CN103939088A - Surveying while drilling system - Google Patents

Surveying while drilling system Download PDF

Info

Publication number
CN103939088A
CN103939088A CN201410173482.0A CN201410173482A CN103939088A CN 103939088 A CN103939088 A CN 103939088A CN 201410173482 A CN201410173482 A CN 201410173482A CN 103939088 A CN103939088 A CN 103939088A
Authority
CN
China
Prior art keywords
data acquisition
communication interface
circuit board
power switch
integrated circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410173482.0A
Other languages
Chinese (zh)
Inventor
王涛
姚磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI GANZH SAFETY EQUIPMENT Co Ltd
Original Assignee
ANHUI GANZH SAFETY EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI GANZH SAFETY EQUIPMENT Co Ltd filed Critical ANHUI GANZH SAFETY EQUIPMENT Co Ltd
Priority to CN201410173482.0A priority Critical patent/CN103939088A/en
Publication of CN103939088A publication Critical patent/CN103939088A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a surveying while drilling system which comprises a surveying mechanism and a data acquisition mechanism, wherein the data acquisition mechanism is connected with the surveying mechanism through a USB data line. The surveying mechanism is provided with a clamping groove, a connection thread, a battery bin, a power switch, a communication interface, an integrated circuit board and a cover plate. The data acquisition mechanism is provided with a second power switch, a charging interface, a second battery bin, a lithium battery, a circuit board, a second communication interface, a liquid crystal display and a key panel. An acceleration sensor and a magnetic field sensor are arranged on the integrated circuit board. The surveying while drilling system has the advantages of being convenient to use, simple to operate, high in survey precision and the like.

Description

A kind of with boring deviational survey system
Technical field
The present invention relates to one with boring deviational survey system, be applied to measurement and the assembling sphere of the trajectory parameters of coal bed drilling.
Background technology
In the recovery process in colliery; need to then extract certain density gas out to coal bed drilling; in the process of boring, need whether run-off the straight of measured hole, at present, mainly adopt inclination measurement device to measure; but when using, existing inclination measurement device need to first use bit bore; and then inclination measurement device is put in boring, so not only time-consuming taking a lot of work, and deviational survey precision is not high; and existing data acquisition handset need to often change battery, cumbersome.
Summary of the invention
For solving the defect of above-mentioned prior art scheme, the invention discloses a kind of easy to use, simple to operate with boring deviational survey system.
The invention discloses one with boring deviational survey system, comprising: tilt check mechanism, data acquisition mechanism, described data acquisition mechanism is connected with tilt check mechanism by usb data line.
On described tilt check mechanism, be provided with holding tank, connecting thread, battery compartment, power switch, communication interface, surface-mounted integrated circuit, cover plate, described holding tank is arranged on the front portion of tilt check mechanism, described connecting thread is located at the front end of tilt check mechanism, described battery compartment is screwed in the inside of tilt check mechanism, described power switch is arranged on tilt check mechanism inside, described power switch is connected with surface-mounted integrated circuit by electric wire, described communication interface is arranged on tilt check mechanism inside, described communication interface is connected with surface-mounted integrated circuit by wire, described surface-mounted integrated circuit is screwed in the inside of tilt check mechanism, described surface-mounted integrated circuit is connected with battery compartment by electric wire, described cover plate is actively installed on tilt check mechanism.
Described data acquisition mechanism is provided with power switch two, charging inlet, battery compartment two, lithium battery, circuit board, communication interface two, liquid crystal display, key panel, described power switch two, charging inlet is arranged on the front of data acquisition mechanism, described battery compartment two is screwed in data acquisition mechanism inside, described power switch two is connected with circuit board by electric wire, described lithium battery is placed in battery compartment two, described circuit board is connected with battery compartment two by electric wire, described circuit board is screwed in data acquisition mechanism, described communication interface two is arranged on the front of data acquisition mechanism, described communication interface two is connected with circuit board by electric wire, described liquid crystal display is arranged on the front of data acquisition mechanism, described liquid crystal display is connected with circuit board by electric wire, described key panel is arranged on the front of data acquisition mechanism.
Described surface-mounted integrated circuit is provided with acceleration transducer and magnetic field sensor.
Owing to adopting technique scheme, the present invention has following useful advantage:
1, easy to use;
2, simple to operate;
3, deviational survey precision is high.
Brief description of the drawings
Fig. 1 is a kind of sectional structure schematic diagram with boring deviational survey system of the present invention;
Fig. 2 is the sectional structure schematic diagram of a kind of data acquisition mechanism with brill deviational survey system of the present invention.
Wherein: 1-tilt check mechanism; 2-data acquisition mechanism; 3-holding tank; 4-connecting thread; 5-battery compartment; 6-power switch; 7-communication interface; 8-surface-mounted integrated circuit; 9-cover plate; 10-power switch two; 11-charging inlet; 12-battery compartment two; 13-lithium battery; 14-circuit board; 15-communication interface two; 16-liquid crystal display; 17-key panel; 18-acceleration transducer; 19-magnetic field sensor.
Detailed description of the invention
As depicted in figs. 1 and 2, the invention discloses one with boring deviational survey system, comprising: tilt check mechanism 1, data acquisition mechanism 2, described data acquisition mechanism 2 is connected with tilt check mechanism 1 by usb data line.
On described tilt check mechanism 1, be provided with holding tank 3, connecting thread 4, battery compartment 5, power switch 6, communication interface 7, surface-mounted integrated circuit 8, cover plate 9, described holding tank 3 is arranged on the front portion of tilt check mechanism 1, described connecting thread 4 is located at the front end of tilt check mechanism 1, described battery compartment 5 is screwed in the inside of tilt check mechanism 1, described power switch 6 is arranged on tilt check mechanism 1 inside, described power switch 6 is connected with surface-mounted integrated circuit 8 by electric wire, described communication interface 7 is arranged on tilt check mechanism 1 inside, described communication interface 7 is connected with surface-mounted integrated circuit 8 by wire, described surface-mounted integrated circuit 8 is screwed in the inside of tilt check mechanism 1, described surface-mounted integrated circuit 8 is connected with battery compartment 5 by electric wire, described cover plate 9 is actively installed on tilt check mechanism 1.
Described data acquisition mechanism 2 is provided with power switch 2 10, charging inlet 11, battery compartment 2 12, lithium battery 13, circuit board 14, communication interface 2 15, liquid crystal display 16, key panel 17, described power switch 2 10, charging inlet 11 is arranged on the front of data acquisition mechanism 2, described battery compartment 2 12 is screwed in data acquisition mechanism 2 inside, described power switch 2 10 is connected with circuit board 14 by electric wire, described lithium battery 13 is placed in battery compartment 2 12, described circuit board 14 is connected with battery compartment 2 12 by electric wire, described circuit board 14 is screwed in data acquisition mechanism 2, described communication interface 2 15 is arranged on the front of data acquisition mechanism 2, described communication interface 2 15 is connected with circuit board 14 by electric wire, described liquid crystal display 16 is arranged on the front of data acquisition mechanism 2, described liquid crystal display 16 is connected with circuit board 14 by electric wire, described key panel 17 is arranged on the front of data acquisition mechanism 2.
Described surface-mounted integrated circuit 8 is provided with acceleration transducer 18 and magnetic field sensor 19.
The present invention implements like this: before boring, open cover plate 9, battery is put into battery compartment 5, power-on switch 6 and power switch 2 10, first connect communication interface 7 and communication interface 2 15 with usb data connecting line, in order to connect tilt check mechanism 1 and data acquisition mechanism 2, by controlling key panel 17, carry out time synchronized, after synchronous success, pull out usb data connecting line, again cover cover plate 9, get two joint drilling rods, drill bit is contained in drilling rod and carries out foremost drilling operation, tilt check mechanism 1 is passed through to holding tank 3, connecting thread 4 is tightened with the cutting ferrule of that joint drilling rod that is connected drill bit, thereby tilt check mechanism 1 front end is connected with drilling rod, the rear end of tilt check mechanism 1 is connected with another joint drilling rod by inserting cutting ferrule, tilt check mechanism 1 just and drilling rod like this, drill bit forms an entirety, drill bit is in the process of boring, acceleration sensing 18 devices and magnetic field sensor 19 in tilt check mechanism 1 gather inclination angle and azimuth information, and signal is transferred to surface-mounted integrated circuit 8, surface-mounted integrated circuit 8 is processed signal, change and store, punching, survey data and processing, storage data complete simultaneously, thereby avoid first punching, inclination measurement device being put into hole measures brought not convenient again, and acceleration transducer 18 and magnetic field sensor 19 are to inclination angle and azimuth information Real-time Collection, thereby avoid the inaccurate defect of deviational survey precision, then, after drilling construction completes, open cover plate 9, by the communication interface 7 on usb data connecting line connection tilt check mechanism 1 and the communication interface 2 15 in data acquisition mechanism 2, by the key panel 17 of controlling in data acquisition mechanism 2, the data-signal of surface-mounted integrated circuit 8 interior storages is gathered, data-signal is processed on circuit board 14, conversion and storage, show by liquid crystal display 16, when the lithium battery 13 in data acquisition mechanism 2 does not have electric time, charger is connected and can lithium battery 13 be charged with charging inlet 11, avoid often changing not convenient that battery brings, easy to operate.
Finally it should be noted that: above embodiment is only in order to illustrate the present invention and unrestricted technical scheme described in the invention; Therefore, although this manual has been described in detail the present invention with reference to each above-mentioned embodiment,, those of ordinary skill in the art should be appreciated that still and can modify or be equal to replacement the present invention; And all do not depart from technical scheme and the improvement thereof of the spirit and scope of the present invention, it all should be encompassed in claim scope of the present invention.

Claims (4)

1. with boring a deviational survey system, comprising: tilt check mechanism, data acquisition mechanism, is characterized in that: described data acquisition mechanism is connected with tilt check mechanism by usb data line.
2. one according to claim 1 is with boring deviational survey system, it is characterized in that: on described tilt check mechanism, be provided with holding tank, connecting thread, battery compartment, power switch, communication interface, surface-mounted integrated circuit, cover plate, described holding tank is arranged on the front portion of tilt check mechanism, described connecting thread is located at the front end of tilt check mechanism, described battery compartment is screwed in the inside of tilt check mechanism, described power switch is arranged on tilt check mechanism inside, described power switch is connected with surface-mounted integrated circuit by electric wire, described communication interface is arranged on tilt check mechanism inside, described communication interface is connected with surface-mounted integrated circuit by wire, described surface-mounted integrated circuit is screwed in the inside of tilt check mechanism, described surface-mounted integrated circuit is connected with battery compartment by electric wire, described cover plate is actively installed on tilt check mechanism.
3. one according to claim 1 is with boring deviational survey system, it is characterized in that: described data acquisition mechanism is provided with power switch two, charging inlet, battery compartment two, lithium battery, circuit board, communication interface two, liquid crystal display, key panel, described power switch two, charging inlet is arranged on the front of data acquisition mechanism, described battery compartment two is screwed in data acquisition mechanism inside, described power switch two is connected with circuit board by electric wire, described lithium battery is placed in battery compartment two, described circuit board is connected with battery compartment two by electric wire, described circuit board is screwed in data acquisition mechanism, described communication interface two is arranged on the front of data acquisition mechanism, described communication interface two is connected with circuit board by electric wire, described liquid crystal display is arranged on the front of data acquisition mechanism, described liquid crystal display is connected with circuit board by electric wire, described key panel is arranged on the front of data acquisition mechanism.
4. one according to claim 2, with boring deviational survey system, is characterized in that: described surface-mounted integrated circuit is provided with acceleration transducer and magnetic field sensor.
CN201410173482.0A 2014-04-28 2014-04-28 Surveying while drilling system Pending CN103939088A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410173482.0A CN103939088A (en) 2014-04-28 2014-04-28 Surveying while drilling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410173482.0A CN103939088A (en) 2014-04-28 2014-04-28 Surveying while drilling system

Publications (1)

Publication Number Publication Date
CN103939088A true CN103939088A (en) 2014-07-23

Family

ID=51186934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410173482.0A Pending CN103939088A (en) 2014-04-28 2014-04-28 Surveying while drilling system

Country Status (1)

Country Link
CN (1) CN103939088A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912543A (en) * 2015-06-24 2015-09-16 淮南矿业(集团)有限责任公司 Deviational survey while drilling device
CN105937898A (en) * 2016-06-29 2016-09-14 武汉长澳大地工程有限公司 Fully-intelligent inclination measuring device and inclination measuring method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5513710A (en) * 1994-11-07 1996-05-07 Vector Magnetics, Inc. Solenoid guide system for horizontal boreholes
CN1948707A (en) * 2006-11-20 2007-04-18 北京航空航天大学 Strapdown type hole drilling inclinometer based on magnetic resistance and inclination sensor
CN201620879U (en) * 2010-02-26 2010-11-03 煤炭科学研究总院重庆研究院 While-drilling inclination measurement device for nearly horizontal directional long drill hole of underground coal mine
CN202081881U (en) * 2011-04-15 2011-12-21 北京海蓝科技开发有限责任公司 Special data processing instrument for wireless logging while drilling
CN202645539U (en) * 2012-04-18 2013-01-02 中煤科工集团西安研究院 Borehole clinometer without cable based on synchronous technology
CN203189005U (en) * 2012-09-17 2013-09-11 郑州士奇测控技术有限公司 Track measuring system by putting abrasion drill in drill hole
CN203879487U (en) * 2014-04-28 2014-10-15 安徽感知安全装备有限公司 Measuring while drilling inclinometry system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5513710A (en) * 1994-11-07 1996-05-07 Vector Magnetics, Inc. Solenoid guide system for horizontal boreholes
CN1948707A (en) * 2006-11-20 2007-04-18 北京航空航天大学 Strapdown type hole drilling inclinometer based on magnetic resistance and inclination sensor
CN201620879U (en) * 2010-02-26 2010-11-03 煤炭科学研究总院重庆研究院 While-drilling inclination measurement device for nearly horizontal directional long drill hole of underground coal mine
CN202081881U (en) * 2011-04-15 2011-12-21 北京海蓝科技开发有限责任公司 Special data processing instrument for wireless logging while drilling
CN202645539U (en) * 2012-04-18 2013-01-02 中煤科工集团西安研究院 Borehole clinometer without cable based on synchronous technology
CN203189005U (en) * 2012-09-17 2013-09-11 郑州士奇测控技术有限公司 Track measuring system by putting abrasion drill in drill hole
CN203879487U (en) * 2014-04-28 2014-10-15 安徽感知安全装备有限公司 Measuring while drilling inclinometry system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912543A (en) * 2015-06-24 2015-09-16 淮南矿业(集团)有限责任公司 Deviational survey while drilling device
CN105937898A (en) * 2016-06-29 2016-09-14 武汉长澳大地工程有限公司 Fully-intelligent inclination measuring device and inclination measuring method

Similar Documents

Publication Publication Date Title
CA3055699C (en) Improvements to equipment and methods for downhole surveying and data acquisition for a drilling operation
CN205936594U (en) Three -dimensional geological data gathers portable equipment with transmission
CN101798923B (en) System and method for remote control coal mine evacuation working face advance detection and forecasting
CN101343997A (en) Directional tool of horizontal long drill hole
CN103982173A (en) System and method for measuring drilling track under coal mine
CN203879487U (en) Measuring while drilling inclinometry system
CN103939088A (en) Surveying while drilling system
CN104062155B (en) A kind of body of groundwater gas collecting device
CN102628355B (en) Cable-free borehole clinometer and synchronous inclinometry method thereof based on synchronization technology
CN205577979U (en) It is mining along with boring measurement system
CN204716227U (en) With brill inclination measurement device
CN203879486U (en) Measuring while drilling inclinometry device of measuring while drilling inclinometry system
CN104912543A (en) Deviational survey while drilling device
CN204085983U (en) Intelligence geologic media exploration hammer
CN202209951U (en) Convergence measurement point equipment
CN110242287A (en) A kind of Tunneling by mining method perforation hole size scalability detection device and application method
CN103867187A (en) Oil well indicator diagram liquid level collecting device
CN205665039U (en) Geographic information gathers measuring device
CN203097872U (en) Video recording instrument for roadway roof drill hole
CN205300654U (en) Opencut side slope three -dimensional configuration stability analysis system based on unmanned aerial vehicle telemetering measurement
CN202926322U (en) Drill vibration signal collection short section
CN203572980U (en) Water-exploring CT instrument
CN203035191U (en) Drilling pressure measuring device
CN203685161U (en) Panoramic drilling image obtaining system for power survey
CN203512459U (en) Drilling mud storage tank liquid level alarming device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140723