CN103915896A - Debugging method for transformer substation comprehensive information acquiring system - Google Patents

Debugging method for transformer substation comprehensive information acquiring system Download PDF

Info

Publication number
CN103915896A
CN103915896A CN201310003825.4A CN201310003825A CN103915896A CN 103915896 A CN103915896 A CN 103915896A CN 201310003825 A CN201310003825 A CN 201310003825A CN 103915896 A CN103915896 A CN 103915896A
Authority
CN
China
Prior art keywords
terminal
information acquisition
server
comprehensive information
information acquiring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310003825.4A
Other languages
Chinese (zh)
Other versions
CN103915896B (en
Inventor
奚永巍
刘俊
吴铭梓
董瑞安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
Original Assignee
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd filed Critical SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
Priority to CN201310003825.4A priority Critical patent/CN103915896B/en
Publication of CN103915896A publication Critical patent/CN103915896A/en
Application granted granted Critical
Publication of CN103915896B publication Critical patent/CN103915896B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a debugging method for a transformer substation comprehensive information acquiring system. The debugging method comprises the following steps that firstly, an outer loop of a comprehensive information acquiring terminal is detected; secondly, in-screen wiring of the comprehensive information acquiring terminal is detected; thirdly, a terminal server is debugged; fourthly, the comprehensive information acquiring terminal and the terminal server are set according to test parameters, and whether data transmission, data storage, data processing and report form processing are correct or not is detected by establishing communication between the terminal server and an electric energy acquiring server and communication between the terminal server and an electric energy quality monitoring server. Compared with the prior art, the debugging method for the transformer substation comprehensive information acquiring system has the advantages that the debugging process is simple, debugging efficiency is high, and the debugging cost is low.

Description

The adjustment method of a kind of transformer station comprehensive information acquisition system
Technical field
The present invention relates to a kind of transformer station integrated information acquisition technique, especially relate to the adjustment method of a kind of transformer station comprehensive information acquisition system.
Background technology
Shanghai Power Network as one just at the super-huge city of development electrical network, be faced with the year two thousand twenty Shanghai and will be built into the significant development opportunity of international economy, finance, trade, shipping centre, also the reliability service to electrical network and the quality of power supply have proposed high requirement thus.Along with development and the raising of the industrial and commercial service trade in Shanghai and living standard, electrical network power load constantly increases, and variation has also occurred load configuration gradually simultaneously, and nonlinear-load is increasing, and the power quality problem of electrical network becomes increasingly conspicuous.Be embodied in: the proportion of rectification, impact load is more and more higher, the harmonics level of electrical network constantly increases; Track traffic, electric railway and other large-scale single-phase load have increased the weight of the three-phase imbalance of electrical network etc.Be faced with the demand from each side such as operation of power networks, technical supervision, customer demands, holonomic system is being born and is solving weighty responsibility and the immense pressure of power quality problem in Shanghai Electric Power Co.The solution of power quality problem, relates to a series of work such as monitoring, assessment, improvement of the quality of power supply, and comprehensively electric energy quality monitoring is the basis of whole work.The debud mode ubiquity complex procedures of existing transformer station information acquisition system, the problem such as debug process is loaded down with trivial details, debugging efficiency is low, debugging cost is high.
Summary of the invention
Object of the present invention is exactly the adjustment method that a kind of transformer station comprehensive information acquisition system is provided in order to overcome the defect that above-mentioned prior art exists.
Object of the present invention can be achieved through the following technical solutions:
An adjustment method for transformer station's comprehensive information acquisition system, is characterized in that, comprises the following steps:
1) external loop of integrated information acquisition terminal is detected;
2) the screen internal wiring of integrated information acquisition terminal is detected;
3) terminal server is debugged;
4) according to test parameter, integrated information acquisition terminal terminal and terminal server are arranged, then communicate by terminal server and generated energy acquisition server and electric energy quality monitoring server, whether all correctly detect transfer of data, data loading, data processing, report form processing.
The described external loop to integrated information acquisition terminal detects and is specially:
Whether detection input analog signal, power supply connect correct, whether have short circuit in voltage circuit, whether have open circuit in current circuit, and whether loop exists earth point.
The described screen internal wiring to integrated information acquisition terminal detects and is specially:
Whether correctly detect the interior holding wire connection of screen, whether the wiring of isolating switch is correct.
Described debugs and is specially terminal server:
Send instruction to terminal server respectively from generated energy acquisition server and electric energy quality monitoring server, whether correctly detect communication port, detect the correctly instruction of response terminal server of information acquisition terminal, whether the data that inspection is uploaded are correct, check whether the time delay of data upload meets the requirement of technical specification.
Compared with prior art, the present invention has the advantages such as debug process is simple, debugging efficiency is high, debugging cost is low, enters after debugging, has guaranteed transformer station's comprehensive information acquisition system security of operation, stable, and data acquisition accurately, reliably.
Accompanying drawing explanation
Fig. 1 is flow chart of the present invention.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
Embodiment
As shown in Figure 1, the adjustment method of a kind of transformer station comprehensive information acquisition system, comprises the following steps:
1) external loop of integrated information acquisition terminal is detected;
2) the screen internal wiring of integrated information acquisition terminal is detected;
3) terminal server is debugged;
4) according to test parameter, integrated information acquisition terminal terminal and terminal server are arranged, then communicate by terminal server and generated energy acquisition server and electric energy quality monitoring server, whether all correctly detect transfer of data, data loading, data processing, report form processing.
The described external loop to integrated information acquisition terminal detects and is specially: whether detection input analog signal, power supply connect correct, whether have short circuit in voltage circuit, whether have open circuit in current circuit, and whether loop exists earth point.
The described screen internal wiring to integrated information acquisition terminal detects and is specially: whether correctly detect the interior holding wire connection of screen, whether the wiring of isolating switch is correct.
Described debugs and is specially terminal server: send instruction to terminal server respectively from generated energy acquisition server and electric energy quality monitoring server, whether correctly detect communication port, detect the correctly instruction of response terminal server of information acquisition terminal, whether the data that inspection is uploaded are correct, check whether the time delay of data upload meets the requirement of technical specification.

Claims (4)

1. an adjustment method for transformer station's comprehensive information acquisition system, is characterized in that, comprises the following steps:
1) external loop of integrated information acquisition terminal is detected;
2) the screen internal wiring of integrated information acquisition terminal is detected;
3) terminal server is debugged;
4) according to test parameter, integrated information acquisition terminal terminal and terminal server are arranged, then communicate by terminal server and generated energy acquisition server and electric energy quality monitoring server, whether all correctly detect transfer of data, data loading, data processing, report form processing.
2. the adjustment method of a kind of transformer station according to claim 1 comprehensive information acquisition system, is characterized in that, the described external loop to integrated information acquisition terminal detects and is specially:
Whether detection input analog signal, power supply connect correct, whether have short circuit in voltage circuit, whether have open circuit in current circuit, and whether loop exists earth point.
3. the adjustment method of a kind of transformer station according to claim 1 comprehensive information acquisition system, is characterized in that, the described screen internal wiring to integrated information acquisition terminal detects and is specially:
Whether correctly detect the interior holding wire connection of screen, whether the wiring of isolating switch is correct.
4. the adjustment method of a kind of transformer station according to claim 1 comprehensive information acquisition system, is characterized in that, described debugs and be specially terminal server:
Send instruction to terminal server respectively from generated energy acquisition server and electric energy quality monitoring server, whether correctly detect communication port, detect the correctly instruction of response terminal server of information acquisition terminal, whether the data that inspection is uploaded are correct, check whether the time delay of data upload meets the requirement of technical specification.
CN201310003825.4A 2013-01-06 2013-01-06 The adjustment method of a kind of transformer station comprehensive information acquisition system Expired - Fee Related CN103915896B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310003825.4A CN103915896B (en) 2013-01-06 2013-01-06 The adjustment method of a kind of transformer station comprehensive information acquisition system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310003825.4A CN103915896B (en) 2013-01-06 2013-01-06 The adjustment method of a kind of transformer station comprehensive information acquisition system

Publications (2)

Publication Number Publication Date
CN103915896A true CN103915896A (en) 2014-07-09
CN103915896B CN103915896B (en) 2016-04-20

Family

ID=51041370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310003825.4A Expired - Fee Related CN103915896B (en) 2013-01-06 2013-01-06 The adjustment method of a kind of transformer station comprehensive information acquisition system

Country Status (1)

Country Link
CN (1) CN103915896B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN102024318A (en) * 2009-09-09 2011-04-20 浙江省电力公司 Automatic adjustment method based on planned power utilization information collection terminal
CN201804100U (en) * 2010-09-15 2011-04-20 浙江涵普电力科技有限公司 Acquisition terminal testing device
JP2012038044A (en) * 2010-08-05 2012-02-23 Chugoku Electric Power Co Inc:The Test device and test method of monitoring control system
CN102593733A (en) * 2011-12-31 2012-07-18 长园深瑞继保自动化有限公司 Debugging method for transformer substation equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101546472A (en) * 2009-04-29 2009-09-30 安徽省电力公司芜湖供电公司 Integrated universal simulation test system and implement method for electric network scheduling and electric quantity collection
CN102024318A (en) * 2009-09-09 2011-04-20 浙江省电力公司 Automatic adjustment method based on planned power utilization information collection terminal
JP2012038044A (en) * 2010-08-05 2012-02-23 Chugoku Electric Power Co Inc:The Test device and test method of monitoring control system
CN201804100U (en) * 2010-09-15 2011-04-20 浙江涵普电力科技有限公司 Acquisition terminal testing device
CN102593733A (en) * 2011-12-31 2012-07-18 长园深瑞继保自动化有限公司 Debugging method for transformer substation equipment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周孔均: "电能表与采集终端通信测试系统的设计", 《电测与仪表》 *
岳虎 等: "电力用户用电信息采集系统中集中器的调试", 《工业计量》 *

Also Published As

Publication number Publication date
CN103915896B (en) 2016-04-20

Similar Documents

Publication Publication Date Title
CN103954883B (en) A kind of Secondary Connections of PTs inspection method and device
CN208459507U (en) Arrester online monitoring system
WO2014153764A1 (en) Method and device for automatic test of relay protection function of intelligent substation
CN109031069A (en) The diagnostic system of high-tension switch cabinet Partial discharge signal
CN102890259A (en) Line fault indicator detecting system
CN103323655A (en) Non-contact alternating current and direct current crosstalk online detecting device and non-contact alternating current and direct current crosstalk online detecting method
CN104155627B (en) Error characteristic detection method of extra high voltage capacitive voltage transformer
CN111999600B (en) Intelligent distribution network terminal secondary current loop fault diagnosis positioning method and system
CN105301390A (en) Wireless insulation monitoring device and monitoring method thereof
CN205563986U (en) On --spot service terminals of power consumption information collection system
CN204028273U (en) A kind of pitch-controlled system heavy duty External cable test board
CN103915896B (en) The adjustment method of a kind of transformer station comprehensive information acquisition system
CN202886581U (en) Line fault indicator detecting system
CN203216999U (en) Capacitive equipment dielectric loss live line measurement sampling device
CN205120899U (en) Locomotive high voltage insulation detecting system
CN201903597U (en) Detection device for engine cable
CN205430277U (en) GPRS terminal communication fault finding system
CN104777386A (en) Failure analyzing and detecting system for cable accessories
CN104537828A (en) Device for detecting carrier communication in power consumption information collection device
CN203786256U (en) Low-frequency superposition type measuring circuit
CN103543730A (en) Fault diagnosis system for chip mounters
CN208705429U (en) The diagnostic system of high-tension switch cabinet Partial discharge signal
CN207301792U (en) Interface test system between direct current control system and stable control system
CN113904919A (en) Safety and stability control system channel fault positioning method based on full link alarm
CN102608406A (en) Electric current monitoring terminal of online monitoring device for capacitive equipment of transformer substation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160420

Termination date: 20210106