CN103863067A CN201410077360.1A CN201410077360A CN103863067A CN 103863067 A CN103863067 A CN 103863067A CN 201410077360 A CN201410077360 A CN 201410077360A CN 103863067 A CN103863067 A CN 103863067A
Authority
CN
China
Prior art keywords
glass
sheet glass
speed train
production method
high speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410077360.1A
Other languages
Chinese (zh)
Other versions
CN103863067B (en
Inventor
吴贲华
姜守进
王银茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Iron Anchor Technology Co ltd
Original Assignee
Jiangsu Tiemao Glass Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Tiemao Glass Co Ltd filed Critical Jiangsu Tiemao Glass Co Ltd
Priority to CN201410077360.1A priority Critical patent/CN103863067B/en
Publication of CN103863067A publication Critical patent/CN103863067A/en
Application granted granted Critical
Publication of CN103863067B publication Critical patent/CN103863067B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Glass To Other Materials (AREA)

Abstract

The invention provides a production method for high-speed train front windshields capable of being rapidly replaced and a front windshield produced by the scheme. The invention is characterized in that the production method includes the following steps: mounting holes are drilled on the circumferential edge of a piece of inner glass; T-shaped bolts are mounted in the holes, the heads of the bolts are in the glass, and the rods of the bolts are outside the glass; a piece of outer glass, a rubber strip and the inner glass are cleaned; in the step of assembly, the outer glass, the rubber strip and the inner glass which are cleaned are sequentially assembled; vacuumization is carried out in order to exhaust the air; preheating and prepressing are carried out, so that the two pieces of glass and the rubber strip are preliminarily stuck together; constant-temperature pressing is carried out, so that the outer glass, the rubber strip and the inner glass are stuck together. The invention has the advantages that: when the high-speed train front windshield needs to be replaced, the front windshield is convenient to mount and dismount, the time needed by replacement is greatly shortened, moreover, the structure of the high-speed train front windshield capable of being rapidly replaced is simple, and the production cost is low.

Description

Can quick-replaceable high speed train windshield production method and windshield
Technical field
The present invention relates to a kind of high speed train windshield, be specially a kind of windshield that can quick-replaceable high speed train windshield production method and produce by this scheme.
Background technology
High speed train overall trip speed is per hour more than 200 kilometers, vehicle body adopts airflow design, particularly headstock is generally bullet-shaped, windshield not only performance requriements is high, and face shaping is special, for reducing windage and guaranteeing firm, sealing effectiveness, install is generally by the direct bonding of polyurethane adhesive or by after being combined with aluminum alloy window frame, by being coated with the mode of sealant, identical to guarantee with car body panel beating again, meet the technical requirements of seamless assembling.Because having determined current high speed train windshield, mounting means generally can not carry out quick-replaceable, gear glass breakage after change time, difficulty glass being disassembled with the apparatus such as perching knife, iron hammer is very large, will remove cullet and old polyurethane adhesive after dismounting, time-consuming bothersome; After removing work completes, also need to be bonded together with new polyurethane adhesive and vehicle body, and the curing time that needs 5-6 days of polyurethane adhesive is waited polyurethane adhesive to solidify rear train completely and could run, glass of general replacement needs the time of one week again.
Summary of the invention
For the problems referred to above, the object of the present invention is to provide one can quick-replaceable high speed train windshield production method, can shorten the replacing time of windshield, reach quick-replaceable object.
Another object is to provide a kind of high speed train windshield.
The present invention realizes like this
One can quick-replaceable high speed train windshield production method, it is characterized in that comprising the following steps:
(1) bore mounting hole in the edge of interior sheet glass;
(2) T-shaped screw is installed in hole, screw head is in glass, and body of screw portion is outside glass;
(3) externally sheet glass, film and interior sheet glass clean;
(4) close sheet: outer sheet glass, film and interior sheet glass after clean are assembled successively;
(5) vacuumize;
(6) carry out preheating precompressed;
(7) carry out constant temperature pressurization processing.
Further, while closing sheet, ambient temperature is 25 ℃-27 ℃, and relative humidity is 20-30%, and the best is relative humidity 25%.
Further, the vacuum coefficient while vacuumizing is 0.09MPa-0.1MPa.
Further, temperature when preheating precompressed is 120 ℃-150 ℃, and pressure is 0.09MPa-0.1MPa.
Further, temperature when constant temperature pressurization is 120 ℃-150 ℃, and pressure is 1.1MPa-1.25MPa.
A kind of high speed train windshield, comprises outer sheet glass, interior sheet glass, it is characterized in that, described interior sheet glass edge is provided with mounting hole, and T-shaped screw is set in hole, and outer sheet glass and interior sheet glass are bonding by film, screw head is embedded in glass, and body of screw portion is outside glass.
Further, also comprise and the nut of T-shaped screw adaptation.
Beneficial effect of the present invention: while changing high speed train windshield, assembling, convenient disassembly, greatly shorten replacing required time, and provided by the invention can quick-replaceable high speed train windshield reasonable in design, by the production technology of doubling glass, do not need more complicated processing, productive costs is low.
Accompanying drawing explanation
Fig. 1 is windshield front view;
Fig. 2 is the part sectional view along A-A line in Fig. 1;
Fig. 3 is windshield assembling schematic diagram.
In figure:
1. outer sheet glass; 2. interlayer film; 3.T type screw; 4. interior sheet glass; 5. rubber seal; 6. vehicle body; 7. spring washer; 8. nut; 9. sealant.
The specific embodiment
In order to make those skilled in the art person understand better the present invention program, below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Embodiment 1
One can quick-replaceable high speed train windshield production method, carries out according to following steps:
(1) edge of interior sheet glass is bored to upper mounting hole;
(2) T-shaped screw is installed in hole, screw head is in glass, and body of screw portion is outside glass;
(3) externally sheet glass, film and interior sheet glass clean;
(4) close sheet: outer sheet glass, interior sheet glass and film are assembled successively, and outer sheet glass aligns overlapping with interior sheet glass, cuts off the unnecessary film of glass periphery;
(5) by vacuumizing rubber band on the glass sock assembling, glass is carried out to cold-draw, the vacuum keep of vacuum air storage tank is at 0.09MPa-0.1MPa, and the cold-draw time is not less than 5min, to discharge the air between glass and film;
(6) glass is carried out to preheating precompressed, when preheating precompressed, ambient temperature is set between 120 ℃-150 ℃, and vacuum pressure settings, at 0.09MPa-0.1MPa, tentatively sticks together film and glass.
(7) preliminary bonding glass after preheating precompressed is put into and in autoclave, carried out High Temperature High Pressure processing, first the temperature in autoclave is risen to 50 ℃-80 ℃, to autoclave inflating pressure, when still internal gas pressure reaches 0.7MPa-0.8MPa, suspend the pressurization to autoclave, make the air between glass sandwich overflow glass; After reaching 135 ℃-150 ℃, temperature in the kettle stops heating, keep temperature constant state, autoclave is carried out to defuelling pressurization, still internal pressure stops pressurization after reaching 1.1MPa-1.25MPa, make to remain in still 135 ℃-150 ℃ of temperature, pressure 1.1-1.25MPa, in still under constant temperature and pressure state after 1h-1.5h, start cooling in still, when temperature is down to 50 ℃, in still, start step-down, until after air emptying, glass is taken out in still, by this step process, film and glass are firmly sticked together, also improved product strength.
Embodiment 2
By the aforementioned high speed train windshield can quick-replaceable train windshield production method obtaining, comprise outer sheet glass 1 and interior sheet glass 4, outer sheet glass 1 does not arrange mounting hole, interior sheet glass 4 edges are provided with mounting hole, are illustrated in figure 1 the front view of windshield, and T-shaped screw 3 is set in hole, outer sheet glass 1 is bonding by film 2 with interior sheet glass 4, screw head is embedded in glass, and body of screw portion is outside glass, and windshield is along the cutaway view of A-A line as shown in Figure 2.
When installation, rubber seal 5 is assembled on high speed train vehicle body 6, with equipment such as suckers or manually windshield is placed on sealing member 5, then assemble spring washer 7 and nut 8, glass is fixedly mounted on vehicle body 6, finally between vehicle body 6 and glass, stamp sealant 9, as shown in Figure 3; Rubber seal can be also other sealing member with vibration damping, sealing function.
In the time that the breakage of generation train windshield need to be changed glass, cut open the sealant between windshield and car body, shed nut and spring washer and just can directly dismantle windshield, shorten significantly the required time of windshield of changing, and the screw that outer plate glass outer side does not protrude do not have mounting hole yet, leak tightness and smooth in appearance are guaranteed.
Above the present invention is described in detail.Herein principle of the present invention and embodiment are set forth, above explanation is just for helping to understand core concept of the present invention.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some improvement and modification to the present invention, these improvement and modification also fall in the protection domain of the claims in the present invention.

Claims (7)

1. can a quick-replaceable high speed train windshield production method, it is characterized in that comprising the following steps:
(1) bore mounting hole in the edge of interior sheet glass;
(2) T-shaped screw is installed in hole, screw head is in glass, and body of screw portion is outside glass;
(3) externally sheet glass, film and interior sheet glass clean;
(4) close sheet: outer sheet glass, film and interior sheet glass after clean are assembled successively;
(5) vacuumize, to discharge air;
(6) carry out preheating precompressed, make glass and film tentatively bonding;
(7) carry out constant temperature pressurization processing, outer sheet glass, film and interior sheet glass are bonded together.
2. according to claim 1 can quick-replaceable high speed train windshield production method, it is characterized in that, while closing sheet, ambient temperature is 25 ℃-27 ℃, relative humidity is 25%.
3. according to claim 2 can quick-replaceable high speed train windshield production method, it is characterized in that, the vacuum coefficient while vacuumizing is 0.09MPa-0.1MPa.
4. according to claim 3 can quick-replaceable high speed train windshield production method, it is characterized in that, temperature when preheating precompressed is 120 ℃-150 ℃, pressure is 0.09MPa-0.1MPa.
5. according to claim 4 can quick-replaceable high speed train windshield production method, it is characterized in that, temperature when constant temperature pressurization is 120 ℃-150 ℃, pressure is 1.1MPa-1.25MPa.
6. a high speed train windshield, comprises outer sheet glass, interior sheet glass, it is characterized in that, described interior sheet glass edge is provided with mounting hole, and T-shaped screw is set in hole, and outer sheet glass and interior sheet glass are bonding by film, screw head is embedded in glass, and body of screw portion is outside glass.
7. the high speed train windshield of fast changeable according to claim 6, is characterized in that, also comprises the nut with T-shaped screw adaptation.
CN201410077360.1A 2014-03-04 2014-03-04 Can quick-replaceable high speed train windshield production method and windshield Active CN103863067B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410077360.1A CN103863067B (en) 2014-03-04 2014-03-04 Can quick-replaceable high speed train windshield production method and windshield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410077360.1A CN103863067B (en) 2014-03-04 2014-03-04 Can quick-replaceable high speed train windshield production method and windshield

Publications (2)

Publication Number Publication Date
CN103863067A true CN103863067A (en) 2014-06-18
CN103863067B CN103863067B (en) 2016-03-23

Family

ID=50902328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410077360.1A Active CN103863067B (en) 2014-03-04 2014-03-04 Can quick-replaceable high speed train windshield production method and windshield

Country Status (1)

Country Link
CN (1) CN103863067B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108312670A (en) * 2018-01-30 2018-07-24 四川雄港玻璃有限公司 A kind of production technology of doubling glass

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0382267A1 (en) * 1989-02-06 1990-08-16 Polyplastic B.V. Double-walled caravan window with fitting cap for fixing a setback hinge or lock
US5540514A (en) * 1993-11-30 1996-07-30 Saint-Gobain Vitrage Mechanical connection between a glazing element and a supporting structure
EP0801201A1 (en) * 1996-04-12 1997-10-15 Saint-Gobain Vitrage System for fixing a toughened glass sheet and accordingly equipped glass sheet
CN1399702A (en) * 1999-11-24 2003-02-26 阿图尔-费希尔股份公司费希尔厂 Insulating glass window
GB2440042A (en) * 2006-07-11 2008-01-16 Saint Gobain Glazing structure comprising pane adhesively bonded to a base which is removably fixed to a structure
CN101228332A (en) * 2005-05-27 2008-07-23 法国圣戈班玻璃厂 Device for fixing substrates, in particular glass substrates

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0382267A1 (en) * 1989-02-06 1990-08-16 Polyplastic B.V. Double-walled caravan window with fitting cap for fixing a setback hinge or lock
US5540514A (en) * 1993-11-30 1996-07-30 Saint-Gobain Vitrage Mechanical connection between a glazing element and a supporting structure
EP0801201A1 (en) * 1996-04-12 1997-10-15 Saint-Gobain Vitrage System for fixing a toughened glass sheet and accordingly equipped glass sheet
CN1399702A (en) * 1999-11-24 2003-02-26 阿图尔-费希尔股份公司费希尔厂 Insulating glass window
CN101228332A (en) * 2005-05-27 2008-07-23 法国圣戈班玻璃厂 Device for fixing substrates, in particular glass substrates
GB2440042A (en) * 2006-07-11 2008-01-16 Saint Gobain Glazing structure comprising pane adhesively bonded to a base which is removably fixed to a structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王承遇等: "《玻璃材料手册》", 31 January 2008, article "夹层玻璃的制造工艺" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108312670A (en) * 2018-01-30 2018-07-24 四川雄港玻璃有限公司 A kind of production technology of doubling glass
CN108312670B (en) * 2018-01-30 2020-09-22 四川雄港玻璃有限公司 Production process of laminated glass

Also Published As

Publication number Publication date
CN103863067B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN103921804B (en) Bullet train fast changeable vehicle window
CN202952994U (en) Train window structure of passenger room of high-speed motor train unit
CN2648023Y (en) Vacuum glass with flexible support elastic sealing
CN106677678A (en) Urban rail vehicle window and urban rail vehicle
CN103863067B (en) Can quick-replaceable high speed train windshield production method and windshield
CN102173136A (en) Compound glass raw sheet and manufacturing method and application thereof
CN203543975U (en) Railway vehicle side window
CN201865494U (en) Frameless glass door
KR930011145B1 (en) Method and apparatus for applying anti-lacerative plastic layer to glass
CN203666672U (en) Quick-to-replace bullet train front windscreen
CN204383411U (en) There is the bus window of Defrosting structure
CN203770332U (en) Gluing and laminating tool for lens of rearview mirror of automobile
CN202380878U (en) Improved structure of automobile window glass lifter motor installing support
CN202734170U (en) Pipeline pressing plate of air conditioner for automobile
CN111016945A (en) Front windshield structure capable of being rapidly disassembled and assembled
CN208264252U (en) A kind of window on train with strong resistance to high and cold performance
CN203666673U (en) Quick-to-replace bullet train side window
CN209521692U (en) The airtight vehicle window of rail vehicle
CN203978207U (en) A kind of air-conditioning unit steel access door
CN207942912U (en) A kind of new automobile sealing strip
CN203592754U (en) Vacuum film covering machine
CN208931096U (en) A kind of high sealing performance car door
CN206231327U (en) A kind of automobile front wind screen Decoration straps structure
CN221065095U (en) Replacement assembly for wind power gear box sealing ring
CN206053749U (en) A kind of medi-empty glass window for lightly constructed and simply equipped building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 128 Changjiang West Road, Hai'an County, Nantong City, Jiangsu Province, 226600

Patentee after: Jiangsu Iron Anchor Technology Co.,Ltd.

Address before: No. 128 Changjiang West Road, Hai'an County, Nantong City, Jiangsu Province, 226600

Patentee before: JIANGSU TIEMAO GLASS Co.,Ltd.

CP01 Change in the name or title of a patent holder