CN103922222A - Lifting device for assembling steam turbine reheat interceptor valve cover and bush - Google Patents

Lifting device for assembling steam turbine reheat interceptor valve cover and bush Download PDF

Info

Publication number
CN103922222A
CN103922222A CN201410174436.2A CN201410174436A CN103922222A CN 103922222 A CN103922222 A CN 103922222A CN 201410174436 A CN201410174436 A CN 201410174436A CN 103922222 A CN103922222 A CN 103922222A
Authority
CN
China
Prior art keywords
steam turbine
contiguous block
assembling
connecting rods
lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410174436.2A
Other languages
Chinese (zh)
Other versions
CN103922222B (en
Inventor
王治军
高岩
梁毅超
宋兵
张久鑫
董中杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Electric Power Generation Equipment National Engineering Research Center Co ltd
Harbin Turbine Co Ltd
Original Assignee
Harbin Turbine Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Turbine Co Ltd filed Critical Harbin Turbine Co Ltd
Priority to CN201410174436.2A priority Critical patent/CN103922222B/en
Publication of CN103922222A publication Critical patent/CN103922222A/en
Application granted granted Critical
Publication of CN103922222B publication Critical patent/CN103922222B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a lifting device for assembling a steam turbine reheat interceptor valve cover and a bush and relates to a lifting device, aiming at solving the problems that the process is complex and a workpiece interior structure is influenced by spot welding in a conventional lifting method. A cross bracket body comprises a connecting block and four cylindrical connecting rods, wherein the connecting block and the four cylindrical connecting rods form the cross bracket body; one ends of the four cylindrical connecting rods are fixedly connected with the connecting block into a whole; axes of the four cylindrical connecting rods are positioned on the same plane; the other end of each cylindrical connecting rod is in threaded connection with a capping nut; a nut cap of the capping nut is a cylinder; the lower end of a hook is fixedly arranged on the connecting block. The lifting device is used for assembling the steam turbine reheat interceptor valve cover and the bush.

Description

Hanging apparatus for steam turbine reheat control valve valve gap and lining assembling
Technical field
The present invention relates to a kind of hanging apparatus, be specifically related to a kind of hanging apparatus for steam turbine reheat control valve valve gap and lining assembling.
Background technology
Steam turbine reheat control valve valve gap and lining interference connect joins, and lining need to be put into after liquid nitrogen shrinkage, reinstalls in valve gap, during lining normal temperature, between steam turbine reheat control valve valve gap and lining, is interference fit.
At present, the assembling of steam turbine reheat control valve valve gap and lining lifting adopts first spot welding hanger, then uses crane lifting hanger, finally hanger is cut off.
To sum up, existing hanging method needs welding, pincers worker reconditioning operation, exists complex process and spot welding meeting to impact to inside workpiece structure.
Summary of the invention
The problem that the present invention exists complex process and spot welding meeting to impact to inside workpiece structure for solving existing hanging method, and then a kind of hanging apparatus for steam turbine reheat control valve valve gap and lining assembling is provided.
The present invention solves the problems of the technologies described above the technical scheme of taking to be: the hanging apparatus for steam turbine reheat control valve valve gap and lining assembling of the present invention comprises hook, cross-shaped support body and four cover nuts, cross-shaped support body comprises contiguous block and four cylinder connecting rods, contiguous block and four cylinder connecting rods form cross-shaped support body, one end of four cylinder connecting rods all fixes as one with contiguous block, the axis of four cylinder connecting rods is with in one plane, the other end of every cylinder connecting rod has been threaded one and has covered nut, the nut cover of cover nut is cylinder, the lower end of hook is packed on contiguous block.
The invention has the beneficial effects as follows:
On the hanging apparatus assembling with lining for steam turbine reheat control valve valve gap of the present invention, four cover nuts are threaded with the outer end of cylinder connecting rod, lining upper inside wall is along the circumferential direction processed with flange, four cover nuts outwards screw out with the flange of lining inwall and overlap, compare with existing hanging method, lining steadily can be lifted and carries out liquid nitrogen cold-shrinkage, save the operation of welding and pincers worker reconditioning, simplified operation;
Hanging apparatus for the assembling of steam turbine reheat control valve valve gap and lining of the present invention is without spot welding hanger, the problem of having avoided spot welding to impact to inside workpiece structure;
The present invention also has advantages of simple in structure, low cost of manufacture.
Accompanying drawing explanation
Fig. 1 is the block diagram of the hanging apparatus for steam turbine reheat control valve valve gap and lining assembling of the present invention, the cutaway view of reheat control valve valve gap, lining and hanging apparatus when Fig. 2 is lining lifting.
The specific embodiment
The specific embodiment one: as shown in Fig. 1~2, the hanging apparatus for steam turbine reheat control valve valve gap and lining assembling of present embodiment comprises hook 1, cross-shaped support body 3 and four cover nuts 4, cross-shaped support body 3 comprises contiguous block 3-1 and four cylinder connecting rod 3-2, contiguous block 3-1 and four cylinder connecting rod 3-2 form cross-shaped support body 3, one end of four cylinder connecting rod 3-2 all fixes as one with contiguous block 3-1, the axis of four cylinder connecting rod 3-2 is with in one plane, the other end of every cylinder connecting rod 3-2 has been threaded one and has covered nut 4, the nut cover of cover nut 4 is cylinder, the lower end of hook 1 is packed on contiguous block 3-1.
During use, four cover nuts 4 are screwed in to contiguous block 3-1 direction separately, then hanging apparatus is put into lining endoporus, the hanging apparatus degree of depth is lower than the flange of lining, again four cover nuts 4 are outwards screwed out respectively, the top end face of four cover nuts 4 is contact bush inwall respectively, the top of four cover nuts 4 overlaps mutually with the flange of lining respectively, finally lining is steadily assembled in valve gap endoporus, after normal temperature, pull down hanging apparatus, lathe on valve gap and lining is machined away to the flange of lining endoporus and surplus to figure paper size.
The specific embodiment two: as shown in Figure 1, contiguous block 3-1's is shaped as cuboid described in present embodiment.So design, can guarantee four uniform surroundings that are arranged on contiguous block 3-1 of pipe link 3-2, and the angle between adjacent two pipe link 3-2 is 90o, lift so stressed evenly, hoisting process is steady.Other composition and annexation are identical with the specific embodiment one.
The specific embodiment three: as shown in Figure 2, be processed with central through hole 3-1-1 on present embodiment contiguous block 3-1, the lower end of hook 1 is threaded with nut 2 through the central through hole 3-1-1 of contiguous block 3-1.So design, prevents that lifting rope from existing torsional deflection, and during lifting, lining produces rotation, links up with 1 rotation when screw thread connects, and lining can not rotate.Other composition and annexation are identical with the specific embodiment one or two.

Claims (3)

1. the hanging apparatus for the assembling of steam turbine reheat control valve valve gap and lining, described hanging apparatus comprises hook (1), cross-shaped support body (3) and four cover nuts (4), it is characterized in that: cross-shaped support body (3) comprises contiguous block (3-1) and four cylinder connecting rods (3-2), contiguous block (3-1) forms cross-shaped support body (3) with four cylinder connecting rods (3-2), one end of four cylinder connecting rods (3-2) all fixes as one with contiguous block (3-1), the axis of four cylinder connecting rods (3-2) is with in one plane, the other end of every cylinder connecting rod (3-2) has been threaded one and has covered nut (4), the nut cover of cover nut (4) is cylinder, the lower end of hook (1) is packed on contiguous block (3-1).
2. the hanging apparatus for the assembling of steam turbine reheat control valve valve gap and lining according to claim 1, is characterized in that: described contiguous block (3-1) be shaped as cuboid.
3. the hanging apparatus for the assembling of steam turbine reheat control valve valve gap and lining according to claim 1 and 2, it is characterized in that: on contiguous block (3-1), be processed with central through hole (3-1-1), the lower end of hook (1) is connected with nut thread through the central through hole (3-1-1) of contiguous block (3-1).
CN201410174436.2A 2014-04-28 2014-04-28 For the hanging apparatus that steam turbine reheat control valve valve gap and lining assemble Active CN103922222B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410174436.2A CN103922222B (en) 2014-04-28 2014-04-28 For the hanging apparatus that steam turbine reheat control valve valve gap and lining assemble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410174436.2A CN103922222B (en) 2014-04-28 2014-04-28 For the hanging apparatus that steam turbine reheat control valve valve gap and lining assemble

Publications (2)

Publication Number Publication Date
CN103922222A true CN103922222A (en) 2014-07-16
CN103922222B CN103922222B (en) 2015-12-30

Family

ID=51140663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410174436.2A Active CN103922222B (en) 2014-04-28 2014-04-28 For the hanging apparatus that steam turbine reheat control valve valve gap and lining assemble

Country Status (1)

Country Link
CN (1) CN103922222B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3310114A1 (en) * 1983-03-21 1984-09-27 Albert Böcker GmbH & Co KG, 4712 Werne Transport arrangement for the portions of a rubble chute
JPH05286688A (en) * 1992-04-08 1993-11-02 Shin Etsu Handotai Co Ltd Takeout structure for graphite part
CN201010425Y (en) * 2007-02-06 2008-01-23 江西铜业集团公司 Special suspending device for gyratory breaker thrust bearing
CN201442792U (en) * 2009-06-12 2010-04-28 潍坊市跃龙橡胶有限公司 Lifting tool for wheel tire vulcanization model
CN201545602U (en) * 2009-11-20 2010-08-11 宝山钢铁股份有限公司 Tool for hoisting annular objects
CN101913527A (en) * 2010-07-21 2010-12-15 泰州市西贝吊具厂 Electric extension tongs
CN102515018A (en) * 2011-12-27 2012-06-27 沪东重机有限公司 Hoisting tool for polycarbonate (PC) water jacket
CN202414955U (en) * 2012-01-04 2012-09-05 山东科技大学 Limit folding type lifting device capable of adjusting lifting angles of clamping jaws

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3310114A1 (en) * 1983-03-21 1984-09-27 Albert Böcker GmbH & Co KG, 4712 Werne Transport arrangement for the portions of a rubble chute
JPH05286688A (en) * 1992-04-08 1993-11-02 Shin Etsu Handotai Co Ltd Takeout structure for graphite part
CN201010425Y (en) * 2007-02-06 2008-01-23 江西铜业集团公司 Special suspending device for gyratory breaker thrust bearing
CN201442792U (en) * 2009-06-12 2010-04-28 潍坊市跃龙橡胶有限公司 Lifting tool for wheel tire vulcanization model
CN201545602U (en) * 2009-11-20 2010-08-11 宝山钢铁股份有限公司 Tool for hoisting annular objects
CN101913527A (en) * 2010-07-21 2010-12-15 泰州市西贝吊具厂 Electric extension tongs
CN102515018A (en) * 2011-12-27 2012-06-27 沪东重机有限公司 Hoisting tool for polycarbonate (PC) water jacket
CN202414955U (en) * 2012-01-04 2012-09-05 山东科技大学 Limit folding type lifting device capable of adjusting lifting angles of clamping jaws

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张德进: "叉车专用卷材卷板类物件运输吊具的研制", 《工程机械》, vol. 44, no. 6, 30 June 2013 (2013-06-30), pages 3 - 5 *

Also Published As

Publication number Publication date
CN103922222B (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN205290270U (en) Pipeline external clamp
CN203751574U (en) Multi-angle automatic welding robot
CN204221722U (en) Power plant is large-scale to be threaded parts mounting auxiliary without guide frame
CN203781637U (en) Hoisting device for assembling valve cover and lining of medium voltage regulating valve of steam turbine
CN103922222B (en) For the hanging apparatus that steam turbine reheat control valve valve gap and lining assemble
CN105600669A (en) Hoisting overturning method for ring brick of RH vacuum impregnation pipe
CN204938918U (en) Large-scale water turbine runner stands up instrument
CN205230733U (en) Mutual -inductor vacuum oil injection frock
CN107673245A (en) A kind of 1600T masts hang kingpost lower pillar stand cylinder preparation method
CN204879179U (en) Oil pipe leak protection crack control activity piecing devices
CN203922460U (en) A kind of clamping device for handling large thin-wall cylinder forging
CN101920904B (en) Hoist tool for round piece with groove on periphery surface
CN203333140U (en) Sand core sling
CN204003773U (en) A kind of large specification oil hydraulic cylinder special pipe hoop
CN203855296U (en) Special suspension device for pump shafts and piston rods
CN203667804U (en) Stepless adjustment hoist device
CN205765523U (en) Grinding conical bore fixture
CN204300034U (en) A kind of oil cylinder suspension arrangement
CN205363378U (en) Anchor clamps are used in processing of drum spare
CN203756677U (en) Fixing connecting device capable of changing relative positions randomly
CN203754214U (en) Horizontal fitting-hoisting device for shaft coupling
CN205013433U (en) Adopt hydro -cylinder of novel connected mode
CN204700609U (en) A kind of Automatic-clamping hydraulic pressure finish turning mandrel
CN104908008B (en) Equipment made by a kind of pipe that dissipates
CN204747943U (en) Manhole cover dismounting device for heat exchanger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230206

Address after: 150000 building 3, high tech production base, Nangang District, Harbin City, Heilongjiang Province

Patentee after: HARBIN TURBINE Co.,Ltd.

Patentee after: Harbin Electric Power Generation Equipment National Engineering Research Center Co.,Ltd.

Address before: 150046 No. three power road 345, Xiangfang District, Heilongjiang, Harbin

Patentee before: HARBIN TURBINE Co.,Ltd.

TR01 Transfer of patent right
CI03 Correction of invention patent

Correction item: transfer of patent right

Correct: HARBIN TURBINE Co.,Ltd.|150000 building 3, high tech production base, Nangang District, Harbin City, Heilongjiang Province|HADIAN POWER EQUIPMENT NATIONAL ENGINEERING RESEARCH CENTER CO.,LTD.

False: HARBIN TURBINE Co.,Ltd.|150000 building 3, high tech production base, Nangang District, Harbin City, Heilongjiang Province|Harbin Electric Power Generation Equipment National Engineering Research Center Co.,Ltd.

Number: 07-02

Volume: 39

CI03 Correction of invention patent