CN103861406A - Special integrated scrubbing tower for removing PM2.5 - Google Patents

Special integrated scrubbing tower for removing PM2.5 Download PDF

Info

Publication number
CN103861406A
CN103861406A CN201410134305.1A CN201410134305A CN103861406A CN 103861406 A CN103861406 A CN 103861406A CN 201410134305 A CN201410134305 A CN 201410134305A CN 103861406 A CN103861406 A CN 103861406A
Authority
CN
China
Prior art keywords
tower body
water
technique
ring pipe
spray gun
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410134305.1A
Other languages
Chinese (zh)
Other versions
CN103861406B (en
Inventor
任镇华
杜刚
朱丽刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Great Huan Group Co., Ltd
Original Assignee
Jiangsu MounTop Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu MounTop Group Co Ltd filed Critical Jiangsu MounTop Group Co Ltd
Priority to CN201410134305.1A priority Critical patent/CN103861406B/en
Publication of CN103861406A publication Critical patent/CN103861406A/en
Application granted granted Critical
Publication of CN103861406B publication Critical patent/CN103861406B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

The invention discloses a special integrated scrubbing tower for removing PM2.5. A circulating water pool is arranged at the bottom of a tower body; a water pump is arranged in the circulating water pool; an inlet pipe is arranged on the outer side of the bottom of the tower body; a distribution grid is arranged on the inner side of the bottom of the tower body; a process water supply vertical pipe, a first process water supply ring pipe and a second process water supply ring pipe are arranged on the outer side of the middle of the tower body; a lower spray gun, an upper spray gun and an inner cone are arranged on the inner side of the middle of the tower body; the lower spray gun is connected with the first process water supply ring pipe; the upper spray gun is connected with the second process water supply ring pipe; the first process water supply ring pipe and the second process water supply ring pipe are connected with the water pump through the process water supply vertical pipe; a rotary flow vertical shaft is arranged inside the inner cone; a rotational flow guide plate is arranged on the rotary vertical shaft; the lower end of the inner cone is connected with a porous plate dehydrator; an exhaust port of the porous plate dehydrator is connected with an airflow outlet pipe; a water outlet of the porous plate dehydrator is connected with the circulating water pool. The dust-containing airflow can be subjected to lifting atomization and dehydration effect, so that the effects of deeply reducing temperature and removing dust are achieved.

Description

A kind of PM2.5 Special integrated scrubbing tower of removing
Technical field
The present invention relates to the flue dust degree of depth eliminating equipment of domestic iron and steel metallurgy, cement, the dry-dedusting system generation loss of power plant enterprise, especially a kind of PM2.5 Special integrated scrubbing tower of removing.
Background technology
At present, domestic iron and steel, cement power plant absorb to transform and adopt dry dust removal (cloth bag, electric precipitation) in the process modification of traditional wet dedusting, but the defective workmanship of himself is the important sources that causes Present Domestic big and medium-sized cities molecule to produce, further for producing, haze provides material base.Taking blast furnace gas as example, traditional handicraft is humidifying dust collecting process, adopts a literary composition to add the mode of dewatering again after two literary composition washings, need a large amount of waters, and equipment takes up an area larger.Although the dry dedusting technology water consumption after improvement reduces greatly, but cause the dissipation of dedusting particle more, common dry dedusting technology can remove particle more than 50mg/m3, along with the improvement of cloth bag can be removed particle more than 10mg/m3, if need further to remove more molecule, need on cloth bag, carry out overlay film, increase resistance for this reason, need add Wind Volume and change operating mode.
Summary of the invention
Goal of the invention: the object of this invention is to provide a kind of PM2.5 of removal Special integrated scrubbing tower, to overcome original dust pelletizing system dedusting degree of depth deficiency, to take up an area greatly the shortcoming that water is many.
To achieve these goals, the present invention has adopted following technical scheme:
A kind of PM2.5 Special integrated scrubbing tower of removing, comprise scrubbing tower body, described scrubbing tower body comprises tower body top, tower body middle part and tower body bottom, described tower body bottom arranges circulating water pool, circulating water pool arranges water pump, tower body bottom outside inlet porting pipe, tower body bottom inside arranges distribution grid, water standpipe in the arranged outside technique of described tower body middle part, water ring pipe two in water ring pipe one and technique in technique, inner side, tower body middle part arranges lower floor's spray gun, upper strata spray gun and interior centrum, lower floor's spray gun is connected with water ring pipe one in technique, upper strata spray gun is connected with water ring pipe two in technique, in technique, water ring pipe one is connected with water pump by water standpipe in technique with water ring pipe two in technique, interior centrum upper end extends tower body top, in interior centrum inside, eddy flow vertical shaft is set, eddy flow guide plate is set on eddy flow vertical shaft, interior centrum lower end is connected with orifice plate dehydrator, orifice plate dehydrator exhaust outlet is connected with airflow outlet pipe by exit bend, exit bend inside arranges axial flow blower, and orifice plate dehydrator discharge outlet is connected with circulating water pool by U-shaped hydrolock discharge pipe line.
In the present invention, preferably, described U-shaped hydrolock discharge pipe line comprises water standpipe one under technique, under technique, water standpipe one upper end is connected with orifice plate dehydrator discharge outlet, under technique, water standpipe one lower end is connected with water standpipe two lower ends under technique, under technique, water standpipe two upper ends are connected with lower water oviduct upper end, and insert in circulating water pool lower water oviduct lower end, at lower water oviduct middle part, valve are set.
In the present invention, preferred, some layers of inspection platform of described tower body middle part arranged outside arrange people's ladder rung and helper and turn pin platform between inspection platform and ground.
In the present invention, preferred, described tower body bottom sidewall offers manhole.
Beneficial effect: (1) the present invention can allow dust-contained airflow through lifting atomization dehydration, thus reach the effect of deep temperature reduction dedusting; (2) can allow air-flow produce voluntarily acceleration by the eddy flow guide plate of interior centrum, make the dust-contained airflow after dry method dust enter and can accelerate and dewater by autorotation under general operating mode; (3), with respect to existing dry-dedusting system, the present invention has the processing that occupation of land is little, dust removal efficiency is high, water consumption is few, be applicable to multiple dust-contained airflow; (4) simple in structure, the highly versatile, simple to operate of the present invention.
Brief description of the drawings
Fig. 1 is external structure of the present invention;
Fig. 2 is cut-away view of the present invention;
Fig. 3 is distribution grid layout drawing;
Fig. 4 is upper strata spray gun layout drawing;
Fig. 5 is lower floor's spray gun layout drawing;
Fig. 6 is interior centrum upper layer bracket layout drawing;
Fig. 7 is eddy flow guide plate installation diagram;
Fig. 8 is that the A-A of Fig. 7 is to cutaway view;
Fig. 9 is that the B of Fig. 7 is to view;
Figure 10 is that inspection platform, people's ladder rung and helper turn pin platform layout drawing.
In figure: 1-inlet tube, 2-distribution grid, 3-manhole, 4-lower floor spray gun, 5-interior centrum lower floor support, 6-upper strata spray gun, 7-interior centrum upper layer bracket, 8-tower body top, 9-tower body middle part, 10-tower body bottom, 11-circulating water pool, 12-people ladder rung, 13-helper turns pin platform, 14-inspection platform, water standpipe in 15-technique, water ring pipe one in 16-technique, water ring pipe two in 17-technique, water standpipe one under 18-technique, water standpipe two under 19-technique, 20-lower water oviduct, 21-valve, 22-interior centrum top, 23-interior centrum bottom, 24-eddy flow guide plate, 25-orifice plate dehydrator, 26-axial flow blower, 27-airflow outlet pipe, 28-water pump, 29-eddy flow vertical shaft, 30-metal hose.
Detailed description of the invention:
Below in conjunction with accompanying drawing, the present invention is done further and explained.
As shown in Figure 1 to 9, removal PM2.5 Special integrated scrubbing tower of the present invention comprises scrubbing tower body, and scrubbing tower body comprises tower body top 8, tower body middle part 9 and tower body bottom 10, between tower body top 8, tower body middle part 9 and tower body bottom 10 by being welded and fixed.
Tower body bottom 10 arranges circulating water pool 11, and circulating water pool 11 arranges water pump 28, and water pump 28 is two, a water circulating pump, an exclusive water pump.Tower body bottom 10 arranged outside inlet tubes 1,10 inner sides, tower body bottom arrange distribution grid, and inlet tube 1 and distribution grid 2 are all by being welded and fixed.Inlet tube 1 gas outlet and horizontal plane form angle theta, and θ size is determined according to gas flow process condition, generally at 30 ° to 45 °.
Water ring pipe 2 17 in water ring pipe 1 and technique in water standpipe 15, technique in the 9 arranged outside techniques of tower body middle part, in technique, in water standpipe 15, technique, in water ring pipe 1 and technique, water ring pipe 2 17 is all fixed by 9 outer walls in the middle part of support and clip and tower body.9 inner sides, tower body middle part arrange lower floor's spray gun 4, upper strata spray gun 7 and interior centrum.Lower floor's spray gun 4 and upper strata spray gun 7 are all fixed by support and tower body middle part 9 inwalls.Lower floor's spray gun 4 is connected with water ring pipe 1 in technique by metal hose 30, upper strata spray gun 7 is connected with water ring pipe 2 17 in technique by metal hose 30, and in technique, water ring pipe 1 is connected with water circulating pump by water standpipe 15 in technique with water ring pipe 2 17 in technique.The concrete quantity of inner cone is determined according to the actual airflow amount of technique, the bevel angle of each inner cone is consistent, each interior centrum comprises interior centrum top 22 and interior centrum bottom 23 two parts, in interior vertebra, centrum top 22 and interior centrum bottom 23 hang on 9 centers, tower body middle part by interior centrum upper layer bracket 7 and interior centrum lower floor support 5 respectively, between interior centrum top 22 and interior centrum bottom 23, connect by flange.
Interior centrum upper end extends tower body top 8, in interior centrum inside, eddy flow vertical shaft 29 is set, and welds spiral helicine eddy flow guide plate 24 on eddy flow vertical shaft 29, and interior centrum lower end is connected with orifice plate dehydrator 25.Orifice plate dehydrator 25 exhaust outlets are connected with airflow outlet pipe 27 by exit bend, and exit bend inside arranges axial flow blower 26, and orifice plate dehydrator 25 discharge outlet are connected with circulating water pool 11 by U-shaped hydrolock discharge pipe line.U-shaped hydrolock discharge pipe line comprises water standpipe 1 under technique, under technique, water standpipe one 18 upper ends are connected with orifice plate dehydrator 25 discharge outlet, under technique, water standpipe one 18 lower ends are connected with water standpipe 2 19 lower ends under technique, under technique, water standpipe 2 19 upper ends are connected with lower water oviduct 20 upper ends, insert in circulating water pool 11 lower water oviduct 20 lower ends, at lower water oviduct 20 middle parts, valve 21 is set.
As shown in figure 10, for convenience of scrubbing tower is carried out to repair and maintenance, at some layers of inspection platform of tower body middle part 9 arranged outside 14, people's ladder rung 12 and helper are set between inspection platform 14 and ground and turn pin platform 13.In tower body bottom, 10 sidewalls offer manhole 3.
Operation principle of the present invention: the dust-contained airflow after dry method dust enters in scrubbing tower body from inlet tube 1 with certain economic velocity, dust-contained airflow evenly rises under the effect of distribution grid 2, the dust-contained airflow rising and reverse contact of atomization process water form that is promoted to lower floor's spray gun 4 by water circulating pump and sprays, to realize the object of preliminary atomization, dust in dust-contained airflow is divided into two parts, a part directly falls into circulating water pool 11, another part continues to rise with the form of atomization air flow, the reverse contact of atomization process water form spraying with upper strata spray gun 6, to realize the object of further atomization, dust-contained airflow enters inner cone top 22 in the fluidisation upset by scrubbing tower top 8, air-flow is integrated in interior cone top 22 processes, after further constantly accelerating, enter orifice plate dehydrator 25 by inner cone bottom 23 under the effect of rotating guide 24, dust-contained airflow is separated by aqueous vapor orifice plate dehydrator 25 is interior, dust part enters circulating water pool 11 with the form of sewage by U-shaped hydrolock draining, circulating water pool 11 arranges two water pumps, in the time of normal spray washing, water circulating pump is opened, outer draining pump cuts out, sewage in circulating water pool 11 reaches certain cycles of concentration, while needing outer row to focus on, start outer draining pump.Gas after aqueous vapor separates is purified, and the air-flow after purification is discharged from airflow outlet pipe 27 after aspirating by axial flow blower 26.Axial flow blower 26 is for balanced gas causes drag losses by scrubbing tower in the object that arranges of this technique, ensures that the operating mode of whole original system is stable, can be because not setting up this apparatus system to affect original system operating mode.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (4)

1. remove PM2.5 Special integrated scrubbing tower for one kind, comprise scrubbing tower body, it is characterized in that: described scrubbing tower body comprises tower body top (8), tower body middle part (9) and tower body bottom (10), described tower body bottom (10) arranges circulating water pool (11), circulating water pool (11) arranges water pump (28), tower body bottom (10) arranged outside inlet tube (1), inner side, tower body bottom (10) arranges distribution grid (2), water standpipe (15) in (9) the arranged outside technique of described tower body middle part, water ring pipe two (17) in water ring pipe one (16) and technique in technique, inner side, tower body middle part (9) arranges lower floor's spray gun (4), upper strata spray gun (6) and interior centrum, lower floor's spray gun (4) is connected with water ring pipe in technique one (16), upper strata spray gun (6) is connected with water ring pipe in technique two (17), in technique, water ring pipe one (16) is connected with water pump (28) by water standpipe (15) in technique with water ring pipe in technique two (17), interior centrum upper end extends tower body top (8), in interior centrum inside, eddy flow vertical shaft (29) is set, eddy flow guide plate (24) is set on eddy flow vertical shaft (29), interior centrum lower end is connected with orifice plate dehydrator (25), orifice plate dehydrator (25) exhaust outlet is connected with airflow outlet pipe (27) by exit bend, exit bend inside arranges axial flow blower (26), and orifice plate dehydrator (25) discharge outlet is connected with circulating water pool (11) by U-shaped hydrolock discharge pipe line.
2. a kind of PM2.5 Special integrated scrubbing tower of removing according to claim 1, it is characterized in that: described U-shaped hydrolock discharge pipe line comprises water standpipe one (18) under technique, under technique, water standpipe one (18) upper end is connected with orifice plate dehydrator (25) discharge outlet, under technique, water standpipe one (18) lower end is connected with two (19) lower ends of water standpipe under technique, under technique, water standpipe two (19) upper ends are connected with lower water oviduct (20) upper end, insert in circulating water pool (11) lower water oviduct (20) lower end, at lower water oviduct (20) middle part, valve (21) is set.
3. a kind of PM2.5 Special integrated scrubbing tower of removing according to claim 1, it is characterized in that: described tower body middle part some layers of inspection platform of (9) arranged outside (14) arrange people's ladder rung (12) and helper and turn pin platform (13) between inspection platform (14) and ground.
4. a kind of PM2.5 Special integrated scrubbing tower of removing according to claim 1, is characterized in that: described tower body bottom (10) sidewall offers manhole (3).
CN201410134305.1A 2014-04-03 2014-04-03 A kind of removal PM2.5 Special integrated scrubbing tower Active CN103861406B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410134305.1A CN103861406B (en) 2014-04-03 2014-04-03 A kind of removal PM2.5 Special integrated scrubbing tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410134305.1A CN103861406B (en) 2014-04-03 2014-04-03 A kind of removal PM2.5 Special integrated scrubbing tower

Publications (2)

Publication Number Publication Date
CN103861406A true CN103861406A (en) 2014-06-18
CN103861406B CN103861406B (en) 2015-08-12

Family

ID=50900778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410134305.1A Active CN103861406B (en) 2014-04-03 2014-04-03 A kind of removal PM2.5 Special integrated scrubbing tower

Country Status (1)

Country Link
CN (1) CN103861406B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2321514Y (en) * 1998-03-18 1999-06-02 董达 Cyclone dust romover
EP1625882A1 (en) * 2004-08-10 2006-02-15 Gunther Neumann Device for cleaning air
CN201988312U (en) * 2011-01-10 2011-09-28 潍坊兴潍科技创新咨询服务中心 Embedded gas eluting tower
CN202015519U (en) * 2011-01-18 2011-10-26 青岛汇森能源设备有限公司 Gas-liquid separator
CN203803283U (en) * 2014-04-03 2014-09-03 江苏大峘集团有限公司 Special integrated washing tower for removing PM2.5 (Particulate Matter 2.5)

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2321514Y (en) * 1998-03-18 1999-06-02 董达 Cyclone dust romover
EP1625882A1 (en) * 2004-08-10 2006-02-15 Gunther Neumann Device for cleaning air
CN201988312U (en) * 2011-01-10 2011-09-28 潍坊兴潍科技创新咨询服务中心 Embedded gas eluting tower
CN202015519U (en) * 2011-01-18 2011-10-26 青岛汇森能源设备有限公司 Gas-liquid separator
CN203803283U (en) * 2014-04-03 2014-09-03 江苏大峘集团有限公司 Special integrated washing tower for removing PM2.5 (Particulate Matter 2.5)

Also Published As

Publication number Publication date
CN103861406B (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN105233605B (en) Boiler smoke dedusting and purifying device
CN203971651U (en) A kind of rinsing type exhaust gas treating tower
CN104645768B (en) A kind of Wet type cyclone dust arrester
CN203569127U (en) Blast furnace gas alkali-spraying dechlorination device
CN107261808A (en) A kind of double ultra-clean desulfurized dust collection columns of spray of the double turbulent flows of single cycle
CN105833628A (en) Microporous plate type water-film dust remover
CN106669347B (en) Labyrinth type cyclone dust removal device and dust removal method
CN207187488U (en) A kind of double ultra-clean desulfurized dust collection columns of spray of the double turbulent flows of single cycle
CN206414914U (en) A kind of environmentally friendly moisture film desulfurating dust-removing equipment in limekiln
CN203803283U (en) Special integrated washing tower for removing PM2.5 (Particulate Matter 2.5)
CN204294007U (en) Automatic ash removing formula spiral board duster
CN102886189B (en) Spiral venturi scrubber and wet-method desulphurization and denitration dust-collecting system
CN103861406B (en) A kind of removal PM2.5 Special integrated scrubbing tower
CN103170207B (en) Wet-method vortex vane wheel air purification device
CN205199214U (en) Magnetic force whirlwind wet dust collector
CN205199211U (en) Disrotatory wet dust collector
CN201085993Y (en) Turbulent flow type spray flue gas desulfurization column
CN103643984A (en) Composite dedusting and purification device for tail gas multistage separation of exhaust shaft of uranium mine
CN106422740A (en) Centrifugal type deep flue gas purification device provided with shunting ring and desulfurization tower
CN207546779U (en) A kind of three proofings cyclone separator
CN207287042U (en) A kind of environmental protective wetting cyclone dust collector
CN206793314U (en) Adsorbed film of water deduster
CN206447594U (en) A kind of efficient ammonia nitrogen stripping tower
CN206008392U (en) The formula that crosses desulfurization is equipped
CN105251303A (en) Counter-rotating wet type dust collector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 211112 Tianyuan East Road, Jiangning District, Jiangsu, China, No. 368, No.

Patentee after: Great Huan Group Co., Ltd

Address before: 211112 Tianyuan East Road, Jiangning District, Jiangsu, China, No. 368, No.

Patentee before: Jiangsu MounTop Group Co., Ltd.