CN103883132B - Low head assemble method and jig structure on a kind of Nuclear Safety shell - Google Patents

Low head assemble method and jig structure on a kind of Nuclear Safety shell Download PDF

Info

Publication number
CN103883132B
CN103883132B CN201410143778.8A CN201410143778A CN103883132B CN 103883132 B CN103883132 B CN 103883132B CN 201410143778 A CN201410143778 A CN 201410143778A CN 103883132 B CN103883132 B CN 103883132B
Authority
CN
China
Prior art keywords
zone
coverboard
central post
pillar
locating piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410143778.8A
Other languages
Chinese (zh)
Other versions
CN103883132A (en
Inventor
周大杰
刘旭东
殷国东
沈鏖
徐航
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Industrial Installation Engineering Co Ltd
Original Assignee
Shenyang Industrial Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Industrial Installation Engineering Co Ltd filed Critical Shenyang Industrial Installation Engineering Co Ltd
Priority to CN201410143778.8A priority Critical patent/CN103883132B/en
Publication of CN103883132A publication Critical patent/CN103883132A/en
Application granted granted Critical
Publication of CN103883132B publication Critical patent/CN103883132B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention discloses low head assemble method and jig structure on a kind of Nuclear Safety shell, utilize ring-type support column and central post fixed adjustment housing, complete the installation of upper and lower end socket, described support column adopts two sections formula, hypomere adopts hydraulic pressure adjustment mode, can meet the requirement of containment construction, and the mode of employing central post adjustment coverboard can be more effectively convenient, shore supports structure is more simple efficient simultaneously, can save a large amount of time costs and financial cost.

Description

Low head assemble method and jig structure on a kind of Nuclear Safety shell
Technical field
The present invention relates to industrial mounting technique field, is a kind of nuclear power housing assemble method and jig structure specifically.
Background technology
CV containment is made up of the large assembly of bottom (head), lower cylinder, middle cylinder, top cylindrical shell and cover head 5, and material is SA738GrB.Main installation difficult point is in the assembling of upper low head, and upper low head internal diameter is 39624mm, height 11468mm, and each end socket is about 575T, and by 4 band compositions, be often with Spherical Tank Shell Plates quantity to be followed successively by 2,6,24 and 32 pieces, maximum veneer weight is about 10.5T.Because end socket diameter is large, Spherical Tank Shell Plates quantity is many, adopts assembled moulding bed assemble method in the past, uses some supporting legs, mesa-shaped reticulates support, then by the splicing of the coverboard of containment on moulding bed, utilize the ball pivot adjuster adjustment coverboard attitude on support, complete installation.The moulding bed of this method is complicated, has that difficulty of construction is large, the cycle long, high cost shortcoming, and adjusting device is overweight due to plate, often occurs regulating difficulty, the situation that even cannot regulate.Similar technology is the assembled moulding bed of a kind of AP1000 nuclear power dome as Chinese Patent Application No. 201320240731.4 discloses, comprise support dome ring beam along whole inner ring column circumferentially, support dome radial girders one end along whole outer ring column circumferentially, support the dome radial girders other end along whole concrete foundation circumferentially.Inner ring column and outer ring column form by two sections vertically, after dome body is assembled, are removed by the upper semisection of inner ring column and outer ring column, and inner ring column is connected by supporting bracket with the lower semisection of outer ring column; Support bracket and dome model calling.This technology adopts double-deck column, and cost is high, complex structure.
Summary of the invention
For solving the problems of the technologies described above, the object of this invention is to provide low head assemble method and jig structure on a kind of Nuclear Safety shell, concrete technical scheme is as follows:
Low head assemble method on a kind of Nuclear Safety shell, comprises the steps:
One. low head assemble method:
1) annular lower supporting rod braced structures is assembled;
Stanchion base arranges stone bolt, and slotted hole opened by pillar lower bolster, is convenient to adjust shore position, uses sky to hang and erects pillar and cylinder lever connecting rod, form closed loop cirque structure;
2) central post is erect;
Erect central post at annular brace center, central post divides two sections, with bolts, and upper central post arranges multiple hanger, lower end mat and ground slugging, ensures stability;
3) unwrapping wire; Total powerstation is set at the scene, measures shore position and by the tight knot adjustment shore position on pull bar, behind location, pillar lower bolster be welded fixing;
4) group is to equatorial zone; First be assembled with the coverboard of pier construction, then insert without pillar coverboard, and use locating piece to lock, by the chock adjustment group on locating piece to gap, repeat above step, until equatorial zone closes;
5) group is to lower temperate zone; Use sky to hang and lower temperate zone coverboard is lifted into precalculated position, connect dilatory between lower temperate zone coverboard and central post rope, adjustment coverboard angle, is connected with equatorial zone with locating piece after putting in place; After first piece of coverboard is in place, the coverboard of adjacent position is installed, adopts the method identical with first piece, be connected with equatorial zone and lastblock coverboard after in place; Repeat above step, until lower temperate zone closes; After lower temperate zone is closed, by the chock on adjustment locating piece, adjustment group, to gap, qualified rear dismounting lower temperate zone all draws rope;
6) group is to the dilatory rope in lower frigid zone and dismounting lower frigid zone; Assemble method is identical with lower temperate zone;
7) central post is removed; Central post is dismantled after installing and terminating by lower frigid zone, divides two sections and hangs dismounting with sky;
8) group is to bottom crown; After central post is removed, using sky to hang bottom crown hoisted in position, is lock with locating piece after adjusting to the right place; Same method installs another block bottom crown;
9) check assembled size, adjust seam; After overall package is in place, check integral assembling size, by the chock adjustment group on locating piece to gap, appearance and size, qualified rear preparation welding;
10) connection transportation support, jacking end socket, removes all the other pillars, transport;
Two. upper cover assemble method
Adopt the turned legs identical with low head pillar and central post, comprise the steps:
1) group is to equatorial zone; Group is to the front backing plate being with welding material identical with coverboard inside coverboard under the line, epimere pillar is welded afterwards on backing plate, the equatorial zone coverboard having welded epimere pillar is installed on hypomere pillar, the equator zone plate of adjacent struts is installed again, equator zone plate not with epimere pillar in the middle of last grafting, and, location fastening by locating piece, repeat above step, until equatorial zone closes;
2) upper temperature zone, upper frigid zone and top crown is assembled; Assembling mode is identical with low head, uses sky to hang and locates with coordinating of dilatory rope, by the chock adjustment assembly clearance of locating piece.
The present invention further discloses the jig structure realizing described method, comprise the lower supporting rod braced structures that annular is arranged and the central post being arranged on annular center position, described lower supporting rod braced structures comprises drag link, diagonal member, support column, and described support column is made up of hypomere pillar, epimere pillar; Described hypomere pillar is hydraulic lifting structure, and described drag link connects two adjacent support columns, and described diagonal member is that diagonal form is connected with adjacent two support columns; Described central post divides two sections, with bolts, and upper central post arranges multiple hanger, lower end mat and ground slugging, ensures stability.
Described support column quantity is 16.
Described connection hanger quantity is 24.
Advantage of the present invention is: the present invention can meet the requirement of containment construction, and the mode of employing central post adjustment coverboard can be more effectively convenient, and shore supports structure is more simple efficient simultaneously, can save a large amount of time costs and financial cost.
Accompanying drawing explanation
Fig. 1 is containment structure schematic diagram;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is annular lower supporting rod braced structures;
Rod structure centered by Fig. 4;
Fig. 5 is equatorial zone scheme of installation;
Fig. 6 is lower temperate zone scheme of installation;
Fig. 7 is lower frigid zone scheme of installation;
Fig. 8 is transport schematic diagram;
Fig. 9 is upper cover equatorial zone scheme of installation;
In figure, 1 is equatorial zone, 2 upper temperature zones, 3 is upper frigid zone, and 4 is upper pole band, and 5 is lower temperate zone, 6 is lower frigid zone, and 7 is lower pole band, and 8 is annular lower supporting rod braced structures, 81 is epimere pillar, and 82 is hypomere pillar, and 83 is drag link, 84 is diagonal member, post centered by 9, and 91 for connecting hanger, 92 is bolt, and 101 is hoist cable, and 811 is backing plate.
Detailed description of the invention
Illustrate the present invention below in conjunction with accompanying drawing, as shown in Figure 1, housing can be divided into following components: upper cover is equatorial zone, upper temperature zone, upper frigid zone, upper pole band, and low head is equatorial zone, lower temperate zone, lower frigid zone, lower pole band; As shown in Figure 2, each band forms by the housing of varying number;
As shown in Figure 3 and Figure 4, jig structure comprises the lower supporting rod braced structures that annular is arranged and the central post being arranged on annular center position, described lower supporting rod braced structures comprises drag link, diagonal member, support column, and described support column is made up of hypomere pillar, epimere pillar; Described hypomere pillar is hydraulic lifting structure, and described drag link connects two adjacent support columns, and described diagonal member is that diagonal form is connected with adjacent two pillars; Described central post divides two sections, with bolts, and upper central post arranges multiple rigidity adjusting yoke and connects hanger, lower end mat and ground slugging, ensures stability.Central post segment design can make the amount of deflection of steel column reduce, and is convenient to remove simultaneously.
In the present embodiment, described support column quantity is 16, and described connection hanger quantity is 24.According to different shell count, can make the appropriate adjustments.
As shown in Figure 5-Figure 8, the main construction process of low head comprises:
The annular lower supporting rod braced structures of 1.1 assembling.Stanchion base arranges stone bolt, and slotted hole opened by pillar lower bolster, is convenient to adjust shore position, uses sky to hang and erects pillar and cylinder lever connecting rod, form closed loop cirque structure.
1.2 erect central post.Central post is erect at annular brace center.Central post divides two sections, with bolts, and upper central post arranges 24 dilatory ropes and connects hanger, lower end mat and ground slugging, ensures stability.
1.3 unwrapping wire.Total powerstation is set at the scene, measures shore position and by the tight knot adjustment shore position on pull bar, behind location, pillar lower bolster be welded fixing.
1.4 groups to equatorial zone.First be assembled with the coverboard of pier construction, then insert without pillar coverboard, and use locating piece to lock, by the chock adjustment group on locating piece to gap, repeat above step, until leukorrhea with bloody discharge closes.
1.5 groups to lower temperate zone.Use sky to hang and lower temperate zone coverboard is lifted into precalculated position, connect dilatory between lower temperate zone coverboard and central post rope, by Chain block adjustment coverboard angle, be connected with equatorial zone with locating piece after putting in place.After first piece of coverboard is in place, the coverboard of adjacent position is installed, adopts the method identical with first piece, be connected with equatorial zone and lastblock coverboard after in place.Repeat above step, until lower temperate zone closes.
1.6 remove the dilatory rope of lower temperate zone.After lower temperate zone is closed, by the chock on adjustment locating piece, adjustment group, to gap, qualified rear dismounting lower temperate zone all draws rope.
1.7 groups to the dilatory rope in lower frigid zone and dismounting lower frigid zone.Assemble method is identical with lower temperate zone.
1.8 remove central post.Central post is dismantled after installing and terminating by lower frigid zone, divides two sections and hangs dismounting with sky.
1.9 groups to bottom crown.After central post is removed, using sky to hang bottom crown hoisted in position, with the Chain block adjustment on lifting rope, is lock with locating piece after putting in place.Same method installs another block bottom crown.
1.10 check assembled size, tune seam.After overall package is in place, check integral assembling size, by the chock adjustment group on locating piece to gap, appearance and size, qualified rear preparation welding.
1.11 about the consideration of transporting.As Fig. 8, black round dot is expressed as the pillar of band hydraulic structure, after integral solder terminates, utilize hydraulic means to remove on these four pillars, ensure that haulage vehicle enters, in figure, arrow represents haulage vehicle and support approach axis, connection transportation support afterwards, jacking end socket, removes all the other pillars, transport.
The main construction process of 2 upper cover
Adopt the turned legs identical with low head pillar and central post, comprise the steps:
1) group is to equatorial zone; As shown in Figure 9, group is to the front backing plate being with welding material identical with coverboard inside coverboard under the line, upper supporting column is welded afterwards on backing plate, the equatorial zone coverboard having welded upper supporting column is installed in lower supporting rod braced structures, the equator zone plate of adjacent struts is installed again, the equator zone plate not with upper supporting column in the middle of last grafting, and, location fastening by locating piece, repeat above step, until equatorial zone closes.Pillar separately establishes inclined support structure, coverboard location, equatorial zone and anti-deformation can be helped.
2) upper temperature zone, upper frigid zone and top crown is assembled; Assembling mode is identical with low head, uses sky to hang and locates with coordinating of dilatory rope, by the chock adjustment assembly clearance of locating piece.

Claims (4)

1. a low head assemble method on Nuclear Safety shell, is characterized in that comprising the steps:
One. low head assemble method:
1) annular lower supporting rod braced structures is assembled;
Stanchion base arranges stone bolt, and slotted hole opened by pillar lower bolster, is convenient to adjust shore position, uses sky to hang and erects pillar and cylinder lever connecting rod, form closed loop cirque structure;
2) central post is erect;
Erect central post at annular brace center, central post divides two sections, with bolts, and upper central post arranges multiple hanger, lower end mat and ground slugging, ensures stability;
3) unwrapping wire; Total powerstation is set at the scene, measures shore position and by the tight knot adjustment shore position on pull bar, behind location, pillar lower bolster be welded fixing;
4) group is to equatorial zone; First be assembled with the coverboard of pier construction, then insert without pillar coverboard, and use locating piece to lock, by the chock adjustment group on locating piece to gap, repeat above step, until equatorial zone closes;
5) group is to lower temperate zone; Use sky to hang and lower temperate zone coverboard is lifted into precalculated position, connect dilatory between lower temperate zone coverboard and central post rope, adjustment coverboard angle, is connected with equatorial zone with locating piece after putting in place; After first piece of coverboard is in place, the coverboard of adjacent position is installed, adopts the method identical with first piece, be connected with equatorial zone and lastblock coverboard after in place; Repeat above step, until lower temperate zone closes; After lower temperate zone is closed, by the chock on adjustment locating piece, adjustment group, to gap, qualified rear dismounting lower temperate zone all draws rope;
6) group is to the dilatory rope in lower frigid zone and dismounting lower frigid zone; Assemble method is identical with lower temperate zone;
7) central post is removed; Central post is dismantled after installing and terminating by lower frigid zone, divides two sections and hangs dismounting with sky;
8) group is to bottom crown; After central post is removed, using sky to hang bottom crown hoisted in position, is lock with locating piece after adjusting to the right place; Same method installs another block bottom crown;
9) check assembled size, adjust seam; After overall package is in place, check integral assembling size, by the chock adjustment group on locating piece to gap, appearance and size, qualified rear preparation welding;
10) connection transportation support, jacking end socket, removes all the other pillars, transport;
Two. upper cover assemble method
Adopt the turned legs identical with low head pillar and central post, comprise the steps:
1) group is to equatorial zone; Group is to the front backing plate being with welding material identical with coverboard inside coverboard under the line, epimere pillar is welded afterwards on backing plate, the equatorial zone coverboard having welded epimere pillar is installed on hypomere pillar, the equator zone plate of adjacent struts is installed again, equator zone plate not with epimere pillar in the middle of last grafting, and, location fastening by locating piece, repeat above step, until equatorial zone closes;
2) upper temperature zone, upper frigid zone and top crown is assembled; Assembling mode is identical with low head, uses sky to hang and locates with coordinating of dilatory rope, by the chock adjustment assembly clearance of locating piece.
2. one kind realizes the jig structure of method described in claim 1, it is characterized in that: comprise the lower supporting rod braced structures that annular is arranged and the central post being arranged on annular center position, described lower supporting rod braced structures comprises drag link, diagonal member, support column, and described support column is made up of hypomere pillar, epimere pillar; Described hypomere pillar is hydraulic lifting structure, and described drag link connects two adjacent support columns, and described diagonal member is that diagonal form is connected with adjacent two support columns; Described central post divides two sections, with bolts, and upper central post arranges multiple hanger, lower end mat and ground slugging, ensures stability.
3. structure according to claim 2, is characterized in that: described support column quantity is 16.
4. structure according to claim 2, is characterized in that: described connection hanger quantity is 24.
CN201410143778.8A 2014-04-11 2014-04-11 Low head assemble method and jig structure on a kind of Nuclear Safety shell Expired - Fee Related CN103883132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410143778.8A CN103883132B (en) 2014-04-11 2014-04-11 Low head assemble method and jig structure on a kind of Nuclear Safety shell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410143778.8A CN103883132B (en) 2014-04-11 2014-04-11 Low head assemble method and jig structure on a kind of Nuclear Safety shell

Publications (2)

Publication Number Publication Date
CN103883132A CN103883132A (en) 2014-06-25
CN103883132B true CN103883132B (en) 2016-01-13

Family

ID=50952231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410143778.8A Expired - Fee Related CN103883132B (en) 2014-04-11 2014-04-11 Low head assemble method and jig structure on a kind of Nuclear Safety shell

Country Status (1)

Country Link
CN (1) CN103883132B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105014251A (en) * 2015-08-12 2015-11-04 上海核工程研究设计院 Auxiliary equipment
CN105133881B (en) * 2015-09-10 2017-07-07 中核能源科技有限公司 HTGR Nuclear Power Plant containment bracket section wall body module method of construction
CN106013815B (en) * 2016-05-24 2019-07-09 中国核工业二三建设有限公司 The short supporting leg mounting tool of steel containment vessel of nuclear power station bottom (head) and installation method
CN106141476B (en) * 2016-07-22 2018-06-29 中国化学工程第三建设有限公司 A kind of assemble method of super-large diameter without ribbed stiffener thin-wall semi top seal closure
CN107093472B (en) * 2017-05-03 2019-03-01 中国核工业第五建设有限公司 The assemble method of steel containment vessel and its end socket in AP1000 nuclear power station
CN107824997B (en) * 2017-10-31 2020-10-16 武汉一冶钢结构有限责任公司 Method for mounting asymmetric equatorial belt shell plate
CN110145031A (en) * 2019-06-03 2019-08-20 重庆宝汇钢结构工程有限公司 A kind of major diameter slab steel construction hollow ball and preparation method thereof
CN114986445B (en) * 2022-06-09 2023-12-01 浙江东南网架股份有限公司 Factory assembling method for spherical reticulated shell dome structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05287811A (en) * 1992-04-08 1993-11-02 Mamoru Kawaguchi Dome shaped roof structure
CN101967886A (en) * 2010-11-16 2011-02-09 中国核工业第五建设有限公司 Assembly and installation methods of steel containment vessel of nuclear power station
CN102535870A (en) * 2011-12-30 2012-07-04 大连理工大学 Tooling support for assembling and transporting nuclear-power containment-vessel cover head
CN102700870A (en) * 2011-10-11 2012-10-03 国家核电技术有限公司 Seal head module, large container and method for manufacturing seal head module and large container
CN103015737A (en) * 2012-12-28 2013-04-03 中国核工业第五建设有限公司 Method for mounting steel containment cofferdam of nuclear power plant

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05287811A (en) * 1992-04-08 1993-11-02 Mamoru Kawaguchi Dome shaped roof structure
CN101967886A (en) * 2010-11-16 2011-02-09 中国核工业第五建设有限公司 Assembly and installation methods of steel containment vessel of nuclear power station
CN102700870A (en) * 2011-10-11 2012-10-03 国家核电技术有限公司 Seal head module, large container and method for manufacturing seal head module and large container
CN102535870A (en) * 2011-12-30 2012-07-04 大连理工大学 Tooling support for assembling and transporting nuclear-power containment-vessel cover head
CN103015737A (en) * 2012-12-28 2013-04-03 中国核工业第五建设有限公司 Method for mounting steel containment cofferdam of nuclear power plant

Also Published As

Publication number Publication date
CN103883132A (en) 2014-06-25

Similar Documents

Publication Publication Date Title
CN103883132B (en) Low head assemble method and jig structure on a kind of Nuclear Safety shell
CN203846786U (en) Nuclear power containment upper end socket and lower end socket assembly jig frame structure
CN102359303B (en) Extra-high voltage common circuit iron tower assembling method
CN102359302B (en) Extra-high voltage large-span iron tower assembling method
CN102689736B (en) Special supporting device of cover head of nuclear island containment vessel made of steel and transportation method
CN102505846B (en) Steel pipe column bearing table girder connection construction method
CN102674136A (en) Lifting method for large-scale tower equipment
CN102146729B (en) Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN109958195A (en) A kind of nuclear power station heap container supporting embedded part construction method
CN104481194B (en) A kind of flip-chip method of vertical type tubular equipment
CN205973618U (en) Shell ring hoisting device in chimney
CN203639095U (en) Inner-side-column lifting device for reverse installation method
CN106141476A (en) A kind of super-large diameter is without the assemble method of ribbed stiffener thin-wall semi top seal closure
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN101693329A (en) Pairing welding device for oil storage tanks and method thereof
CN202658590U (en) Integral assembled drilling platform
CN201703776U (en) Inverted lifting device of storage tank
CN202296815U (en) Hoisting support rod for large-tonnage large-span structure
CN205741942U (en) A kind of great cantilever chooses arm pier cap beam segmental timbering
CN210483094U (en) Inverted triangular pipe truss lifting device
CN205638804U (en) Wind power tower cylinder protects bearing structure
CN202655839U (en) Movable pipe truss assembling clamping fixture
CN105350698A (en) Large-span dome installation construction method
CN202055506U (en) Umbrella-shaped platform easy to assemble and disassemble for top construction in spherical container
CN105417422B (en) A kind of packaged type independence derrick mast hoisting device and its hanging method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20200411