CN103924518A - Track beam setting up device and method - Google Patents

Track beam setting up device and method Download PDF

Info

Publication number
CN103924518A
CN103924518A CN201410133370.2A CN201410133370A CN103924518A CN 103924518 A CN103924518 A CN 103924518A CN 201410133370 A CN201410133370 A CN 201410133370A CN 103924518 A CN103924518 A CN 103924518A
Authority
CN
China
Prior art keywords
top frame
track beam
plate
track
hydraulic jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410133370.2A
Other languages
Chinese (zh)
Other versions
CN103924518B (en
Inventor
吴金山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN201410133370.2A priority Critical patent/CN103924518B/en
Publication of CN103924518A publication Critical patent/CN103924518A/en
Application granted granted Critical
Publication of CN103924518B publication Critical patent/CN103924518B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种轨道梁的架设装置及其方法,属于高架、桥梁施工技术领域,用于解决轨道梁吊装定位精度差的问题。该装置,设置于已安装到位轨道梁端部的第一顶架;设置于待安装轨道梁端部的第二顶架,且第二顶架与第一顶架相抵;第二顶架带动待安装轨道梁在第一顶架的液压千斤顶的推动下向远离第一顶架的方向移动。该方法,大型吊机将待安装轨道梁吊装到与已安装到位轨道梁间距为30mm≤d<50mm,然后安装第一顶架、第二顶架和液压千斤顶,最后吊钩尚未完全放松时,启动液压千斤顶推动第二顶架带动待安装轨道梁移动,手动测量d,直至d=50mm时,关闭液压千斤顶。该装置,安装定位精度高,操作方便,结构简单,制作成本低。

The invention discloses a track beam erecting device and a method thereof, which belong to the technical field of viaduct and bridge construction and are used to solve the problem of poor hoisting and positioning accuracy of track beams. The device is set on the first top frame installed at the end of the track beam; it is set on the second top frame at the end of the track beam to be installed, and the second top frame is against the first top frame; the second top frame drives the to-be-installed top frame The installation track beam moves away from the direction of the first top frame under the promotion of the hydraulic jack of the first top frame. In this method, the large-scale crane lifts the track beam to be installed to a distance of 30mm≤d<50mm from the installed track beam, and then installs the first top frame, the second top frame and the hydraulic jack. Finally, when the hook has not been completely loosened, Start the hydraulic jack to push the second top frame to move the track beam to be installed, measure d manually until d=50mm, and then close the hydraulic jack. The device has high installation and positioning accuracy, convenient operation, simple structure and low manufacturing cost.

Description

一种轨道梁的架设装置及其方法A track beam erecting device and method thereof

技术领域technical field

本发明属于高架、桥梁施工技术领域,尤其涉及一种轨道梁的架设装置及其方法。The invention belongs to the technical field of viaduct and bridge construction, and in particular relates to a track beam erecting device and a method thereof.

背景技术Background technique

轨道梁为混凝土结构,通常轨道梁的自身重量达到200吨。在安装轨道梁时,需要采用大型吊装机械,将该轨道梁吊装到柱顶的支座上。根据安装规范,水平方向上相邻两根轨道梁之间的间隙宽度为50mm。为了使得轨道梁吊装定位精确,通常采用的方法是,吊装待安装轨道梁之前,用一块木板垫在已安装到位的轨道梁的端面,该木板厚度为50mm。待安装轨道梁吊装就位后,用吊机将该待安装轨道梁缓缓放到支座上,并将该待安装轨道梁的端面紧贴该木板,然后将木板抽走,使得新吊装的轨道梁与已安装到位的轨道梁形成规定的间隙。采用这样的吊装方式操作简单,但是不安全,新吊装的轨道梁吊装完成后,存在所述木板压得太紧而无法抽出来,或者所述木板压得太松而导致相邻的两个轨道梁之间的间隙过大的问题。而且采用这样的吊装方式,还可能由于撞击使得已安装到位的轨道梁变动位置。因此,如何提供一种轨道梁的架设装置及其方法,提高轨道梁吊装定位精度是本领域技术人员亟待解决的一个技术问题。The track beam is a concrete structure, and usually the weight of the track beam reaches 200 tons. When installing the track beam, it is necessary to adopt a large hoisting machine to hoist the track beam to the support on the top of the column. According to the installation specification, the gap width between two adjacent track beams in the horizontal direction is 50mm. In order to make the hoisting and positioning of the track beams accurate, the usual method is, before hoisting the track beams to be installed, use a wooden board to cushion the end face of the installed track beams, the thickness of which is 50mm. After the track beam to be installed is hoisted in place, the track beam to be installed is slowly placed on the support with a crane, and the end face of the track beam to be installed is close to the wooden board, and then the wooden board is pulled away, so that the newly hoisted The track beams form a defined gap with the track beams already in place. This kind of hoisting method is easy to operate, but it is not safe. After the hoisting of the newly hoisted track beams is completed, the wooden boards are too tightly pressed to be pulled out, or the wooden boards are too loosely pressed so that two adjacent tracks Problems with excessive gaps between beams. And adopt such hoisting method, also may cause the track beam that has been installed in place to change the position due to impact. Therefore, how to provide a track beam erecting device and its method to improve the hoisting and positioning accuracy of the track beam is a technical problem to be solved urgently by those skilled in the art.

