A kind of seismic reflector method of closing Download PDFInfo
- Publication number
- CN103869356B CN103869356B CN201210530093.XA CN201210530093A CN103869356B CN 103869356 B CN103869356 B CN 103869356B CN 201210530093 A CN201210530093 A CN 201210530093A CN 103869356 B CN103869356 B CN 103869356B
- Authority
- CN
- China
- Prior art keywords
- seismic
- guan
- value
- mis
- trace data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention is to make the same seismic reflector method of closing of different directions identification in oil exploration, each seismic channel reflecting interface locus is identified by main profile direction is mutual on a plurality of seismic profile, setting-out on a plurality of seismic profile, mutual each seismic channel reflecting interface locus of mark, by the sequencing of seismic channel, adjacent seismic channel per pass time value is subtracted each other, obtain closing difference, adjacent for seismic channel Guan Bi difference is subtracted each other and obtains two mis-tie misclosure sudden change values, if mis-tie misclosure sudden change value is more than marginal value, the neighboring track then repaired is suddenlyd change and identifies, until the seismic reflector in whole work area is fully completed, and without Guan Bi vestige.The present invention can recognize that Depth Domain seismic data or time domain seismic data, is recorded in real time at different directions seismic reflector mark and it is eliminated in real time, improve work efficiency during identifying.
Description
Technical field
The present invention is petroleum exploration field seismic reflector identification technology, be a kind of make different directions identification samely
Shake reflecting interface method of closing.
Background technology
In petroleum and natural gas seismic prospecting, the seismic data formed after frequently with 3-D seismics information processing carries out ground
The identification of shake reflecting interface.These interfaces can be reflected by the waveform of seismic wave, forms seismic reflector.Ground
The identification of shake reflecting interface has a variety of method, the most frequently used recognition methods to be the seismic data of earthquake-capturing to be drawn
Become seismic profile, by manually identifying the seismic reflector reflected by seismic data on seismic profile.Wherein,
3-D seismics wave datum stores in the 3 D stereo mode of rule, and horizontal direction presses line, road arrangement, a 3-D seismics
Data have some lines, if having arterial highway on every line;The point data that several time domains are discrete is had in each road in longitudinal direction,
Multichannel seismic data is drawn out continuously and i.e. can be shown as seismic cross-section.3-D seismics wave datum composition has one
The transverse and longitudinal net region at fixed interval, can reflect the geological condition in a region.Seismic reflector is also according to this grid
A curved surface is shown as with discrete point.The process of identification seismic reflector is exactly with consecutive shock road as background, passes through
On each seismic channel, the degree of depth at labelling seismic reflector place or time location, ultimately form a group of grid interface
Depth value, and be saved in magnetic disk media.And one of the emphasis that faces of this recognition methods and difficulties, it is simply that
The two dimensional cross-section of different directions identifies the closed-ended question at same reflection interface in the range of three-dimensional spatial area, only
The seismic reflector that all directions all close just is identified as the seismic reflector of merit.
The background of seismic reflector identification be by three dimensions in the range of multiple tracks seismic data in horizontal or vertical direction
Continuously display, be depicted as two dimensional cross-section.And arrange to be defined as a direction main profile section, other direction defines
For cross-track section.Seismic reflector identification carrys out labelling on these sections.But owing to utilizing these
During seismic wave reflection subterranean interface uncertain to the subjective understanding of subsurface reflective boundary and the two of seismic profiling information
Justice, causing can to the position of same reflection Interface Mark on different angles i.e. main profile section and cross-track section
Can understanding difference.Application personnel need repeatedly to switch the section of both different directions, revise mark position, the most really
Recognize labelling.But due to pip only one of which labelling point on a seismic channel, when in one direction (such as main survey
Line section) after labelling, if being modified labelling at another direction (such as cross-track section), and have one
Fixed difference (mis-tie misclosure), owing to this labelling action is all carried out continuously, labeled after, cut open at cross-track
By can not distinguishing the original position of labelling on main profile section on face, being also not easy to give original main profile for change simultaneously and cuing open
Face.Seeing accompanying drawing 1, in accompanying drawing 1-(a), L1 represents that, at the seismic reflector that principal section identifies continuously, L2 and L2 ' is
The seismic reflector of mark on contact section.In an O position, it is on the seismic channel that can see of two kinds of sections
The home position (see accompanying drawing 1-(a)) of reflecting interface, when principal section identify at L1, seismic reflector at O (see attached
Fig. 1-(b)), owing to being affected by recognizing, may identify at L2 ' at contact section, cause reflecting interface identification point to become
For O ' (see accompanying drawing 1-(c)).Now, O point original in accompanying drawing 1-(c) is covered by follow-up labelling, application
Personnel need the manual profile position remembered and just now showed, in order to switch back, the position of contrast other direction mark,
But owing to the appearance of O and O ' is not known a priori by, application personnel are difficult to predictably remember previous position.Cause
This, existing method can not Real time identification mis-tie misclosure and navigate to produce mis-tie misclosure seismic channel, work efficiency is relatively low.
Summary of the invention
It is to provide a kind of mis-tie misclosure produced when being automatically identified in different directions identification seismic reflector mesh of the present invention,
The final seismic reflector method of closing eliminating mis-tie misclosure.
Implementing of the present invention comprises the steps:
1) three-dimensional work area seismic data is gathered;
Step 1) described collection is by manually blowing out generation artificial earthquake, then gathers with seismic wave acquisition instrument
Seismic data.
2) on a plurality of seismic profile, each ground is alternately identified by the mode of setting-out by main profile or cross-track direction
Shake reflecting interface locus, road, the value of longitudinal direction is very first time value;
Step 2) described in seismic reflector locus be the coordinate position in the range of three-dimensional space, wire size,
Taoist monastic name is the value of both direction in plane, represents with X, Y;Time value is the value of longitudinal direction, represents with Z.
3) with step 2) cross-track or main profile direction intersect, setting-out on a plurality of seismic profile, mark alternately
Knowing each seismic channel reflecting interface locus, the value of longitudinal direction is the second time value;
4) press the sequencing of seismic channel, take very first time value and second time value of adjacent three seismic channels, then
Deducting very first time value by the second time value of each seismic channel respectively, gained difference takes absolute value, and obtains three seismic channels
Guan Bi difference;
The interim orbit of three seismic channels is closed difference compare with mis-tie misclosure marginal value, such as larger than marginal value, then reflect boundary
The time value that face records on interim orbit does not closes, and has the mis-tie misclosure that need to repair;
Step 4) described in mis-tie misclosure marginal value be to be set by interactive interface, for more than 10.
5) by step 4) adjacent twice Guan Bi difference is subtracted each other in three seismic channels, and the difference of gained takes absolute value,
To two mis-tie misclosure sudden change values, mis-tie misclosure sudden change value is compared with mis-tie misclosure sudden change marginal value, if the two mis-tie misclosure
Sudden change value is both greater than mis-tie misclosure sudden change marginal value, and the interim orbit of the most adjacent three seismic channels has the neighboring track Guan Bi that need to repair
Difference sudden change;
Step 5) described mis-tie misclosure sudden change value marginal value, for the allowing of mis-tie misclosure sudden change value of adjacent two seismic channels
Marginal value, set by interactive interface, for more than 10.
6) utilize step 4) and step 5) obtain result identification Guan Bi Trace Data generate, and revise or delete close
Close Trace Data;
Step 6) described in determination process as follows:
Guan Bi Trace Data generate: if in step 4) in have the mis-tie misclosure that need to repair, and in step 5) interim orbit
Have the neighboring track mis-tie misclosure sudden change that need to repair, then interim orbit generates Guan Bi Trace Data;Otherwise interim orbit does not generates Guan Bi
Trace Data;
Guan Bi Trace Data amendment: if interim orbit generates Guan Bi Trace Data, and original interim orbit has closed trace
Mark data, then update the time value of Guan Bi Trace Data;
Guan Bi Trace Data is deleted: if interim orbit does not generates Guan Bi Trace Data, and original interim orbit has existed Guan Bi
Trace Data, the Guan Bi Trace Data in Ze Jianggai road is deleted;
Being represented with wire size, Taoist monastic name and time value respectively the locus of Guan Bi Trace Data, its time value is step
2) very first time value in.
7) by step 6) the Guan Bi Trace Data that produces, it is indicated in interim orbit by its locus with sign format
On time value position;
8) it is repeated in step 4)-7), until the Guan Bi Trace Data completing all seismic channels on section generates and marks
Show;
9) it is repeated in step 2)-8), until the seismic reflector identification in whole three-dimensional work area is fully completed, and
Leave over without Guan Bi Trace Data, then seismic reflector is of completely closed.
The present invention has and input data is had adaptability flexibly, both can identify Depth Domain seismic data, and again might be used
With recognition time territory seismic data.Different directions earthquake it is recorded in real time at anti-during seismic reflector identification
The mis-tie misclosure existed when penetrating interface identification, and during identification subsequently, it is eliminated in real time, as shown in Figure 2.
The present invention eliminates mis-tie misclosure in real time in the process of seismic reflector identification, improves work efficiency.
Accompanying drawing explanation
Fig. 1 is the theoretical schematic diagram producing mis-tie misclosure during seismic reflector identification;
Fig. 2 is the present invention theoretical schematic diagram to reaching Guan Bi during seismic reflector identification;
Fig. 3 is seismic reflector marking effect figure on certain section;
Fig. 4 is the design sketch generating Guan Bi Trace Data by the method for the present invention in seismic reflector identification procedure;
Fig. 5 is with method inc design sketch of seismic reflector on the section intersected with accompanying drawing 4 of the present invention;
Fig. 6 is the design sketch realizing seismic reflector Guan Bi by the method for the present invention;
Fig. 7 is certain inc design sketch of work area seismic reflector;
Fig. 8 is the design sketch realizing certain work area seismic reflector Guan Bi by the method for the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing and the example in detail present invention.
Method provided by the present invention can identify the mis-tie misclosure that seismic reflector produces when different directions identifies automatically,
And the historical position not closing earthquake genuine shake reflecting interface is recorded by Guan Bi Trace Data.In seismic reflection subsequently
Next step identification schemes is formulated in the position indicated according to Guan Bi vestige during interface identification, and mark limit, limit eliminates mis-tie misclosure,
Until the Guan Bi Trace Data of all seismic channels is all deleted, reach reflecting interface of completely closed.Thus realize in earthquake
The correct explanation of the closure effect during reflecting interface identification, beneficially seismic reflector.
The specific embodiment of the invention is:
1) three-dimensional work area seismic data to be identified is gathered.
2) the upper mark of the multiple sections (such as main profile section) in direction seismic reflector locus,
To every very first time value together.As shown in accompanying drawing 2 (a).
3) with step 2) survey line profile direction intersect, the multiple sections in another direction are (as cross-track cuts open
Face) on indicate identified very first time position, as shown in accompanying drawing 2 (b) with circle.Identify earthquake more anti-
Space of planes position, firing area, obtains every the second time value together.As shown in accompanying drawing 2 (c).
4) press the sequencing of seismic channel, take very first time value and second time value of adjacent three seismic channels, respectively
Deducting very first time value by the second time value of each seismic channel, gained difference takes absolute value, and obtains closing of three seismic channels
Close difference.
5) by step 4) adjacent twice Guan Bi difference is subtracted each other in three seismic channels, and the difference of gained takes absolute value,
To two mis-tie misclosure sudden change values;
6) if step 4) in the Guan Bi difference of interim orbit that obtains more than mis-tie misclosure marginal value, and step 5) in
To two mis-tie misclosure sudden change values be both greater than mis-tie misclosure sudden change marginal value, then interim orbit generate Guan Bi Trace Data, as attached
Shown in Fig. 2 (c), otherwise do not generate.When original interim orbit has closed Trace Data, if generated
New Guan Bi Trace Data then revises Guan Bi Trace Data, otherwise deletes original Guan Bi Trace Data, such as accompanying drawing 2 (e)
Shown in.
7) by step 6) the middle Guan Bi Trace Data produced, it is indicated in interim orbit by its locus with sign format
Very first time position on.As shown in accompanying drawing 2 (c), accompanying drawing 2 (d).
8) it is repeated in step 4)-7), until the Guan Bi Trace Data completing all seismic channels on section generates and marks
Show.
9) it is repeated in step 2)-8), until the seismic reflector identification in whole three-dimensional work area is fully completed, and
Leaving over without Guan Bi Trace Data, seismic reflector is of completely closed.As shown in accompanying drawing 2 (f).
Experiment embodiment of the present invention is as follows:
1) certain three-dimensional work area seismic data is gathered.Work area area 84km2, main profile 280, cross-track 480
Bar.
2) setting mis-tie misclosure marginal value as 20 by interactive interface, mis-tie misclosure sudden change marginal value is 20.
3) main profile seismic reflector is identified every 4, then every 20 mark ground on cross-track section
Shake reflecting interface.As shown in Figure 3, cross-track section having many circles, these circles are at main profile subscript
The reflecting interface known, position is the very first time value position of reflecting interface.(here reflecting interface single-point circle accords with
Number indicate because on main profile every 4 identify seismic reflectors, so see on cross-track is exactly
One circle in every 4 road.If neighboring track has reflecting interface data, then the data cube computation of per pass is got up and mark with line
Show.)
Seismic reflection circle meanwhile, in the case of seismic reflector is not closed, in the range of base map shows full work area
Face.As shown in Figure 7, there is the reflecting interface of the partially reflective interface of three lines and surrounding mark in black surround " " not
Guan Bi (is in particular in that color and ambient data color are without transition, color change).In accompanying drawing 7 inc three
Line is corresponding with three surveys line at three seismic channel places in accompanying drawing 3.
4) during mark cross-track, find that certain three roads mark results and other road mark result is not same
On shake reflecting interface, such as accompanying drawing 4.Cross-track identifies after seismic reflector (using setting-out mode), is marked
Know seismic reflector data meet inventive step 6) described in Guan Bi Trace Data formation condition, this three road is described
Seismic reflector does not closes.Therefore Guan Bi Trace Data is generated, and by " ◇ " symbology in very first time position
Put, such as accompanying drawing 4.
5), after Guan Bi Trace Data generates, illustrate that the seismic reflector data of mark exist on main profile and do not close
Situation, the seismic reflector of main profile need to be reinterpreted.
6) show three main profile sections not closing place respectively according to Guan Bi vestige symbology position, can see
To the reflecting interface position in cross-track direction than current section reflecting interface position more upwards, there is Guan Bi vestige simultaneously
Data symbol, therefore needs to repair this inc situation, such as accompanying drawing 5.So again identifying on main profile section
Reflecting interface so that it is position is upwards moved.Again mark after, meet inventive step 6) described in Guan Bi Trace Data
Deletion condition, so deleting three Guan Bi Trace Data, reflecting interface closes, such as accompanying drawing 6.
7) on base map, visible full work area seismic reflector all closes, as shown in Figure 8.
Claims (5)
1. a seismic reflector method of closing, feature is to comprise the steps:
1) three-dimensional work area seismic data is gathered;Described collection is by manually blowing out generation artificial earthquake, then using
The seismic data that seismic wave acquisition instrument gathers;
2) on a plurality of seismic profile, each ground is alternately identified by the mode of setting-out by main profile or cross-track direction
Shake reflecting interface locus, road, the value of longitudinal direction is very first time value;
3) with step 2) cross-track or main profile direction intersect, setting-out on a plurality of seismic profile, mark alternately
Knowing each seismic channel reflecting interface locus, the value of longitudinal direction is the second time value;
4) press the sequencing of seismic channel, take very first time value and second time value of adjacent three seismic channels, then
Deducting very first time value by the second time value of each seismic channel respectively, gained difference takes absolute value, and obtains three seismic channels
Guan Bi difference;
The interim orbit of three seismic channels is closed difference compare with mis-tie misclosure marginal value, such as larger than marginal value, then reflect boundary
The time value that face records on interim orbit does not closes, and has the mis-tie misclosure that need to repair;
5) by step 4) adjacent twice Guan Bi difference is subtracted each other in three seismic channels, and the difference of gained takes absolute value,
To two mis-tie misclosure sudden change values, mis-tie misclosure sudden change value is compared with mis-tie misclosure sudden change marginal value, if the two mis-tie misclosure
Sudden change value is both greater than mis-tie misclosure sudden change marginal value, and the interim orbit of the most adjacent three seismic channels has the neighboring track Guan Bi that need to repair
Difference sudden change;
6) utilize step 4) and step 5) obtain result identification Guan Bi Trace Data generate, and revise or delete close
Close Trace Data;
7) by step 6) the Guan Bi Trace Data that produces, it is indicated in interim orbit by its locus with sign format
On time value position;
8) it is repeated in step 4)-7), until the Guan Bi Trace Data completing all seismic channels on section generates and marks
Show;
9) it is repeated in step 2)-8), until the seismic reflector identification in whole three-dimensional work area is fully completed, and
Leave over without Guan Bi Trace Data, then seismic reflector is of completely closed.
Method the most according to claim 1, feature is step 2) described in seismic reflector locus be three
Coordinate position in the range of dimension solid space, wire size, Taoist monastic name are the value of both direction in plane, represent with X, Y;
Time value is the value of longitudinal direction, represents with Z.
Method the most according to claim 1, feature is step 4) described in mis-tie misclosure marginal value be by mutual boundary
Face sets, for more than 10.
Method the most according to claim 1, feature is step 5) described mis-tie misclosure sudden change value marginal value, for adjacent
The admissible marginal value of the mis-tie misclosure sudden change value of two seismic channels, is set by interactive interface, for more than 10.
Method the most according to claim 1, feature is step 6) detailed process as follows:
Guan Bi Trace Data generate: if in step 4) in have the mis-tie misclosure that need to repair, and in step 5) interim orbit
Have the neighboring track mis-tie misclosure sudden change that need to repair, then interim orbit generates Guan Bi Trace Data;Otherwise interim orbit does not generates Guan Bi
Trace Data;
Guan Bi Trace Data amendment: if interim orbit generates Guan Bi Trace Data, and original interim orbit has closed trace
Mark data, then update the time value of Guan Bi Trace Data;
Guan Bi Trace Data is deleted: if interim orbit does not generates Guan Bi Trace Data, and original interim orbit has existed Guan Bi
Trace Data, the Guan Bi Trace Data in Ze Jianggai road is deleted;
Being represented with wire size, Taoist monastic name and time value respectively the locus of Guan Bi Trace Data, its time value is step
2) very first time value in.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210530093.XA CN103869356B (en) | 2012-12-10 | 2012-12-10 | A kind of seismic reflector method of closing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210530093.XA CN103869356B (en) | 2012-12-10 | 2012-12-10 | A kind of seismic reflector method of closing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103869356A CN103869356A (en) | 2014-06-18 |
CN103869356B true CN103869356B (en) | 2016-10-26 |
Family
ID=50908089
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210530093.XA Active CN103869356B (en) | 2012-12-10 | 2012-12-10 | A kind of seismic reflector method of closing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103869356B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110888167B (en) * | 2019-10-23 | 2021-07-30 | 广州海洋地质调查局 | Correction method and processing terminal for two-dimensional survey line seismic data closure error |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1070267A (en) * | 1991-07-09 | 1993-03-24 | 兰得马克制图公司 | Be used for seeking the method and apparatus of 3D seismic data reflecting interface |
US5251184A (en) * | 1991-07-09 | 1993-10-05 | Landmark Graphics Corporation | Method and apparatus for finding horizons in 3D seismic data |
CN1797039A (en) * | 2004-12-29 | 2006-07-05 | 中国石油天然气集团公司 | Method for automatic tracking 3D geological horizon |
-
2012
- 2012-12-10 CN CN201210530093.XA patent/CN103869356B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1070267A (en) * | 1991-07-09 | 1993-03-24 | 兰得马克制图公司 | Be used for seeking the method and apparatus of 3D seismic data reflecting interface |
US5251184A (en) * | 1991-07-09 | 1993-10-05 | Landmark Graphics Corporation | Method and apparatus for finding horizons in 3D seismic data |
CN1797039A (en) * | 2004-12-29 | 2006-07-05 | 中国石油天然气集团公司 | Method for automatic tracking 3D geological horizon |
Non-Patent Citations (3)
Title |
---|
交互闭合差校正方法;苏永昌;《石油地球物理勘探》;19941231;第29卷(第6期);第793-798页 * |
准噶尔盆地腹部地震剖面闭合差的校正;张学东;《中国西部油气地质》;20060930;第2卷(第3期);第324-328页 * |
地震剖面匹配闭合差校正;高荣涛等;《物探化探计算技术》;20080131;第30卷(第1期);第17-21页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103869356A (en) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1028129C (en) | Method and apparatus for finding horizons in 3d seismic data | |
US10466388B2 (en) | System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles | |
EP2924471A1 (en) | Systems and methods for modeling fracture networks in reservoir volumes from microseismic events | |
Koledoye et al. | A new process-based methodology for analysis of shale smear along normal faults in the Niger Delta | |
Tomassetti et al. | Modeling lateral facies heterogeneity of an upper Oligocene carbonate ramp (Salento, southern Italy) | |
CN103592681A (en) | Signal classification based seismic image horizon tracking method | |
CN103592698A (en) | Observing system evaluation method and device based on seismic attributes | |
CN105321204A (en) | Three-dimensional geological raster body model construction method | |
CN103969683A (en) | Method for picking position faces in batched mode based on constraint in three-dimensional seismic interpretation | |
US8422745B2 (en) | Method of modelling an underground heterogeneous medium from multipoint statistics | |
CN103869356B (en) | A kind of seismic reflector method of closing | |
Konoshonkin et al. | Machine learning clustering of reservoir heterogeneity with petrophysical and production data | |
Shabalin et al. | Tight oil development in RN-Yuganskneftegas | |
US11163079B2 (en) | Method for producing a geological vector model | |
Rocco et al. | Steam Development Areal Surveillance Programme in Petroleum Development Oman | |
Anderson | Structural relationships between surface lineaments and basement faulting in the northeastern Williston Basin | |
Gawith et al. | Integrating geoscience and engineering for improved field management and appraisal | |
Gruber et al. | Multi-Disciplinary Data Integration as Key to Resolve Complex Structural | |
Abbots et al. | Using 3D geological modelling and connectivity analysis to locate remaining oil targets in the Brent reservoir of the mature Brent field | |
CN111335870A (en) | Method and device for determining oil gas potential | |
Saputra et al. | A cost-effective method to maximize the hydrocarbon recovery by optimizing the vertical well placements through the simulation opportunity index | |
James et al. | The Brent Field: improving subsurface characterization for late field life management | |
Davis et al. | The In Salah gas project, Central Algeria: bringing an eight field gas development to sanction | |
Mallick et al. | Seismic & Quantitative Interpretation and Uncertainty Update, Example from Western Desert, Onshore Egypt | |
Wakefield et al. | GSI3D model metadata report for HS2 area 6 (Cubbington to Hampton-in-Arden) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |