CN103879523A - Drilling ship - Google Patents

Drilling ship Download PDF

Info

Publication number
CN103879523A
CN103879523A CN201410074065.0A CN201410074065A CN103879523A CN 103879523 A CN103879523 A CN 103879523A CN 201410074065 A CN201410074065 A CN 201410074065A CN 103879523 A CN103879523 A CN 103879523A
Authority
CN
China
Prior art keywords
drilling
platform
drilling well
pedestal
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410074065.0A
Other languages
Chinese (zh)
Inventor
王春涛
郑银萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201410074065.0A priority Critical patent/CN103879523A/en
Publication of CN103879523A publication Critical patent/CN103879523A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention belongs to the field of construction equipment for offshore drilling operation and discloses a drilling ship which comprises floating ship bodies, windlasses, propellers, uprights, connecting cross beams, a cockpit, a helicopter platform, a drilling tower, tower cranes, a machine platform framework, a drilling base and a drilling platform. Each floating ship body is of a hollow closed-type ship body structure, four propellers are arranged under each floating ship body, two uprights are welded on each floating ship body and connected through one connecting cross beam, the drilling base is built at the tops of the uprights, four sets of windlasses are arranged on the left side and the right side of the drilling base, the tower cranes are arranged the left side and the right side of the drilling base, the cockpit is built on the drilling base, the helicopter platform is arranged at the top of the cockpit and arranged overhead the drilling base through the machine platform framework, the drilling platform is fixed on a wellhead in the middle of the drilling base, and the drilling tower is mounted on the drilling platform. By the drilling ship, the problems of huge difficulty and extremely high cost in building a base-type platform at an abyssal area and proneness to causing huge loss due to the fact that low-grade ore is mined after the platform is built are solved.