发明内容Contents of the invention

本发明的目的在于提供一种轨道梁的架设装置及其方法,以解决现有技术吊装轨道梁定位精度差的问题。The object of the present invention is to provide a track beam erecting device and method thereof, so as to solve the problem of poor positioning accuracy of hoisting track beams in the prior art.

为了实现上述目的,本发明的技术方案是:一种轨道梁的架设装置及其方法,包括:设置于已安装到位轨道梁的端部的第一顶架;设置于待安装轨道梁的端部的第二顶架,且所述第二顶架与所述第一顶架相抵;所述第二顶架在所述第一顶架的液压千斤顶的推动下向远离所述第一顶架的方向移动,使得所述待安装轨道梁向远离所述已安装到位轨道梁的方向移动。In order to achieve the above object, the technical solution of the present invention is: a track beam erecting device and its method, comprising: a first top frame arranged at the end of the track beam installed in place; The second top frame, and the second top frame is against the first top frame; the second top frame is pushed away from the first top frame by the hydraulic jack of the first top frame direction movement, so that the track beam to be installed moves away from the installed track beam.

进一步地,所述第一顶架包括第一底板、分别竖向设置于所述第一底板两端的反力板和第一勾板,所述液压千斤顶固定在所述反力板上,所述第一勾板与所述第一底板的连接部位卡接在所述已安装到位轨道梁的端部。Further, the first top frame includes a first bottom plate, a reaction force plate and a first hook plate vertically arranged at both ends of the first bottom plate, the hydraulic jack is fixed on the reaction force plate, and the The connecting portion of the first hook plate and the first bottom plate is clamped on the end of the installed track beam.

进一步地,所述第一顶架还包括两套沿所述架设装置的轴线对称设置的固定组件,所述固定组件包括一螺杆、压板一以及压板二,所述压板一位于所述第一底板的上方,所述压板二位于所述已安装到位轨道梁的底端,所述压板一、压板二通过所述螺杆螺栓连接。Further, the first top frame also includes two sets of fixing assemblies arranged symmetrically along the axis of the erecting device, the fixing assemblies include a screw, pressing plate 1 and pressing plate 2, and the pressing plate 1 is located on the first bottom plate above, the pressure plate 2 is located at the bottom of the installed track beam, and the pressure plate 1 and pressure plate 2 are connected by the screw bolts.

进一步地,所述固定组件还包括一支撑杆,所述支撑杆的一端与所述第一底板固定连接,所述支撑杆的另一端与所述压板一固定连接。Further, the fixing assembly further includes a support rod, one end of the support rod is fixedly connected to the first bottom plate, and the other end of the support rod is fixedly connected to the pressing plate.

进一步地,所述第一顶架还包括两块筋板,所述筋板分别与所述第一底板、所述第一勾板和所述反力板固定连接,且两块所述筋板沿所述架设装置的轴线对称设置于所述液压千斤顶的外侧。Further, the first top frame also includes two ribs, the ribs are respectively fixedly connected with the first bottom plate, the first hook plate and the reaction force plate, and the two ribs It is arranged symmetrically on the outside of the hydraulic jack along the axis of the erecting device.

进一步地,所述第二顶架包括第二底板、竖向设置于所述第二底板一端的第二勾板,所述第二勾板与所述第二底板的连接部位卡接在所述待安装轨道梁的端部。Further, the second top frame includes a second bottom plate and a second hook plate vertically arranged at one end of the second bottom plate, and the connecting part between the second hook plate and the second bottom plate is clamped on the The end of the track beam to be installed.

进一步地,所述第一顶架与所述第二顶架相抵后,所述第二勾板位于两块所述第一勾板之间。Further, after the first top frame and the second top frame are abutted, the second hook plate is located between the two first hook plates.

进一步地,所述第二顶架还包括两块筋板,所述筋板分别与所述第二底板和所述第二勾板固定连接,且两块所述筋板沿所述第二顶架的轴线对称设置。Further, the second top frame also includes two ribs, the ribs are respectively fixedly connected with the second bottom plate and the second hook plate, and the two ribs are The axis of the frame is symmetrically arranged.

进一步地,所述第二顶架还包括两块加固板,所述加固板分别与所述筋板和所述第二底板固定连接。Further, the second top frame further includes two reinforcing plates, and the reinforcing plates are respectively fixedly connected with the ribs and the second bottom plate.

一种利用轨道梁的架设装置架设轨道梁的方法,包括如下步骤:A method for erecting a track beam using a track beam erecting device, comprising the steps of:

步骤一:采用大型吊机将所述待安装轨道梁吊到柱顶的支座上,使得其与所述已安装到位轨道梁之间的水平距离d控制在30mm≤d<50mm;Step 1: Use a large crane to hoist the track beam to be installed to the support on the top of the column, so that the horizontal distance d between it and the track beam that has been installed in place is controlled within 30mm≤d<50mm;

步骤二:将所述第一顶架和所述第二顶架分别安装到已安装到位轨道梁的端部和待安装轨道梁的端部,液压千斤顶固定安装在第一顶架上;Step 2: Install the first top frame and the second top frame to the end of the installed track beam and the end of the track beam to be installed respectively, and the hydraulic jack is fixedly installed on the first top frame;

步骤三:待所述大型吊机的吊钩尚未完全放松时,启动液压千斤顶推动所述第二顶架向远离所述第一顶架的方向移动,使得所述待安装轨道梁向远离所述已安装到位轨道梁的方向移动,手动测量d,直至d=50mm时,关闭液压千斤顶。Step 3: When the hook of the large crane is not completely loosened, start the hydraulic jack to push the second top frame to move away from the first top frame, so that the track beam to be installed moves away from the Move in the direction of the installed track beam, manually measure d, until d = 50mm, close the hydraulic jack.

本发明与现有技术相比,具有如下优点和有益效果:Compared with the prior art, the present invention has the following advantages and beneficial effects:

1、本发明的轨道梁的架设装置,包括设置于已安装到位轨道梁的端部的第一顶架,还有与第一顶架相抵的设置于待安装轨道梁的端部的第二顶架,第一顶架上安装有液压千斤顶。待安装轨道梁吊装时,与水平方向上相邻的已安装到位的轨道梁之间的水平距离d保持在30mm≤d<50mm,然后在待安装轨道梁的吊钩尚未完全放松时,第二顶架在第一顶架的液压千斤顶的推动下向远离第一顶架的方向移动,使得待安装轨道梁向远离已安装到位轨道梁的方向移动,从而将二者之间的水平间距d扩大到50mm,以符合安装规范。本发明的轨道梁的架设装置,安装调整精度高,其安装精度可以达到1mm,操作方便,结构简单,单件重量为30kg,制作成本低。1. The erecting device of the track beam of the present invention includes a first top frame arranged at the end of the track beam installed in place, and a second top frame which is arranged at the end of the track beam to be installed against the first top frame frame, a hydraulic jack is installed on the first top frame. When the track beam to be installed is hoisted, the horizontal distance d between the adjacent installed track beam in the horizontal direction shall be kept at 30mm≤d<50mm, and then when the hook of the track beam to be installed has not been completely loosened, the second The top frame moves away from the first top frame under the push of the hydraulic jack of the first top frame, so that the track beam to be installed moves away from the installed track beam, thereby expanding the horizontal distance d between the two to 50mm to comply with installation specifications. The track beam erecting device of the present invention has high installation and adjustment accuracy, the installation accuracy can reach 1 mm, convenient operation, simple structure, single piece weight is 30 kg, and low production cost.

2、本发明的轨道梁的架设装置,第一顶架还包括两套沿架设装置的轴线对称设置的固定组件,固定组件包括一螺杆、位于第一底板上方的压板一以及位于已安装到位轨道梁底端的压板二,压板一、压板二通过螺杆螺栓连接。通过设置固定组件,能够克服液压千斤顶工作过程中在第一顶架上产生的弯矩,从而防止第一顶架产生翻转。2. For the erection device of the track beam of the present invention, the first top frame also includes two sets of fixed assemblies arranged symmetrically along the axis of the erected device. The fixed assembly includes a screw rod, a pressing plate above the first bottom plate, and a rail located on the installed track. The second pressing plate at the bottom of the beam, the first pressing plate and the second pressing plate are connected by screw bolts. By arranging the fixing assembly, the bending moment generated on the first top frame during the working process of the hydraulic jack can be overcome, thereby preventing the first top frame from turning over.

附图说明Description of drawings

本发明的轨道梁的架设装置及其方法由以下的实施例及附图给出。The erection device and method of the track beam of the present invention are provided by the following embodiments and accompanying drawings.

图1是本发明一实施例的轨道梁的架设装置的结构示意图;Fig. 1 is a schematic structural view of a track beam erecting device according to an embodiment of the present invention;

图2是图1的A-A剖视图;Fig. 2 is A-A sectional view of Fig. 1;

图3是本发明一实施例的第一顶架的结构示意图;Fig. 3 is a schematic structural view of a first top frame according to an embodiment of the present invention;

图4是本发明一实施例的第二顶架的结构示意图。Fig. 4 is a schematic structural view of a second top frame according to an embodiment of the present invention.

具体实施方式Detailed ways

以下结合附图和具体实施例对本发明轨道梁的架设装置及其方法作进一步详细说明。根据下面说明和权利要求书,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本发明实施例的目的。The device and method for erecting the track beam of the present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. Advantages and features of the present invention will be apparent from the following description and claims. It should be noted that all the drawings are in a very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.

结合图1和图2,一种轨道梁的架设装置,包括:设置于已安装到位轨道梁1的端部的第一顶架10;设置于待安装轨道梁2的端部的第二顶架20,且第二顶架20与第一顶架10相抵。第二顶架20在第一顶架10的液压千斤顶3的推动下向远离第一顶架10的方向移动,从而带动待安装轨道梁2向远离已安装到位轨道梁1的方向移动。按照轨道梁安装规范,同一直线上相抵的两根轨道梁之间的水平间距d为50mm。在安装调整待安装轨道梁2的位置时,采用手动测量其与已安装到位轨道梁1之间的水平间距d,并适时控制液压千斤顶3的开启与关闭,直至待安装轨道梁2与已安装到位轨道梁1的水平间距d为50mm。特别地,本实施例的轨道梁的架设装置,安装调整精度高,其调整精度可以达到1mm。1 and 2, an erection device for a track beam includes: a first top frame 10 arranged at the end of the track beam 1 installed in place; a second top frame arranged at the end of the track beam 2 to be installed 20, and the second top frame 20 is against the first top frame 10. The second top frame 20 moves away from the first top frame 10 under the push of the hydraulic jack 3 of the first top frame 10 , thereby driving the track beam 2 to be installed to move away from the installed track beam 1 . According to the track beam installation specification, the horizontal distance d between two track beams offset on the same straight line is 50mm. When installing and adjusting the position of the track beam 2 to be installed, manually measure the horizontal distance d between it and the installed track beam 1, and control the opening and closing of the hydraulic jack 3 in a timely manner until the track beam 2 to be installed and the installed The horizontal spacing d of the track beams 1 in place is 50mm. In particular, the installation and adjustment accuracy of the track beam erecting device of this embodiment is high, and the adjustment accuracy can reach 1 mm.

具体来说,继续参考图2和图3,第一顶架10包括第一底板11、分别竖向设置于第一底板11两端的反力板12和第一勾板13,液压千斤顶3固定在反力板12上,第一勾板13与第一底板11的连接部位卡接在已安装到位轨道梁1的端部。通过设置第一勾板13,克服了液压千斤顶3工作过程中水平方向的反向推力,从而使得第一顶架10达到受力平衡。Specifically, referring to Fig. 2 and Fig. 3, the first top frame 10 includes a first base plate 11, a reaction force plate 12 and a first hook plate 13 vertically arranged at both ends of the first base plate 11 respectively, and the hydraulic jack 3 is fixed on On the counter force plate 12 , the connecting part of the first hook plate 13 and the first bottom plate 11 is clamped on the end of the installed track beam 1 . By arranging the first hook plate 13, the reverse thrust in the horizontal direction during the working process of the hydraulic jack 3 is overcome, so that the first top frame 10 achieves force balance.

进一步地,连接于第一底板11端部的第一勾板13为两块,两块第一勾板13沿架设装置的轴线对称设置于液压千斤顶3的两侧。这样能够防止液压千斤顶3正常工作时,其刚性顶举件一端倾翻,从而保证第一顶架10的受力平衡。Further, there are two first hook plates 13 connected to the end of the first bottom plate 11, and the two first hook plates 13 are symmetrically arranged on both sides of the hydraulic jack 3 along the axis of the erecting device. This can prevent the hydraulic jack 3 from tipping over when the hydraulic jack 3 is working normally, thereby ensuring the force balance of the first top frame 10 .

具体来说,由于液压千斤顶3中心到已安装到位轨道梁1的梁面有一定的距离,在液压千斤顶3工作施力时,将在第一顶架10上产生弯矩,从而有可能导致第一顶架10产生翻转。因此,为了防止第一顶架10倾覆,还可以沿架设装置的轴线对称设置两套固定组件。该固定组件包括螺杆4,压板一51以及压板二52。压板一51位于第一底板11的上方,压板二52位于已安装到位轨道梁1的底端,压板一51、压板二52通过螺杆4螺栓连接。通过加设固定组件,螺杆4通过压板一51、压板二52将第一顶架10从垂直方向紧紧地与已安装到位轨道梁1压住,能够克服液压千斤顶3工作时产生的弯矩,从而使得第一顶架10达到受力平衡。Specifically, since there is a certain distance between the center of the hydraulic jack 3 and the beam surface of the installed track beam 1, when the hydraulic jack 3 works and applies force, a bending moment will be generated on the first top frame 10, which may cause the second A top frame 10 is turned over. Therefore, in order to prevent the first top frame 10 from overturning, two sets of fixing assemblies can also be arranged symmetrically along the axis of the erecting device. The fixing assembly includes a screw 4 , a first pressing plate 51 and a second pressing plate 52 . Pressing plate one 51 is positioned at the top of first bottom plate 11, and pressing plate two 52 is positioned at the bottom end of track beam 1 that has been installed in place, and pressing plate one 51, pressing plate two 52 are connected by screw rod 4 bolts. By adding a fixed assembly, the screw rod 4 presses the first top frame 10 tightly with the installed track beam 1 from the vertical direction through the first pressing plate 51 and the second pressing plate 52, which can overcome the bending moment generated when the hydraulic jack 3 works, In this way, the first top frame 10 achieves force balance.

当然,为了进一步加强固定组件的固定效果,固定组件还包括一支撑杆14,支撑杆14的一端与第一底板11固定连接,支撑杆14的另一端与压板一51固定连接。Certainly, in order to further enhance the fixing effect of the fixing assembly, the fixing assembly further includes a support rod 14 , one end of the support rod 14 is fixedly connected to the first bottom plate 11 , and the other end of the support rod 14 is fixedly connected to the pressure plate one 51 .

特别地,为了更好地固定竖向设置于第一底板11两端的反力板12和第一勾板13,第一顶架10上还设有两块筋板15,筋板15分别与第一底板11、第一勾板13以及反力板12固定连接,且两块筋板15沿架设装置的轴线对称设置于液压千斤顶3的外侧。In particular, in order to better fix the reaction plate 12 and the first hook plate 13 vertically arranged at the two ends of the first bottom plate 11, two ribs 15 are also arranged on the first top frame 10, and the ribs 15 are connected with the first top frame 10 respectively. A base plate 11 , a first hook plate 13 and a counter force plate 12 are fixedly connected, and two rib plates 15 are arranged symmetrically on the outside of the hydraulic jack 3 along the axis of the erecting device.

进一步地,继续参考图1、图2和图4,架设装置的第二顶架20具体结构是这样的:包括第二底板21、竖向设置于第二底板21一端的第二勾板22,第二勾板22与第二底板21的连接部位卡接在待安装轨道梁2的端部。特别地,第一顶架10与第二顶架20相抵后,第二勾板22位于两块第一勾板13之间。待安装轨道梁2吊装时,当其吊装的吊钩尚未完全放松时,启动安装在第一顶架10上的液压千斤顶3,推动第二勾板22,使得待安装轨道梁2的端部的第二顶架20向远离第一顶架10的方向移动,从而带动待安装轨道梁2向远离已安装到位轨道梁1的方向移动,保证待安装轨道梁2与已安装到位轨道梁1的水平间距d为50mm。Further, referring to Fig. 1, Fig. 2 and Fig. 4, the specific structure of the second top frame 20 of the erecting device is as follows: it includes a second bottom plate 21, a second hook plate 22 vertically arranged at one end of the second bottom plate 21, The connecting portion of the second hook plate 22 and the second bottom plate 21 is clamped on the end of the track beam 2 to be installed. In particular, after the first top frame 10 and the second top frame 20 abut against each other, the second hook plate 22 is located between the two first hook plates 13 . When the track beam 2 to be installed is hoisted, when the hoisting hook has not been completely loosened, start the hydraulic jack 3 installed on the first top frame 10, and push the second hook plate 22, so that the end of the track beam 2 to be installed The second top frame 20 moves away from the first top frame 10, thereby driving the track beam 2 to be installed to move away from the installed track beam 1, ensuring the level of the track beam 2 to be installed and the installed track beam 1 The distance d is 50mm.

当然,为了使得液压千斤顶3推动第二顶架20向远离第一顶架10的方向移动时,第二勾板22的强度符合要求,第二顶架20还包括两块筋板23,筋板23分别与第二底板21和第二勾板22固定连接,且两块筋板23沿第二顶架20的轴线对称设置。第二顶架20还包括两块加固板24。加固板24分别与筋板23和第二底板21固定连接。通过加设加固板24,进一步提高了第二顶架20的整体强度,满足了第二顶架20在液压千斤顶3的推动作用下向远离第一顶架10的方向移动,从而实现了待安装轨道梁2向远离已安装到位轨道梁1的方向移动的要求。Certainly, in order to make the hydraulic jack 3 push the second top frame 20 to move away from the direction of the first top frame 10, the strength of the second hook plate 22 meets the requirements, and the second top frame 20 also includes two ribs 23, the ribs 23 are fixedly connected with the second bottom plate 21 and the second hook plate 22 respectively, and the two rib plates 23 are arranged symmetrically along the axis of the second top frame 20 . The second top frame 20 also includes two reinforcing plates 24 . The reinforcing plate 24 is fixedly connected with the rib plate 23 and the second bottom plate 21 respectively. By adding the reinforcing plate 24, the overall strength of the second top frame 20 is further improved, and the second top frame 20 is moved away from the first top frame 10 under the promotion of the hydraulic jack 3, thereby realizing the The requirement for the track beam 2 to move away from the installed track beam 1.

下面继续参考图1和图2详细说明本发明的利用轨道梁的架设装置架设轨道梁的方法。The method for erecting a rail beam using the rail beam erecting device of the present invention will be described in detail below with reference to FIG. 1 and FIG. 2 .

一种利用轨道梁的架设装置架设轨道梁的方法,包括如下步骤:A method for erecting a track beam using a track beam erecting device, comprising the steps of:

步骤一:采用大型吊机将待安装轨道梁2吊到柱顶的支座上,并使得其与水平方向上相邻的已安装到位轨道梁1之间的水平距离d控制在30mm≤d<50mm。Step 1: Use a large crane to hoist the track beam 2 to be installed to the support on the top of the column, and make the horizontal distance d between it and the installed track beam 1 adjacent in the horizontal direction be controlled within 30mm≤d< 50mm.

步骤二:将第一顶架10和第二顶架20分别安装到已安装到位轨道梁1的端部和待安装轨道梁2的端部,液压千斤顶3固定安装在第一顶架10上。Step 2: Install the first top frame 10 and the second top frame 20 to the end of the installed track beam 1 and the end of the track beam 2 to be installed respectively, and the hydraulic jack 3 is fixedly installed on the first top frame 10 .

