CN103886532A - Standardization test method for urban public facilities - Google Patents

Standardization test method for urban public facilities Download PDF

Info

Publication number
CN103886532A
CN103886532A CN201410109490.9A CN201410109490A CN103886532A CN 103886532 A CN103886532 A CN 103886532A CN 201410109490 A CN201410109490 A CN 201410109490A CN 103886532 A CN103886532 A CN 103886532A
Authority
CN
China
Prior art keywords
planning
communal facility
facility
index
public facilities
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410109490.9A
Other languages
Chinese (zh)
Inventor
张建召
赵玉奇
游涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN
Original Assignee
JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN filed Critical JIANGSU INSTITUTE OF URBAN PLANNING AND DESIGN
Priority to CN201410109490.9A priority Critical patent/CN103886532A/en
Publication of CN103886532A publication Critical patent/CN103886532A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a standardization test method for urban public facilities. The method comprises the steps that firstly, one kind of public facilities is selected, and after the coverage of various travel modes for the public facilities within the planning time threshold, the residential land area of the public facilities in the service coverage of the public facilities is worked out; secondly, the reasonable number of resident populations of the public facility service is worked out according to the residential land area, then the reasonable index of the public facilities is obtained and is compared with the planning index of the public facilities, and whether the index planning is reasonable or not is judged; thirdly, the service coverage rate of the public facilities is calculated and compared with the planning coverage index of the public facilities to judge whether planning coverage index of the public facilities is reasonable or not. After all public facility plans of a city are inspected, a comparison result is settled and output. The standardization test method is convenient to operate, and solves the problems of simple estimation and insufficient science support in the urban public facility spatial layout planning.

Description

A kind of urban public utilities standardization method of inspection
Technical field
The present invention relates to Urban Planning method, relate in particular to a kind of urban public utilities standardization method of inspection.
Background technology
People's livelihood problem, concerning broad masses of the people's vital interests, ensureing and improving People's livelihood becomes the most important thing of domestic public affair.Form with it sharp contrast, domestic city planning field about people's livelihood problem especially about relating to the careful technical support of shortage science on the communal facility Planning of spatial arrangement of common people's vital interests.
At present, aspect patented invention, also there is no a kind of urban public utilities standardization method of inspection.The method that industry practitioner generally adopts in the real work of city planning establishment is: point centered by facility, using geometric distance as radius, draw a border circular areas, as the reasonable service range of this facility; According to resident population's total amount estimation all installations index, then simply distribute with reference to standard.With respect to the planning technology progress of science and the requirements of the times that people's livelihood benefit highlights day by day, there is many drawbacks in the existing processing gimmick of too simplifying:
1, draw the line inaccurate;
2, cannot simulate resident's actual trip situation;
3, lack follow-up inspection and feedback.
Summary of the invention
Technical matters to be solved by this invention is the defect for background technology, and a kind of urban public utilities standardization method of inspection is provided.
The present invention is for solving the problems of the technologies described above by the following technical solutions:
A kind of urban public utilities standardization method of inspection, specifically comprises the following steps:
Step 1), certain class communal facility of required inspection in selection city;
Step 2), according to the planning time threshold value of such communal facility, calculate the coverage pattern of various travel modals in this time threshold;
Step 3), is multiplied by the coverage pattern of such communal facility various travel modals in its planning time threshold value respectively after the usage ratio of this travel modal, adds up and obtains the residential estate area in the service coverage of such communal facility;
Step 4), the index of residential estate per capita by the residential estate area in the service coverage of such communal facility divided by planning, obtains resident population's quantity that such communal facility is served;
Step 5), resident population's quantity that such communal facility is served is multiplied by thousand people's indexs of such facility, obtains the reasonable index that such communal facility need to possess;
Step 6), whether the reasonable index that such communal facility need to be possessed and the planning index of such communal facility compare, reasonable to judge the planning index of such facility;
Step 7), the residential estate total area by the residential estate area of the service coverage of such communal facility divided by city, obtains the service coverage rate of such communal facility;
Whether step 8), covers index by the planning of the service coverage rate of such communal facility and such communal facility and compares, reasonable to judge that the planning of such facility covers index;
Step 9), selects the communal facility of other kinds, execution step 2) to step 8), until all communal facility complete inspections are complete in city.
The present invention adopts above technical scheme compared with prior art, has following technique effect:
The simple estimation existing in urban public utilities programming and distribution, the problem of science underbraced are solved, can simulate resident's actual trip, science delimited the service range of communal facility, effectively extract facilities services population, realize the correspondence of " people,, facility ", analyze facility and whether meet standard, effectively promote people's livelihood happiness.
Accompanying drawing explanation
Fig. 1 is method flow diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, technical scheme of the present invention is described in further detail:
As shown in Figure 1, the invention discloses a kind of urban public utilities standardization method of inspection, mainly comprise the following steps:
Step 1), certain class communal facility of required inspection in selection city;
Step 2), according to the planning time threshold value of such communal facility, calculate the coverage pattern of various travel modals in this time threshold;
Step 3), is multiplied by the coverage pattern of such communal facility various travel modals in its planning time threshold value respectively after the usage ratio of this travel modal, adds up and obtains the residential estate area in the service coverage of such communal facility;
Step 4), the index of residential estate per capita by the residential estate area in the service coverage of such communal facility divided by planning, obtains resident population's quantity that such communal facility is served;
Step 5), resident population's quantity that such communal facility is served is multiplied by thousand people's indexs of such facility, obtains the reasonable index that such communal facility need to possess;
Step 6), whether the reasonable index that such communal facility need to be possessed and the planning index of such communal facility compare, reasonable to judge the planning index of such facility;
Step 7), the residential estate total area by the residential estate area of the service coverage of such communal facility divided by city, obtains the service coverage rate of such communal facility;
Whether step 8), covers index by the planning of the service coverage rate of such communal facility and such communal facility and compares, reasonable to judge that the planning of such facility covers index;
Step 9), selects the communal facility of other kinds, execution step 2) to step 8), until all communal facility complete inspections are complete in city.
Before execution step 1, first should obtain the land used vector drawing of urban geographic information, city planning scheme and roadnet planning vector drawing and meet national standard, industry standard or policy document and this allocation plan achievement in the projecting parameter that proposes.
Described urban geographic information at least comprises urban traffic information, and obtains the gait of march of all kinds of trip modes on dissimilar road surface in described urban traffic information; Described all kinds of trip mode comprise walking, by bike, take bus, take car, take the modes such as subway; Described gait of march refers to that this area is as general design standards value in the Urban Traffic information on services softwares such as Baidu's map, high moral map.
Complete single border and planning information that described land used polar plot paper bag is drawn together all kinds of lands used such as residential estate, public administration and public service facility land used, commerce services industry facilities land, industrial land, logistics land used, municipal land used and park green land are complete, and described all kinds of land used titles and character meet " Standard for classification of urban land and for planning of constructional land " (GB50137-2011) relevant regulations; The complete, single of described all kinds of lands used border is for fear of plot leakage or double counting; The planning information of described all kinds of lands used comprises that planned land use area, floor area of building, plot ratio, ratio of green space, building height, parking stall, technician's number and service cover the planning indexs such as resident's quantity.
Described roadnet planning polar plot paper bag is drawn together the planning information such as path and width and design speed per hour at interior all types urban road such as city expressway, trunk roads, secondary distributor road and branch road.
Described projecting parameter specifically comprise facility reasonable service radius, planning time threshold value, cook up line mode ratio, plan thousand people's indexs of residential estate index value, facility per capita etc.
Then,, by associated the land used vector drawing of above-mentioned city planning scheme and embed above-mentioned urban geographic information, formation can be for the information work platform of inquiring about, choose, calculate and export data; Above-mentioned roadnet is planned to vector drawing is associated and embed above-mentioned information work platform, form the Trip Costs database of many Transportation Strategies.
Described association and embedding grammar only need the interior those skilled in the art of industry by computer aided drawing software and Geographic Information System related software, with manually or the automatic mode of program, under unified spatial coordinate system, realize comprehensive integration of multiple spatial informations of areal.
The Trip Costs database of described many Transportation Strategies, emphasize the importance of trip mode and time cost and significant, for example in daily life, people often explain distance for 15 minutes by driving, " 15 minutes healthy circles " also often proposed in government policy file, the space planning layout principle that " having 10 minutes walk, it is green to see " etc. improves People's livelihood, therefore, according to well-known apart from S=speed V* time T, those skilled in the art in industry only need the average velocity V on different brackets road by different trip modes, adding necessary field attribute weighting processes in embedding road and land used, can form above-mentioned Trip Costs database.Wherein, described many Transportation Strategies refer to Combination and the multifarious strategy set in the selection of trip mode people, such as both can first walking, rear public transport, the trip strategy of walking again, also can select first to call a taxi, the trip strategy of rear subway, walking again etc.
Because urban public utilities are due to the complicacy of himself system, communal facility dissimilar, different brackets presents obvious otherness on service radius, therefore needs classification to check item by item.Therefore, the communal facility of described examine can be a certain type, a certain grade or some communal facilitys.
Step 2) concrete steps be: according to the planning time threshold value of such communal facility, operation time, cost Weighted distance model, calculated the coverage pattern of various travel modals in this time threshold.
The logical organization of described time cost accessibility model is to rely on the Trip Costs database of many Transportation Strategies, the distance summation S(that calculates all directions that facility can cover in given time T by known average velocity V is S=V*T), be called for short accessibility scope; This model has carried out science and has used with practice in city planning relevant industries field, and not yet unified title is universal, and non-the present invention proposes first, does not therefore apply for protection.Its great advantage can be caught time cost easily, simulates relatively really the actual trip situation of people in city.
For guaranteeing that the those skilled in the art in industry can move this model, further set forth described accessibility model running principle: in generalized information system, first the orthogonal grid that uses certain precision in study area is divided into grating image, according to the current time cost rate in each unit, space, Production Time cost grid map (Time Cost Raster), then the target source take facility position as path computing (Source), according to shortest path first, carry out Cost Distance computing (Cost Weighted Distance), output cumulative cost figure (Accumulated Cost), path direction figure (Direction), target area under one's jurisdiction figure (Allocation), finally carry out Reclassify again classification obtain the facility accessibility scope of different time sections.
Described planning time threshold value refers to that people that national regulation or project study are pointed out use the maximum recommended value of public service travel time.
In step 3), the usage ratio of described travel modal, refers to that planning compilation process is according to traffic study, simulation and the calculating allocation proportion of definite multiple travel modal afterwards.
Illustrate step 4) to step 6): it is 30 hectares that the service of supposing covers residential estate area, and residential estate area is 30m per capita 2/ people, corresponding resident population is 10000 people.Thousand people's indexs of supposing floor area of building are 10m 2/ thousand people, the floor-space index (F.S.I.) of described facility is 10000 people * 10 m 2/ thousand people=100m 2.Suppose that initial planning floor-space index (F.S.I.) is 500 m 2, both subtract each other can draw " reduction 400 m 2floor area of building " planning proposal.
In step 7), service coverage rate is the important indicator of reflection communal facility space layout fairness, and its value is higher, illustrates that programming and distribution are more reasonable, more favourable people's livelihood happiness.
Suppose that planning coverage rate is 85%, and the service coverage rate of using the present invention to calculate is 70%, is less than planning requirement, illustrates that such facility space layout is unreasonable, fairness deficiency, need to adjust facility position or increase facility quantity.
By the disclosed method of the invention described above embodiment, work out information platform and go on a journey into cost according to storehouse based on programme, carry out approachability analysis, line time threshold value, traffic trip ratio, the planning information such as residential estate area and thousand people's indexs are per capita cooked up in association, reached inspection, have improved the planning purpose of index.
The method of describing in conjunction with embodiment disclosed herein or the step of algorithm can directly be implemented with software module or two combinations that hardware, processor are carried out.Software module can be placed in known any other forms of storage medium in random access memory (RAM), internal memory, ROM (read-only memory) (ROM), electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technical field.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited to this, any be familiar with those skilled in the art the present invention disclose technical side big in; the variation that can expect easily or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim.

Claims (4)

1. a urban public utilities standardization method of inspection, is characterized in that, specifically comprises the following steps:
Step 1), certain class communal facility of required inspection in selection city;
Step 2), according to the planning time threshold value of such communal facility, calculate the coverage pattern of various travel modals in this time threshold;
Step 3), is multiplied by the coverage pattern of such communal facility various travel modals in its planning time threshold value respectively after the usage ratio of this travel modal, adds up and obtains the residential estate area in the service coverage of such communal facility;
Step 4), the index of residential estate per capita by the residential estate area in the service coverage of such communal facility divided by planning, obtains resident population's quantity that such communal facility is served;
Step 5), resident population's quantity that such communal facility is served is multiplied by thousand people's indexs of such facility, obtains the reasonable index that such communal facility need to possess;
Step 6), whether the reasonable index that such communal facility need to be possessed and the planning index of such communal facility compare, reasonable to judge the planning index of such facility;
Step 7), the residential estate total area by the residential estate area of the service coverage of such communal facility divided by city, obtains the service coverage rate of such communal facility;
Whether step 8), covers index by the planning of the service coverage rate of such communal facility and such communal facility and compares, reasonable to judge that the planning of such facility covers index;
Step 9), selects the communal facility of other kinds, execution step 2) to step 8), until all communal facility complete inspections are complete in city.
2. the urban public utilities standardization method of inspection according to claim 1, it is characterized in that, before testing, obtain the land used vector drawing of urban geographic information, city planning scheme and roadnet planning vector drawing and meet national standard, industry standard or policy document and this allocation plan achievement in the projecting parameter that proposes.
3. the urban public utilities standardization method of inspection according to claim 2, is characterized in that, described urban geographic information at least comprises urban traffic information and the gait of march of all kinds of trip mode on dissimilar road surface.
4. the urban public utilities standardization method of inspection according to claim 3, is characterized in that, described all kinds of trip modes comprise walking, by bike, take bus, take car, take subway.
CN201410109490.9A 2014-03-24 2014-03-24 Standardization test method for urban public facilities Pending CN103886532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410109490.9A CN103886532A (en) 2014-03-24 2014-03-24 Standardization test method for urban public facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410109490.9A CN103886532A (en) 2014-03-24 2014-03-24 Standardization test method for urban public facilities

Publications (1)

Publication Number Publication Date
CN103886532A true CN103886532A (en) 2014-06-25

Family

ID=50955410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410109490.9A Pending CN103886532A (en) 2014-03-24 2014-03-24 Standardization test method for urban public facilities

Country Status (1)

Country Link
CN (1) CN103886532A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104851283A (en) * 2015-05-14 2015-08-19 陆化普 Method and apparatus of automatic generation of urban transport strategy planning scheme
CN104992397A (en) * 2015-07-17 2015-10-21 重庆市规划设计研究院 Urban and rural public service facility planning technical application system and method based on mobile phone APP
CN110532337A (en) * 2019-08-28 2019-12-03 北京市测绘设计研究院 Communal facility service ability method for improving towards intelligence community
CN110852479A (en) * 2019-10-12 2020-02-28 上海市政工程设计研究总院(集团)有限公司 Method for evaluating service radius of public service facility based on population coverage rate
CN111563666A (en) * 2020-04-24 2020-08-21 武汉理工大学 Urban public service facility space configuration evaluation method based on network heat
CN111639833A (en) * 2020-04-23 2020-09-08 中国科学院空天信息创新研究院 Urban human living environment suitability comprehensive evaluation method based on natural and human multi-factor
CN112598561A (en) * 2020-12-29 2021-04-02 华南理工大学 City block public open space configuration method based on real population data
CN112907126A (en) * 2021-03-23 2021-06-04 西藏大学 Road traffic resource allocation fairness measurement method
CN113011768A (en) * 2021-03-31 2021-06-22 中国城市建设研究院有限公司 Public facility data processing method, system, electronic device and medium
CN113298301A (en) * 2021-05-17 2021-08-24 东南大学 Urban service facility evaluation and optimization method based on crowd digital portrait
CN114063995A (en) * 2022-01-17 2022-02-18 深圳市图元科技有限公司 Development engine system and method based on managed pipe city visualization
CN114202249A (en) * 2022-01-18 2022-03-18 太原市城乡规划设计研究院 Community life circle public service facility space supply and demand balance model

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张建召 等: "基本公共服务政策要点梳理与绩效考核空间模式初探——基于政府主体视角的实证建构", 《国际城市规划》 *
祁毅 等: "基于空间可达性栅格建模的公共设施布局规划分析方法", 《创新与发展——2006高校GIS论坛论文集》 *
顾鸣东 等: "公共设施空间可达性与公平性研究概述", 《城市问题》 *
颜辉武 等: "基于GIS的城市公共设施规划分析模型的研究", 《苏州城建环保学院学报》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104851283A (en) * 2015-05-14 2015-08-19 陆化普 Method and apparatus of automatic generation of urban transport strategy planning scheme
CN104992397A (en) * 2015-07-17 2015-10-21 重庆市规划设计研究院 Urban and rural public service facility planning technical application system and method based on mobile phone APP
CN110532337A (en) * 2019-08-28 2019-12-03 北京市测绘设计研究院 Communal facility service ability method for improving towards intelligence community
CN110532337B (en) * 2019-08-28 2024-02-27 北京市测绘设计研究院 Smart community-oriented public facility service capability improving method
CN110852479A (en) * 2019-10-12 2020-02-28 上海市政工程设计研究总院(集团)有限公司 Method for evaluating service radius of public service facility based on population coverage rate
CN111639833A (en) * 2020-04-23 2020-09-08 中国科学院空天信息创新研究院 Urban human living environment suitability comprehensive evaluation method based on natural and human multi-factor
CN111563666B (en) * 2020-04-24 2023-04-25 武汉理工大学 Urban public service facility space configuration evaluation method based on network heat
CN111563666A (en) * 2020-04-24 2020-08-21 武汉理工大学 Urban public service facility space configuration evaluation method based on network heat
CN112598561A (en) * 2020-12-29 2021-04-02 华南理工大学 City block public open space configuration method based on real population data
CN112598561B (en) * 2020-12-29 2023-09-29 华南理工大学 Urban neighborhood public open space configuration method based on real population data
CN112907126A (en) * 2021-03-23 2021-06-04 西藏大学 Road traffic resource allocation fairness measurement method
CN113011768A (en) * 2021-03-31 2021-06-22 中国城市建设研究院有限公司 Public facility data processing method, system, electronic device and medium
CN113011768B (en) * 2021-03-31 2021-12-03 中国城市建设研究院有限公司 Public facility data processing method, system, electronic device and medium
CN113298301A (en) * 2021-05-17 2021-08-24 东南大学 Urban service facility evaluation and optimization method based on crowd digital portrait
CN113298301B (en) * 2021-05-17 2024-04-30 东南大学 Urban service facility evaluation and optimization method based on crowd digital portraits
CN114063995A (en) * 2022-01-17 2022-02-18 深圳市图元科技有限公司 Development engine system and method based on managed pipe city visualization
CN114202249A (en) * 2022-01-18 2022-03-18 太原市城乡规划设计研究院 Community life circle public service facility space supply and demand balance model
CN114202249B (en) * 2022-01-18 2024-05-14 太原市城乡规划设计研究院 Construction method of community life circle public service facility space supply and demand balance model

Similar Documents

Publication Publication Date Title
CN103886532A (en) Standardization test method for urban public facilities
Namdeo et al. Spatial planning of public charging points using multi-dimensional analysis of early adopters of electric vehicles for a city region
Zhu et al. The impacts of urban mass rapid transit lines on the density and mobility of high-income households: A case study of Singapore
US20160063516A1 (en) Methods and apparatus to estimate commercial characteristics based on geospatial data
Tian et al. Traffic generated by mixed-use developments: Thirteen-region study using consistent measures of built environment
Beames et al. Amenity proximity analysis for sustainable brownfield redevelopment planning
Pu et al. Impact of license plate restriction policy on emission reduction in Hangzhou using a bottom-up approach
Guo et al. The impact of walkable environment on single-family residential property values
CN101561903A (en) Fully automatic substation locating and sizing method considering geographic information
CN112860952B (en) Method and system for positioning and overhauling parts by inspection robot
Sekar et al. An analysis of growth dynamics in Chennai Metropolitan area
Eisel et al. Finding suitable locations for charging stations
CN106130110B (en) The electric taxi charging station constant volume method on trip ground is selected based on stratified probability
Cucuzzella et al. A TOD index integrating development potential, economic vibrancy, and socio-economic factors for encouraging polycentric cities
Li et al. Identify impacting factor for urban rail ridership from built environment spatial heterogeneity
Samanta et al. Identifying feasible locations for rail transit stations: Two-stage analytical model
Zhou et al. Using mapping tools to prioritize electric vehicle charger benefits to underserved communities
ROTH et al. Digital participatory landscape planning for renewable energy–Interactive visual landscape assessment as basis for the geodesign of wind parks in Germany
Moudon et al. A transportation-efficient land use mapping index
Sprey et al. Georeferenced Determination of the Potential of Public Charging Infrastructure
Tamayao Urbanization and Vehicle Electrification in the United States: Life Cycle CO2 Emissions Estimation and Climate Policy Implications
Stouffs et al. Modelling informal settlements using a hybrid automata approach
Van Leuven A Method for Defining Downtown Business District Boundaries in Pre-Automobile Towns and Cities
Hsu Disparities in public charging infrastructure deployment and inequitable electric vehicle ownership cost based on income and race
Block-Schachter Hysteresis and urban rail: The effects of past urban rail on current residential and travel choices

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140625

WD01 Invention patent application deemed withdrawn after publication