CN103906211A - 基于优选关闭基站的网络节能方法 - Google Patents
基于优选关闭基站的网络节能方法 Download PDFInfo
- Publication number
- CN103906211A CN103906211A CN201410153805.XA CN201410153805A CN103906211A CN 103906211 A CN103906211 A CN 103906211A CN 201410153805 A CN201410153805 A CN 201410153805A CN 103906211 A CN103906211 A CN 103906211A
- Authority
- CN
- China
- Prior art keywords
- base station
- network
- user
- load
- sigma
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/02—Power saving arrangements
- H04W52/0203—Power saving arrangements in the radio access network or backbone network of wireless communication networks
- H04W52/0206—Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410153805.XA CN103906211B (zh) | 2014-04-16 | 2014-04-16 | 基于优选关闭基站的网络节能方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410153805.XA CN103906211B (zh) | 2014-04-16 | 2014-04-16 | 基于优选关闭基站的网络节能方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103906211A true CN103906211A (zh) | 2014-07-02 |
CN103906211B CN103906211B (zh) | 2017-07-18 |
Family
ID=50997304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410153805.XA Active CN103906211B (zh) | 2014-04-16 | 2014-04-16 | 基于优选关闭基站的网络节能方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103906211B (zh) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104640185A (zh) * | 2015-02-25 | 2015-05-20 | 东南大学 | 一种基于基站协作的小区休眠节能方法 |
CN105162844A (zh) * | 2015-08-05 | 2015-12-16 | 中国联合网络通信集团有限公司 | 一种任务分配的方法及装置 |
WO2016078268A1 (zh) * | 2014-11-19 | 2016-05-26 | 中兴通讯股份有限公司 | 节能方法及装置 |
CN105636119A (zh) * | 2015-12-29 | 2016-06-01 | 西安交通大学 | 基于能量效率和流量负载的联合优化微微基站休眠方法 |
CN105657803A (zh) * | 2016-02-17 | 2016-06-08 | 东南大学 | 一种lte-a网络有限负载优先决策节能算法 |
WO2016134676A1 (en) * | 2015-02-27 | 2016-09-01 | Huawei Technologies Co., Ltd. | System and method for user terminal-aware cell switch-off |
CN106304116A (zh) * | 2016-07-15 | 2017-01-04 | 北京邮电大学 | 一种实现能量消耗最小化的两阶段基站睡眠策略 |
CN106686701A (zh) * | 2015-11-10 | 2017-05-17 | 中国移动通信集团公司 | 一种小区内与小区之间联合节电的方法及装置 |
CN107493584A (zh) * | 2017-07-31 | 2017-12-19 | 清华大学 | 一种确定基站休眠方案的方法和装置 |
CN108882269A (zh) * | 2018-05-21 | 2018-11-23 | 东南大学 | 结合缓存技术的超密集网络小站开关方法 |
CN114630405A (zh) * | 2022-04-02 | 2022-06-14 | 中国电信股份有限公司乌鲁木齐分公司 | 一种通信系统能耗管理方法、电子设备及存储介质 |
CN114650590A (zh) * | 2022-04-02 | 2022-06-21 | 中国电信股份有限公司乌鲁木齐分公司 | 一种通信系统能耗管理方法、电子设备及存储介质 |
US11576118B1 (en) * | 2021-08-04 | 2023-02-07 | Nokia Solutions And Networks Oy | Optimizing usage of power using switch off of cells |
CN116114317A (zh) * | 2020-12-14 | 2023-05-12 | 华为技术有限公司 | 通信方法、装置及系统 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102186209A (zh) * | 2011-04-21 | 2011-09-14 | 东南大学 | 多小区重叠覆盖下的节能策略 |
CN102695251A (zh) * | 2011-03-21 | 2012-09-26 | 上海贝尔股份有限公司 | 移动通信系统中的节能方法 |
WO2013091249A1 (en) * | 2011-12-23 | 2013-06-27 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and radio network node for ranking cells in a cellular network |