Description

Drilling ship
Technical field
The present invention relates to drilling ship, belong to the preparation of construction field of Offshore Operation.
Background technology
At present China's oil problem in short supply has become increasingly conspicuous has become the state of second largest energy resource consumption in the world, China's oil is consumed external interdependency and has been reached 49%, and the Growth of Consumption impetus is still continuing, account for 1/3rd of China's oil total resources according to statistics China of National Energy Board south sea petroleum geology storage capacity, and substantially belong to abyssal area, the technology that country does not have moulding in abyssal area, the South Sea is at present to the basic base type platform that uses of its exploitation, jack-up platform is exploited offshore oil, extremely difficult owing to building base type platform or jack-up platform in abyssal area, investment cost is tens times of shoal water zone, and blindly build base type platform in abyssal area and exploit and very easily adopt lean ore and cause great loss.The problem of encountering in order to solve current China's mining depth sea area oil, need to develop a energy and be applicable to abyssal area applicable neritic area, relatively cheap, the safe and reliable novel offshore oil exploitation equipment of cost again.
Summary of the invention
The object of this invention is to provide drilling ship.
The problem to be solved in the present invention be build in abyssal area that base type platform is extremely difficult and expense is high, built platform after exploitation easily cause the problem of great loss to lean ore.
For realizing object of the present invention, the technical solution used in the present invention is:
Drilling ship, comprise pontoon body, windlass, propelling unit, column, connecting cross beam, driving compartment, helicopter platform, drilling well pylon, tower crane, board skeleton, drilling well pedestal and drilling platform, described pontoon body is the closed hull steel structure of hollow, pontoon body has two, under each pontoon body, there are four propelling units, propelling unit is arranged on each two of stem and ship stern, on each pontoon body, be welded with two root posts, between column, be connected and fixed by connecting cross beam, column top has drilling well pedestal, the drilling well pedestal left and right sides is provided with 4 groups of windlass altogether, the drilling well pedestal left and right sides is also provided with tower crane and facilitates carrying and the transfer of mechanical equipment, driving compartment is built on drilling well pedestal, driving compartment top is provided with helicopter platform, helicopter platform is maked somebody a mere figurehead on drilling well pedestal by board skeleton, board skeleton is formed by shaped steel assembly welding, drilling well pedestal is provided with multiple well heads, in the middle of drilling well pedestal, on well head, be fixed with drilling platform, drilling well pylon is housed on drilling platform, it is firm that drilling well pylon is connected into grid structure safety by steel welding.
Propelling unit is 360 ° of full circle swinging types, and propelling unit is streamlined reefer housing in addition; Windlass is to drag three units; Drilling well pylon maximum height is 30 meters.
Advantage of the present invention is: adopt pontoon body to solve as the carrier of drilling ship difficulty and trouble that exploitation offshore oil need be built base type platform completely, pontoon body is can be shifted and recycle the waste that can not cause up-front investment completely after the drilling ship of carrier is once built, drilling well pedestal is fixed the demand that has not only met marine drilling and has been met simultaneously the demand of structural strength by column and connecting cross beam, on drilling well pedestal, adopt 4 group one to drag the windlass of three units to locate completely pontoon body, on drilling ship, be also provided with helicopter platform and facilitate crew's investigation and on and off duty.
Accompanying drawing explanation
Fig. 1 is drilling ship integral structure figure of the present invention;
Fig. 2 is drilling ship local structural graph of the present invention;
In figure: 1, pontoon body 2, windlass 3, propelling unit 4, column 5, connecting cross beam 6, driving compartment 7, helicopter platform 8, drilling well pylon 9, tower crane 10, board skeleton 11, drilling well pedestal 12 drilling platform.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is further illustrated.
Drilling ship of the present invention, comprise pontoon body 1, windlass 2, propelling unit 3, column 4, connecting cross beam 5, driving compartment 6, helicopter platform 7, drilling well pylon 8, tower crane 9, board skeleton 10, drilling well pedestal 11 and drilling platform 12, described pontoon body 1 is the closed hull steel structure of hollow, pontoon body 1 has two, adopt pontoon body 1 to solve as the carrier of drilling ship difficulty and trouble that exploitation offshore oil need be built base type platform completely, the drilling ship that pontoon body 1 is carrier can be shifted and recycle the waste that can not cause up-front investment completely after once building, each pontoon body has for 1 time the propelling unit 3 of 360 ° of full circle swinging types of four tyre streamlined reefer housings that power resources are provided, propelling unit 3 is arranged on each two of stem and ship stern, on each pontoon body 1, be welded with two root posts 4, between column 4, be connected and fixed by connecting cross beam 5, column 4 tops have drilling well pedestal 11, drilling well pedestal 11 left and right sides are provided with altogether 4 group one and drag the windlass 2 of three units to locate completely pontoon body 1, drilling well pedestal 11 left and right sides are also provided with tower crane 9 and facilitate carrying and the transfer of mechanical equipment, driving compartment 6 is built on drilling well pedestal 11, driving compartment 6 tops are provided with helicopter platform 7 and facilitate crew's investigation and on and off duty, helicopter platform 7 is maked somebody a mere figurehead on drilling well pedestal 11 by board skeleton 10, board skeleton 10 is formed by shaped steel assembly welding, drilling well pedestal 11 is provided with multiple well heads, in the middle of drilling well pedestal 11, on well heads, is fixed with drilling platform 12, and drilling well pylon 8 is housed on drilling platform 12, and drilling well pylon 8 maximum heights are 30 meters, and to be connected into grid structure safety by steel welding firm.
Using method of the present invention: the oil production point having surveyed is sailed to or be pulled to towboat to drilling ship, after determining exploitation coordinate, cast anchor pontoon body 1 is fixed with windlass 2, utilize on request drilling well pylon 8 to carry out drilling well according to drilling well step, encountering heavy machinery can utilize to take and lift up into row lifting, unit staff investigate or helicopter platform 7 use the helicopters that utilize on and off duty on and off duty, can utilize pontoon body 1 construction that is shifted again to carry out offshore oil exploitation if recovery process runs into the phenomenon such as lean ore or quick-fried ore deposit; Therefore the present invention has applicable abyssal area and is applicable to again the advantages such as neritic area, cost be relatively cheap, safe and reliable.

Claims (4)

1. drilling ship, comprise pontoon body (1), windlass (2), propelling unit (3), column (4), connecting cross beam (5), driving compartment (6), helicopter platform (7), drilling well pylon (8), tower crane (9), board skeleton (10), drilling well pedestal (11) and drilling platform (12), it is characterized in that: described pontoon body (1) is the closed hull steel structure of hollow, pontoon body (1) has two, under each pontoon body (1), there are four propelling units (3), propelling unit (3) is arranged on each two of stem and ship stern, on each pontoon body (1), be welded with two root posts (4), between column (4), be connected and fixed by connecting cross beam (5), column (4) top has drilling well pedestal (11), drilling well pedestal (11) left and right sides is provided with 4 groups of windlass (2) altogether, drilling well pedestal (11) left and right sides is also provided with tower crane (9), driving compartment (6) is built on drilling well pedestal (11), driving compartment (6) top is provided with helicopter platform (7), helicopter platform (7) is maked somebody a mere figurehead on drilling well pedestal (11) by board skeleton (10), board skeleton (10) is formed by shaped steel assembly welding, drilling well pedestal (11) is provided with multiple well heads, in the middle of drilling well pedestal (11), on well head, be fixed with drilling platform (12), drilling well pylon (8) is housed on drilling platform (12), drilling well pylon (8) is connected into grid structure by steel welding.
2. drilling ship according to claim 1, is characterized in that: described propelling unit (3) is 360 ° of full circle swinging types, and propelling unit (3) is streamlined reefer housing in addition.
3. drilling ship according to claim 1, is characterized in that: described windlass (2) is to drag three units.
4. drilling ship according to claim 1, is characterized in that: described drilling well pylon (8) maximum height is 30 meters.
CN201410074065.0A 2014-03-03 2014-03-03 Drilling ship Pending CN103879523A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410074065.0A CN103879523A (en) 2014-03-03 2014-03-03 Drilling ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410074065.0A CN103879523A (en) 2014-03-03 2014-03-03 Drilling ship

Publications (1)

Publication Number Publication Date
CN103879523A true CN103879523A (en) 2014-06-25

Family

ID=50948724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410074065.0A Pending CN103879523A (en) 2014-03-03 2014-03-03 Drilling ship

Country Status (1)

Country Link
CN (1) CN103879523A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3949693A (en) * 1974-05-02 1976-04-13 Erno Raumfahrttechnik Gmbh Partially submerged floating platform
US4063650A (en) * 1976-02-02 1977-12-20 Exxon Production Research Company Equipment handling system
CN1404452A (en) * 2000-02-02 2003-03-19 弗里德-戈德曼有限公司 Dynamically positioned semi-submersible drilling vessel with slender horizontal braces
CN102137973A (en) * 2007-09-13 2011-07-27 迪埃特斯瓦勒公司 Method for installing a drilling apparatus on a rig and for preparing drilling operations
CN103158838A (en) * 2013-03-18 2013-06-19 中集海洋工程研究院有限公司 Split-type drilling ship and manufacturing method of the same
CN203844976U (en) * 2014-03-03 2014-09-24 浙江海洋学院 Novel offshore drilling ship

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3949693A (en) * 1974-05-02 1976-04-13 Erno Raumfahrttechnik Gmbh Partially submerged floating platform
US4063650A (en) * 1976-02-02 1977-12-20 Exxon Production Research Company Equipment handling system
CN1404452A (en) * 2000-02-02 2003-03-19 弗里德-戈德曼有限公司 Dynamically positioned semi-submersible drilling vessel with slender horizontal braces
CN102137973A (en) * 2007-09-13 2011-07-27 迪埃特斯瓦勒公司 Method for installing a drilling apparatus on a rig and for preparing drilling operations
CN103158838A (en) * 2013-03-18 2013-06-19 中集海洋工程研究院有限公司 Split-type drilling ship and manufacturing method of the same
CN203844976U (en) * 2014-03-03 2014-09-24 浙江海洋学院 Novel offshore drilling ship

Similar Documents

Publication Publication Date Title
CN203544335U (en) Semisubmersible living platform
CN102107720B (en) Marine fan integrated setting system
CN101804849B (en) Construction program of semi-submersible platform for offshore oil and gas development
CN203345167U (en) Movable jack-up artificial island
CN103939300B (en) A kind of complete offshore wind power machine installation method
CN103925172A (en) Integral mounting assisting device and mounting method for tension leg type offshore floating wind turbine
CN102862656A (en) Modular above-water platform
CN104805821B (en) Marine oil field natural gas compressing processes jack-up unit
CN205221016U (en) A light -duty assembly platform device for wave energy electricity generation
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
CN202911923U (en) Combined energy source boat
CN203844976U (en) Novel offshore drilling ship
CN104260828A (en) Method for lifting extra-large type bow portion total segment
CN103979081B (en) The marine buoyant wind machine integral installation workboat of deep drinking water
CN201817802U (en) Ocean platform hydraulic lifting device
CN103482025A (en) Novel inwards rotation tower single-point mooring device
CN203497133U (en) Single-point mooring apparatus of novel inner turret
WO2024008211A1 (en) Alternate stepping deep-sea mining system and method based on clean energy platform
CN202863729U (en) Modularization abovewater platform
CN202879763U (en) Stabilizing system for marine engineering working/living multifunctional vessel
CN203410602U (en) Maritime ship repair platform
CN104554639A (en) Installation equipment for large offshore wind power equipment
CN202064291U (en) Traveling construction supporting pier with floating and sinking functions
CN103879523A (en) Drilling ship
CN202966598U (en) Novel bottom-supported marine wind turbine mounting barge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140625

RJ01 Rejection of invention patent application after publication