CN103935872A - Goods elevator double-channel iron sill - Google Patents
Goods elevator double-channel iron sill Download PDFInfo
- Publication number
- CN103935872A CN103935872A CN201410090080.4A CN201410090080A CN103935872A CN 103935872 A CN103935872 A CN 103935872A CN 201410090080 A CN201410090080 A CN 201410090080A CN 103935872 A CN103935872 A CN 103935872A
- Authority
- CN
- China
- Prior art keywords
- square tube
- channel
- party
- section steel
- iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
The invention discloses a goods elevator double-channel iron sill. The goods elevator double-channel iron sill comprises box iron, a first square tube, a second square tube and a third square tube. The box iron is fixedly arranged on the wall face through bolts. The first square tube, the second square tube and the third square tube are arranged on the box iron in sequence. The first square tube and the third square tube are arranged on the two sides of the box iron in the transverse direction respectively and are flush with the tail ends of the two sides. The distance between the first square tube and the second square tube is equal to the distance between the second square tube and the third square tube. The surface of the goods elevator double-channel iron sill is galvanized. Original soft aluminum alloy is removed, and the goods elevator double-channel iron sill is formed by welding the iron square tubes and the box iron, and is very firm and durable. The square tubes and the box iron are ready-made on the market and can be used when bought back, and a large amount of electricity, natural gas and other energy is saved.
Description
Technical field
The present invention relates to elevator cage, be specifically related to a kind of Cargo Lift double flute iron sill.
Background technology
If lift boy owner's Introduced from Japan of China and European technique and technology, its middle level door pedal mainly taking Mitsubishi as main, be full aluminium sill pedal.Due to the insufficient strength of aluminum alloy own, if it is more soft to lack timeliness while making, supportive is inadequate, full aluminium sill needs whole hot extrusion, and will be in aging oven timeliness, more consuming time, in the time making, expend again a large amount of natural fuelses, electric power, to consume metallic aluminium cost also higher, and do not meet the standard of present energy-saving consumption-reducing.
Summary of the invention
The object of the present invention is to provide that a kind of durable, rule of origin is convenient, the low Cargo Lift double flute iron sill of energy resource consumption.
Technical scheme of the present invention is, a kind of Cargo Lift double flute iron sill, comprise channel-section steel, the first square tube, the second square tube and third party's pipe, described channel-section steel is bolted and is arranged at metope, described the first square tube, the second square tube and third party's pipe are successively set on channel-section steel top, described the first square tube and described third party pipe are arranged at respectively the both sides of channel-section steel horizontal position, and keep flushing with both sides tail end, spacing size between spacing size and the second square tube and third party's pipe between described the first square tube and the second square tube is identical, described Cargo Lift double flute iron sill surface adopts zinc-plated processing.
In a preferred embodiment of the present invention, the spacing size between described the first square tube and the second square tube is 12.5mm, and the spacing size between the second square tube and third party's pipe is 12.5mm.
In a preferred embodiment of the present invention, described channel-section steel transverse width is 90mm.
In a preferred embodiment of the present invention, the specification of described the first square tube is 20mm*30mm, and the specification of described the second square tube is 30mm*30mm, and the specification of described third party's pipe is 15mm*30mm.
In a preferred embodiment of the present invention, described the first square tube, the second square tube and the top of third party's pipe and the top of metope keep flushing.
In a preferred embodiment of the present invention, described the first square tube, the second square tube and third party manage and adopt method and the channel-section steel of welding to be fixed together.
Of the present invention is a kind of Cargo Lift double flute iron sill, has cancelled original softer aluminum alloy, is all welded by iron square tube and channel-section steel, very durable, square tube and channel-section steel are all that market is ready-made, buy back and can make, and cut and have economized a large amount of electric power, natural fuels equal energy source.
Brief description of the drawings
Fig. 1 is the structural representation in Cargo Lift double flute iron sill of the present invention one preferred embodiment;
In accompanying drawing, each mark is as follows: 1, channel-section steel, 2, the first square tube, 3, the second square tube, 4, third party's pipe, 5, bolt.
Detailed description of the invention
Below preferred embodiment of the present invention is described in detail, thereby so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that, protection scope of the present invention is made to more explicit defining.
Of the present invention is a kind of Cargo Lift double flute iron sill, shown in Figure 1, comprise channel-section steel 1, the first square tube 2, the second square tube 3 and third party manage 4, described channel-section steel 1 is fixedly installed on metope by bolt 5, described the first square tube 2, the second square tube 3 and third party manage 4 and are successively set on channel-section steel 1 top, described the first square tube 2 and described third party manage 4 both sides that are arranged at respectively channel-section steel 1 horizontal position, and keep flushing with both sides tail end, it is identical that spacing size between described the first square tube 2 and the second square tube 3 and the second square tube 3 and third party manage spacing size between 4, described Cargo Lift double flute iron sill surface adopts zinc-plated processing.
Spacing size between described the first square tube 2 and the second square tube 3 is 12.5mm, and the spacing size that the second square tube 3 and third party manage between 4 is 12.5mm.
Described channel-section steel 1 transverse width is 90mm.
The specification of described the first square tube 2 is 20mm*30mm, and the specification of described the second square tube 3 is 30mm*30mm, and it is 15mm*30mm that described third party manages 4 specification.
Described the first square tube 2, the second square tube 3 and third party manage 4 top and keep flushing with the top of metope.
Method and channel-section steel 1 that described the first square tube 2, the second square tube 3 and third party manage 4 employing welding are fixed together.
Of the present invention is a kind of Cargo Lift double flute iron sill, has cancelled original softer aluminum alloy, is all welded by iron square tube and channel-section steel, very durable, square tube and channel-section steel are all that market is ready-made, buy back and can make, and cut and have economized a large amount of electric power, natural fuels equal energy source.
The foregoing is only the specific embodiment of the present invention; but protection scope of the present invention is not limited to this; any those of ordinary skill in the art are in the disclosed technical scope of the present invention; the variation that can expect without creative work or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain that claims were limited.
Claims (6)
1. a Cargo Lift double flute iron sill, it is characterized in that: comprise channel-section steel, the first square tube, the second square tube and third party's pipe, described channel-section steel is bolted and is arranged at metope, described the first square tube, the second square tube and third party's pipe are successively set on channel-section steel top, described the first square tube and described third party pipe are arranged at respectively the both sides of channel-section steel horizontal position, and keep flushing with both sides tail end, spacing size between spacing size and the second square tube and third party's pipe between described the first square tube and the second square tube is identical, the zinc-plated processing of described Cargo Lift double flute iron sill surface employing.
2. Cargo Lift double flute iron sill according to claim 1, is characterized in that: the spacing size between described the first square tube and the second square tube is 12.5mm, and the spacing size between the second square tube and third party's pipe is 12.5mm.
3. Cargo Lift double flute iron sill according to claim 1, is characterized in that: described channel-section steel transverse width is 90mm.
4. Cargo Lift double flute iron sill according to claim 1, is characterized in that: the specification of described the first square tube is 20mm*30mm, and the specification of described the second square tube is 30mm*30mm, and the specification of described third party's pipe is 15mm*30mm.
5. Cargo Lift double flute iron sill according to claim 1, is characterized in that: described the first square tube, the second square tube and the top of third party's pipe and the top of metope keep flushing.
6. Cargo Lift double flute iron sill according to claim 1, is characterized in that: described the first square tube, the second square tube and third party manage and adopt method and the channel-section steel of welding to be fixed together.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410090080.4A CN103935872A (en) | 2014-03-13 | 2014-03-13 | Goods elevator double-channel iron sill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410090080.4A CN103935872A (en) | 2014-03-13 | 2014-03-13 | Goods elevator double-channel iron sill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103935872A true CN103935872A (en) | 2014-07-23 |
Family
ID=51183803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410090080.4A Pending CN103935872A (en) | 2014-03-13 | 2014-03-13 | Goods elevator double-channel iron sill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103935872A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05319755A (en) * | 1992-05-13 | 1993-12-03 | Mitsubishi Electric Corp | Sill of elevator |
JPH0867483A (en) * | 1994-08-31 | 1996-03-12 | Otis Elevator Co | Threshold of household elevator |
JPH08198560A (en) * | 1995-01-30 | 1996-08-06 | Otis Elevator Co | Threshold of household elevator |
JPH09151066A (en) * | 1995-12-04 | 1997-06-10 | Otis Elevator Co | Threshold of elevator |
CN1167075A (en) * | 1996-04-22 | 1997-12-10 | 科恩股份公司 | Threshood for lift-well landing door |
CN101070131A (en) * | 2007-06-09 | 2007-11-14 | 梁超杰 | Iron-made elevator sill |
CN201517010U (en) * | 2009-08-31 | 2010-06-30 | 浙江怡达快速电梯有限公司 | elevator sill |
-
2014
- 2014-03-13 CN CN201410090080.4A patent/CN103935872A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05319755A (en) * | 1992-05-13 | 1993-12-03 | Mitsubishi Electric Corp | Sill of elevator |
JPH0867483A (en) * | 1994-08-31 | 1996-03-12 | Otis Elevator Co | Threshold of household elevator |
JPH08198560A (en) * | 1995-01-30 | 1996-08-06 | Otis Elevator Co | Threshold of household elevator |
JPH09151066A (en) * | 1995-12-04 | 1997-06-10 | Otis Elevator Co | Threshold of elevator |
CN1167075A (en) * | 1996-04-22 | 1997-12-10 | 科恩股份公司 | Threshood for lift-well landing door |
CN101070131A (en) * | 2007-06-09 | 2007-11-14 | 梁超杰 | Iron-made elevator sill |
CN201517010U (en) * | 2009-08-31 | 2010-06-30 | 浙江怡达快速电梯有限公司 | elevator sill |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103981975B (en) | Bamboo-wood-filled buckling restrained support | |
CN203855287U (en) | Two-channel-bar sill for goods elevator | |
CN203855286U (en) | Three-channel-bar sill for goods elevator | |
CN103935872A (en) | Goods elevator double-channel iron sill | |
CN204137552U (en) | PE pipe manufacturing process roller support | |
CN103879868A (en) | Three-channel-bar sill for goods elevator | |
CN202401142U (en) | Anode carbon block | |
CN204527521U (en) | A kind of friction stir welding Aluminium ships base plate | |
CN203976196U (en) | The compound anticreep corrosion-resistant steel of a kind of M type sill component | |
CN204137705U (en) | PE pipe internal field transhipment universal wheel bracket | |
CN205132152U (en) | Nozzle and air bubble for air bubble | |
CN201348118Y (en) | Acid-resistant pipeline | |
CN206220347U (en) | A kind of wind resistance color steel | |
CN204647732U (en) | Special-shaped heat preserving cover block | |
CN204358315U (en) | A kind of high-rise residential building main sewer road | |
CN203821638U (en) | Assembly type steel structure wallboard joint | |
CN203976197U (en) | The compound anti-dealuminzation sill component of a kind of hook-shaped M type | |
CN203345395U (en) | Mounting rack for large steel pipe | |
CN201928534U (en) | Flameproof shell | |
CN203769065U (en) | Novel cold-formed steel framework bearing structure with boundary beam | |
CN106813025A (en) | A kind of multiple tube for being incubated noise reduction macromolecular material | |
CN205471469U (en) | A buffer memory car for buffer memory workshop | |
CN204876165U (en) | Outer wall body combined member | |
CN104129700A (en) | M-shaped composite stainless steel anti-falling sill assembly | |
CN201547403U (en) | Copper aluminum composite pipe fitting structure of copper cladding aluminum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140723 |