CN103940055B - Control method of air-conditioning water heater - Google Patents

Control method of air-conditioning water heater Download PDF

Info

Publication number
CN103940055B
CN103940055B CN201410109813.4A CN201410109813A CN103940055B CN 103940055 B CN103940055 B CN 103940055B CN 201410109813 A CN201410109813 A CN 201410109813A CN 103940055 B CN103940055 B CN 103940055B
Authority
CN
China
Prior art keywords
water heater
period
air conditioner
cycle
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410109813.4A
Other languages
Chinese (zh)
Other versions
CN103940055A (en
Inventor
曾庆龙
任鹏
明开云
陈军平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201410109813.4A priority Critical patent/CN103940055B/en
Publication of CN103940055A publication Critical patent/CN103940055A/en
Application granted granted Critical
Publication of CN103940055B publication Critical patent/CN103940055B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The invention discloses a control method of an air-conditioning water heater, which comprises the following steps: step S1: setting validity of cycle timing of each day in a cycle, starting time and ending time of a plurality of time intervals of each day in the cycle, and setting temperature corresponding to operation modes and operation modes of the air-conditioning water heater in the plurality of time intervals, and storing set parameters in a storage unit of the air-conditioning water heater; and step S2: and controlling the operation of the air-conditioning water heater according to the validity of the cycle timing, the starting time and the ending time of a plurality of periods, the operation mode and the set temperature in each day of the cycle. According to the control method of the air-conditioning water heater, a user can flexibly set the parameters such as the effectiveness of the periodic timing of each day, the on/off time of the water heater, the running mode, the set temperature and the like according to the use habit of the user, the intelligent degree is high, the control method is more humanized, and different requirements of the user are met; moreover, the power consumption can be saved to a certain extent, and the energy-saving effect is realized.

