CN103871518B - 一种核电厂超温超功率保护温差信号处理方法 - Google Patents
一种核电厂超温超功率保护温差信号处理方法 Download PDFInfo
- Publication number
- CN103871518B CN103871518B CN201210540938.3A CN201210540938A CN103871518B CN 103871518 B CN103871518 B CN 103871518B CN 201210540938 A CN201210540938 A CN 201210540938A CN 103871518 B CN103871518 B CN 103871518B
- Authority
- CN
- China
- Prior art keywords
- temperature signal
- calibration
- power
- time
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Abstract
本发明属于电厂反应堆冷却剂系统过程测量技术,具体公开了一种核电厂超温超功率保护温差信号处理方法。通过采集需校准的主回路温差信号,利用其平均值和功率平均值,得出温差校准增益系数,从而对测得的主回路温差信号进行校准,在调试期间,当热功率升至75%F~100%FP条件下,校准温差信号通道设置校准系数,利于操作员直观的比较校准前与校准后的温差信号值,同时保证了通道校准的准确性,确保超温超功率停堆保护功能的有效性,提高了电厂的安全性和经济性。
Description
技术领域
本发明属于电厂反应堆冷却剂系统过程测量技术,具体涉及一种温差信号处理方法。
背景技术
在核电厂中,反应堆保护系统设置超温ΔT和超功率ΔT保护通道用来保护堆芯安全,防止在I类工况(正常运行和运行瞬变工况下预计不发生燃料损伤)和II类工况(事故后反应堆可以转入安全状态,只有一小部分燃料元件受损,事故中释出的放射性应当对公众不构成威胁)下堆芯发生偏离泡核沸腾(DNB)和燃料棒中心熔化。超温ΔT保护用以保护堆芯以防止出现DNB;超功率ΔT保护则用以保护堆芯以防止出现超线功率密度引起燃料棒中心熔化。超温ΔT和超功率ΔT紧急停堆保护通道是由多个测量信号所组成的保护定值通道,其中,反应堆冷却剂系统主回路冷热段温差信号转换为功率信号后作为超温超功率实测值,与平均温度信号、冷却剂压力及轴向功率偏差等信号共同计算得出的超温超功率设定值进行比较从而产生超温超功率停堆保护信号。主回路冷热段温差信号作为超温超功率保护通道的重要参数,核电厂在调试期间需要在功率升至75%FP与满功率100%FP时对该测量通道进行校准试验,以保证反应堆功率与各环路主回路温度的对应一致性。
在调试校准试验前,各环路的主回路温差信号ΔTi为:
ΔTi=(T热i-T冷i),其中T冷i为该环路的冷段温度,T热i为该环路的热段温度,i=1……m,m为环路个数。
在调试校准试验后,需根据校准公式重新对该环路的温差信号进行系数设置,校准后的温差信号ΔTi’为
ΔTi’=K*(T热i-T冷i)+α,其中,K为温差信号的增益,α为温差信号的偏置。
在校准后温差信号就转换为功率信号参与后续超温超功率保护计算。但在电厂运行时,操作员还需要记录温差温度值,但是校准后操作员只能实时观测到功率值。
在采用模拟技术的核电厂中,信号通过硬件进行处理,进行反应堆冷却剂温度测量通道校准调试试验校准后直接将新的偏置与增益系数设置到温差信号计算组件中,但设置后操作员就无法直观获得校准前的温差信号值。如果为操作员提供便利,在温差信号组件后再增加组件设置新的校准系数,又由于新增加硬件会影响通道的精度与响应时间,对于超温超功率保护是不利的。因此模拟技术核电厂中,在校准试验后,操作员就无法实时监测到温差温度数据,需通过冷热段温度计算才能获取。
随着数字化技术的广泛应用,目前国内绝大多数在建的核电厂均采用了全数字化的DCS仪控平台。信号采集后全部通过软件进行处理,因此就使得在温差信号的计算模块后增加软件处理模块设置调试试验温差信号校准系数的方案变得可行,而不会影响通道的精度与响应时间并便于操作员记录与分析。
此外,基于模拟技术的核电厂在调试时升功率期间对温差信号通道进行校准时,由于测量通道中传输信号均为电量,对于温差信号的校准公式如下:
S=g*(E1-E2)+Vp
其中,S为温差信号输出电压信号,E1与E2分别为冷热段电阻温度计输出电压信号,g与Vp分别为温差信号加法组件的增益与偏置。当测得温差信号为0℃时,输出电压为0V,则得出偏置Vp为零。当温差信号为ΔTe时,输出为在满功率(100%FP)下的额定电压值,据此可解出增益g。ΔTe为在特定功率平台下外推得到的各环路温差平均值与功率平均值的比值乘以系数。
对于使用数字化技术的核电厂,由于测量通道中传输信号均为实际值,而非电量,因此适用于模拟技术核电厂调试试验时的温差信号校准算法就不再适用于数字化核电厂。因此需开发一种新的校准算法。
发明内容
本发明的目的在于针对调试试验时数字化核电厂超温超功率保护通道,提供一种核电厂超温超功率保护温差信号处理方法。
实现本发明的技术方案如下:
一种核电厂超温超功率保护温差信号处理方法,它包括如下步骤:
1)当核功率升至a%FP后,对主回路温差信号进行n次测量,每次测量的温差为(ΔTa)i,其中i=1,2,……,n,a在区间[75,100]内;
2)利用下式,确定核功率升至a%FP后,n次测量的温差平均值
3)利用下式,确定所测量的n次温差信号的功率平均值(Pa)平均
其中,(Pa)i为当核功率升至a%FP后,主回路温差信号经过n次测量,每次测量时的核功率值;
4)利用下式确定满功率100%FP时的平均值(ΔT100)e
其中,K′为焓的非线性变化系数,当核功率为100%FP时,K′为1;
5)利用下式,确定温差校准增益系数A;
其中,ΔTnom为满功率时的额定温差值
6)利用下式确定校准后的每次测量的温差信号值
本发明所取得的有益效果如下:通过采集需校准的主回路温差信号,利用其平均值和功率平均值,得出温差校准增益系数,从而对测得的主回路温差信号进行校准,在调试期间,当热功率升至75%F~100%FP条件下,校准温差信号通道设置校准系数,利于操作员直观的比较校准前与校准后的温差信号值,同时保证了通道校准的准确性,确保超温超功率停堆保护功能的有效性,提高了电厂的安全性和经济性。
具体实施方式
下面结合具体实施例对本发明进行详细的描述。
主回路冷热段温度经DCS(Distributed Control System数字化仪表控制系统—集散控制系统)采集后通过软件进行后续如滤波、校准、等信号处理后,经减法模块计算得出温差信号,再设置校准模块对温差信号进行处理。校准模块的函数式设置为:
ΔTi’=A*ΔTi+B。
其中ΔTi为输入,ΔTi’为输出,A与B为校准函数增益与偏置,由于校准前后温差零点是一致的,因此,偏置B=0。
在核电厂调试期间,当核功率升至75%FP以上时,需校准主回路温差信号。假设某环路的温差信号在特定功率平台p做了n次测量,每次测量的温差为(ΔTa)i,a为[75,100],其中i=1,2,……,n。
实施例1
1)核功率升至75%FP,主回路温差信号经过n次测量的温差平均值。
其中,(ΔT75)i为当核功率升至75%FP时,主回路温差信号经过n次测量,每次测量的温差值;
2)确定所测量的n次温差信号的功率平均值(P75)平均
其中,(P75)i为当核功率升至75%FP时,主回路温差信号经过n次测量,每次测量时的核功率值;
3)利用下式确定满功率时的温差信号(ΔT100)e
其中,K′为焓的非线性变化系数。
4)利用下式,确定核功率升至75%FP时的温差校准增益系数A;
其中,ΔTnom为满功率时的额定温差值。
5)确定当核功率升至75%FP时,校准后的每次测量的温差信号值
实施例2
1)确定核功率升至100%FP,主回路温差信号经过n次测量的温差平均值。
其中,(ΔT100)i为当核功率升至100%FP时,主回路温差信号经过n次测量,每次测量的温差值;
2)确定所测量的n次温差信号的功率平均值(P100)平均
其中,(P100)i为当核功率升至100%FP时,主回路温差信号经过n次测量,每次测量时的核功率值;
3)利用下式,确定满功率100%FP时的平均值(ΔT100)e
此时,K′为1;
4)确定当核功率升至100%FP时的温差校准增益系数A
其中,ΔTnom为满功率时的额定温差值
5)确定当核功率升至100%FP时,校准后的每次测量的温差信号值
显然,本领域的技术人员可以对本发明进行各种改动和变型而不脱离本发明的精神和范围。倘若这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。
Claims (1)
1.一种核电厂超温超功率保护温差信号处理方法,其特征在于,它包括如下步骤:
1)当核功率升至a%FP后,对主回路温差信号进行n次测量,每次测量的温差为(ΔTa)i,其中i=1,2,……,n,a在区间[75,100]内;
2)利用下式,确定核功率升至a%FP后,n次测量的温差平均值
3)利用下式,确定所测量的n次温差信号的功率平均值(Pa)平均
其中,(Pa)i为当核功率升至a%FP后,主回路温差信号经过n次测量,每次测量时的核功率值;
4)利用下式确定满功率100%FP时的平均值(ΔT100)e
其中,P100表示满功率额定值
其中,K′为当核功率升至100%FP时如何校准主回路温差信号,当核功率为100%FP时,K′为1;
5)利用下式,确定温差校准增益系数A;
其中,ΔTnom为满功率时的额定温差值
6)利用下式确定校准后的每次测量的温差信号值
(ΔT′a)i=A×(ΔTa)i,i=1,2,…,n。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210540938.3A CN103871518B (zh) | 2012-12-14 | 2012-12-14 | 一种核电厂超温超功率保护温差信号处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210540938.3A CN103871518B (zh) | 2012-12-14 | 2012-12-14 | 一种核电厂超温超功率保护温差信号处理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103871518A CN103871518A (zh) | 2014-06-18 |
CN103871518B true CN103871518B (zh) | 2016-08-31 |
Family
ID=50909957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210540938.3A Active CN103871518B (zh) | 2012-12-14 | 2012-12-14 | 一种核电厂超温超功率保护温差信号处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103871518B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106448775B (zh) * | 2016-09-23 | 2018-09-11 | 中广核工程有限公司 | 一种核电站反应堆保护系统安全参数监控装置与方法 |
CN107195347A (zh) * | 2017-06-23 | 2017-09-22 | 中国核动力研究设计院 | 一种校准堆外核测电离室的方法 |
CN111261306A (zh) * | 2020-01-22 | 2020-06-09 | 中国核动力研究设计院 | 一种核电厂反应堆冷却剂热段温度的测量方法及系统 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1500238A (zh) * | 2001-03-29 | 2004-05-26 | ��ʯ��ģ��Ӧ��(˽��)����˾ | 控制核反应堆出口温度的方法和控制系统 |
CN103869846A (zh) * | 2012-12-14 | 2014-06-18 | 中国核动力研究设计院 | 一种主回路冷热段平均温度信号处理方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6395391A (ja) * | 1986-10-09 | 1988-04-26 | 株式会社東芝 | 加圧水型原子炉 |
-
2012
- 2012-12-14 CN CN201210540938.3A patent/CN103871518B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1500238A (zh) * | 2001-03-29 | 2004-05-26 | ��ʯ��ģ��Ӧ��(˽��)����˾ | 控制核反应堆出口温度的方法和控制系统 |
CN103869846A (zh) * | 2012-12-14 | 2014-06-18 | 中国核动力研究设计院 | 一种主回路冷热段平均温度信号处理方法 |
Non-Patent Citations (3)
Title |
---|
压水堆运行中△T超温度/超功率保护分析;张大发;《海军工程大学学报》;20011031;第13卷(第5期);第9-12页 * |
基于非线性温-焓对应关系的非共沸制冷剂评价;赵力 高攀;《中国科学 E辑 技术科学》;20061231;第36卷(第5期);第569-578页 * |
数字化核电厂反应堆冷却剂温度测量通道校准试验研究;霍雨佳 等;《核动力工程》;20150430;第36卷(第2期);第77-80页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103871518A (zh) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106128529B (zh) | 一种堆芯三维功率分布的在线测量方法 | |
JPH11264887A (ja) | 原子炉核計装システム、このシステムを備えた原子炉出力分布監視システムおよび原子炉出力分布監視方法 | |
CN103869846B (zh) | 一种主回路冷热段平均温度信号处理方法 | |
Coble et al. | A review of sensor calibration monitoring for calibration interval extension in nuclear power plants | |
CN103195583B (zh) | 一种采用排气温度分散度监测保护燃气轮机燃烧的方法 | |
KR100991441B1 (ko) | 원자력발전소 노외계측기의 재규격화 교정방법 | |
CN103871518B (zh) | 一种核电厂超温超功率保护温差信号处理方法 | |
CN106448775B (zh) | 一种核电站反应堆保护系统安全参数监控装置与方法 | |
CN105247620A (zh) | 用于堆芯监测和保护的混合反应堆堆芯内探测器组件 | |
Li et al. | Development and validation of a PWR on-line power-distribution monitoring system NECP-ONION | |
In et al. | Assessment of core protection and monitoring systems for an advanced reactor SMART | |
Jabbari et al. | Power calculation of VVER-1000 reactor using a thermal method, applied to primary–secondary circuits | |
RU2312374C2 (ru) | Способ градуировки канала измерения плотности нейтронного потока в ядерном реакторе в абсолютных единицах мощности | |
KR102508733B1 (ko) | 즉발형 노내핵계측기 신호 보정 시스템 및 그 방법 | |
Antonopoulos-Domis et al. | Moderator temperature coefficient of reactivity in Pressurized Water Reactors: theoretical investigation and numerical simulations | |
Tsypin et al. | 16N γ-ray diagnostics of a nuclear reactor in a nuclear power plant | |
Zhang et al. | Study on the Method for the Safety-Related Instrument Calibration Periodic Test Interval Extension of Nuclear Power Unit With Digital I&C System Based on Setpoint and Uncertainty Analysis | |
Skifton | High-Temperature Irradiation-Resistant Thermocouple (HTIR-TC) Qualification Work | |
Alekseev et al. | Outcomes of the “steady-state crisis” experiment in the MIR reactor channel | |
Sweeney et al. | Relationship of core exit-temperature noise to thermal-hydraulic conditions in PWRs | |
Hashemian et al. | I&C System Sensors for Advanced Nuclear Reactors | |
El’shin et al. | Experimental Neutronics Investigations of Nuclear Propulsion Reactors on Prototype Test Bases | |
Webb et al. | Comparison of CECOR algorithm to Lagrange multiplier method to estimate reactor power distributions | |
Antila et al. | Recent improvements in on-line core supervision at Loviisa NPP | |
Fan et al. | Algorithm Research of the ICCMS for Qinshan Phase II NPP Based on FirmSys Platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |