- CN103941801A CN103941801A CN201410114616.1A CN201410114616A CN103941801A CN 103941801 A CN103941801 A CN 103941801A CN 201410114616 A CN201410114616 A CN 201410114616A CN 103941801 A CN103941801 A CN 103941801A
- Authority
- CN
- China
- Prior art keywords
- cpc
- analog
- current
- power
- power controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
一种基于总负载电流的多机功率自动分配方法,步骤为:1)将多台CPC功率控制器的模拟输入端X2.7、模拟输出端X2.9连接采样电阻R的右端;将模拟地X2.10连接采样电阻的左端;2)通过CPC功率控制器的控制面板,将A08控制方式选项设为多机功率分配;将B01模拟输入2选项设为负载电流输入;将B02模拟输出口选型设为0~20mA正逻辑;将B04可编程模拟输出口选项设为电流;3)模拟输出端X2.9输出此CPC功率控制器的实际电流,电流通过流进了模拟地X2.10里,模拟输入端X2.7采集此电压值并送入CPC功率控制器内部;流过电阻R的电流为所有CPC功率控制器目前的实际电流之和,对总负载电流分析,若导通的时刻与峰值点相一致,将CPC功率控制器的导通区域移至谷值点,解决电网冲击的问题。
Description
技术领域
本发明属于CPC系列功率控制器(以下简称为控制器)应用技术领域,具体涉及一种基于总负载电流的多机功率自动分配方法。多机功率自动分配(AAM:Automatic Assignment on Multiplecontroller system),属于CPC系列功率控制器的一种典型应用,适用于多台控制器同时工作于周波方式时的情况。
背景技术
随着电力电子技术的发展,功率控制器被更多的用于加热等行业,特别对于窑炉这种多点温度控制的场合,需要多台控制器同时进行控制。周波(过零)模式相比于相控模式,几乎不会产生谐波污染,但由于其固有特性,会导致总负载电流的突变,对电网产生冲击,多台控制器同时使用时更为明显。
发明内容
为了克服上述现有技术的不足,本发明的目的是提供一种基于总负载电流的多机功率自动分配方法,用于多台功率控制器同时工作于周波模式时,解决其电网冲击的技术问题。
为了实现上述目的,本发明的技术方案是:一种基于总负载电流的多机功率自动分配方法,包括以下步骤:
1)将多台CPC功率控制器的模拟输入端X2.7、模拟输出端X2.9连接采样电阻R的右端;将模拟地X2.10连接采样电阻的左端;
2)通过CPC功率控制器的控制面板,将A08控制方式选项设定为多机功率分配;将B01模拟输入2选项设定为负载电流输入;将B02模拟输出口选型设定为0~20mA正逻辑;将B04可编程模拟输出口选项设定为电流;
3)模拟输出端X2.9输出大小等比例于此功率控制器目前的实际电流,电流通过采样电阻R流进了模拟地X2.10里,采样电阻R中产生与实际电流相对应的电压值,模拟输入端X2.7采集此电压值并送入CPC功率控制器内部;由于电流的叠加,流过电阻R的电流为所有CPC功率控制器目前的实际电流之和,即总的负载电流可通过模拟输入端X2.7采集到每台CPC功率控制器内部,每台CPC功率控制器对总负载电流进行分析,找出其峰值点与谷值点,若导通的时刻与峰值点相一致,说明此CPC功率控制器的导通区域不合适,可将此CPC功率控制器的导通区域移至谷值点,即用高点补充低点,便可使总电流分布趋于平滑,减少了对电网的冲击。
本发明与现有技术相比,有以下优点:
1)以总负载电流为调节依据,考虑到了各负载间的差异,实现了真正意义上的功率分配。
2)无任何制约条件,不受控制器故障状态的影响。
3)可在不停机的情况下,随意增加或减少控制器的数量。
4)采用模拟输出作为功率分配信息的传输媒介,硬件简单,方便实现,抗干扰能力前。
附图说明
图1为本发明的硬件连接图。
图2为本发明未进行功率分配的各控制器电流及总负载电流图。
图3为本发明第一次功率分配后的各控制器电流及总负载电流图。
图4为本发明第二次功率分配后的各控制器电流及总负载电流图。
具体实施方式
下面结合附图和具体实施例对本发明作进一步详细说明。
参见图1,一种基于总负载电流的多机功率自动分配的方法,包括以下步骤:
1)将多台CPC功率控制器与采样电阻R相连,具体为,每个CPC功率控制器的模拟输入端X2.7、模拟输出端X2.9连接采样电阻R的右端;模拟地X2.10连接采样电阻的左端;通过CPC功率控制器的控制面板,将A08控制方式选项设定为多机功率分配;将B01模拟输入2选项设定为负载电流输入;将B02模拟输出口选型设定为0~20mA正逻辑;将B04可编程模拟输出口选项设定为电流;
3)模拟输出端X2.9输出大小等比例于此控制器目前的实际电流,电流通过采样电阻R流进了模拟地X2.10里,采样电阻R中产生与实际电流相对应的电压值,模拟输入端X2.7采集此电压值并送入CPC功率控制器内部;由于电流的叠加,流过电阻R的电流为所有CPC功率控制器目前的实际电流之和,即总的负载电流可通过模拟输入端X2.7采集到每台CPC功率控制器内部,每台CPC功率控制器对总负载电流进行分析,找出其峰值点与谷值点,若导通的时刻与峰值点相一致,说明此CPC功率控制器的导通区域不合适,可将此CPC功率控制器的导通区域移至谷值点,即用高点补充低点,便可使总电流分布趋于平滑,减少了对电网的冲击。
自动分配原理可通过图2、图3、图4表示,横坐标表示时间,纵坐标表示电流的大小。1~4#CPC功率控制器,总负载电流。图2表示在未进行功率分配之前,由于各控制器运行的随机性及叠加原理,导致总负载电流波动较大,存在对电网的冲击。发现其峰值点出现在了2#控制器导通的时刻;图3为第一次调节后的总电流图,由于将2#控制器的导通区域移到了波谷处,此时的总电流相比于之前的较为平滑;根据上述原则,进行第二次的调节,将1#控制器的导通区域向右移致波谷处,总电流如图4所示,可看出,总电流平滑无突变,无电网冲击。
Claims (3)
- 一种基于总负载电流的多机功率自动分配方法,其特征在于,包括以下步骤:1.将多台CPC功率控制器的模拟输入端X2.7、模拟输出端X2.9连接采样电阻R的右端;将模拟地X2.10连接采样电阻的左端。
- 2.通过CPC功率控制器的控制面板,将A08控制方式选项设定为多机功率分配;将B01模拟输入2选项设定为负载电流输入;将B02模拟输出口选型设定为0~20mA正逻辑;将B04可编程模拟输出口选项设定为电流。
- 3.模拟输出端X2.9输出大小等比例于此CPC功率控制器目前的实际电流,电流通过采样电阻R流进了模拟地X2.10里,采样电阻R中产生与实际电流相对应的电压值,模拟输入端X2.7采集此电压值并送入CPC功率控制器内部;由于电流的叠加,流过电阻R的电流为所有CPC功率控制器目前的实际电流之和,即总的负载电流可通过模拟输入端X2.7采集到每台CPC功率控制器内部,然后对总负载电流进行分析,找出其峰值点与谷值点,若导通的时刻与峰值点相一致,说明此CPC功率控制器的导通区域不合适,可将此CPC功率控制器的导通区域移至谷值点,即用高点补充低点,便可使总电流分布趋于平滑,减少了对电网的冲击。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410114616.1A CN103941801A (zh) | 2014-03-26 | 2014-03-26 | 一种基于总负载电流的多机功率自动分配方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410114616.1A CN103941801A (zh) | 2014-03-26 | 2014-03-26 | 一种基于总负载电流的多机功率自动分配方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103941801A true CN103941801A (zh) | 2014-07-23 |
Family
ID=51189506
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410114616.1A Pending CN103941801A (zh) | 2014-03-26 | 2014-03-26 | 一种基于总负载电流的多机功率自动分配方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103941801A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1452733A (en) * | 1974-01-15 | 1976-10-13 | Siemens Ag | System for regulating the power supplied to a threephase load |
US5543666A (en) * | 1993-10-09 | 1996-08-06 | Priesemuth; Wolfgang | Method of reducing the peak load of energy supply network systems and apparatus for limiting the power consumption of a consumer unit fed from an energy supply connection |
JPH09215198A (ja) * | 1996-02-07 | 1997-08-15 | Hitachi Ltd | 自動電圧調整装置 |
DE10248447A1 (de) * | 2002-10-17 | 2004-04-29 | Badische Stahl-Engineering Gmbh | Verfahren und Vorrichtungen zur Impedanzanpassung |
CN102620390A (zh) * | 2012-04-27 | 2012-08-01 | 广东志高空调有限公司 | 一种来电随机延时自启动空调控制方法 |
CN102769385A (zh) * | 2012-05-28 | 2012-11-07 | 华为技术有限公司 | 多相并联均流控制方法、装置及系统 |
CN103365275A (zh) * | 2013-07-08 | 2013-10-23 | 四川英杰电气股份有限公司 | 一种负载功率控制方法及晶闸管功率控制器 |
-
2014
- 2014-03-26 CN CN201410114616.1A patent/CN103941801A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1452733A (en) * | 1974-01-15 | 1976-10-13 | Siemens Ag | System for regulating the power supplied to a threephase load |
US5543666A (en) * | 1993-10-09 | 1996-08-06 | Priesemuth; Wolfgang | Method of reducing the peak load of energy supply network systems and apparatus for limiting the power consumption of a consumer unit fed from an energy supply connection |
JPH09215198A (ja) * | 1996-02-07 | 1997-08-15 | Hitachi Ltd | 自動電圧調整装置 |
DE10248447A1 (de) * | 2002-10-17 | 2004-04-29 | Badische Stahl-Engineering Gmbh | Verfahren und Vorrichtungen zur Impedanzanpassung |
CN102620390A (zh) * | 2012-04-27 | 2012-08-01 | 广东志高空调有限公司 | 一种来电随机延时自启动空调控制方法 |
CN102769385A (zh) * | 2012-05-28 | 2012-11-07 | 华为技术有限公司 | 多相并联均流控制方法、装置及系统 |
CN103365275A (zh) * | 2013-07-08 | 2013-10-23 | 四川英杰电气股份有限公司 | 一种负载功率控制方法及晶闸管功率控制器 |
Non-Patent Citations (1)
Title |
---|
西安西驰电气股份有限公司: "CPC-H单相调功器说明书", 《WWW.XICHI.CN/SERVICE/DOWNLOADS/TYPEID/1/P/1.HTML》, 31 December 2013 (2013-12-31) * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102447265B (zh) | 带回馈功能功率单元的加载装置及方法 | |
CN103746389B (zh) | 基于无功电压特性的风电500kV汇集变电站无功补偿配置方法 | |
CN104600718A (zh) | 一种直流输电分层接入系统无功控制方法及装置 | |
CN104459393A (zh) | 一种大容量可调模拟rlc试验负载 | |
CN106130189A (zh) | 施工现场临时供电状态监控系统及方法 | |
CN103558478B (zh) | 一种微电网变换器硬件在回路系统测试平台 | |
CN104569691A (zh) | 多类型储能系统的参数检测方法以及系统 | |
CN104113140B (zh) | 一种工业企业厂级电力需量控制系统及装置 | |
CN205960636U (zh) | 浪涌电流控制电路及供电装置 | |
CN103941801A (zh) | 一种基于总负载电流的多机功率自动分配方法 | |
CN109194173B (zh) | 单相级联h桥多电平变流器的负载平衡范围优化方法 | |
Kanth et al. | Mitigation of real power loss, THD & enhancement of voltage profile with optimal DG allocation using PSO & sensitivity analysis | |
CN207081826U (zh) | 一种基于实负荷的智能电能表运行误差远程校验的验证装置 | |
Gonzalez et al. | Effect of non-unity power factor operation in photovoltaic inverters employing grid support functions | |
Zhu et al. | Load frequency control with dynamic demand control for deregulated power system | |
CN109713675A (zh) | 基于双闭环的电力弹簧控制方法 | |
CN107544034A (zh) | 一种大功率能量回馈型电子负载 | |
CN204243768U (zh) | 一种自动无功平衡补偿装置 | |
CN103995556B (zh) | 一种可连续调节功率的热负载及方法 | |
Huang et al. | Automatic reactive power control in distribution network based on Feeder Power Factor Assessment | |
CN105470999A (zh) | 一种基于分布式有限时间控制器的微电网功率分配方法 | |
Coteli et al. | Virtual laboratory for power electronic based reactive power compensators | |
CN205195269U (zh) | 一种带电容投切控制功能的电力有源滤波装置 | |
CN105276577A (zh) | 大型循环流化床机组锅炉主控压力设定值优化系统 | |
CN204068281U (zh) | 三相三线不平衡负载模拟装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140723 |