步骤三:待大型吊机的吊钩尚未完全放松时,启动液压千斤顶3推动第二顶架20向远离第一顶架10的方向移动,使得待安装轨道梁2向远离已安装到位轨道梁1的方向移动,手动测量d,直至d=50mm时,关闭液压千斤顶3。Step 3: When the hook of the large crane has not been completely loosened, start the hydraulic jack 3 to push the second top frame 20 to move away from the first top frame 10, so that the track beam 2 to be installed moves away from the installed track beam 1 Move in the direction of d, manually measure d, until d = 50mm, close the hydraulic jack 3.

由于吊装待安装轨道梁2的大型吊机的吊钩尚未完全放松,此时待安装轨道梁2与支座之间的摩擦力较小,对其位置调整所需用力也较小。特别地,液压千斤顶的调整精度可以达到1mm,从而待安装轨道梁2安装时的调整精度也可以达到1mm。因此,本发明的利用轨道梁的架设装置架设轨道梁的方法,操作简单,提高了待安装轨道梁的安装精度。Since the hook of the large crane for hoisting the track beam 2 to be installed has not been fully loosened, the frictional force between the track beam 2 to be installed and the support is relatively small, and the force required for its position adjustment is also small. In particular, the adjustment accuracy of the hydraulic jack can reach 1mm, so the adjustment accuracy of the track beam 2 to be installed can also reach 1mm. Therefore, the method for erecting the rail beam using the rail beam erecting device of the present invention is simple to operate and improves the installation accuracy of the rail beam to be installed.

综上所述,本实施例提供的轨道梁的架设装置,包括设置于已安装到位轨道梁的端部的第一顶架,还有与第一顶架相抵的设置于待安装轨道梁的端部的第二顶架,第一顶架上安装有液压千斤顶。待安装轨道梁吊装时,与水平方向上相邻的已安装到位的轨道梁之间的水平距离d保持在30mm≤d<50mm,然后在待安装轨道梁的吊钩尚未完全放松时,第二顶架在第一顶架的液压千斤顶的推动下向远离第一顶架的方向移动,使得待安装轨道梁向远离已安装到位轨道梁的方向移动,从而将二者之间的水平间距d扩大到50mm,以符合安装规范。此外,本发明轨道梁的架设装置,结构简单,单件重量为30kg,制作成本低。第一顶架设置有竖向的第一勾板和第二勾板,第一勾板与第一底板的连接部位卡接在已安装到位轨道梁的端部,克服了液压千斤顶工作过程中第二勾板的反作用力,从而达到受力平衡。而且本发明的利用轨道梁的架设装置架设轨道梁的方法,操作方便,安装调整精度高,其调整精度可以达到1mm,解决了现有技术吊装轨道梁定位精度差的问题。To sum up, the erection device of the track beam provided by this embodiment includes the first top frame arranged at the end of the track beam already installed in place, and the end of the track beam to be installed which abuts against the first top frame. The second top frame at the top, and a hydraulic jack is installed on the first top frame. When the track beam to be installed is hoisted, the horizontal distance d between the adjacent installed track beam in the horizontal direction shall be kept at 30mm≤d<50mm, and then when the hook of the track beam to be installed has not been completely loosened, the second The top frame moves away from the first top frame under the push of the hydraulic jack of the first top frame, so that the track beam to be installed moves away from the installed track beam, thereby expanding the horizontal distance d between the two to 50mm to comply with installation specifications. In addition, the track beam erecting device of the present invention has a simple structure, a single piece weighs 30kg, and low manufacturing cost. The first top frame is provided with a vertical first hook plate and a second hook plate. The connecting part of the first hook plate and the first bottom plate is clamped at the end of the track beam that has been installed in place, which overcomes the need for hydraulic jacks during the working process. The reaction force of the two hook plates, so as to achieve the balance of force. Moreover, the method for erecting the track beam using the erecting device of the track beam of the present invention is convenient to operate and has high installation and adjustment accuracy, and the adjustment accuracy can reach 1mm, which solves the problem of poor positioning accuracy of the hoisting track beam in the prior art.

上述描述仅是对本发明较佳实施例的描述,并非对本发明范围的任何限定。本领域的技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求的保护范围。The above description is only a description of the preferred embodiments of the present invention, and does not limit the scope of the present invention in any way. Any changes and modifications made by those skilled in the art based on the above disclosures shall fall within the protection scope of the claims.

Claims (10)

1.一种轨道梁的架设装置,其特征在于,包括:1. An erection device of a track beam, characterized in that, comprising: 设置于已安装到位轨道梁的端部的第一顶架;The first top frame arranged at the end of the installed track beam; 设置于待安装轨道梁的端部的第二顶架,且所述第二顶架与所述第一顶架相抵;a second top frame arranged at the end of the track beam to be installed, and the second top frame is against the first top frame; 所述第二顶架在所述第一顶架的液压千斤顶的推动下向远离所述第一顶架的方向移动,使得所述待安装轨道梁向远离所述已安装到位轨道梁的方向移动。The second top frame moves away from the first top frame under the push of the hydraulic jack of the first top frame, so that the track beam to be installed moves away from the installed track beam . 2.如权利要求1所述的轨道梁的架设装置,其特征在于,所述第一顶架包括第一底板、分别竖向设置于所述第一底板两端的反力板和第一勾板,所述液压千斤顶固定在所述反力板上,所述第一勾板与所述第一底板的连接部位卡接在所述已安装到位轨道梁的端部。2. The erecting device of the track beam according to claim 1, wherein the first top frame comprises a first bottom plate, a reaction force plate and a first hook plate vertically arranged at both ends of the first bottom plate respectively , the hydraulic jack is fixed on the reaction force plate, and the connecting part between the first hook plate and the first bottom plate is clamped on the end of the installed track beam. 3.如权利要求2所述的轨道梁的架设装置,其特征在于,所述第一顶架还包括两套沿所述架设装置的轴线对称设置的固定组件,所述固定组件包括一螺杆、压板一以及压板二,所述压板一位于所述第一底板的上方,所述压板二位于所述已安装到位轨道梁的底端,所述压板一、压板二通过所述螺杆螺栓连接。3. The erection device of the track beam as claimed in claim 2, wherein the first top frame also includes two sets of fixed assemblies arranged symmetrically along the axis of the erected device, and the fixed assembly includes a screw rod, Pressing plate 1 and pressing plate 2, the pressing plate 1 is located above the first base plate, the pressing plate 2 is located at the bottom of the installed track beam, and the pressing plate 1 and pressing plate 2 are connected by the screw bolts. 4.如权利要求3所述的轨道梁的架设装置,其特征在于,所述固定组件还包括一支撑杆,所述支撑杆的一端与所述第一底板固定连接,所述支撑杆的另一端与所述压板一固定连接。4. The erecting device of the track beam according to claim 3, wherein the fixing assembly further comprises a support rod, one end of the support rod is fixedly connected to the first bottom plate, and the other end of the support rod One end is fixedly connected with the pressing plate. 5.如权利要求1至4任一项所述的轨道梁的架设装置,其特征在于,所述第一顶架还包括两块筋板,所述筋板分别与所述第一底板、所述第一勾板和所述反力板固定连接,且两块所述筋板沿所述架设装置的轴线对称设置于所述液压千斤顶的外侧。5. The erection device of the track beam according to any one of claims 1 to 4, wherein the first top frame further comprises two ribs, and the ribs are connected to the first bottom plate and the first rib respectively. The first hook plate is fixedly connected to the reaction force plate, and the two rib plates are arranged symmetrically on the outside of the hydraulic jack along the axis of the erecting device. 6.如权利要求1至4任一项所述的轨道梁的架设装置,其特征在于,所述第二顶架包括第二底板、竖向设置于所述第二底板一端的第二勾板,所述第二勾板与所述第二底板的连接部位卡接在所述待安装轨道梁的端部。6. The erecting device for track beams according to any one of claims 1 to 4, wherein the second top frame comprises a second bottom plate, a second hook plate vertically arranged at one end of the second bottom plate , the connecting portion of the second hook plate and the second bottom plate is clamped on the end of the track beam to be installed. 7.如权利要求6所述的轨道梁的架设装置,其特征在于,所述第一顶架与所述第二顶架相抵后,所述第二勾板位于两块所述第一勾板之间。7. The erecting device for track beams according to claim 6, wherein after the first top frame and the second top frame are abutted, the second hook plate is located between the two first hook plates between. 8.如权利要求7所述的轨道梁的架设装置,其特征在于,所述第二顶架还包括两块筋板,所述筋板分别与所述第二底板和所述第二勾板固定连接,且两块所述筋板沿所述第二顶架的轴线对称设置。8. The erecting device of track beams according to claim 7, wherein the second top frame further comprises two ribs, and the ribs are connected to the second bottom plate and the second hook plate respectively. are fixedly connected, and the two ribs are arranged symmetrically along the axis of the second top frame. 9.如权利要求8所述的轨道梁的架设装置,其特征在于,所述第二顶架还包括两块加固板,所述加固板分别与所述筋板和所述第二底板固定连接。9. The erecting device of the track beam according to claim 8, wherein the second top frame further comprises two reinforcement plates, and the reinforcement plates are respectively fixedly connected with the rib plate and the second bottom plate . 10.一种利用权利要求1至9任一项所述的轨道梁的架设装置架设轨道梁的方法,其特征在于,包括如下步骤:10. A method for erecting a track beam using the track beam erecting device described in any one of claims 1 to 9, characterized in that it comprises the following steps: 步骤一:采用大型吊机将所述待安装轨道梁吊到柱顶的支座上,使得其与Step 1: Use a large crane to hang the track beam to be installed on the support at the top of the column so that it is in line with the 所述已安装到位轨道梁之间的水平距离d控制在30mm≤d<50mm;The horizontal distance d between the installed track beams is controlled at 30mm≤d<50mm; 步骤二:将所述第一顶架和所述第二顶架分别安装到已安装到位轨道梁的端部和待安装轨道梁的端部,液压千斤顶固定安装在第一顶架上;Step 2: Install the first top frame and the second top frame to the end of the installed track beam and the end of the track beam to be installed respectively, and the hydraulic jack is fixedly installed on the first top frame; 步骤三:待所述大型吊机的吊钩尚未完全放松时,启动液压千斤顶推动所述第二顶架向远离所述第一顶架的方向移动,使得所述待安装轨道梁向远离所述已安装到位轨道梁的方向移动,手动测量d,直至d=50mm时,关闭液压千斤顶。Step 3: When the hook of the large crane is not completely loosened, start the hydraulic jack to push the second top frame to move away from the first top frame, so that the track beam to be installed moves away from the Move in the direction of the installed track beam, manually measure d, until d = 50mm, close the hydraulic jack.
CN201410133370.2A 2014-04-03 2014-04-03 A kind of stringer of rail beam and method thereof Expired - Fee Related CN103924518B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410133370.2A CN103924518B (en) 2014-04-03 2014-04-03 A kind of stringer of rail beam and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410133370.2A CN103924518B (en) 2014-04-03 2014-04-03 A kind of stringer of rail beam and method thereof

Publications (2)

Publication Number Publication Date
CN103924518A true CN103924518A (en) 2014-07-16
CN103924518B CN103924518B (en) 2016-01-13

Family

ID=51142898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410133370.2A Expired - Fee Related CN103924518B (en) 2014-04-03 2014-04-03 A kind of stringer of rail beam and method thereof

Country Status (1)

Country Link
CN (1) CN103924518B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374296A (en) * 2018-02-27 2018-08-07 中建五局土木工程有限公司 The construction method of straddle type monorail rail tracks installation
CN111824799A (en) * 2020-07-16 2020-10-27 中国核工业第二二建设有限公司 Heavy equipment unloading device and unloading method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201486156U (en) * 2009-05-15 2010-05-26 中国十七冶建设有限公司 Accurate adjustment device for adjusting gap between large-sized steel members
CN202299465U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Quick adjustment device for steel beam hoisting
JP5178443B2 (en) * 2008-10-16 2013-04-10 株式会社Ihiインフラシステム Truss type setting beam
CN203145482U (en) * 2013-04-10 2013-08-21 中国十九冶集团有限公司 Assembly counterpart device for steel structure parts
CN203807946U (en) * 2014-04-03 2014-09-03 上海市机械施工集团有限公司 Track beam erecting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5178443B2 (en) * 2008-10-16 2013-04-10 株式会社Ihiインフラシステム Truss type setting beam
CN201486156U (en) * 2009-05-15 2010-05-26 中国十七冶建设有限公司 Accurate adjustment device for adjusting gap between large-sized steel members
CN202299465U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Quick adjustment device for steel beam hoisting
CN203145482U (en) * 2013-04-10 2013-08-21 中国十九冶集团有限公司 Assembly counterpart device for steel structure parts
CN203807946U (en) * 2014-04-03 2014-09-03 上海市机械施工集团有限公司 Track beam erecting device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赛铁兵: "跨座式单轨PC轨道梁线形调整施工技术", 《铁道标准设计》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374296A (en) * 2018-02-27 2018-08-07 中建五局土木工程有限公司 The construction method of straddle type monorail rail tracks installation
CN108374296B (en) * 2018-02-27 2019-05-03 中建五局土木工程有限公司 Construction method of straddle type monorail track beam installation
CN111824799A (en) * 2020-07-16 2020-10-27 中国核工业第二二建设有限公司 Heavy equipment unloading device and unloading method
CN111824799B (en) * 2020-07-16 2022-04-08 中国核工业第二二建设有限公司 Heavy equipment unloading device and unloading method

Also Published As

Publication number Publication date
CN103924518B (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN108894116B (en) Prefabricated stand column assembling construction method
CN104372947A (en) Integral mold plate feeding and retreating construction method for elevator shaft
CN108661313A (en) A kind of cast-in-place linkage section mould plate supporting device of tool-type concrete folding plate
CN207749421U (en) A kind of regulating device for controlling prefabricated stand column installation verticality
CN204476416U (en) The simple and easy sliding form apparatus of a kind of vertical shaft concrete lining
CN106759457A (en) The installation method of cantilever design high-accuracy built-in fitting
CN104495614B (en) A kind of large deformation Rock Crane Rail Support track arrangement and installation and debugging method thereof
CN103924518B (en) A kind of stringer of rail beam and method thereof
CN103770215B (en) The installation positioning method of tube coupling end box hat
CN102561714B (en) Prefabricated panel mounting and adjusting platform
CN106567538A (en) Positioning mold for bathroom concrete flanges
CN106978904A (en) A kind of lattice column locating guide device and the technique constructed using locating guide device
CN207597264U (en) Leg structure in a kind of upstroke movable framework
CN104453217A (en) Elevator shaft whole formwork lifting construction method
CN205382707U (en) A concrete placement support frame for civil engineering
CN204689552U (en) A kind of equipment jacking apparatus of zigzag
CN219772736U (en) Steel box girder assembling and positioning structure
CN103132494A (en) Embedded anchor cone accurate positioning method
CN105715046A (en) Steel and wood template component and construction method thereof
CN203807946U (en) Track beam erecting device
CN208167549U (en) A kind of steel form constructing structure for groove profile girder steel
CN205654123U (en) Building system of underpining
CN104372948A (en) Elevator shaft formwork lifting frame
CN204899939U (en) Bent wall wherein partition wall formworking jumbo
CN202000266U (en) Supporting structure of bridge coping template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

CF01 Termination of patent right due to non-payment of annual fee