US20130310048A1 (en) * | 2012-05-15 | 2013-11-21 | Fujitsu Limited | Cell activation and deactivation in heterogeneous networks |
-
2014
- 2014-04-16 CN CN201410153805.XA patent/CN103906211B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102695251A (zh) * | 2011-03-21 | 2012-09-26 | 上海贝尔股份有限公司 | 移动通信系统中的节能方法 |
CN102186209A (zh) * | 2011-04-21 | 2011-09-14 | 东南大学 | 多小区重叠覆盖下的节能策略 |
WO2013091249A1 (en) * | 2011-12-23 | 2013-06-27 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and radio network node for ranking cells in a cellular network |
US20130310048A1 (en) * | 2012-05-15 | 2013-11-21 | Fujitsu Limited | Cell activation and deactivation in heterogeneous networks |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105682109A (zh) * | 2014-11-19 | 2016-06-15 | 中兴通讯股份有限公司 | 节能方法及装置 |
WO2016078268A1 (zh) * | 2014-11-19 | 2016-05-26 | 中兴通讯股份有限公司 | 节能方法及装置 |
CN104640185B (zh) * | 2015-02-25 | 2018-10-09 | 东南大学 | 一种基于基站协作的小区休眠节能方法 |
CN104640185A (zh) * | 2015-02-25 | 2015-05-20 | 东南大学 | 一种基于基站协作的小区休眠节能方法 |
WO2016134676A1 (en) * | 2015-02-27 | 2016-09-01 | Huawei Technologies Co., Ltd. | System and method for user terminal-aware cell switch-off |
US9980218B2 (en) | 2015-02-27 | 2018-05-22 | Huawei Technologies Canada Co., Ltd. | System and method for user terminal-aware cell switch-off |
CN105162844B (zh) * | 2015-08-05 | 2018-07-13 | 中国联合网络通信集团有限公司 | 一种任务分配的方法及装置 |
CN105162844A (zh) * | 2015-08-05 | 2015-12-16 | 中国联合网络通信集团有限公司 | 一种任务分配的方法及装置 |
CN106686701B (zh) * | 2015-11-10 | 2019-06-25 | 中国移动通信集团公司 | 一种小区内与小区之间联合节电的方法及装置 |
CN106686701A (zh) * | 2015-11-10 | 2017-05-17 | 中国移动通信集团公司 | 一种小区内与小区之间联合节电的方法及装置 |
CN105636119A (zh) * | 2015-12-29 | 2016-06-01 | 西安交通大学 | 基于能量效率和流量负载的联合优化微微基站休眠方法 |
CN105636119B (zh) * | 2015-12-29 | 2019-05-21 | 西安交通大学 | 基于能量效率和流量负载的联合优化微微基站休眠方法 |
CN105657803A (zh) * | 2016-02-17 | 2016-06-08 | 东南大学 | 一种lte-a网络有限负载优先决策节能算法 |
CN106304116A (zh) * | 2016-07-15 | 2017-01-04 | 北京邮电大学 | 一种实现能量消耗最小化的两阶段基站睡眠策略 |
CN107493584A (zh) * | 2017-07-31 | 2017-12-19 | 清华大学 | 一种确定基站休眠方案的方法和装置 |
CN108882269A (zh) * | 2018-05-21 | 2018-11-23 | 东南大学 | 结合缓存技术的超密集网络小站开关方法 |
CN108882269B (zh) * | 2018-05-21 | 2021-07-30 | 东南大学 | 结合缓存技术的超密集网络小站开关方法 |
CN116114317A (zh) * | 2020-12-14 | 2023-05-12 | 华为技术有限公司 | 通信方法、装置及系统 |
US11576118B1 (en) * | 2021-08-04 | 2023-02-07 | Nokia Solutions And Networks Oy | Optimizing usage of power using switch off of cells |
US20230043765A1 (en) * | 2021-08-04 | 2023-02-09 | Nokia Solutions And Networks Oy | Optimizing usage of power using switch off of cells |
CN114630405A (zh) * | 2022-04-02 | 2022-06-14 | 中国电信股份有限公司乌鲁木齐分公司 | 一种通信系统能耗管理方法、电子设备及存储介质 |
CN114650590A (zh) * | 2022-04-02 | 2022-06-21 | 中国电信股份有限公司乌鲁木齐分公司 | 一种通信系统能耗管理方法、电子设备及存储介质 |
CN114650590B (zh) * | 2022-04-02 | 2024-05-14 | 中国电信股份有限公司乌鲁木齐分公司 | 一种通信系统能耗管理方法、电子设备及存储介质 |
CN114630405B (zh) * | 2022-04-02 | 2024-07-02 | 中国电信股份有限公司乌鲁木齐分公司 | 一种通信系统能耗管理方法、电子设备及存储介质 |
Also Published As
Publication number | Publication date |
---|---|
CN103906211B (zh) | 2017-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103906211A (zh) | 基于优选关闭基站的网络节能方法 | |
CN108832626B (zh) | 一种低压配电台区拓扑识别方法及系统 | |
CN109195170B (zh) | 小区扩容方法、装置及存储介质 | |
Guo et al. | Asymptotic deployment gain: A simple approach to characterize the SINR distribution in general cellular networks | |
Maleki et al. | Censored truncated sequential spectrum sensing for cognitive radio networks | |
Kustiawan et al. | Handoff decision using a Kalman filter and fuzzy logic in heterogeneous wireless networks | |
CN103929781A (zh) | 超密集异构网络下跨层干扰协调优化方法 | |
Saxena et al. | Traffic-aware energy optimization in green LTE cellular systems | |
CN113382477B (zh) | 应用于无线网络用户间上行干扰建模的方法 | |
Ma et al. | Modeling and analysis for vertical handoff based on the decision tree in a heterogeneous vehicle network | |
CN105636056A (zh) | 一种频谱资源自优化的节能方法、装置和系统 | |
JP2023535841A (ja) | 基地局の省エネルギー処理方法及び処理装置 | |
CN106714223B (zh) | 一种基站能耗模型的建立方法及装置 | |
CN112235804A (zh) | 基站远端单元动态划归方法和装置、小区组网方法和系统 | |
Hu et al. | Multi-agent DRL-based resource allocation in downlink multi-cell OFDMA system | |
Gao et al. | Accurate load prediction algorithms assisted with machine learning for network traffic | |
Vishvaksenan et al. | Experimental study on Elliott wave theory for handoff prediction | |
CN116209046B (zh) | 一种实时节能的移动通信方法、装置、网络侧设备及介质 | |
Hu et al. | An efficient computing task offloading strategy based on energy consumption and load balancing degree | |
Mazza et al. | A user-satisfaction based offloading technique for smart city applications | |
CN108900325B (zh) | 一种电力通信业务与无线专网技术的适配性评估方法 | |
Guerra et al. | Optimization of base station on-off switching with a machine learning approach | |
CN103167577A (zh) | 一种关闭小区的方法、站点装置 | |
CN104469811A (zh) | 认知无线传感网络分簇合作频谱感知硬融合方法 | |
Kailai et al. | A stochastic geometry based two-stage energy consumption minimization strategy via sleep mode with QoS constraint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210401 Address after: 201306 building C, No. 888, Huanhu West 2nd Road, Lingang New Area, Pudong New Area, Shanghai Patentee after: Shanghai Hanxin Industrial Development Partnership (L.P.) Address before: 210096, No. four archway, Xuanwu District, Jiangsu, Nanjing 2 Patentee before: SOUTHEAST University |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230918 Address after: 201615 room 301-6, building 6, no.1158, Jiuting Central Road, Jiuting Town, Songjiang District, Shanghai Patentee after: White box (Shanghai) Microelectronics Technology Co.,Ltd. Address before: 201306 building C, No. 888, Huanhu West 2nd Road, Lingang New Area, Pudong New Area, Shanghai Patentee before: Shanghai Hanxin Industrial Development Partnership (L.P.) |
|
TR01 | Transfer of patent right |