CN103914758A - Carrier wave collector asset fine management method - Google Patents
Carrier wave collector asset fine management method Download PDFInfo
- Publication number
- CN103914758A CN103914758A CN201410123517.XA CN201410123517A CN103914758A CN 103914758 A CN103914758 A CN 103914758A CN 201410123517 A CN201410123517 A CN 201410123517A CN 103914758 A CN103914758 A CN 103914758A
- Authority
- CN
- China
- Prior art keywords
- acquisition device
- carrier acquisition
- collector
- information
- electric energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a carrier wave collector asset fine management method. The method comprises the steps that a carrier wave collector table is built, the carrier wave collector table comprises a carrier wave collector serial number, carrier wave collector and electric energy meter associated information and state information; the collector serial number in the carrier wave collector table corresponds to the carrier wave collector label serial number in a storehouse; a collector distribution table is built in a server; for a carrier wave collector which has been installed on site but has not been associated, after the carrier wave collector is installed on site, barcode reading is conducted on the collector asset serial number of the carrier wave collector through a handheld device, an electricity meter task information table and the carrier wave collector table in the handheld device are input into the server, and the collector distribution table data in the server are updated. By means of the carrier wave collector asset fine management method, the carrier wave collector installing information input by installing workers on site serves as the first-hand information, the information is intuitive, real time, reliable and convenient in statistic analysis, so that the carrier wave collector asset management is in a closed-loop state and timely, and the error rate is low.
Description
Technical field
The present invention relates to electrical management technical field, relate in particular to carrier acquisition device assets fine-grained management method.
Background technology
In electrical management, low pressure narrowband carrier communication construction adopts construction mode from bottom to top, be that collecting device is led out from marketing system, installation is closed attaching to fasten and is given acquisition system at the scene, acquisition system is obtained the underlying assets such as concentrator, carrier acquisition device archives according to the information obtaining from marketing system, if obtain failure, after waiting for manual intervention adjustment, again obtain and file, until file successfully, after acquisition system attaching flow process completes, the relation of concentrator installation situation and collector and electric energy meter is fed back to marketing system.The asset managements such as carrier acquisition device are as the criterion with the information after filing in power information acquisition system.
Describe and can see from above step, according to method in the past, concentrator, after carrier acquisition device is installed to scene after receiving, installation concentrator numbering, quantity and collector numbering, obtaining of quantity, be established as basis with concentrator-carrier acquisition device-ammeter corresponding relation, and the foundation of corresponding relation will be subject to equipment quality, parameter and version, installation quality, GPRS movable signal intensity, many-sided reasons such as low pressure narrowband carrier communication conditions, directly affecting concentrator-collector-ammeter corresponding relation sets up, thereby cause in low pressure narrowband carrier process of construction in the past, asset management is difficult to realize thing, card, account is consistent, file after failure and need manpower intervention, need cycle regular hour etc. O&M personnel to be collected and the analyst of main website processing, labor intensive and material resources.And, said method cannot be realized the promptness of concentrator and carrier acquisition device asset management and check, even the successfully number of filing of first day reaches 100% after installing, on time, also at least lag behind one day, if things go on like this, must cause asset equipment management absence, account, card, thing cannot be guaranteed 100% correspondence, cause loss of assets, managerial confusion, do not meet and gather project construction requirement and audit requirement.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of carrier acquisition device assets fine-grained management method.For this reason, the present invention is by the following technical solutions:
Carrier acquisition device assets fine-grained management method, is characterized in that its foundation has carrier acquisition device table, has carrier acquisition device numbering, carrier acquisition device and electric energy meter related information, status information in described carrier acquisition device table; Before carrier acquisition device is led out from warehouse, in described carrier acquisition device table, collector numbering is corresponding with carrier acquisition device tag number in warehouse, and whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Before carrier acquisition device is led out from warehouse, also in server, set up collector allocation table, in described collector allocation table, include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and the binding time of electric energy meter and carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse;