Description

The control method of air conditioner and water heater
Technical field
The present invention relates to household appliance technical field, particularly relate to the control method of a kind of air conditioner and water heater.
Background technology
The timing mode of the air conditioner and water heater of prior art is more single, it may be assumed that user sets machine on the controller After the startup and shutdown time of group, unit can carry out machine open/close according to this time every day;But, if user Wish that unit can run according to initial/end time automatically in the period that every day is different, it is desirable alternatively to unit exists The different periods of every day runs different patterns, then this kind of timing cannot meet user's request, thus current Inadequate hommization, function imperfection, shortcoming that intelligence degree is the highest is there is in air conditioner and water heater in terms of timing.
Summary of the invention
For above-mentioned prior art present situation, the technical problem to be solved is, it is provided that a kind of air-conditioning The control method of water heater, it can realize the timing of different periods every day, and the operational mode of each period and Temperature can set, to meet user's difference use needs.
In order to solve above-mentioned technical problem, the control method of a kind of air conditioner and water heater provided by the present invention, bag Include following steps:
Step S1: the effectiveness of cycle timing of every day, multiple periods of every day in the cycle in setting cycle Initial time and the operational mode of the described air conditioner and water heater in end time, multiple described period and described fortune The design temperature that row mode is corresponding, by effectiveness, the initial time of multiple described period of the timing of described cycle With the memory element that end time, described operational mode and described design temperature are stored in described air conditioner and water heater In;And
Step S2: in the every day in the described cycle, according to the effectiveness of timing of described cycle, multiple described The initial time of period and end time, described operational mode and described design temperature control described air conditioning hot The operation of device.
Wherein in an embodiment, the described cycle is nature week.
Wherein in an embodiment, in the described cycle, the described period of every day is 2~8 sections.
Wherein in an embodiment, described operational mode include refrigeration mode, heating mode, hot-water mode, Refrigeration is held concurrently hot-water mode and is heated double hot-water mode.
Wherein in an embodiment, the described operation mould of multiple described period interior on the same day in the described cycle Formula can arbitrarily be arranged.
Wherein in an embodiment, also include before described step S1:
By each described operational mode and the configuration parameter of the described air conditioner and water heater relevant to described design temperature Set temperature range corresponding to state is stored in described memory element;
When setting described operational mode and described design temperature, it is judged that described operational mode and described configuration parameter State, and judge to set temperature range, described setting according to described operational mode and described configuration parameter state Temperature sets in temperature range described.
Wherein in an embodiment, described step S2 includes:
Step S21: in the every day in the described cycle, it is judged that the effectiveness of timing of described cycle, if effectively, Then proceed to step S22;
Step S22: according to initial time and end time, multiple described period of multiple described period on the same day The described design temperature described air conditioner and water heater of control that corresponding described operational mode is corresponding with described operational mode Operation.
Wherein in an embodiment, described step S22 includes:
Step S221: the effectual time in the multiple described period judging the same day;
Step S222: in each described effectual time, according to the described operation mould that described effectual time is corresponding The operation of the described design temperature described air conditioner and water heater of control that formula is corresponding with described operational mode.
Wherein in an embodiment, also wrap before the effectual time in the multiple described period judging the same day Include:
Step S220: the multiple described period on the same day is ranked up according to the time sequencing of initial time.
Wherein in an embodiment, it is judged that effectual time in the multiple described period on the same day particularly as follows:
Judge whether the initial time of described period was equal to or was later than the knot of the upper described period being adjacent The bundle time, and whether the initial time of this period is early than its end time, if it is, this period is effective, If it is not, then this period is invalid.
Wherein in an embodiment, during cycle timing operation, if changing having of timing of described cycle Effect property and/or the initial time of multiple described period and end time and/or described operational mode and/or described in set Fixed temperature, the most described air conditioner and water heater runs according to the parameter after changing.
Compared with prior art, by the control method of the air conditioner and water heater of the present invention, user can be according to self Use habit set flexibly the effectiveness (effectively with invalid) of cycle every day timing, the machine open/close time of water heater, The parameter such as operational mode and design temperature, intelligence degree is high, more humane, meets user's difference needs; Furthermore, it is possible to set initial/end time and the temperature of multiple period, electricity consumption can be saved to a certain extent, Realize energy-conservation effect;Additionally, the parameter of all settings stores in the memory unit, power-off will not be lost, Play the effect of power-off protection.
Additional technical feature of the present invention is had the advantage that will enter in this specification detailed description of the invention part Row explanation.
Accompanying drawing explanation
Fig. 1 is the system block diagram of the controller of the air conditioner and water heater in embodiments of the invention;
Fig. 2 is the overview flow chart of the control method of the air conditioner and water heater in embodiments of the invention;
Fig. 3 is the operational mode decision flowchart of the control method of the air conditioner and water heater in embodiments of the invention;
Fig. 4 is in a control method embodiment wherein of the air conditioner and water heater in embodiments of the invention Cycle timing performs procedure chart.
Detailed description of the invention
