CN103866924B - Standing-seam roof structure - Google Patents
Standing-seam roof structure Download PDFInfo
- Publication number
- CN103866924B CN103866924B CN201210549328.XA CN201210549328A CN103866924B CN 103866924 B CN103866924 B CN 103866924B CN 201210549328 A CN201210549328 A CN 201210549328A CN 103866924 B CN103866924 B CN 103866924B
- Authority
- CN
- China
- Prior art keywords
- folding piece
- seam roof
- piece structure
- standing
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses standing-seam roof structure, wherein, comprise vertical structure part and seam roof slab, described vertical structure part passes below described seam roof slab, stretches out certain altitude to described seam roof slab extension; Also comprise multiple folding piece structure, multiple described folding piece structure is arranged along the vertical direction of described vertical structure part respectively, the upside of described folding piece structure is fixed on described vertical structure part, and the downside of described folding piece structure is fixedly installed in above described seam roof slab; Also comprise multiple waterproof case, multiple described waterproof case is covered in above the link position of described folding piece structure and described vertical structure part respectively.The present invention is directed to the construction of steel work alteration work vertical structure part through large area standing-seam plank house face especially, effectively ensures integral roofing water resistance, and construction is simple, good reliability, cost are low, meets feature and the demand of alteration work construction.<!--1-->
Description
Technical field
The present invention relates to roofing transformation field, especially standing-seam roof structure.
Background technology
Due to current stage steel building alteration work, because its architecture indoor area is limited, building roof becomes the place of utilization, part external device (air-conditioning, blower fan etc.) is arranged in above roofing, effective space utilizing building, but conventional steel structure colored steel roof cannot meet the load of above-mentioned external device, roofing need be adopted to arrange structural frame and place above-mentioned external device, vertical structure need pass through standing-seam roofing, needs again to ensure waterproof effect.
Current existing way is as follows: when vertical structure component is through standing seam roof slabs, need before roof panel is laid, and under plate face, arrange small-sized gutter around steel column, introduced by water in large gutter, plate internal orifice is opened and used waterproof end plug.Also can use in normal conditions, but difficulty of construction is comparatively large, and integral construction progress cannot ensure.In Severe rainstorm situation, because of reasons such as gutter displacement, rainwater may be caused to pour in down a chimney phenomenon, and roof overall heat insulation effect cannot meet, accordingly, traditional node way all cannot reach designing requirement from reliability, economy and construction difficulty.
Summary of the invention
For the problems referred to above of existing existence, now provide a kind of standing-seam roof structure, overcome the difficulty of construction existed in prior art high and the technical problems such as roof waterproof cannot be realized well.
Concrete technical scheme is as follows:
A kind of standing-seam roof structure, wherein, comprise vertical structure part and seam roof slab, described vertical structure part passes below described seam roof slab, stretches out certain altitude to described seam roof slab extension;
Also comprise multiple folding piece structure, multiple described folding piece structure is arranged along the vertical direction of described vertical structure part respectively, the upside of described folding piece structure is fixed on described vertical structure part, and the downside of described folding piece structure is fixedly installed in above described seam roof slab;
Also comprise multiple waterproof case, multiple described waterproof case is covered in above the link position of described folding piece structure and described vertical structure part respectively.
Above-mentioned standing-seam roof structure, wherein, described folding piece structure is L-type folding piece structure, and described folding piece structural vertical part is connected with described vertical structure part, and the lateral part of described folding piece structure is fixed on described seam roof slab.
Above-mentioned standing-seam roof structure, wherein, the top of the vertical portion of described folding piece structure and the fixed connection point of described vertical structure part and described vertical portion in a distance.
Above-mentioned standing-seam roof structure, wherein, the vertical portion of described folding piece structure adopts tapping screw to be fixedly connected with described vertical structure part.
Above-mentioned standing-seam roof structure, wherein, the lateral part of described folding piece structure adopts the mode of welding to be fixed on described seam roof slab.
Above-mentioned standing-seam roof structure, wherein, to be 45 degree of angles with described vertical structure part, mode is covered on the link position of described folding piece structure and described vertical structure part described waterproof case.
Above-mentioned standing-seam roof structure, wherein, described waterproof case is steel plate.
The beneficial effect of technique scheme is:
A kind of standing-seam roof structure in the present invention, be directed to the construction of steel work alteration work vertical structure part through large area standing-seam plank house face especially, can effectively improve at structural member through after standing-seam roofing, the guarantee of integral roofing water resistance, and construction is simple, good reliability, cost are low, meet feature and the demand of alteration work construction.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of standing-seam roof structure of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the invention will be further described, but not as limiting to the invention.
As shown in fig. 1, a kind of standing-seam roof structure, wherein, comprise vertical structure part 1 and seam roof slab 2, seam roof slab 2 is layed in above roofing, and vertical structure part 1 passes below seam roof slab 2, and stretches out certain altitude to seam roof slab 2 extension.
Further, also comprise multiple folding piece structure 3, the plurality of folding piece structure 3 is arranged along the vertical direction of vertical structure part 1 respectively, wherein, the upside of this folding piece structure 3 is fixed on vertical structure part 1, and the downside of folding piece structure 3 is fixedly installed in above seam roof slab 2; Also comprise waterproof case 4, it is covered in above the link position of folding piece structure 3 and vertical structure part 1.
In one embodiment of the invention, select the folding piece structure 3 of a L-type structure, wherein, this folding piece structure 3 vertical portion 31 is connected with vertical structure part 1, and the lateral part 32 of this folding piece structure 3 is fixed on seam roof slab 2.
In one embodiment of the invention, the top of the vertical portion 31 of this folding piece structure 3 and the fixed connection point of vertical structure part 1 and vertical portion 31 in a distance.
In one embodiment of the invention, the vertical portion 31 of this folding piece structure 3 adopts tapping screw 5 to be fixedly connected with vertical structure part 1.
In one embodiment of the invention, the lateral part 32 of this folding piece structure 3 adopts the mode of welding to be fixed on seam roof slab 2, such as, in one embodiment of the invention, the lateral part 32 of folding piece structure 3 is welded on seam roof slab 2 by the splash guard 20 of an Al-Mg-Mn alloy.
In one embodiment of the invention, the link position that this waterproof case 4 is covered in folding piece structure 3 and vertical structure part 1 is formed in 45 degree of angles between this waterproof case 4 and vertical structure part 1, preferably, steel plate or batch water plate can be selected as waterproof case 4, utilize this waterproof case 4 that current can be guided to flow out along waterproof case 4 from seam roof slab 2, and then effectively prevent from seeping water with the link position of vertical structure part 1 from folding piece structure 3 entering within doors.
In one embodiment of the invention, the vertical portion 31 of folding piece structure 3 and the contact of vertical structure part 1 top node 11 and all adopt fluid sealant to seal at the top node 12 that waterproof case 4 contacts with vertical structure part 1.
In sum, standing-seam roof structure in the present invention, be directed to the construction of steel work alteration work vertical structure part through large area standing-seam plank house face especially, can at vertical structure part through after standing-seam roofing, effective guarantee integral roofing water resistance, and construction is simple, good reliability, cost are low, meet feature and the demand of alteration work construction.
The foregoing is only preferred embodiment of the present invention, not thereby limit claim of the present invention, so all utilizations manual of the present invention and the change of the equivalent structure done by diagramatic content, be all included in protection scope of the present invention.
Claims (7)
1. a standing-seam roof structure, is characterized in that, comprises vertical structure part and seam roof slab, and described vertical structure part passes below described seam roof slab, stretches out certain altitude to described seam roof slab extension;
Also comprise multiple folding piece structure, multiple described folding piece structure is arranged along the vertical direction of described vertical structure part respectively, the upside of described folding piece structure is fixed on described vertical structure part, and the downside of described folding piece structure is fixedly installed in above described seam roof slab;
Also comprise multiple waterproof case, multiple described waterproof case is covered in above the link position of described folding piece structure and described vertical structure part respectively.
2. standing-seam roof structure according to claim 1, it is characterized in that, described folding piece structure is L-type folding piece structure, and the vertical portion of described folding piece structure is connected with described vertical structure part, and the lateral part of described folding piece structure is fixed on described seam roof slab.
3. standing-seam roof structure according to claim 2, is characterized in that, the top of the vertical portion of described folding piece structure and the fixed connection point of described vertical structure part and described vertical portion in a distance.
4. according to the arbitrary described standing-seam roof structure of Claims 2 or 3, it is characterized in that, the vertical portion of described folding piece structure adopts tapping screw to be fixedly connected with described vertical structure part.
5. standing-seam roof structure according to claim 4, is characterized in that, the lateral part of described folding piece structure adopts the mode of welding to be fixed on described seam roof slab.
6. standing-seam roof structure according to claim 1, is characterized in that, described waterproof case is to be covered on the link position of described folding piece structure and described vertical structure part with the mode of described vertical structure part 45 degree of angles.
7. standing-seam roof structure according to claim 6, is characterized in that, described waterproof case is steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210549328.XA CN103866924B (en) | 2012-12-17 | 2012-12-17 | Standing-seam roof structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210549328.XA CN103866924B (en) | 2012-12-17 | 2012-12-17 | Standing-seam roof structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103866924A CN103866924A (en) | 2014-06-18 |
CN103866924B true CN103866924B (en) | 2016-04-06 |
Family
ID=50905904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210549328.XA Active CN103866924B (en) | 2012-12-17 | 2012-12-17 | Standing-seam roof structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103866924B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001207597A (en) * | 2000-01-31 | 2001-08-03 | Toray Ind Inc | Connecting structure for roof structural body made of frp |
JP2002004513A (en) * | 2000-06-19 | 2002-01-09 | Kamisho Kk | Mutual connecting structure between vertically roofed type metallic roof plate |
EP1489245A1 (en) * | 2003-06-19 | 2004-12-22 | Megadar S.r.l. | Sheet metal covering system for roofs and the like |
CN201447812U (en) * | 2009-01-16 | 2010-05-05 | 孙悦 | Stand-up overhand metal roofing structure |
KR20110033560A (en) * | 2009-09-25 | 2011-03-31 | 조관호 | A water leakage prevention roof panel structure |
CN202299161U (en) * | 2011-11-01 | 2012-07-04 | 安徽鲁班建设投资集团有限公司 | Connection assembly for connecting semi-spherical roof sunlight panel |
CN202299160U (en) * | 2011-10-21 | 2012-07-04 | 安徽鲁班建设投资集团有限公司 | Connecting piece for block-shaped connection of roof sunshine plates on large-span semispherical dome |
CN203008249U (en) * | 2012-12-17 | 2013-06-19 | 上海建工五建集团有限公司 | Roof structure |
-
2012
- 2012-12-17 CN CN201210549328.XA patent/CN103866924B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001207597A (en) * | 2000-01-31 | 2001-08-03 | Toray Ind Inc | Connecting structure for roof structural body made of frp |
JP2002004513A (en) * | 2000-06-19 | 2002-01-09 | Kamisho Kk | Mutual connecting structure between vertically roofed type metallic roof plate |
EP1489245A1 (en) * | 2003-06-19 | 2004-12-22 | Megadar S.r.l. | Sheet metal covering system for roofs and the like |
CN201447812U (en) * | 2009-01-16 | 2010-05-05 | 孙悦 | Stand-up overhand metal roofing structure |
KR20110033560A (en) * | 2009-09-25 | 2011-03-31 | 조관호 | A water leakage prevention roof panel structure |
CN202299160U (en) * | 2011-10-21 | 2012-07-04 | 安徽鲁班建设投资集团有限公司 | Connecting piece for block-shaped connection of roof sunshine plates on large-span semispherical dome |
CN202299161U (en) * | 2011-11-01 | 2012-07-04 | 安徽鲁班建设投资集团有限公司 | Connection assembly for connecting semi-spherical roof sunlight panel |
CN203008249U (en) * | 2012-12-17 | 2013-06-19 | 上海建工五建集团有限公司 | Roof structure |
Also Published As
Publication number | Publication date |
---|---|
CN103866924A (en) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203569761U (en) | Secondary waterproof structure of spherical aluminum plate roof | |
CN203961152U (en) | A kind of roofing Durchgangshohle position waterproof construction | |
CN203008249U (en) | Roof structure | |
CN201962860U (en) | Energy-saving metal roofing techonosphere | |
CN103758221A (en) | Roof deformation joint structure of automobile ramp | |
CN103866924B (en) | Standing-seam roof structure | |
CN202299178U (en) | Solar roof tile structure and solar roof tile structure combination | |
CN103343590A (en) | Energy-saving daylighting roof capable of achieving structural drainage | |
CN103337796B (en) | Outdoor waterproof louver device | |
CN105672587B (en) | It is a kind of to wear roof building construction for the room substation GIS | |
CN204002293U (en) | Steel-structure factory building brick wall and color steel wall junction waterproof are received limit | |
CN202073225U (en) | Anti-leakage colored steel tile roof with local structure | |
CN103255881B (en) | Waterproof structure of special-shaped gable wall | |
CN202899319U (en) | Waterproof panel point of side wall of existing building and roof of new-built building | |
CN210622131U (en) | Buffer device for blocking rainwater to reduce flow speed | |
CN204475700U (en) | Roof top hung rectangular skylight | |
CN207651905U (en) | A kind of box-type substation | |
CN203334497U (en) | Ventilating and daylighting structure for large-span building | |
CN210067260U (en) | A waterproof drainage system of assembled roofing for modular building | |
CN205444721U (en) | A wear roofing building structure for transformer substation GIS room | |
CN203613698U (en) | Roof for mobile house | |
CN103088952B (en) | Method and panel point structure preventing high-cross falling objects from damaging low-cross steel roof | |
CN202990271U (en) | Roof board flow-guiding overlapping device | |
CN207612219U (en) | A kind of waterproof construction applied to photovoltaic module installation | |
CN201228979Y (en) | Roof nor'wester for finished flue |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |