CN103924513A CN201410166704.6A CN201410166704A CN103924513A CN 103924513 A CN103924513 A CN 103924513A CN 201410166704 A CN201410166704 A CN 201410166704A CN 103924513 A CN103924513 A CN 103924513A
Authority
CN
China
Prior art keywords
bearing beam
cover plate
bridge
shrinkage joint
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410166704.6A
Other languages
Chinese (zh)
Other versions
CN103924513B (en
Inventor
鲁应慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lu Yinghui
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410166704.6A priority Critical patent/CN103924513B/en
Publication of CN103924513A publication Critical patent/CN103924513A/en
Application granted granted Critical
Publication of CN103924513B publication Critical patent/CN103924513B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

Disclosed is an expansion device of a bridge steel cover plate. A plurality of pairs of positioning anchor plates are arranged on the two sides of an expansion joint and are all welded with anchor steel bars. A first bearing beam and a second bearing beam are arranged on the two sides of the expansion joint on a bridge abutment or a beam body respectively and are welded and fixedly connected with one ends of the positioning anchor plates, the top end of the first bearing beam and the bottom face of a cross-joint cover plate are welded and fixed, and the top of the second bearing beam and the bottom of the cross-joint cover plate are in movable contact. A deformable steel elastic body is arranged between the first bearing beam and the second bearing beam in the length direction of a bridge, and the two ends of the steel elastic body in the length direction of the bridge are fixedly connected with the first bearing beam and the second bearing beam respectively. Under the vehicle-mounted impact, the cross-joint cover plate is visual in structural stress, simple, safe and reasonable, the vehicle jumping phenomenon is obviously reduced compared with an existing expansion device, and it is guaranteed that the expansion device can be safely used under various deformation functions. Transmitted force between beam bodies at a beam joint is small, the steel elastic body provides support for a waterproof structure, and mounting is simple, quick and convenient.

Description

Telescopic device of bridge steel cover plate
Technical field
The present invention relates to bridge construction field, is a kind of linkage of bridge expanssion joint specifically.
Background technology
In prior art, bridge expanssion joint place is all provided with stretching device, all some defects of existence in various degree of these stretching devices, a large amount of Maurer expansion installations that use at present, easy laying dust, card stone in its seam, jumping car is obvious, and water proof rubber easily departs from and leaks, beam seam both sides concrete is subject to Vehicular impact because jumping car, very easily damages.
Summary of the invention
Technical problem to be solved by this invention is to ensure, under the prerequisite of stretching device telescopicing performance, to provide a kind of Telescopic device of bridge steel cover plate, solving jumping car, the waterproof problem of stretching device.
Described Telescopic device of bridge steel cover plate, both sides, shrinkage joint at abutment or beam body are embedded with anchor bar, on the shrinkage joint of abutment or beam body, be equipped with steel fibrous concrete, it is characterized in that: the described stretching device that is installed on top, shrinkage joint comprises across seam cover plate, location anchor slab, the first bearing beam, the second bearing beam and steel bomb body;
Described location anchor slab is provided with multipair in the both sides at shrinkage joint, all weld with anchor bar, described the first bearing beam and the second bearing beam are located at respectively the both sides at shrinkage joint on abutment or beam body, and all parallel with shrinkage joint, being welded and fixed with one end of location anchor slab respectively away from shrinkage joint one side of the first bearing beam and the second bearing beam, the top of described the first bearing beam and described across seam cover plate bottom surface be welded and fixed, the top of described the second bearing beam is provided with described across the parallel platform of seam cover plate, with the bottom movable contact across seam cover plate;
Between described the first bearing beam and the second bearing beam, be provided with the steel bomb body bridge length direction-agile shape, described steel bomb body is fixedly connected with described the second bearing beam with described the first bearing beam respectively at the two ends of bridge length direction.
In the time that shrinkage joint is less than or equal to 160mm, adopt following scheme: relatively described the second bearing beam of described the first bearing beam is arranged at the direction to the car side of road, described across seam cover plate the first bearing beam outside side be provided with the anchoring spring that spring force is vertical direction.
In the time that being greater than 160mm, shrinkage joint adopts following scheme: what relatively described the second bearing beam of described the first bearing beam was arranged at road goes car direction side, described across seam cover plate the first bearing beam outside side be provided with the anchoring spring that spring force is vertical direction, above stitching cover plate, be equipped with the leveling cover plate that thickness is less than or equal to 12mm described, the second bearing beam top is located in one end that described leveling cover plate approaches shrinkage joint, the relative other end in direction to the car side away from shrinkage joint.
Now, described leveling cover plate is provided with in 1/7~1/3 position, one end apart from direction to the car side the anchoring spring that spring force is vertical direction.
A kind of embodiment of steel bomb body, described steel bomb body is provided with one or more, and the shape of cross section of its connector is axisymmetric two parts, the oblique joint face at the solder side that every part is two ends and middle part, solder side is parallel with the first bearing beam, and oblique joint face is connected with the oblique obtuse angle of solder side.
At the top of described steel bomb body and be describedly provided with flashing member between across seam cover plate.
The present invention has following beneficial effect:
1, multiple functional, be well positioned to meet beam body and stretch and other deformation requirements, to drive a vehicle comfortable, draining is unobstructed, and waterproof is tight; Stone, laying dust can not blocked in shrinkage joint, and good water-proof effect therefore can be because of the infringement bridge that leaks;
2, simple in structure, fabrication and installation are convenient, and maintenance is simple and easy, durable in use;
3, be static determinacy primary structure member across seam cover plate, under vehicle-mounted impact, structure stress is directly perceived, simple, safe and reasonable.
4, utilized as down train feature: compared with girder seam device across seam cover plate with compared with the reverse leveling cover plate of crossbeam seam device, at the steep bank of the less discrepancy in elevation (≤12mm) forming along direction of traffic, can not affect driving comfort level.And jump car phenomenon significantly better than existing stretching device.
5, be elasticity anchoring: a, ensured that this device can use safely under beam body dilatation various metamorphosis in addition across seam cover plate fixed end; Between b, beam seam place beam body, power transmission is less, thereby do not affect the stressed safety of beam body itself.
6, can control cover plate underbeam seam size, thus ensured cover plate stressed at last and controlled;
7, a, steel bomb body are that waterproof construction provides support, and b, can in advance this device be connected into entirety, thereby make to install simple, fast and easy.
Brief description of the drawings
Fig. 1 is following (containing) beam seam of 160mm stretching device embodiment profile,
Fig. 2 is the top view of Fig. 1,
Fig. 3 is that 160mm stitches stretching device embodiment profile with upper beam,
Fig. 4 is the top view of Fig. 3,
Fig. 5 is the floor map across seam cover plate and leveling cover plate.
In figure: 1-deck paving, 2-anticracking steel mesh reinforcement, 3-steel fibrous concrete, 4-location anchor slab, 5-anchoring spring, 6-across seam cover plate, the 7-the first bearing beam, 8-flashing member, 9-steel bomb body, the 10-the second bearing beam, 11-leveling cover plate, 12-abutment or beam body, 13-anchor bar, 14-oblique joint face.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further described: stretching device structure be the less shrinkage joint of shrinkage joint below 160mm as shown in Fig. 1,2 time, and the described stretching device that is installed on top, shrinkage joint comprises across seam cover plate 6, location anchor slab 4, the first bearing beam 7, the second bearing beam 10 and steel bomb body 9; Described location anchor slab 4 is provided with multipair in the both sides at shrinkage joint, all weld with anchor bar 13, described the first bearing beam 7 and the second bearing beam 10 are located at respectively the both sides at shrinkage joint on abutment or beam body, and all parallel with shrinkage joint, being welded and fixed with one end of location anchor slab 4 respectively away from shrinkage joint one side of the first bearing beam 7 and the second bearing beam 10, the top of described the first bearing beam 7 and described across seam cover plate 6 bottom surface be welded and fixed, the top of described the second bearing beam 10 is provided with described across the parallel platform of seam cover plate 6, with the bottom movable contact across seam cover plate 6; Between described the first bearing beam 7 and the second bearing beam 10, be provided with the steel bomb body 9 bridge length direction-agile shape, described steel bomb body is fixedly connected with described the second bearing beam 10 with described the first bearing beam 7 respectively at the two ends of bridge length direction.
Relatively described the second bearing beam 10 of described the first bearing beam 7 is arranged at the direction to the car side of road, described across seam cover plate 6 the first bearing beam 7 outside side be provided with the anchoring spring 5 that spring force is vertical direction.
A kind of structure embodiment of steel bomb body, described steel bomb body 9 is provided with one or more, the shape of cross section of its connector is axisymmetric two parts, every part is the solder side at two ends and the oblique joint face 14 at middle part, solder side is parallel with the first bearing beam 7, and oblique joint face 14 is connected with the oblique obtuse angle of solder side.At the top of described steel bomb body 9 and be describedly provided with flashing member 8 between across seam cover plate 6.
In the time that shrinkage joint is greater than 160mm, as shown in Figure 3,4, what relatively described the second bearing beam 10 of described the first bearing beam 7 was arranged at road goes car direction side, described across seam cover plate 6 the first bearing beam 7 outside side be provided with the anchoring spring 5 that spring force is vertical direction, above stitching cover plate 6, be equipped with the leveling cover plate 11 that thickness is less than or equal to 12mm described, the second bearing beam 10 tops are located in one end that described leveling cover plate 11 approaches shrinkage joint, the relative other end in direction to the car side away from shrinkage joint.
Now, described leveling cover plate 11 is provided with in 1/7~1/3 position, one end apart from direction to the car side the anchoring spring 5 that spring force is vertical direction.
When shrinkage joint is larger, as Fig. 5, be provided with staggered broach seam across seam cover plate and leveling cover plate, prevent the distortion at width.
Illustrate work progress below:
1, in factory, a complete set of stretching device is completed, shrinkage joint is 160mm will separately make across seam cover plate and leveling cover plate compared with bigger device when above, on-the-spot installation.After all subitem completes across seam cover plate, leveling cover plate, anchoring spring, control seam load anchoring composite member, steel bomb body waterproof construction support member and flashing member etc., become a whole set of equipment in factory-assembled, be then transported to scene, wait to be installed.
2, digging in-situ notch:, at the notch of both sides, beam body gap excavation respective depth and width, check and supplement pre-buried anchor bar.Clean out dregs in beam seam and notch; Check beam end of body preset clearance size (if do not met the requirement of beam body elongation, must cut a part of beam body).The corresponding relation (old seam transformation needs bar planting, can first extend compression apparatus, rear boring bar planting) that checks embedded bar position and stretching device anchor slab, Site Welding or cutting, be linked to be the one whole section stretching device consistent with notch size by segmentation finished product.
3, with soft material filling beam seam, and in stretching device face width (containing location anchor slab) scope, padding compress soft material (cystosepiment, shoddy cotton, knitting bagged sandy soil etc.) below stretching device.
4, package unit is put into notch, adjust linearity and elevation, and by anchor slab and embedded bar welding anchoring and location, then by embedded bar and location anchor slab firm welding.
5, colligation ater-casting anti-cracking concrete steel mesh reinforcement.Under inspection stretching device side bar, whether padding is tight for soft material; First use gap under high-grade cement mortar (in right amount) shutoff side bar, in case concrete enters beam seam and stretching device the inside, while reaching suitable intensity etc. cement mortar, by specification procedure cast ater-casting concrete.Spread anticracking steel mesh reinforcement, concreting.After concrete setting, can come into operation.
Attention:
1. stretching device must be steady, light and slow in the time transporting and get on or off the bus, and must not arbitrarily lose and put, clash into or uneven stacking.To prevent damaging member or impact use planeness because of shock.
2. the installation of two-way driving deck expansion installation should be arranged a joint from knick point, after installation, joint is welded.
3. must adopt suitable firm method, while ensureing ater-casting concrete casting, concrete could not enter " beam seam " and " shrinkage joint " the inside, and suggestion first uses high-grade cement mortar (appropriate! ) gap under shutoff side bar, while reaching suitable intensity etc. cement mortar, by specification procedure cast ater-casting concrete.
4. anchor slab and embedded bar or bar planting must have enough weld lengths, and concrete welding position can suitably be adjusted according to field condition.
5. the stretching device of old seam transformation is installed necessary bar planting, and bar planting length must not be less than 8 centimetres.
6. while pouring into a mould ater-casting concrete, must take reliable measure to ensure that concrete does not water stretching device surface, to ensure cleaning and the presentation quality of product.

Claims (6)

1. a Telescopic device of bridge steel cover plate, be embedded with anchor bar (13) in the both sides, shrinkage joint of abutment or beam body, on the shrinkage joint of abutment or beam body, be equipped with steel fibrous concrete (3), it is characterized in that: the described stretching device that is installed on top, shrinkage joint comprises across seam cover plate (6), location anchor slab (4), the first bearing beam (7), the second bearing beam (10) and steel bomb body (9);
Described location anchor slab (4) is provided with multipair in the both sides at shrinkage joint, all weld with anchor bar (13), described the first bearing beam (7) and the second bearing beam (10) are located at respectively the both sides at shrinkage joint on abutment or beam body, and all parallel with shrinkage joint, being welded and fixed with one end of location anchor slab (4) respectively away from shrinkage joint one side of the first bearing beam (7) and the second bearing beam (10), the top of described the first bearing beam (7) and described across seam cover plate (6) bottom surface be welded and fixed, the top of described the second bearing beam (10) is provided with described across the parallel platform of seam cover plate (6), with the bottom movable contact across seam cover plate (6),
Between described the first bearing beam (7) and the second bearing beam (10), be provided with the steel bomb body (9) bridge length direction-agile shape, described steel bomb body is fixedly connected with described the second bearing beam (10) with described the first bearing beam (7) respectively at the two ends of bridge length direction.
2. Telescopic device of bridge steel cover plate according to claim 1, it is characterized in that: relatively described the second bearing beam of described the first bearing beam (7) (10) is arranged at the direction to the car side of road, described across seam cover plate (6) the first bearing beam (7) outside side be provided with the anchoring spring (5) that spring force is vertical direction.
3. Telescopic device of bridge steel cover plate according to claim 1, it is characterized in that: what relatively described the second bearing beam of described the first bearing beam (7) (10) was arranged at road goes car direction side, described across seam cover plate (6) the first bearing beam (7) outside side be provided with the anchoring spring (5) that spring force is vertical direction, above stitching cover plate (6), be equipped with the leveling cover plate (11) that thickness is less than or equal to 12mm described, described leveling cover plate (11) approaches the one end at shrinkage joint and is located at the second bearing beam (10) top, the relative other end in direction to the car side away from shrinkage joint.
4. Telescopic device of bridge steel cover plate according to claim 3, is characterized in that: described leveling cover plate (11) is provided with the anchoring spring (5) that spring force is vertical direction in 1/7~1/3 position, one end apart from direction to the car side.
5. Telescopic device of bridge steel cover plate according to claim 1, it is characterized in that: described steel bomb body (9) is provided with one or more, the shape of cross section of its connector is axisymmetric two parts, every part is the solder side at two ends and the oblique joint face (14) at middle part, solder side is parallel with the first bearing beam (7), and oblique joint face (14) is connected with the oblique obtuse angle of solder side.
6. Telescopic device of bridge steel cover plate according to claim 1, is characterized in that: at the top of described steel bomb body (9) and be describedly provided with flashing member (8) between across seam cover plate (6).
CN201410166704.6A 2014-04-24 2014-04-24 Telescopic device of bridge steel cover plate Expired - Fee Related CN103924513B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410166704.6A CN103924513B (en) 2014-04-24 2014-04-24 Telescopic device of bridge steel cover plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410166704.6A CN103924513B (en) 2014-04-24 2014-04-24 Telescopic device of bridge steel cover plate

Publications (2)

Publication Number Publication Date
CN103924513A true CN103924513A (en) 2014-07-16
CN103924513B CN103924513B (en) 2015-12-30

Family

ID=51142893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410166704.6A Expired - Fee Related CN103924513B (en) 2014-04-24 2014-04-24 Telescopic device of bridge steel cover plate

Country Status (1)

Country Link
CN (1) CN103924513B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040580A (en) * 2015-06-30 2015-11-11 中国一冶集团有限公司 Cross seam sealing steel cover plate comb tooth telescopic device for bridge and implementation method of cross seam sealing steel cover plate comb tooth telescopic device
CN105544384A (en) * 2015-11-27 2016-05-04 中铁第四勘察设计院集团有限公司 Modularized multi-direction displacement cover plate type telescopic device and bridge
CN107299591A (en) * 2017-09-04 2017-10-27 中国建筑第七工程局有限公司 A kind of non-bolt corrugated sheet bridge extension joint
CN109137726A (en) * 2018-09-28 2019-01-04 苏州同尚工程设计咨询有限公司 A kind of expanded joint structure and its implementation method suitable for bridge
CN110886210A (en) * 2019-12-16 2020-03-17 内江师范学院 Bridge expansion joint width adjusting device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0978513A (en) * 1995-09-18 1997-03-25 Nitta Ind Corp Expansion joint for bridge
CN1273306A (en) * 1999-10-10 2000-11-15 江阴职工大学 Full-enclosed elasticjoint for road bridge
CN2880898Y (en) * 2006-02-21 2007-03-21 杨延新 Imbedded elastic expansion device
CN201517198U (en) * 2009-03-20 2010-06-30 鲁应慧 Telescopic device of bridge steel cover plate
CN101838965A (en) * 2009-03-20 2010-09-22 鲁应慧 Bridge deck steel-plastic body expansion device
CN102021884A (en) * 2009-09-16 2011-04-20 鲁应慧 Telescopic device for steel elastomer bridge deck girder body
CN203782559U (en) * 2014-04-24 2014-08-20 鲁应慧 Expansion and contraction device for bridge steel cover plate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0978513A (en) * 1995-09-18 1997-03-25 Nitta Ind Corp Expansion joint for bridge
CN1273306A (en) * 1999-10-10 2000-11-15 江阴职工大学 Full-enclosed elasticjoint for road bridge
CN2880898Y (en) * 2006-02-21 2007-03-21 杨延新 Imbedded elastic expansion device
CN201517198U (en) * 2009-03-20 2010-06-30 鲁应慧 Telescopic device of bridge steel cover plate
CN101838965A (en) * 2009-03-20 2010-09-22 鲁应慧 Bridge deck steel-plastic body expansion device
CN102021884A (en) * 2009-09-16 2011-04-20 鲁应慧 Telescopic device for steel elastomer bridge deck girder body
CN203782559U (en) * 2014-04-24 2014-08-20 鲁应慧 Expansion and contraction device for bridge steel cover plate

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040580A (en) * 2015-06-30 2015-11-11 中国一冶集团有限公司 Cross seam sealing steel cover plate comb tooth telescopic device for bridge and implementation method of cross seam sealing steel cover plate comb tooth telescopic device
CN105544384A (en) * 2015-11-27 2016-05-04 中铁第四勘察设计院集团有限公司 Modularized multi-direction displacement cover plate type telescopic device and bridge
CN105544384B (en) * 2015-11-27 2017-09-19 中铁第四勘察设计院集团有限公司 Modularization multi-directional deflection cover-plate type retractor device and bridge
CN107299591A (en) * 2017-09-04 2017-10-27 中国建筑第七工程局有限公司 A kind of non-bolt corrugated sheet bridge extension joint
CN109137726A (en) * 2018-09-28 2019-01-04 苏州同尚工程设计咨询有限公司 A kind of expanded joint structure and its implementation method suitable for bridge
CN110886210A (en) * 2019-12-16 2020-03-17 内江师范学院 Bridge expansion joint width adjusting device

Also Published As

Publication number Publication date
CN103924513B (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN103924513B (en) Telescopic device of bridge steel cover plate
CN104005338B (en) A kind of long-span cablestayed bridges tower beam three-dimensional temporary consolidation structure
CN104018425B (en) A kind of quick-replaceable bridge expansion joint installation and installation method thereof
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103243646B (en) Earthquake proof PTFE (Poly Tetra Fluoro Ethylene) plate rubber bearing small displacement comb plate extensible device
CN107268432B (en) Shock-absorbing impact-resistant bridge expansion joint mechanism and construction method thereof
KR101260397B1 (en) Single Pile Concrete Track Structure and Its Settlement Recovering Device
CN106245529A (en) Railway tee girder falls beam method safely and fast
CN203782559U (en) Expansion and contraction device for bridge steel cover plate
WO2016138776A1 (en) Lowly disposed line structure used in medium-low speed magnetic levitation traffic engineering fill section
CN103741595A (en) Bridge head structure for controlling bump at bridge head
CN102817299A (en) Structure for repairing urban bituminous pavements and construction method thereof
CN105040580A (en) Cross seam sealing steel cover plate comb tooth telescopic device for bridge and implementation method of cross seam sealing steel cover plate comb tooth telescopic device
CN105239503B (en) A kind of six to displacement fishback retractor device
CN109184256B (en) Displacement construction method for building
CN204266132U (en) Adopt the railway Frame Pier crossbeam of D type beam
CN103306306A (en) Anti-differential settlement inspection well device and construction method thereof
CN104711918A (en) Method for repairing crack and faulted slab at longitudinal joint part of cement concrete pavement
KR101368913B1 (en) Method for constructing face slab of concrete face rockfill dam using rail integrated side form
KR101705141B1 (en) Improved technique of railway track ballast operation
CN105113384A (en) Z-shaped bridge end transition slab structure and construction method thereof
CN205116002U (en) Six to shift comb pinion rack telescoping device
CN112252159B (en) Bridge and pavement integrated construction structure and construction method
CN108894098B (en) Bridge slab base for solving problem of vehicle bump at bridge head and method for solving problem of vehicle bump at bridge head
CN205000232U (en) Z shape transition slab structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Luo Yanming

Inventor after: Lu Yinghui

Inventor after: Lv Guopeng

Inventor after: Wang Lin

Inventor after: Dan Yaojia

Inventor before: Lu Yinghui

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20161024

Address after: Cuiwei cross road 430000 Hubei province Wuhan city Hanyang District No. 10

Patentee after: WUHAN HANYANG MUNICIPAL CONSTRUCTION GROUP CORPORATION

Address before: 430015 Wuhan Municipal Design Institute, Changqing Road, Jianghan District, Hubei, Wuhan 40, China

Patentee before: Lu Yinghui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200622

Address after: 430000 No.2, 7 / F, No.5 Decai Li, Jiang'an District, Wuhan City, Hubei Province

Patentee after: Lu Yinghui

Address before: Cuiwei cross road 430000 Hubei province Wuhan city Hanyang District No. 10

Patentee before: WUHAN HANYANG MUNICIPAL CONSTRUCTION Group Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20210424