Below with reference to the accompanying drawings and in conjunction with the embodiments the present invention is described in detail.It should be noted that not In the case of conflict, the feature in following embodiment and embodiment can be mutually combined.
Fig. 1 show the system block diagram of the controller of the air conditioner and water heater of embodiments of the invention.From Fig. 1's System block diagram is it can be seen that the controller of air conditioner and water heater of the embodiment of the present invention is by display unit 101, button Operating unit 102, performance element 103, memory element 104, communication unit 105 and timing unit 106 groups Become, display unit 101, key operation unit 102, memory element 104, communication unit 105 and timing list Unit 106 is connected with performance element 103 respectively.Wherein, key operation unit 102 is for changing the ginseng of setting Numerical value;Display unit 101, for display digit, title, can observe setting at display unit 101 Design parameter value, such as: the design temperature of setting, the operational mode etc. of setting;Performance element 103 is used for holding The various control commands of row, are the cores of whole system;Memory element 104 is for storing the parameter of setting, anti- Only loss of data after power-off;Communication unit 105 is for transmitting control commands;Timing unit 106 stores ten thousand According to current date, year calendar, can calculate what day the same day is.
The overview flow chart of the control method of the air conditioner and water heater that Fig. 2 show in embodiments of the invention.From It can be seen that the control method of described air conditioner and water heater comprises the following steps in figure:
Step S1: user is by the week of every day in key operation unit 102 and display unit 101 setting cycle The effectiveness of phase timing, the initial time of multiple periods of every day and end time in the cycle, multiple described time The design temperature that the operational mode of the described air conditioner and water heater in Duan is corresponding with described operational mode, by described week Effectiveness, the initial time of multiple described period and the end time of phase timing, described operational mode and described Design temperature is stored in the memory element 104 of described air conditioner and water heater.
The described cycle can be nature week (i.e. Monday is to Sunday).
The described cycle timing effectiveness include effective and invalid two kinds can set state, be set to " effectively ", then Represent that the cycle timing of this day is activated, can be properly functioning;It is set to engineering noise, represents that the cycle of this day is fixed Shi Wuxiao.
Living habit according to people determines the hop count of described period, it is preferable that during described every day in cycle described Section is 2~8 sections, and further, the described period is 5 sections.
Described operational mode includes but not limited to following pattern: refrigeration mode, heating mode, hot-water mode, Refrigeration is held concurrently hot-water mode and is heated double hot-water mode.The institute of multiple described period interior on the same day in the described cycle Stating operational mode can arbitrarily arrange, such motility is more preferable.
Owing to, under different operational modes, design temperature has different set point, therefore, is setting Before operational mode and design temperature, first by each operational mode and the air conditioner and water heater relevant to design temperature Set temperature range corresponding to configuration parameter state be stored in described memory element;Operational mode to be set During with design temperature, performance element 103 real-time judge operational mode and configuration parameter state, and according to operation Pattern and configuration parameter state judge to set temperature range, and described design temperature sets temperature range described. So, design temperature, within the scope of the temperature that air conditioner and water heater operational mode is corresponding, prevents the temperature that user sets Degree is that air conditioner and water heater is beyond one's reach temperature.Fig. 3 show the operation mould of the control method of air conditioner and water heater Formula decision flowchart.
From figure 3, it can be seen that operational mode includes that refrigeration mode, heating mode, hot-water mode, refrigeration are held concurrently Hot-water mode and heat double hot-water mode;The configuration parameter state of air conditioner and water heater includes: whether to configure end Fan coil, whether configure water tank, leaving water temperature control or room temperature control, high water temperature loop control Or low water temperature loop control, wherein, tail-end blower fan coil pipe and water tank when air conditioner and water heater dispatches from the factory according to Family needs apolegamy, and leaving water temperature controls or room temperature control, high water temperature loop control or low water temperature Loop control then in air conditioner and water heater running user select as required.Different operational modes and difference Set temperature range corresponding to configuration parameter state is as follows: operational mode is refrigeration mode and air conditioner and water heater is joined Put parameter state and be leaving water temperature control and set temperature range corresponding to configured tail-end blower fan coil pipe is scope 1;Operational mode is refrigeration mode and configuration parameter state is leaving water temperature control and does not configures tail-end blower fan coil pipe Corresponding set temperature range is scope 2;Operational mode is refrigeration mode and configuration parameter state is room temperature Controlling corresponding set temperature range is scope 3, and the acquiescence temperature under this operational mode and this configuration parameter state Degree is 20 DEG C;Operational mode is heating mode and configuration parameter state is leaving water temperature control and the circulation of high water temperature Controlling corresponding set temperature range is scope 4;Operational mode is heating mode and configuration parameter state is water outlet The set temperature range that temperature controls and low water temperature loop control is corresponding is scope 5;Operational mode is heating mode With configuration parameter state be the set temperature range that room temperature control is corresponding be scope 6, this operational mode and should Default temperature under configuration parameter state is 26 DEG C;Operational mode is the set temperature range that hot-water mode is corresponding For scope 7;Refrigeration set temperature range corresponding to hot-water mode of holding concurrently includes that cryogenic temperature can set temperature range and heat Coolant-temperature gage can set temperature range, cryogenic temperature can set temperature range and hot water temperature can set temperature range respectively by Design temperature determination flow according to refrigeration mode and hot-water mode judges;In like manner, double hot-water mode is heated corresponding Set temperature range include heating temperature and can set temperature range and hot water temperature can set temperature range, heat temperature Degree can set temperature range and hot water temperature can set temperature range respectively according to heating mode and the setting of hot-water mode Temperature determination flow judges;Under water heating pattern, if it is invalid, only not configure water tank display hot-water mode Select heating mode and the refrigeration mode of air-conditioning.In Fig. 3, the temperature of temperature 1~scope 7 correspondence is as shown in table 1:
Table 1:
When user by the cycle every day cycle timing parameters (cycle timing effectiveness, the period initial time Between and end time, operational mode, design temperature) after setting completed, performance element 103 can be automatically by institute The cycle timing parameters having setting stores to memory element 104.During cycle timing operation, work as power-off After again power on, then performance element 103 obtains the cycle timing parameters of setting, institute from storage element 104 The cycle timing parameters having setting reverts to the value set before power-off, loss of data when being so possible to prevent power-off.
During cycle timing operation, if changing the effectiveness of timing of described cycle and/or multiple described period Initial time and end time and/or described operational mode and/or described design temperature, the most described air conditioning hot Device runs according to the parameter after changing.
Step S2: in the every day in the described cycle, performance element 103 is effective according to the timing of described cycle Property, the initial time of multiple described period and end time, described operational mode and described design temperature control The operation of described air conditioner and water heater.
Further, described step S2 includes:
Step S21: in the every day in the described cycle, performance element 103 judges the effective of timing of described cycle Property, if it is valid, proceed to step S22, if invalid, the most do not perform the cycle timing on the same day;
Step S22: performance element 103 according to the initial time of the multiple described period on the same day and end time, Described operational mode corresponding to the multiple described periods described design temperature corresponding with described operational mode controls institute State the operation of air conditioner and water heater.
Further, described step S22 includes:
Step S221: the effectual time in the multiple described period that performance element 103 judges the same day.Particularly as follows: Performance element 103 judges whether the initial time of described period is equal to or is later than described in upper be adjacent End time of period, the and whether initial time of this period early than its end time, if it is, this time Duan Youxiao, if it is not, then this period is invalid.Citing is as shown in table 2:
Table 2:
Step S222: in each described effectual time, according to the described operation mould that described effectual time is corresponding The operation of the described design temperature described air conditioner and water heater of control that formula is corresponding with described operational mode.Such as: table 2 In 5 periods in, the only the 1st period, the 3rd period and the 4th period are effective, performance element 103 meeting Perform this 3 periods successively.
Preferably, also include before the effectual time in the multiple described period judging the same day:
Step S220: the multiple described period on the same day is ranked up according to the time sequencing of initial time.By In user when setting multiple period, it is possible to the initial time of multiple period occurs not in accordance with time sequencing The situation of arrangement, and performance element 103 is to perform period timing sequentially in time, therefore, time initial Between period before the end time of previous period be not performed.In order to solve this problem, holding Before the timing of row each period, first the multiple described period on the same day is carried out according to the time sequencing of initial time Sequence.
Fig. 4 show a specific embodiment of described step S2.As shown in Figure 4, described step S2 tool Body includes:
Step 501: judge whether to open cycle timing function, if it is, proceed to step 502;
Step 502: according to current date, calculates what day the same day is automatically;
Step 503: read the setup parameter of the cycle timing on the same day from memory element 104;
Step 504: judge that the cycle timing on the same day is the most effective, if it is, proceed to step 505;If it does not, Then terminate to judge;
Step 505: multiple periods on the same day are ranked up according to the time sequencing of initial time;
Step 506: judge that the 1st period is the most effective, if effectively, proceed to step 507, if invalid, Proceed to step S512;
Step 507: start to perform the timing of the 1st period;
Step 508: judge whether to arrive initial time, if it is, proceed to step 509, as no, then system It is in holding state;
Step 509: send operating instruction;Read from memory element 104 and send the same day setting pattern and Design temperature, unit is run by setting value;
Step 510: judge whether to the end time, if it is, proceed to step 511;
Step 511: send standby command;1st period timing operation is complete;
Step 512: start to perform next section of timing, performance element 103 repeated execution of steps S506~S511;
Step 513: after all periods are finished, the cycle timing operation on the same day is complete.
The control flow that above-described embodiment uses is: before performing the timing of each period, first judge this period Effectiveness, it is of course also possible to use the effectiveness of all periods first judging the same day, then performs all successively The effective period.
As can be seen here, the control method of the air conditioner and water heater in embodiments of the invention, it is achieved that cycle timing Function, user can according to self use habit set flexibly the timing of cycle every day effectiveness (effectively with invalid), The parameters such as machine open/close time, operational mode and the design temperature of water heater, intelligence degree is high, more humane, Meet user's difference needs;Furthermore, it is possible to set initial/end time and the temperature of multiple period, can be Save electricity consumption to a certain extent, it is achieved energy-conservation effect;Additionally, the cycle timing parameters of all settings stores In the memory unit, power-off will not be lost, and plays the effect of power-off protection.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, But therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that, for this area Those of ordinary skill for, without departing from the inventive concept of the premise, it is also possible to make some deformation and Improving, these broadly fall into protection scope of the present invention.

Claims (11)

1. the control method of an air conditioner and water heater, it is characterised in that comprise the following steps:
Step S1: the effectiveness of cycle timing of every day, multiple periods of every day in the cycle in setting cycle Initial time and the operational mode of the described air conditioner and water heater in end time, multiple described period and described fortune The design temperature that row mode is corresponding, by effectiveness, the initial time of multiple described period of the timing of described cycle With the memory element that end time, described operational mode and described design temperature are stored in described air conditioner and water heater In;And
Step S2: in the every day in the described cycle, according to the effectiveness of timing of described cycle, multiple described The initial time of period and end time, described operational mode and described design temperature control described air conditioning hot The operation of device.
The control method of air conditioner and water heater the most according to claim 1, it is characterised in that described cycle For natural week.
The control method of air conditioner and water heater the most according to claim 1, it is characterised in that described cycle The described period of middle every day is 2~8 sections.
The control method of air conditioner and water heater the most according to claim 1, it is characterised in that described operation Pattern includes that refrigeration mode, heating mode, hot-water mode, refrigeration are held concurrently hot-water mode and heat double hot-water mode.
The control method of air conditioner and water heater the most according to claim 4, it is characterised in that described cycle In on the same day in the described operational mode of multiple described period can arbitrarily arrange.
The control method of air conditioner and water heater the most according to claim 4, it is characterised in that described step Also include before S1:
By each described operational mode and the configuration parameter of the described air conditioner and water heater relevant to described design temperature Set temperature range corresponding to state is stored in described memory element;
When setting described operational mode and described design temperature, it is judged that described operational mode and described configuration parameter State, and judge to set temperature range, described setting according to described operational mode and described configuration parameter state Temperature sets in temperature range described.
The control method of air conditioner and water heater the most according to claim 1, it is characterised in that described step S2 includes:
Step S21: in the every day in the described cycle, it is judged that the effectiveness of timing of described cycle, if effectively, Then proceed to step S22;
Step S22: according to initial time and end time, multiple described period of multiple described period on the same day The described design temperature described air conditioner and water heater of control that corresponding described operational mode is corresponding with described operational mode Operation.
The control method of air conditioner and water heater the most according to claim 7, it is characterised in that described step S22 includes:
Step S221: the effectual time in the multiple described period judging the same day;
Step S222: in each described effectual time, according to the described operation mould that described effectual time is corresponding The operation of the described design temperature described air conditioner and water heater of control that formula is corresponding with described operational mode.
The control method of air conditioner and water heater the most according to claim 8, it is characterised in that work as in judgement Also include before effectual time in it multiple described period:
Step S220: the multiple described period on the same day is ranked up according to the time sequencing of initial time.
The control method of air conditioner and water heater the most according to claim 9, it is characterised in that judge to work as Effectual time in it multiple described period particularly as follows:
Judge whether the initial time of described period was equal to or was later than the knot of the upper described period being adjacent The bundle time, and whether the initial time of this period is early than the end time of this period, if it is, this period Effectively, if it is not, then this period is invalid.
The control method of 11. air conditioner and water heaters according to claim 1, it is characterised in that cycle timing In running, if change the described cycle timing effectiveness and/or the initial time of multiple described period and End time and/or described operational mode and/or described design temperature, after the most described air conditioner and water heater is according to changing Parameter run.
CN201410109813.4A 2014-03-21 2014-03-21 Control method of air-conditioning water heater Active CN103940055B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410109813.4A CN103940055B (en) 2014-03-21 2014-03-21 Control method of air-conditioning water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410109813.4A CN103940055B (en) 2014-03-21 2014-03-21 Control method of air-conditioning water heater

Publications (2)

Publication Number Publication Date
CN103940055A CN103940055A (en) 2014-07-23
CN103940055B true CN103940055B (en) 2016-08-31

Family

ID=51187834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410109813.4A Active CN103940055B (en) 2014-03-21 2014-03-21 Control method of air-conditioning water heater

Country Status (1)

Country Link
CN (1) CN103940055B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105783176B (en) * 2014-12-16 2019-05-07 广州松下空调器有限公司 A kind of control method of air-conditioning elimination run
CN104566834B (en) * 2015-01-26 2017-11-14 珠海格力电器股份有限公司 Water heater-air conditioner all-in-one machine and control method and device thereof
CN104881983B (en) * 2015-05-22 2018-12-25 广东美的暖通设备有限公司 Household electrical appliances self-learning method, household electrical appliances self learning system and household electrical appliances
CN106322823A (en) * 2015-06-23 2017-01-11 约克广州空调冷冻设备有限公司 Control method of multifunctional air conditioner water heater unit and controller of multifunctional air conditioner water heater unit
CN105698345A (en) * 2016-04-13 2016-06-22 浙江大学 Automatic periodic starting and shutting control device for split air conditioner
CN107289632B (en) * 2016-11-11 2020-02-04 广东美的暖通设备有限公司 Intelligent water return control method, controller and control system
CN108286795B (en) * 2017-01-09 2020-08-07 芜湖美的厨卫电器制造有限公司 Water heater and control method thereof
CN107687712B (en) * 2017-09-07 2020-06-30 珠海格力电器股份有限公司 Operation method of multifunctional water heater
CN110513874B (en) * 2019-08-12 2020-08-14 珠海格力电器股份有限公司 Water heater control method and device based on power consumption and water heater

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2925902B2 (en) * 1993-12-16 1999-07-28 三洋電機株式会社 Control device for air conditioner
CN101382331B (en) * 2007-04-28 2010-12-01 珠海格力电器股份有限公司 Method for controlling air conditioner to operate according to custom curve
JP2013007507A (en) * 2011-06-23 2013-01-10 Daikin Industries Ltd Air conditioning control system
CN202216359U (en) * 2011-08-05 2012-05-09 珠海格力电器股份有限公司 Control terminal of air conditioner
CN103423833B (en) * 2012-05-18 2016-06-08 珠海格力电器股份有限公司 Multi-split air conditioner operation control method and control device

Also Published As

Publication number Publication date
CN103940055A (en) 2014-07-23

Similar Documents

Publication Publication Date Title
CN103940055B (en) Control method of air-conditioning water heater
US8204628B2 (en) Setpoint recovery with utility time of day pricing
CN104132421B (en) The control method and control system of air conditioner
CN108954823B (en) Phase-change heat storage type heat pump water heater, control method and device thereof and storage medium
CN104110766B (en) A kind of control method of air-conditioner intelligent defrosting
CN106322683B (en) Control method and control system of air conditioner
CN104374055B (en) Control method and system of air conditioning unit
JP2007132553A (en) Hot water storage type water heater
CN103363671A (en) Air energy water heater and control method and device thereof
CN104454478B (en) The control method of compressor frequency, the control device of compressor frequency and air-conditioner
JP5505040B2 (en) Air conditioning controller
CN108253563A (en) Air conditioner and hot water all-in-one machine control method and device
JP2019007692A (en) Storage water heater
CN112432335B (en) Method and device for controlling air conditioner and air conditioner
US11092937B2 (en) Electric product
CN105004065B (en) A kind of control method for water heater
KR20110067814A (en) Washing machine and the control method of the same
JP2015102259A (en) Hot water storage type water heater
JP5648348B2 (en) Futon dryer
JP6520700B2 (en) Hot water storage type hot water heater
JP2018143682A (en) Bathroom clothes dryer and water heater
CN114508809A (en) Method and device for humidifying air conditioner and air conditioner
CN103376741A (en) Temperature control method based on Monte Carlo theory and refrigerator thereof
CN106766216A (en) A kind of intelligent backwater control method, controller and control system
KR102349130B1 (en) Hot water supply system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant