCP, the information that this message requires to SCP report Apply Charging GPRS message for SSF, for example, the authorization resources that affiliated user has used etc.;
6, SCP is receiving after Apply Charging Report GPRS message, sends Release GPRS discharge instruction after detecting authorization resources in the customized business of corresponding user and being used up to SGSN/SSF;
7, SGSN/SSF discharges current data business according to the Release GPRS receiving.
In the prior art, when the authorization resources in the customized data service of user runs out, now user balance is 0, but SGSN can not finish this user's data service at once, but report ACR message to SCP, wait for after SCP issues Release GRPS and just can finish this data service.During this period, user still can continue usage data business, but because user's account balance has been 0, therefore operator cannot collect the charges to user, like this, not only bring loss to operator, and the authorization resources that may cause SGSN and SCP to use user records inconsistent, reduce the charging precision to user, increased charging error.
In order to address the above problem, the present embodiment provides a kind of method of data traffic management, and the executive agent of the method is service control point, as shown in Figure 2, can comprise:
201, service control point receives the charging application response message that serving GPRS support node sends, and charging application response message comprises: the current authorization resources having been used of serving GPRS support node;
202, according to charging application response message and current data business, be the authorization resources of serving GPRS support node configuration use next time, current data business comprises: serving GPRS support node is allowed to all authorization resources that use;
203, send charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.
Adopt after such scheme, service control point receives the charging application response message that serving GPRS support node sends, and charging application response message comprises: the current authorization resources having been used of serving GPRS support node; According to charging application response message and current data business, be the authorization resources of serving GPRS support node configuration use next time, current data business comprises: serving GPRS support node is allowed to all authorization resources that use; Send charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
The present embodiment provides the method for another kind of data traffic management, and the executive agent of the method is serving GPRS support node, as shown in Figure 3, can comprise:
301, serving GPRS support node receives the charging solicitation message that service control point sends, charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used next time is that service control point is serving GPRS support node configuration according to the current data business of the current authorization resources having been used of serving GPRS support node and serving GPRS support node, current data business comprises: serving GPRS support node is allowed to all authorization resources that use, and releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business;
302, discharge current data business according to releasing request.
Adopt after such scheme, serving GPRS support node receives the charging solicitation message that service control point sends, charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used next time is that service control point is serving GPRS support node configuration according to the current data business of the current authorization resources having been used of serving GPRS support node and serving GPRS support node, current data business comprises: serving GPRS support node is allowed to all authorization resources that use, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business, discharge current data business according to releasing request.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
Before user online, first can customized corresponding data service, service control point or serving GPRS support node can carry out charging to user according to the customized data service of user, concrete, can carry out charging according to flow and can also carry out charging according to the time.For example, the customized data service of user can be the 50M/ month, and now service control point or serving GPRS support node carry out charging according to flow; The customized data service of user can be 50 hours/month, and now service control point or serving GPRS support node carry out charging according to the time.
The method that the present embodiment carries out charging to service control point or serving GPRS support node to user is not construed as limiting, and is technology well known to those skilled in the art, and can sets according to actual needs, does not repeat them here.
The present embodiment provides the method for another kind of data traffic management, and the method is to the further expanding of the method shown in Fig. 2 or Fig. 3, and the present embodiment describes as an example of charging methods of volume of flow scene example, as shown in Figure 4, can comprise:
401, service control point receives the charging application response message (being Apply Charging Report GPRS message) that serving GPRS support node sends.
Further, charging application response message can be, but not limited to comprise: the current authorization resources having been used of serving GPRS support node.
Further, authorization resources can be, but not limited to comprise: authorize flow and mandate time etc.Under charging methods of volume of flow, authorization resources can be: authorize flow, the present embodiment describes as mandate flow as example taking authorization resources.
402, service control point, according to charging application response message and current data business, is the mandate flow of serving GPRS support node configuration use next time.
Further, current data business can be, but not limited to comprise: serving GPRS support node is allowed to all mandate flows that use.
Composition an embodiment of the present embodiment, in the current data business of user's application, can comprise all mandate flows, service control point can be not by the disposable all mandate flows serving GPRS support node of distributing to for user, but will partly authorize assignment of traffic to serving GPRS support node by charging application information; And serving GPRS support node also sends charging application response message to service control point, for the service condition of notification service support node mandate flow, so that serving GPRS support node according to charging application response message and current data business, is the mandate flow of serving GPRS support node configuration use next time.
The present embodiment is not construed as limiting the method for service control point assigns authorized resource, is technology well known to those skilled in the art, and can carry out according to actual needs equipment, does not repeat them here.
403, service control point judges that whether the mandate flow using next time is identical with other mandate flows that do not used except the mandate flow having been used in all mandate flows.
In other words, service control point judges whether the mandate flow of use next time distributing is the remaining all mandate flows that do not used of serving GPRS support node, or service control point judges whether the charging solicitation message that will send is the last item charging solicitation message.
404, service control point sends charging solicitation message (being Apply Charging GPRS message) to serving GPRS support node.
Further, if the mandate flow that the mandate flow that used next time is not used with other is identical, charging solicitation message can be, but not limited to comprise: mandate flow and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and discharges current data business after all mandate flows are used up.
Further, if the mandate flow that the mandate flow using next time is not used with other is identical, charging solicitation message can be, but not limited to comprise: the mandate flow that used next time etc.
As an embodiment of the present embodiment, as shown in Figure 5, the main purpose of execution step 403 and 404 is: in the last item charging solicitation message sending to serving GPRS support node at service control point, carry releasing request.
Further alternative, as shown in Figure 6, the present embodiment can also not perform step 403, that is to say, can in all charging solicitation message that send to serving GPRS support node, all add releasing request.
As an embodiment of the present embodiment, when in charging solicitation message when representing that the digit order number of releasing request is set to 0, just discharge current data business after indicating all mandate flows of serving GPRS support node in customized current data business to be used up.
When in charging solicitation message when representing that the digit order number of releasing request is set to 2, just discharge current data business after indicating all mandate flows of serving GPRS support node in customized current data business or mandate time to be used up.
The numerical value that the present embodiment is set up releasing request and the function being set to after different numerical value are not construed as limiting, and are technology well known to those skilled in the art, and can set according to actual needs, do not repeat them here.
405, serving GPRS support node receives the charging solicitation message that service control point sends.
Charging solicitation message can be, but not limited to comprise: mandate flow and the releasing request that used next time, the mandate flow that used next time can be that service control point is serving GPRS support node configuration according to the current data business of the current mandate flow having been used of serving GPRS support node and serving GPRS support node, current data business can be, but not limited to comprise: serving GPRS support node is allowed to all mandate flows that use, and releasing request is used to indicate serving GPRS support node and discharges current data business after all mandate flows are used up.
Further, serving GPRS support node is receiving after the charging solicitation message of service control point transmission, and the user of affiliated this serving GPRS support node can use the mandate flow and the network that in this message, comprise to communicate.
406, serving GPRS support node judges whether all mandate flows are used up.If be used up, perform step 407, if be not used up, send charging application response message and continue execution step 401 to service control point.
407, serving GPRS support node discharges current data business.
As an embodiment of the present embodiment, after user uses the mandate flow that comprises in charging solicitation message and network to communicate, in the time that all mandate flows in all current business are used up, just can discharge current data business according to discharging instruction immediately, needn't be in prior art, after all mandate flows in all current business are used up, need wait until after receiving releasing request and discharge again current business, avoid release current data service delay, increase serving GPRS support node and the service control point consistency to user's use traffic record, and then increase the charging precision to user, reduce charging error.
408, serving GPRS support node sends and discharges response to service control point, so that service control point discharges current data business according to discharging response.
Further, discharging response can be added in charging application response message and be sent to service control point, when in charging application response message for representing that the digit order number that discharges response is while being set to 0, all mandate flows of indicating services control point in customized current data business just discharge current data business after being used up.
The function that the numerical value that the present embodiment is set up release response is not construed as limiting and is set to after different numerical value is not construed as limiting, and is technology well known to those skilled in the art, and can sets according to actual needs, does not repeat them here.
In order clearerly to understand the present embodiment, provide a concrete scene to be briefly described below.
If the customized data service of user is the 50M/ month, service control point is at every turn for the mandate flow that serving GPRS support node distributes is 10M, when service control point detects that serving GPRS support node also remains the mandate flow of 10M before serving GPRS support node sends the 5th charging solicitation message, in the 5th the charging solicitation message that can send to serving GPRS support node, add releasing request, so that serving GPRS support node discharges current data business immediately using after the mandate flow of last 10M, and releasing after current data business to service control point transmission release response, so that service control point discharges current data business.
What deserves to be explained is, the present embodiment is not only applied in the above-mentioned scene providing, and can also be applied to other scenes, does not repeat them here.
Adopt after such scheme, service control point receives the charging application response message that serving GPRS support node sends, and charging application response message comprises: the current authorization resources having been used of serving GPRS support node; According to charging application response message and current data business, be the authorization resources of serving GPRS support node configuration use next time, current data business comprises: serving GPRS support node is allowed to all authorization resources that use; Send charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
Embodiment provides the method for another kind of data traffic management, and the method is to the further expanding of the method shown in Fig. 2 or Fig. 3, and the present embodiment describes as an example of time-based charging pattern scene example, as shown in Figure 7, can comprise:
701, service control point receives the charging application response message that serving GPRS support node sends.
Further, charging application response message can be, but not limited to comprise: the current authorization resources having been used of serving GPRS support node.
Further, authorization resources can be, but not limited to comprise: authorize flow and mandate time etc.Under time-based charging pattern, authorization resources can be: the mandate time, the present embodiment describes as the mandate time as example taking authorization resources.
702, service control point, according to charging application response message and current data business, is the mandate time of serving GPRS support node configuration use next time.
Further, current data business can be, but not limited to comprise: serving GPRS support node is allowed to all mandate times that use.
703, service control point judges that whether the mandate time using next time is identical with other mandate times that do not used except the mandate time having been used in all mandates time.
In other words, service control point judges whether the mandate time of use next time distributing is the remaining all mandates time not used of serving GPRS support node, or service control point judges whether the charging solicitation message that will send is the last item charging solicitation message.
704, service control point sends charging solicitation message to serving GPRS support node.
Further, if the mandate time that the mandate time that used next time is not used with other is identical, charging solicitation message can be, but not limited to comprise: mandate time and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and discharges current data business after all mandates time is used up.
Further, if the mandate time that the mandate time using next time is not used with other is identical, charging solicitation message can be, but not limited to comprise: the mandate time that used next time etc.
As an embodiment of the present embodiment, as shown in Figure 5, the main purpose of execution step 703 and 704 is: in the last item charging solicitation message sending to serving GPRS support node at service control point, carry releasing request.
Further alternative, as shown in Figure 6, the present embodiment can also not perform step 703, that is to say, can in all charging solicitation message that send to serving GPRS support node, all add releasing request.
As an embodiment of the present embodiment, when in charging solicitation message when representing that the digit order number of releasing request is set to 1, just discharge current data business after indicating all mandates time of serving GPRS support node in customized current data business to be used up.
The numerical value of the present embodiment to releasing request and the function being set to after different numerical value are not construed as limiting, and are technology well known to those skilled in the art, and can set according to actual needs, do not repeat them here.
705, serving GPRS support node receives the charging solicitation message that service control point sends.
Charging solicitation message can be, but not limited to comprise: mandate time and the releasing request that used next time, the mandate time that used next time can be that service control point is serving GPRS support node configuration according to the current data business of the current mandate time having been used of serving GPRS support node and serving GPRS support node, current data business can be, but not limited to comprise: serving GPRS support node is allowed to all mandate times that use, and releasing request is used to indicate serving GPRS support node and discharges current data business after all mandates time is used up.
Further, serving GPRS support node is receiving after the charging solicitation message of service control point transmission, and the user of affiliated this serving GPRS support node can use the mandate time and the network that in this message, comprise to communicate.
706, serving GPRS support node judges whether all mandate time is used up.If be used up, perform step 707, if be not used up, send charging application response message and continue execution step 701 to service control point.
707, serving GPRS support node discharges current data business.
708, serving GPRS support node sends and discharges response to service control point, so that service control point discharges current data business according to discharging response.
Further, discharging response can be added in charging application response message and be sent to service control point, when in charging application response message for representing that the digit order number that discharges response is while being set to 1, all mandate time of indicating services control point in customized current data business just discharges current data business after being used up.
Further alternative, if under charging methods of volume of flow, current data business comprises: mandate time and mandate flow, in the time that the mandate time runs out and authorizes flow not run out, can continue as the serving GPRS support node assigns authorized time and authorize flow in requested service control point, user still can use this authorization resources and network to communicate.
What deserves to be explained is, the present embodiment is not only applied in the above-mentioned scene providing, and can also be applied to other scenes, does not repeat them here.
Adopt after such scheme, service control point receives the charging application response message that serving GPRS support node sends, and charging application response message comprises: the current authorization resources having been used of serving GPRS support node; According to charging application response message and current data business, be the authorization resources of serving GPRS support node configuration use next time, current data business comprises: serving GPRS support node is allowed to all authorization resources that use; Send charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
Some device embodiment are provided below, and this device embodiment is corresponding with above-mentioned above-described embodiment providing respectively.
The present embodiment provides a kind of service control point, as shown in Figure 8, can comprise:
Receiver 81, the charging application response message sending for receiving serving GPRS support node, charging application response message comprises: the current authorization resources having been used of serving GPRS support node;
Processor 82, for according to charging application response message and current data business, is the authorization resources of serving GPRS support node configuration use next time, and current data business comprises: serving GPRS support node is allowed to all authorization resources that use;
Transmitter 83, for sending charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.
Further, processor 82, also for judging the authorization resources using next time, whether other authorization resources that do not used except the authorization resources having been used are identical with all authorization resources;
Transmitter 83, specifically for sending charging solicitation message to serving GPRS support node, identical with the authorization resources that other are not used if processor is judged the authorization resources using next time, charging solicitation message comprises: authorization resources and the releasing request that used next time.
Further, receiver 81, the release response also sending for receiving serving GPRS support node, discharges response and is used to indicate service control point release current data business;
Processor 82, also for discharging current data business.
Further, authorization resources is: authorize flow or mandate time.
Further, if under charging methods of volume of flow, authorization resources is: authorize flow.
Further, if under time-based charging pattern, authorization resources is: the mandate time.
Adopt after such scheme, receiver, the charging application response message sending for receiving serving GPRS support node, charging application response message comprises: the current authorization resources having been used of serving GPRS support node; Processor, for according to charging application response message and current data business, is the authorization resources of serving GPRS support node configuration use next time, and current data business comprises: serving GPRS support node is allowed to all authorization resources that use; Transmitter, for sending charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
The present embodiment provides a kind of serving GPRS support node, as shown in Figure 9, can comprise:
Receiver 91, the charging solicitation message sending for receiving service control point, charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used next time is that service control point is serving GPRS support node configuration according to the current data business of the current authorization resources having been used of serving GPRS support node and serving GPRS support node, current data business comprises: serving GPRS support node is allowed to all authorization resources that use, and releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business;
Processor 92, for discharging current data business according to releasing request.
Adopt after such scheme, receiver, the charging solicitation message sending for receiving service control point, charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used next time is that service control point is serving GPRS support node configuration according to the current data business of the current authorization resources having been used of serving GPRS support node and serving GPRS support node, current data business comprises: serving GPRS support node is allowed to all authorization resources that use, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business, processor, for discharging current data business according to releasing request.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
The present embodiment provides another kind of serving GPRS support node, and this serving GPRS support node is to the further expanding of the serving GPRS support node shown in Fig. 9, and as shown in figure 10, can comprise:
Receiver 101, the charging solicitation message sending for receiving service control point, charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used next time is that service control point is serving GPRS support node configuration according to the current data business of the current authorization resources having been used of serving GPRS support node and serving GPRS support node, current data business comprises: serving GPRS support node is allowed to all authorization resources that use, and releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business;
Processor 102, for discharging current data business according to releasing request.
Further, processor 102, also for judging whether all authorization resources are used up; If be used up, discharge current data business;
Serving GPRS support node can also but be not limited to comprise:
Transmitter 103, for sending and discharge response to service control point, so that service control point discharges current data business according to discharging response.
Further, authorization resources is: authorize flow or mandate time.
Further, if under charging methods of volume of flow, authorization resources is: authorize flow.
Further, if under time-based charging pattern, the mandate time is: the mandate time.
Adopt after such scheme, receiver, the charging solicitation message sending for receiving service control point, charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used next time is that service control point is serving GPRS support node configuration according to the current data business of the current authorization resources having been used of serving GPRS support node and serving GPRS support node, current data business comprises: serving GPRS support node is allowed to all authorization resources that use, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business, processor, for discharging current data business according to releasing request.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
The present embodiment provides a kind of system of data traffic management, as shown in figure 11, can comprise:
Serving GPRS support node 112 shown in service control point 111 shown in Fig. 8 and Fig. 9 or Figure 10.
Adopt after such scheme, service control point receives the charging application response message that serving GPRS support node sends, and charging application response message comprises: the current authorization resources having been used of serving GPRS support node; According to charging application response message and current data business, be the authorization resources of serving GPRS support node configuration use next time, current data business comprises: serving GPRS support node is allowed to all authorization resources that use; Send charging solicitation message to serving GPRS support node, charging solicitation message comprises: authorization resources and the releasing request that used next time, releasing request is used to indicate serving GPRS support node and after all authorization resources are used up, discharges current data business.Like this, receive at serving GPRS support node after the charging application response message that includes releasing request of service control point transmission, after being used up, all authorization resources just discharge current data business according to releasing request immediately, avoid service control point and serving GPRS support node to record inconsistent problem to the authorization resources using, and then increased the charging precision to user, reduce charging error.
Through the above description of the embodiments, those skilled in the art can be well understood to the mode that the present invention can add essential common hardware by software and realize, and can certainly pass through hardware, but in a lot of situation, the former is better execution mode.Based on such understanding, the part that technical scheme of the present invention contributes to prior art in essence in other words can embody with the form of software product, this computer software product is stored in the storage medium can read, as the floppy disk of computer, hard disk or CD etc., comprise that some instructions are in order to make a computer equipment (can be personal computer, server, or the network equipment etc.) carry out the method described in each embodiment of the present invention.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited to this, any be familiar with those skilled in the art the present invention disclose technical scope in; can expect easily changing or replacing, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should described be as the criterion with the protection range of claim.

Claims (23)

1. a method for data traffic management, is characterized in that, comprising:
Service control point receives the charging application response message that serving GPRS support node sends, and described charging application response message comprises: the current authorization resources having been used of described serving GPRS support node;
According to described charging application response message and current data business, be the authorization resources of described serving GPRS support node configuration use next time, described current data business comprises: serving GPRS support node is allowed to all authorization resources that use;
Send charging solicitation message to described serving GPRS support node, described charging solicitation message comprises: authorization resources and the releasing request that used described next time, described releasing request is used to indicate described serving GPRS support node and after described all authorization resources are used up, discharges described current data business.
2. the method for data traffic management according to claim 1, is characterized in that, describedly sends charging solicitation message to described serving GPRS support node and comprises:
Judge that whether the authorization resources using described next time is identical with other authorization resources that do not used except the authorization resources having been used in described all authorization resources;
Send charging solicitation message to described serving GPRS support node, if the authorization resources that used described next time is identical with the described authorization resources that other are not used, described charging solicitation message comprises: authorization resources and the described releasing request that used described next time.
3. the method for data traffic management according to claim 1 and 2, is characterized in that, after described serving GPRS support node discharges described current data business, described method also comprises:
Receive the release response that described serving GPRS support node sends, described release response is used to indicate described service control point and discharges described current data business;
Discharge described current data business.
4. according to the method for the data traffic management described in any one in claims 1 to 3, it is characterized in that, described authorization resources is: authorize flow or mandate time.
5. the method for data traffic management according to claim 4, is characterized in that, if under charging methods of volume of flow, described authorization resources is: authorize flow.
6. the method for data traffic management according to claim 4, is characterized in that, if under time-based charging pattern, described authorization resources is: the mandate time.
7. a method for data traffic management, is characterized in that, comprising:
Serving GPRS support node receives the charging solicitation message that service control point sends, described charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used described next time is that described service control point is that described serving GPRS support node configures according to the current data business of the current authorization resources having been used of described serving GPRS support node and described serving GPRS support node, described current data business comprises: serving GPRS support node is allowed to all authorization resources that use, described releasing request is used to indicate described serving GPRS support node and after all authorization resources are used up, discharges described current data business,
Discharge described current data business according to described releasing request.
8. the method for data traffic management according to claim 7, is characterized in that, describedly discharges described current data business according to described releasing request and comprises:
Judge whether described all authorization resources are used up;
If be used up, discharge described current data business;
Send and discharge response to described service control point, so that described service control point discharges described current data business according to described release response.
9. according to the method for the data traffic management described in claim 7 or 8, it is characterized in that, described authorization resources is: authorize flow or mandate time.
10. the method for data traffic management according to claim 9, is characterized in that, if under charging methods of volume of flow, described authorization resources is: authorize flow.
The method of 11. data traffic management according to claim 9, is characterized in that, if under time-based charging pattern, the described mandate time is: the mandate time.
12. 1 kinds of service control points, is characterized in that, comprising:
Receiver, the charging application response message sending for receiving serving GPRS support node, described charging application response message comprises: the current authorization resources having been used of described serving GPRS support node;
Processor, for according to described charging application response message and current data business, is the authorization resources of described serving GPRS support node configuration use next time, and described current data business comprises: serving GPRS support node is allowed to all authorization resources that use;
Transmitter, for sending charging solicitation message to described serving GPRS support node, described charging solicitation message comprises: authorization resources and the releasing request that used described next time, described releasing request is used to indicate described serving GPRS support node and after described all authorization resources are used up, discharges described current data business.
13. service control points according to claim 12, it is characterized in that, described processor, also for judging the authorization resources using described next time, whether other authorization resources that do not used except the authorization resources having been used are identical with described all authorization resources;
Described transmitter, specifically for sending charging solicitation message to described serving GPRS support node, if it is identical with the described authorization resources that other are not used that described processor is judged the authorization resources using described next time, described charging solicitation message comprises: authorization resources and the described releasing request that used described next time.
14. according to the service control point described in claim 12 or 13, it is characterized in that, and described receiver, the release response also sending for receiving described serving GPRS support node, described release response is used to indicate described service control point and discharges described current data business;
Described processor, also for discharging described current data business.
15. according to claim 12 to the service control point described in any one in 14, it is characterized in that, described authorization resources is: authorize flow or mandate time.
16. service control points according to claim 15, is characterized in that, if under charging methods of volume of flow, described authorization resources is: authorize flow.
17. service control points according to claim 4, is characterized in that, if under time-based charging pattern, described authorization resources is: the mandate time.
18. 1 kinds of serving GPRS support nodes, is characterized in that, comprising:
Receiver, the charging solicitation message sending for receiving service control point, described charging solicitation message comprises: authorization resources and the releasing request that used next time, the authorization resources that used described next time is that described service control point is that described serving GPRS support node configures according to the current data business of the current authorization resources having been used of described serving GPRS support node and described serving GPRS support node, described current data business comprises: serving GPRS support node is allowed to all authorization resources that use, described releasing request is used to indicate described serving GPRS support node and after all authorization resources are used up, discharges described current data business,
Processor, for discharging described current data business according to described releasing request.
19. serving GPRS support nodes according to claim 18, is characterized in that, described processor, also for judging whether described all authorization resources are used up; If be used up, discharge described current data business;
Described serving GPRS support node also comprises:
Transmitter, for sending and discharge response to described service control point, so that described service control point discharges described current data business according to described release response.
20. according to the serving GPRS support node described in claim 18 or 19, it is characterized in that, described authorization resources is: authorize flow or mandate time.
21. serving GPRS support nodes according to claim 20, is characterized in that, if under charging methods of volume of flow, described authorization resources is: authorize flow.
22. serving GPRS support nodes according to claim 20, is characterized in that, if under time-based charging pattern, the described mandate time is: the mandate time.
The system of 23. 1 kinds of data traffic management, is characterized in that, comprising:
Claim 12 is to the service control point described in any one in claim 17, and claim 18 is to the serving GPRS support node described in any one in claim 22.
CN201310023366.6A 2013-01-22 2013-01-22 The methods, devices and systems of data traffic management Active CN103945355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310023366.6A CN103945355B (en) 2013-01-22 2013-01-22 The methods, devices and systems of data traffic management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310023366.6A CN103945355B (en) 2013-01-22 2013-01-22 The methods, devices and systems of data traffic management

Publications (2)

Publication Number Publication Date
CN103945355A true CN103945355A (en) 2014-07-23
CN103945355B CN103945355B (en) 2017-08-18

Family

ID=51192792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310023366.6A Active CN103945355B (en) 2013-01-22 2013-01-22 The methods, devices and systems of data traffic management

Country Status (1)

Country Link
CN (1) CN103945355B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1625116A (en) * 2003-12-02 2005-06-08 华为技术有限公司 Metering method based on universal group radio operation flow
EP1655935A1 (en) * 2004-11-08 2006-05-10 Siemens Aktiengesellschaft Method for setting up telephone communications by means of answering devices
CN1863262A (en) * 2005-07-12 2006-11-15 华为技术有限公司 Method and system for charging service of prepaying user
CN101449523A (en) * 2006-06-01 2009-06-03 艾利森电话股份有限公司 Service change and service back in the intelligent network
US20090204520A1 (en) * 2006-07-05 2009-08-13 Stefan Karlsson Method and system for enabling charging of non-charging controlled services
US8260254B2 (en) * 2005-05-03 2012-09-04 Hewlett-Packard Development Company, L.P. Network billing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1625116A (en) * 2003-12-02 2005-06-08 华为技术有限公司 Metering method based on universal group radio operation flow
EP1655935A1 (en) * 2004-11-08 2006-05-10 Siemens Aktiengesellschaft Method for setting up telephone communications by means of answering devices
US8260254B2 (en) * 2005-05-03 2012-09-04 Hewlett-Packard Development Company, L.P. Network billing
CN1863262A (en) * 2005-07-12 2006-11-15 华为技术有限公司 Method and system for charging service of prepaying user
CN101449523A (en) * 2006-06-01 2009-06-03 艾利森电话股份有限公司 Service change and service back in the intelligent network
US20090204520A1 (en) * 2006-07-05 2009-08-13 Stefan Karlsson Method and system for enabling charging of non-charging controlled services

Also Published As

Publication number Publication date
CN103945355B (en) 2017-08-18

Similar Documents

Publication Publication Date Title
CN106817686B (en) Charging method and device
CN100486382C (en) Aging processing apparatus and method in communications system
US9407512B2 (en) Method and apparatus for controlling terminal's access to a wireless network
CN101616490B (en) Method of deciding to release communication resources
WO2017219905A1 (en) Charging method, apparatus and system, and storage medium
CN101540980A (en) Business priority updating indicating method, business priority updating method and device thereof
WO2015188487A1 (en) Service providing method, device and system
CN101808307A (en) Method and device for controlling strategy
JP6122215B2 (en) Method and apparatus for controlling network capacity
CN105515793A (en) On-line charging processing method and system, Openflow controller and Openflow switch
CN109787780A (en) The open functional entity of charging method and ability based on API content
CN102186162A (en) Method and equipment for acquiring accessible state of terminal
CN101923533B (en) Method, device and system for processing prepaid service access
US20220038871A1 (en) Charging method, apparatus, and system
US10476687B2 (en) Method and apparatus for providing service in user equipment of mobile communication system
CN103067903A (en) Charging method and device and system
CN102870379A (en) Method, apparatus and system for obtaining service quality QoS control information
US11223492B2 (en) Wireless communication method and device
CN103685405B (en) Network service system and the method updating firmware thereof
CN103945355A (en) Data service management method, apparatus and system
CN109981813A (en) Message processing method and device
CN103841541A (en) Switching-over method and device of charging systems
CN112383405B (en) Data service charging method, device and system
CN105188043A (en) Method, device and system for charging based on PDN connection
CN111858184A (en) Disaster recovery system, disaster recovery method, storage medium and computing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant