CN103912219A
CN103912219A CN201410163655.0A CN201410163655A CN103912219A CN 103912219 A CN103912219 A CN 103912219A CN 201410163655 A CN201410163655 A CN 201410163655A CN 103912219 A CN103912219 A CN 103912219A
Authority
CN
China
Prior art keywords
hoop
waist hoop
waist
drill
wing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410163655.0A
Other languages
Chinese (zh)
Inventor
刘加峰
吴洁妹
喻强
李耀良
张国磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201410163655.0A priority Critical patent/CN103912219A/en
Publication of CN103912219A publication Critical patent/CN103912219A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a three-wing double-waist-hoop drill for cast-in-situ bored piles. The three-wing double-waist-hoop drill for the cast-in-situ bored piles comprises a drill rod, an upper waist hoop, a lower waist hoop, radial plates, wing plates and drill teeth, wherein the upper portion of the drill rod is fixedly connected with the upper waist hoop via the radial plates, the lower portion of the drill rod is fixedly connected with the lower waist hoop via the wing plates, and the drill teeth are welded on the wing plates. Compared with the prior art, the three-wing double-waist-hoop drill is high in drilled perpendicularity precision. Since the upper waist hoop and the lower waist hoop form guides in certain lengths, control precision for perpendicularity of drilled holes is greatly increased, and hole wall stability is improved. Due to limiting functions of the upper waist hoop and the lower waist hoop, a shaking range of a drill head during drilling is reduced, and hole wall stability is further improved. The three-wing double-waist-hoop drill for the cast-in-situ bored piles is capable of drilling holes for ultra-deep piles and in complex layers, like a sand layer, and has a wide application prospect in foundation engineering construction under the soft soil foundation conditions.

Description

The two waist hoop drill bits of bored pile three wings
Technical field
The present invention relates to drill bit used in a kind of bored pile technique, especially a kind ofly can significantly promote the two waist hoop drill bits of the pore-forming accuracy of bored pile and the three wings of stability.
Background technology
Bored pile refers to and in foundation soil, forms a stake hole at engineering site by machine drilling, and places reinforcing cage, concrete perfusion therein and the stake of making, and is mainly used in the load-bearing basis of upper building or the space enclosing structure of foundation ditch.
Bored pile is the development through decades in China, and technique is comparative maturity, is widely used in the Foundation Design field of national each soft clay area.
Along with the demand of the aspects such as the growing and building height of urban construction increases sharply, construction depth to bored pile and construction precision have proposed more and more higher requirement, and drill bit problem be restriction bored pile always can construction depth and the key factor of vertical precision.Compare conventional drill form, adopt the two waist hoop drill bits of three wings carry out drilling construction can construction depth and the control of verticality precision aspect all have the breakthrough of matter.Because the two waist hoop drill bits of three wings have good guidance quality and stability, can construct and exceed the degree of depth of hundred meters, and verticality precision can reach 1/150, there is direct meaning for promoting bearing capacity of borehole bored concrete pile and range of application.
Summary of the invention
The present invention will provide a kind of bored pile three wings two waist hoop drill bits, this drill bit has good guidance quality and stability, can construct and exceed the degree of depth of hundred meters, and verticality precision can reach 1/150, have direct meaning for promoting bearing capacity of borehole bored concrete pile and range of application.
For achieving the above object, technical scheme of the present invention is: the two waist hoop drill bits of a kind of bored pile three wings, comprise drilling rod, upper waist hoop, lower waist hoop, disc, wing plate, brill tooth, be characterized in: drilling rod top is fixedly connected with upper waist hoop by disc, drilling rod bottom is fixedly connected with lower waist hoop by wing plate, and on wing plate, tooth is bored in welding.
Upper and lower waist hoop is by adopting Q235B steel to process, its thickness 15mm, and height 180mm, upper and lower waist hoop external diameter is identical with drilled pile diameter.Upper and lower waist hoop and drilling rod coaxially arrange, and thick by three 15mm between upper waist hoop and drilling rod, 180mm disc is weldingly connected.
Thick by three 15mm between lower waist hoop and drilling rod, 180mm wing plate is weldingly connected.Distance between upper waist hoop and lower waist hoop is 1000mm.Article three, wing plate forms inverted cone-shaped apex point, 90 ° of bit tip angles.
The beneficial effect that the present invention has compared with conventional drill is:
1. become hole perpendicularity precision high.Due to the guiding of upper and lower twice waist hoop formation certain length, borehole perpendicularity control accuracy is significantly improved.
2. wall stability improves.Due to the effect of contraction of upper and lower twice waist hoop, the shaking amplitude of drill bit in drilling process is reduced, effectively improve wall stability.
The pore-forming that the two waist hoop drill bits of three wings can effectively meet in the bad grounds such as super dark stake boring and layer of sand creeps into, and under Soft Soil, in Foundation Design construction, has broad application prospects.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is along A-A sectional view in Fig. 1;
Fig. 3 is along B-B sectional view in Fig. 1.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment, the invention will be further described.
As shown in Figure 1 to Figure 3, the two waist hoop drill bits of a kind of bored pile three wings, comprise drilling rod 1, upper waist hoop 2, lower waist hoop 3, disc 4, wing plate 5, bore tooth 6.
Drilling rod 1 top is fixedly connected with upper waist hoop 2 by disc 4, and drilling rod 1 bottom is fixedly connected with lower waist hoop 3 by wing plate 5, and on wing plate 5, tooth 6 is bored in welding.
Upper and lower waist hoop 2,3 is processed by employing Q235B steel, its thickness 15mm, and height 180mm, upper and lower waist hoop 2,3 external diameters are identical with drilled pile diameter.Upper and lower waist hoop 2,3 and drilling rod 1 coaxially arrange.Distance between upper waist hoop 2 and lower waist hoop 3 is 1000mm.Article three, wing plate 5 forms inverted cone-shaped apex point, 90 ° of bit tip angles.
As shown in Figure 2, thick by three 15mm between upper waist hoop 2 and drilling rod 2,180mm disc 4 is weldingly connected.
As shown in Figure 3, thick by three 15mm between lower waist hoop 3 and drilling rod 1, tri-wing plates 4 of 180mm are weldingly connected.

Claims (5)

1. the two waist hoop drill bits of bored pile three wings, comprise drilling rod (1), upper waist hoop (2), lower waist hoop (3), disc (4), wing plate (5), bore tooth (6), it is characterized in that: described drilling rod (1) top is fixedly connected with upper waist hoop (2) by disc (4), drilling rod (1) bottom is fixedly connected with lower waist hoop (3) by wing plate (5), and tooth (6) is bored in the upper welding of wing plate (5).
2. the two waist hoop drill bits of bored pile three wings according to claim 1, it is characterized in that: described upper and lower waist hoop (2,3) is by adopting Q235B steel to process, its thickness 15mm, height 180mm, upper and lower waist hoop (2,3) external diameter is identical with drilled pile diameter.
3. the two waist hoop drill bits of bored pile three wings according to claim 1, it is characterized in that: described upper and lower waist hoop (2,3) coaxially arranges with drilling rod (1), thick by three 15mm between upper waist hoop (2) and drilling rod (1), 180mm disc (4) is weldingly connected; Thick by three 15mm between lower waist hoop (3) and drilling rod (1), 180mm wing plate (5) is weldingly connected.
4. the two waist hoop drill bits of bored pile three wings according to claim 1, is characterized in that: the distance between described upper waist hoop (2) and lower waist hoop (3) is 1000mm.
5. the two waist hoop drill bits of bored pile three wings according to claim 1, is characterized in that: described three wing plates (5) form inverted cone-shaped apex point, 90 ° of bit tip angles.
CN201410163655.0A 2014-04-23 2014-04-23 Three-wing double-waist-hoop drill for cast-in-situ bored piles Pending CN103912219A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410163655.0A CN103912219A (en) 2014-04-23 2014-04-23 Three-wing double-waist-hoop drill for cast-in-situ bored piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410163655.0A CN103912219A (en) 2014-04-23 2014-04-23 Three-wing double-waist-hoop drill for cast-in-situ bored piles

Publications (1)

Publication Number Publication Date
CN103912219A true CN103912219A (en) 2014-07-09

Family

ID=51038184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410163655.0A Pending CN103912219A (en) 2014-04-23 2014-04-23 Three-wing double-waist-hoop drill for cast-in-situ bored piles

Country Status (1)

Country Link
CN (1) CN103912219A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804059A (en) * 2014-12-31 2016-07-27 上海市机械施工集团有限公司 Cast-in-situ bored pile hole-forming device and method
CN107165581A (en) * 2017-06-09 2017-09-15 上海建工二建集团有限公司 A kind of GPS drill bit of drilling machine and GPS rig pile foundation drilling construction method
CN107542407A (en) * 2017-09-28 2018-01-05 徐国峰 A kind of cement surface drill bit
CN109083136A (en) * 2018-06-29 2018-12-25 广东工业大学 A kind of anti-overflowing variable section cement-soil stirring pile crown

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533341A (en) * 1991-07-29 1993-02-09 Tenotsukusu:Kk Auger for boring for soil cement composite pile
CN2288261Y (en) * 1997-06-17 1998-08-19 鞠庆海 Dual-purpose drilling broaching bit controlled by centrifugal wings
CN2417283Y (en) * 2000-03-22 2001-01-31 卫龙武 Drill bit with changeable diameter for pouring pile hole
CN201635662U (en) * 2010-04-14 2010-11-17 方远建设集团股份有限公司 Combined drill bit used for cast-in place pile
CN202000899U (en) * 2011-03-28 2011-10-05 郑州市第一建筑工程集团有限公司 Drill bit of rotary drilling rig
CN202578513U (en) * 2012-05-02 2012-12-05 上海智平基础工程有限公司 Filling pile aiguille

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0533341A (en) * 1991-07-29 1993-02-09 Tenotsukusu:Kk Auger for boring for soil cement composite pile
CN2288261Y (en) * 1997-06-17 1998-08-19 鞠庆海 Dual-purpose drilling broaching bit controlled by centrifugal wings
CN2417283Y (en) * 2000-03-22 2001-01-31 卫龙武 Drill bit with changeable diameter for pouring pile hole
CN201635662U (en) * 2010-04-14 2010-11-17 方远建设集团股份有限公司 Combined drill bit used for cast-in place pile
CN202000899U (en) * 2011-03-28 2011-10-05 郑州市第一建筑工程集团有限公司 Drill bit of rotary drilling rig
CN202578513U (en) * 2012-05-02 2012-12-05 上海智平基础工程有限公司 Filling pile aiguille

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804059A (en) * 2014-12-31 2016-07-27 上海市机械施工集团有限公司 Cast-in-situ bored pile hole-forming device and method
CN105804059B (en) * 2014-12-31 2018-03-02 上海市机械施工集团有限公司 Drilling pouring pile hole device and method
CN107165581A (en) * 2017-06-09 2017-09-15 上海建工二建集团有限公司 A kind of GPS drill bit of drilling machine and GPS rig pile foundation drilling construction method
CN107542407A (en) * 2017-09-28 2018-01-05 徐国峰 A kind of cement surface drill bit
CN109083136A (en) * 2018-06-29 2018-12-25 广东工业大学 A kind of anti-overflowing variable section cement-soil stirring pile crown

Similar Documents

Publication Publication Date Title
CN104747088B (en) A kind of leafy hosqe bit of cast-in-situ bored pile list waist and drilling construction method
CN101812976B (en) Adjustable multiple coil extruding and expanding drilling tool
CN107237323A (en) Major diameter super thick boulder bed forming hole method
CN103821141B (en) Helical burr ram construction technology
CN103266599B (en) The dry construction method of digging drilling pile of soil skerry ground churning driven
CN106759282B (en) A kind of mechanical hole building method of super-large diameter hard rock bored concrete pile half
CN105568962B (en) A kind of new self-advancing type multiple holes grouting stake and its grouting construction method
CN104295239A (en) Method for using rotary drilling rig to drill into hard rock stratum
CN103912219A (en) Three-wing double-waist-hoop drill for cast-in-situ bored piles
CN103290840A (en) Prestressed pipe pile construction method under boulder group geological conditions
CN105464105B (en) One kind is without friction pile pile making method
CN206035386U (en) Two waist hoop drill bits of drilling bored concrete pile three wings of drilling rod are pull in area
CN108625362A (en) A kind of bayonet type cast-in-situ bored pile building enclosure and construction method
CN206752454U (en) One kind perfusion embedded pile
CN201874482U (en) Semi-spiral drill rod
CN106592615A (en) Deviation rectification construction method for inclined sink
CN201250397Y (en) Concrete anti-seepage wall with quality inspection coring pipes
CN205918362U (en) Take drill bit of bore bit
CN201650154U (en) Adjustable multi-stage helical extruding type drilling tool
CN209603123U (en) A kind of bottom-enlarging filling pile structure for cutting down negative friction
CN204626439U (en) A kind of ruggedized construction of existing sole plate
CN103452473B (en) One utilizes tunneling boring high counterweight drill bit device to carry out small-diameter deep well construction method
CN106351214A (en) Construction method of long spiral variable diameter concrete pile
CN111733813A (en) One-column one-pile manual and mechanical dry operation combined hole forming construction method
CN104878762A (en) Bored pile construction method suitable for tilt hard rock section

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140709