In the time that carrier acquisition device is led out from warehouse, carrier acquisition device table is imported to server, server is modified to the information of carrier acquisition device table, carrier acquisition device in carrier acquisition device table is numbered and lead out carrier acquisition device tag number to be installed corresponding, whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Server generates bill of assignment, carrier acquisition device table, collector allocation table and meter task information table are encased in handheld device, meter task information table comprises collector number information, Customs Assigned Number, address name, station address, electric energy meter asset number, when carrier acquisition device is in the time leading out umbrella-waiting state, in meter task information, carrier acquisition device is numbered scene and obtains;
When carrier acquisition device is in the time leading out umbrella-waiting state, to install but do not had in associated carrier acquisition device for scene, described handheld device is set up extra contingency table automatically; The status information that contains carrier acquisition device number information, electric energy meter asset number information in described extra contingency table and whether derive, wherein, carrier acquisition device number information is that scene obtains, and electric energy meter asset number information is that scene obtains, and the status information whether deriving is not for deriving;
When carrier acquisition device scene has completed after installation, by handheld device, carrier acquisition device is carried out to bar code and read its collector asset number, by infrared reading power meters information, comprise electric energy meter asset number, electric energy meter address, electric energy meter communication protocol, electric energy meter baud rate, electric energy meter port information, do corresponding one by one according to electric energy meter asset number with the meter task information table that is stored in handheld device inside; Handheld device is revised as the information of its carrier acquisition device table: the corresponding on-the-spot carrier acquisition device asset number of carrier acquisition device numbering, and relating attribute is associated or not associated for being updated to according to pairing result, and carrier acquisition device state is for installing; Handheld device is revised as the information of its meter task information table: carrier acquisition device is numbered on-the-spot corresponding carrier acquisition device asset number, and Customs Assigned Number, address name, station address, electric energy meter asset number be the corresponding information correspondence of the associated all electric energy meters of carrier acquisition device therewith;
When handheld device is set up the corresponding relation of electric energy meter and newly-built collector in inside, acquiescence is associated with the electric energy meter just having read under newly-built collector;
When carrier acquisition device is while being not associated, the carrier acquisition device not associated to these, collector numbering in extra contingency table is updated to corresponding these not associated carrier acquisition device numberings, and whether the ammeter asset number under corresponding this carrier acquisition device of ammeter asset number, do not export as and do not derive;
Meter task information table in handheld device and carrier acquisition device table are imported to server, the collector allocation table data in update server.
In the present invention, concentrator (concentrator) refers to the data of collecting each carrier acquisition device or electric energy meter, and processes storage, and energy and server or handheld device are carried out the equipment of exchanges data simultaneously.Concentrator should use AC three-phase four line power supplies, and under the condition of a disconnected phase or two phase voltages, AC power should be able to maintain the normal work of concentrator and communicate by letter.
In the present invention, carrier acquisition device (acquisition unit) is the energy information for gathering multiple or single electric energy meter, and can with the equipment of concentrator swap data.Electric energy meter data are copied and accepted and kept in to carrier acquisition device, and according to the order of concentrator by store data upload to concentrator.
In the present invention, handheld device (hand-held unit), or claim hand-hold meter reading terminal, refer to can be closely directly and separate unit electric energy meter, concentrator, collector and computing equipment carry out the equipment of exchanges data.
In the present invention, the automatic maintenance of electric energy meter messaging parameter refers to after collecting device installation, and concentrator can be found accessed carrier acquisition device and electric energy meter automatically, generating electric energy table/friendship device for picking configuration parameter, and the function of announcement server.
In the present invention, stock refers to assay approval, is distributed to the carrier acquisition device in warehouse.
In the present invention, after leading out the stock's of referring to carrier acquisition device to be installed to be led out, can carry out the carrier acquisition device of the work such as on-the-spot replacing, installation.
In the present invention, association refers to that scene has completed installation, and has carrier acquisition device and table to count the carrier acquisition device of (electric energy meter) related information.
In the present invention, the low pressure narrowband carrier communication technology refers to that information is modulated into high-frequency signal is superimposed upon the technology communicating on power circuit, and frequency of carrier signal scope is 3kHz~500kHz, and transfer rate is generally 100b~600b.Message transmission rate is lower, and transmitted in both directions is without laying in addition communication line, easy for installation, can easily powerline network be extended to low-voltage customer side, realizes the data acquisition and control to electric supply meter, and adaptability is good.
Owing to adopting technical scheme of the present invention, mount message, the installation quantity of carrier acquisition device are no longer based upon concentrator-collector-Biao and count under the prerequisite of filing, directly by the on-the-spot mount message of installation personnel as first hand data, directly perceived, in real time reliable, be convenient to statistical study.Add up associated carrier acquisition device, can count different installation personnels certain day (can select), collector quantity and the particular user installed respectively; Statistics is checked not associated carrier acquisition device, can count this day of installation personnel certain day (can select) and lead out uninstalled collector, and assets personnel can be in real time to leading out the equipment of being unkitted to check one by one.So far, make carrier acquisition device asset management form closed loop, in time and error rate low, the loss, the damage that cause because of artificial origin of stopping asset equipment from source.
To sum up, the present invention has promoted the asset management level of carrier acquisition device, has realized carrier acquisition management real-time, reduces artificial error rate, increases work efficiency, information covering scope is extensively comprehensive.
Embodiment
Carrier acquisition device assets fine-grained management method provided by the present invention, sets up and has carrier acquisition device table (as table 1), has carrier acquisition device numbering, carrier acquisition device and electric energy meter related information, status information in described carrier acquisition device table; Before carrier acquisition device is led out from warehouse, in described carrier acquisition device table, collector numbering is corresponding with carrier acquisition device tag number in warehouse, and whether relating attribute is not associated, and carrier acquisition device state is not for installing; Table 1:
Title | Field name | Type | Warehouse state | Remarks |
Carrier acquisition device numbering | CollectorID | Varchar(20) | Numbering on opposite depot carrier acquisition device label | ? |
Whether associated | IsUsed | Smallint | Not associated | ? |
State | Status | Varchar(20) | Do not install | Do not install, install, inactive |
Before carrier acquisition device is led out from warehouse, also in server, set up collector allocation table (as table 2), in described collector allocation table, include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and the binding time of electric energy meter and carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse; Table 2:
Title | Field name | Type | Non-NULL | Remarks |
Handheld device numbering | MachineID | Varchar(20) | NUL | ? |
Carrier acquisition device numbering | CollectorID | Varchar(20) | Numbering on opposite depot collector label | ? |
Task status | Staus | Varchar(20) | NUL | ? |
Binding time | BindTime | Datetime | NUL | ? |
In the time that carrier acquisition device is led out from warehouse, carrier acquisition device table is imported to server, server is modified to the information of carrier acquisition device table, carrier acquisition device in carrier acquisition device table is numbered and lead out carrier acquisition device tag number to be installed corresponding, whether relating attribute is not associated, and carrier acquisition device state is not for installing; Carrier acquisition device table after renewal is as shown 1-1:
Title | Field name | Type | Warehouse state | Remarks |
Carrier acquisition device numbering | CollectorID | Varchar(20) | Correspondence is led out the numbering on collector label | ? |
Whether associated | IsUsed | Smallint | Not associated | ? |
State | Status | Varchar(20) | Do not install | Do not install, install, inactive |
Server generates bill of assignment, carrier acquisition device table, collector allocation table and meter task information table are encased in handheld device, meter task information table comprises collector number information, Customs Assigned Number, address name, station address, electric energy meter asset number, when carrier acquisition device is in the time leading out umbrella-waiting state, in meter task information, carrier acquisition device is numbered scene and obtains; As shown in table 3:
Title | Field name | Type | Non-NULL | Remarks |
Carrier acquisition device numbering | Bx_no | Varchar(20) | NUL | ? |
Customs Assigned Number | Cons_no | Varchar(20) | Operating personnel import | ? |
Address name | Cons_name | Varchar(50) | Operating personnel import | ? |
Station address | Elec_addr | Varchar(50) | Operating personnel import | ? |
Electric energy meter asset number | Asset_no | Varchar(50) | Operating personnel import | ? |
When carrier acquisition device is in the time leading out umbrella-waiting state, to install but do not had in associated carrier acquisition device for scene, described handheld device is set up extra contingency table (as table 4) automatically; The status information that contains carrier acquisition device number information, electric energy meter asset number information in described extra contingency table and whether derive, wherein, carrier acquisition device number information is that scene obtains, and electric energy meter asset number information is that scene obtains, and the status information whether deriving is not for deriving; Table 4
Title | Field name | Type | Non-NULL | Remarks |
Carrier acquisition device numbering | Bx_no | Varchar(20) | NUL(scene obtains) | ? |
Electric energy meter asset number | Asset_no | Varchar(20) | NUL(scene obtains) | ? |
Whether derive | Status | varchar | Do not derive | 01 does not derive |
When carrier acquisition device scene has completed after installation, by handheld device, carrier acquisition device is carried out to bar code and read its collector assets label, by infrared reading power meters information, comprise electric energy meter asset number, electric energy meter address, electric energy meter communication protocol, electric energy meter baud rate, electric energy meter port information, do corresponding one by one according to electric energy meter asset number with the meter task information table that is stored in handheld device inside; When handheld device is set up the corresponding relation of electric energy meter and newly-built collector in inside, acquiescence is associated with the electric energy meter just having read under newly-built collector;
Handheld device is revised as the information of its carrier acquisition device table: the corresponding on-the-spot carrier acquisition device asset number of carrier acquisition device numbering, and relating attribute is associated or not associated for being updated to according to pairing result, and carrier acquisition device state is for installing; As show 1-2:
Title | Field name | Type | Warehouse state | Remarks |
Carrier acquisition device numbering | CollectorID | Varchar(20) | Corresponding collection in worksite device numbering | ? |
Whether associated | IsUsed | Smallint | Associated/not associated | ? |
State | Status | Varchar(20) | Install/do not install | Do not install, install, inactive |
Handheld device is revised as the information of its meter task information table: carrier acquisition device is numbered on-the-spot corresponding carrier acquisition device numbering, Customs Assigned Number, address name, station address, electric energy meter asset number be the corresponding information correspondence of the associated all electric energy meters of carrier acquisition device therewith, as table 3-1:
Title | Field name | Type | Non-NULL | Remarks |
Carrier acquisition device numbering | Bx_no | Varchar(20) | On-the-spot carrier acquisition device numbering | ? |
Customs Assigned Number | Cons_no | Varchar(20) | User profile under this carrier acquisition device | ? |
Address name | Cons_name | Varchar(50) | User profile under this carrier acquisition device | ? |
Station address | Elec_addr | Varchar(50) | User profile under this carrier acquisition device | ? |
Electric energy meter asset number | Asset_no | Varchar(50) | User profile under this carrier acquisition device | ? |
When carrier acquisition device is while being not associated, the carrier acquisition device not associated to these, collector numbering in extra contingency table is updated to corresponding these not associated carrier acquisition device numberings, and whether the ammeter asset number under corresponding this carrier acquisition device of ammeter asset number, do not export as and do not derive; As show 4-1
Title | Field name | Type | Non-NULL | Remarks |
Carrier acquisition device numbering | Bx_no | Varchar(20) | On-the-spot extra carrier collector numbering | ? |
Electric energy meter asset number | Asset_no | Varchar(20) | The ammeter assets number of corresponding carrier acquisition device | ? |
Whether derive | Status | varchar | Do not derive | 01 does not derive |
Meter task information table in handheld device is connected and is imported server, the collector allocation table data in update server by wired or wireless data with carrier acquisition device table.
Above form can adopt Excel tables of data at importing server, imports after server, and server converts thereof into DBF user message table.
Comparative example:
Undertaken by the flow process of filing of concentrator-collector-Biao in the past, 11 public changes in certain power supply A village, service station, B village that carrier acquisition device pilot is installed, 1026 family carrier acquisition device installation situation, as table 5-1:
Platform district | Carrier acquisition device number of users was installed the same day | The first day successful number of users of filing after installing | The inconsistent quantity of carrier acquisition device assets number |
The public change in No. 1, A village | 101 | 99 | 2 |
The public change in No. 2, A village | 63 | 60 | 3 |
The public change in No. 3, A village | 99 | 98 | 1 |
The public change in No. 4, A village | 105 | 0 | 105 |
The public change in No. 5, A village | 81 | 75 | 6 |
The public change in No. 6, A village | 95 | 88 | 7 |
The public change in No. 1, B village | 78 | 72 | 6 |
The public change in No. 2, B village | 90 | 87 | 3 |
The public change in No. 3, B village | 58 | 55 | 3 |
The public change in No. 4, B village | 148 | 140 | 8 |
The public change in No. 5, B village | 108 | 101 | 7 |
Gather | 1026 | 875 | 151 |
The inconsistent user of carrier acquisition device assets number is analyzed one by one, draws table 5-2:
Platform district | The inconsistent quantity of carrier acquisition device assets number | Concentrator fails normally to reach the standard grade | Concentrator is searched and is shown unsuccessfully | On-the-spot actual being unkitted (carrier acquisition device loss, damage etc.) | Carrier acquisition device and table meter Communications failure | System interface malloc failure malloc |
The public change in No. 1, A village | 2 | 0 | 2 | 0 | 0 | 0 |
The public change in No. 2, A village | 3 | 0 | 1 | 1 | 1 | 0 |
The public change in No. 3, A village | 1 | 0 | 0 | 0 | 1 | 0 |
The public change in No. 4, A village | 105 | 105 | 0 | 0 | 0 | 0 |
The public change in No. 5, A village | 6 | 0 | 2 | 2 | 1 | 1 |
The public change in No. 6, A village | 7 | 0 | 3 | 2 | 2 | 0 |
The public change in No. 1, B village | 6 | 0 | 3 | 2 | 1 | 0 |
The public change in No. 2, B village | 3 | 0 | 1 | 1 | 1 | 0 |
The public change in No. 3, B village | 3 | 0 | 1 | 1 | 1 | 0 |
The public change in No. 4, B village | 8 | 0 | 3 | 3 | 2 | 0 |
The public change in No. 5, B village | 7 | 0 | 2 | 0 | 4 | 1 |
Gather | 151 | 105 | 18 | 12 | 14 | 2 |
Accounting | 14.72% | 10.23% | 1.75% | 1.17% | 1.36% | 0.19% |
Show according to statistics, according to asset management pattern in the past, concentrator and carrier acquisition device asset management promptness are poor, cannot to being installed, quantity and concrete installation user cannot check in time, even the successfully number of filing of first day reaches 100% after installing, on the time, also at least lag behind one day.
Affect the inconsistent quantity of carrier acquisition device assets number that causes of several large influence factor that concentrator-collector-ammeter corresponding relation sets up up to 14.72%, wherein concentrator fail normally to reach the standard grade accounting 10.23%, concentrator searched and shown unsuccessfully 1.75%, carrier acquisition device and table meter Communications failure 1.36%, system call failure 0.19%.File after failure and need manpower intervention, waiting O&M personnel to be collected and the analyst of main website to process needs cycle regular hour, spends a large amount of man power and materials.
According to above statistics, 11 public changes such as certain power supply A village, service station, B village that in Dec, 2012, carrier wave pilot was installed, asset management real-time and the error rate that after 1026 family carrier acquisition devices installations, cause the failure of filing in second day at 151 families carry out Economic and Efficiency Analysis contrast.
17 public changes such as in June, 2013 power supply C village, service station, D village, E village are installed carrier acquisition device, adopt technical scheme of the present invention, directly by the on-the-spot mount message of installation personnel as first hand data, lead out 1894 carrier acquisition devices, complete 1892, return warehouse-in because of device damage normal procedure, do not occur loss of assets, damage that a cause artificial origin causes for 2.
Economic benefit basic data part:
This partial data is with in Dec, 2013 workload 11Ge Tai district, and 1026 families are basic statistics, and every 1000 families comprise: 20 minutes/family of manpower intervention information filing; Concentrator is not gone up line justification concentrator installation situation, is searched unsuccessful on-the-spot confirmation 120 families that need of table; Carrier acquisition device and 15.6 of table meter Communications failures; (loss, damage etc.) 11.7 are not installed at carrier acquisition device scene; 50 kilometers/platform of round-trip distance (family), time 30 minutes/family; 200 yuan/the working day of working hour expense; 15 liters/hundred kilometers of kilometer oil consumption expenses; 7.45 yuan/liter, No. 93 gasoline; 100 yuan/platform of carrier acquisition device price; Every group of staff of work on the spot 2 people)
The concrete computation process of economic benefit and formula
Every 1000 family two-way process cost savings, comprise 4618 yuan of labour costs, 7576.65 yuan of oil consumption expenses, 1170 yuan of assets expenses, amount to 13364.65 yuan.Specifically be calculated as follows:
★ oil consumption expense: (120+15.6) hundred kilometers of family * 50 kilometers/family=67.8; 15 liters/hundred kilometer * 67.8 hundred kilometers * 7.45 yuan/liters=7576.65 yuan
★ is on-the-spot confirms labour cost: (120+15.6) family * 30 minutes/family=4068 minute=8.475 working days; 2 people * * on 200 yuan/working day, 8.475 working day=3390 yuan
The ★ failure manpower intervention expense of filing: (120+15.6+11.7) * 20 minutes/family=2946 minute=6.14 working days; * on 200 yuan/working day 6.14 working day=1228 yuan
The asset management of ★ standard, saves 1170 yuan of cost and assets expenses.Due to standard the procedure management and control of assets, efficiently solve site operation personnel, the particularly idea of leaving things to chance of external coordination troop installation personnel, after the project implementation, assets lead, join, with reaching 100%, construction is not lost a carrier acquisition device in half a year, is unkitted and damages collector and all regain by number, and economic benefit loss reaches 11.7*100=1170 unit according to a preliminary estimate.
By process optimization, record installed date, installation personnel, name in an account book, family number, address etc., realize the statistical study to on-the-spot installation personnel work quality and quantity, increase substantially asset management level.Equipment promotion is on probation more than a year, and carrier acquisition device is installed user 13.7 ten thousand families, obtains economic benefit and reaches 18.36 ten thousand yuan, calculates according to Zhejiang Province's 1,200 ten thousand family low pressure resident collector installation workload, at least reaches 16,080 ten thousand yuan of economic benefits.
Claims (1)
1. carrier acquisition device assets fine-grained management method, is characterized in that its foundation has carrier acquisition device table, has carrier acquisition device numbering, carrier acquisition device and electric energy meter related information, status information in described carrier acquisition device table; Before carrier acquisition device is led out from warehouse, in described carrier acquisition device table, collector numbering is corresponding with carrier acquisition device tag number in warehouse, and whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Before carrier acquisition device is led out from warehouse, also in server, set up collector allocation table, in described collector allocation table, include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and the binding time of electric energy meter and carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse;
In the time that carrier acquisition device is led out from warehouse, carrier acquisition device table is imported to server, server is modified to the information of carrier acquisition device table, carrier acquisition device in carrier acquisition device table is numbered and lead out carrier acquisition device tag number to be installed corresponding, whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Server generates bill of assignment, carrier acquisition device table, collector allocation table and meter task information table are encased in handheld device, meter task information table comprises collector number information, Customs Assigned Number, address name, station address, electric energy meter asset number, when carrier acquisition device is in the time leading out umbrella-waiting state, in meter task information, carrier acquisition device is numbered scene and obtains;
When carrier acquisition device is in the time leading out umbrella-waiting state, to install but do not had in associated carrier acquisition device for scene, described handheld device is set up extra contingency table automatically; The status information that contains carrier acquisition device number information, electric energy meter asset number information in described extra contingency table and whether derive, wherein, carrier acquisition device number information is that scene obtains, and electric energy meter asset number information is that scene obtains, and the status information whether deriving is not for deriving;
When carrier acquisition device scene has completed after installation, by handheld device, carrier acquisition device is carried out to bar code and read its collector asset number, by infrared reading power meters information, comprise electric energy meter asset number, electric energy meter address, electric energy meter communication protocol, electric energy meter baud rate, electric energy meter port information, do corresponding one by one according to electric energy meter asset number with the meter task information table that is stored in handheld device inside; Handheld device is revised as the information of its carrier acquisition device table: the corresponding on-the-spot carrier acquisition device asset number of carrier acquisition device numbering, and relating attribute is associated or not associated for being updated to according to pairing result, and carrier acquisition device state is for installing; Handheld device is revised as the information of its meter task information table: carrier acquisition device is numbered on-the-spot corresponding carrier acquisition device asset number, and Customs Assigned Number, address name, station address, electric energy meter asset number be the corresponding information correspondence of the associated all electric energy meters of carrier acquisition device therewith;
When handheld device is set up the corresponding relation of electric energy meter and newly-built collector in inside, acquiescence is associated with the electric energy meter just having read under newly-built collector;
When carrier acquisition device is while being not associated, the carrier acquisition device not associated to these, collector numbering in extra contingency table is updated to corresponding these not associated carrier acquisition device numberings, and whether the ammeter asset number under corresponding this carrier acquisition device of ammeter asset number, do not export as and do not derive;
Meter task information table in handheld device and carrier acquisition device table are imported to server, the collector allocation table data in update server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410123517.XA CN103914758B (en) | 2014-03-31 | 2014-03-31 | Carrier wave collector asset fine management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410123517.XA CN103914758B (en) | 2014-03-31 | 2014-03-31 | Carrier wave collector asset fine management method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103914758A true CN103914758A (en) | 2014-07-09 |
CN103914758B CN103914758B (en) | 2017-01-11 |
Family
ID=51040422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410123517.XA Active CN103914758B (en) | 2014-03-31 | 2014-03-31 | Carrier wave collector asset fine management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103914758B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106559388A (en) * | 2015-09-28 | 2017-04-05 | 腾讯科技(深圳)有限公司 | The method and apparatus of bound device |
CN108376274A (en) * | 2018-01-25 | 2018-08-07 | 国网浙江省电力公司衢州供电公司 | A kind of measuring asset management system and method based on mobile operation |
CN108376324A (en) * | 2018-01-25 | 2018-08-07 | 国网浙江省电力公司衢州供电公司 | A kind of carrier acquisition device measuring asset management system and method |
CN109604182A (en) * | 2018-03-14 | 2019-04-12 | 国网浙江省电力公司衢州供电公司 | A kind of collector sorting management system and method based on mobile operation |
CN111612333A (en) * | 2020-05-20 | 2020-09-01 | 国网上海市电力公司 | Metering asset Internet of things management system and method |
CN112188462A (en) * | 2020-10-28 | 2021-01-05 | 云南电网有限责任公司 | Safety management method of data acquisition unit |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020130768A1 (en) * | 2001-03-14 | 2002-09-19 | Hongyuan Che | Low voltage power line carrier communications at fundamental working frequency |
CN101231320A (en) * | 2008-01-31 | 2008-07-30 | 湖北省电力试验研究院 | Undervoltage collection copy system detecting device based on virtual electric energy meter module |
KR101126002B1 (en) * | 2010-09-29 | 2012-03-20 | 한국전력공사 | Automatic meter reading system for monitoring power consumption or power loss |
CN102592422A (en) * | 2012-02-02 | 2012-07-18 | 深圳市科陆电子科技股份有限公司 | Centralized ammeter reading system collector and ammeter asset number collection and management method |
CN103325224A (en) * | 2012-03-24 | 2013-09-25 | 兰宏亮 | GPRS-based remote meter reading device |
-
2014
- 2014-03-31 CN CN201410123517.XA patent/CN103914758B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020130768A1 (en) * | 2001-03-14 | 2002-09-19 | Hongyuan Che | Low voltage power line carrier communications at fundamental working frequency |
CN101231320A (en) * | 2008-01-31 | 2008-07-30 | 湖北省电力试验研究院 | Undervoltage collection copy system detecting device based on virtual electric energy meter module |
KR101126002B1 (en) * | 2010-09-29 | 2012-03-20 | 한국전력공사 | Automatic meter reading system for monitoring power consumption or power loss |
CN102592422A (en) * | 2012-02-02 | 2012-07-18 | 深圳市科陆电子科技股份有限公司 | Centralized ammeter reading system collector and ammeter asset number collection and management method |
CN103325224A (en) * | 2012-03-24 | 2013-09-25 | 兰宏亮 | GPRS-based remote meter reading device |
Non-Patent Citations (2)
Title |
---|
REPO S 等: "Use case analysis of real-time low voltage network management", 《2011 2ND IEEE PES INTERNATIONAL CONFERENCE AND EXHIBITION ON INNOVATIVE SMART GRID TECHNOLOGIES》 * |
李佳: "低压集抄终端智能检测平台的开发与应用", 《电测与仪表》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106559388A (en) * | 2015-09-28 | 2017-04-05 | 腾讯科技(深圳)有限公司 | The method and apparatus of bound device |
CN106559388B (en) * | 2015-09-28 | 2020-11-10 | 腾讯科技(深圳)有限公司 | Method and device for binding equipment |
CN108376274A (en) * | 2018-01-25 | 2018-08-07 | 国网浙江省电力公司衢州供电公司 | A kind of measuring asset management system and method based on mobile operation |
CN108376324A (en) * | 2018-01-25 | 2018-08-07 | 国网浙江省电力公司衢州供电公司 | A kind of carrier acquisition device measuring asset management system and method |
CN108376324B (en) * | 2018-01-25 | 2020-12-18 | 国网浙江省电力公司衢州供电公司 | System and method for managing metering assets of carrier collector |
CN109604182A (en) * | 2018-03-14 | 2019-04-12 | 国网浙江省电力公司衢州供电公司 | A kind of collector sorting management system and method based on mobile operation |
CN111612333A (en) * | 2020-05-20 | 2020-09-01 | 国网上海市电力公司 | Metering asset Internet of things management system and method |
CN111612333B (en) * | 2020-05-20 | 2023-10-24 | 国网上海市电力公司 | Metering resource union management system and method |
CN112188462A (en) * | 2020-10-28 | 2021-01-05 | 云南电网有限责任公司 | Safety management method of data acquisition unit |
Also Published As
Publication number | Publication date |
---|---|
CN103914758B (en) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103927616B (en) | Collector associates the method with electric energy meter rotation | |
CN103914758B (en) | Carrier wave collector asset fine management method | |
CN201757929U (en) | Fully wireless networked power consumer power consumption information acquisition system | |
CN102622829B (en) | Service integration settlement system for ground power supply and air conditioner set of civil airport | |
CN102637203B (en) | Method for processing electric quantity data and monitoring master station for automatic electric energy metering systems | |
CN111600296B (en) | Power load prediction system based on edge calculation and prediction method thereof | |
CN102545213A (en) | System and method for managing line loss of power grid in real time | |
CN103955783A (en) | Low-voltage carrier wave installation site information collecting method | |
WO2015123810A1 (en) | Electric power field operation system combined with smartphone | |
CN207895677U (en) | User attaching relationship automatic recognition system | |
CN102385739A (en) | Integrated information management platform for county-level power supply enterprises | |
CN103366311A (en) | Data fusion processing method based on transformer substation multi-system | |
CN107563740B (en) | Electric power transaction electricity purchasing management platform system and meter data acquisition method | |
CN103793857A (en) | Electric power field operating system combined with smartphone | |
CN102736590A (en) | Remote energy efficiency diagnosis system | |
CN101615028A (en) | Palmtop marketing system for on-site service for electric power customers | |
CN204348052U (en) | Low voltage electric network power information acquisition system | |
CN103632198A (en) | Visualized and full-life measurement asset management system based on intelligent mobile terminal | |
CN103632224A (en) | Automatic management system of electric power meter | |
CN202153309U (en) | Remote management device for oil well in oil field | |
CN201749557U (en) | Wireless network-based ammeter remote collection copy system | |
US9047757B2 (en) | Systems and methods for remotely controlling an advanced metering infrastructure | |
CN106027668A (en) | Manhole cover addressing system and method | |
CN102346955A (en) | Remote wireless concentrated reading system for residential electricity meter | |
CN114944022A (en) | Factory security patrol system based on NFC technology and use method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |