CN103835322A - 管桩竖向和水平加载装置 - Google Patents

管桩竖向和水平加载装置 Download PDF

Info

Publication number
CN103835322A
CN103835322A CN201410097278.5A CN201410097278A CN103835322A CN 103835322 A CN103835322 A CN 103835322A CN 201410097278 A CN201410097278 A CN 201410097278A CN 103835322 A CN103835322 A CN 103835322A
Authority
CN
China
Prior art keywords
vertical
horizontal
loading
jack
load plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410097278.5A
Other languages
English (en)
Other versions
CN103835322B (zh
Inventor
郭昭胜
崔娟玲
贺武斌
李悦
韩鹏举
白晓红
徐培红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Hua Ji Tiancheng Civil Engineering Testing Co Ltd
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN201410097278.5A priority Critical patent/CN103835322B/zh
Publication of CN103835322A publication Critical patent/CN103835322A/zh
Application granted granted Critical
Publication of CN103835322B publication Critical patent/CN103835322B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及管桩的加载装置,具体是一种管桩竖向和水平加载装置,包括竖向加载千斤顶和水平加载千斤顶,还包括对接的放置于管桩顶部的两块竖向加载板,两块槽块,四根螺杆,伸出管桩的每块竖向加载板下方均垂直的设有水平加载板,两块水平加载板相互平行,所述槽块的一侧为平面、相对的另一侧为与管桩外壁相配合的弧面,两块槽块通过平面固定于两块水平加载板内侧,所述竖向加载千斤顶固定于管桩顶部上方且其柱塞与两块竖向加载板对接处加载配合,所述水平加载千斤顶的端部固定有垫板,垫板贴靠于一侧水平加载板的外侧,四根螺杆依次通过垫板、一侧水平加载板以及另一侧水平加载板的四个角部。

Description

管桩竖向和水平加载装置
技术领域
    本发明涉及管桩的加载装置,具体是一种管桩竖向和水平加载装置。
背景技术
   现有的对桩基进行水平和竖向组合加载的方式一般为在桩基顶部垫一层钢板,然后利用千斤顶或重物通过这层钢板对桩基施加竖向荷载,同时在桩侧壁施加水平荷载。使用千斤顶作为加载工具时,需先将千斤顶固定在桩基上方的一固定物体上。桩基在水平荷载作用下会产生水平位移,使得竖向荷载的作用点偏离初始位置,造成竖向荷载作用方向不竖直,在桩顶产生附加的弯矩,进而影响测试的准确性,严重时还会引起桩基的突然倾倒或折断,引发安全事故。
发明内容
本发明为了解决现有竖向和水平加载装置不能实现一体化进行的问题,提供了一种管桩竖向和水平加载装置。
本发明是通过以下技术方案实现的:管桩竖向和水平加载装置,包括竖向加载千斤顶和水平加载千斤顶,还包括对接的放置于管桩顶部的两块竖向加载板,两块槽块,四根螺杆,伸出管桩的每块竖向加载板下方均垂直的设有水平加载板,两块水平加载板相互平行,所述槽块的一侧为平面、相对的另一侧为与管桩外壁相配合的弧面,两块槽块通过平面固定于两块水平加载板内侧,所述竖向加载千斤顶固定于管桩顶部上方且其柱塞与两块竖向加载板对接处加载配合,所述水平加载千斤顶的端部固定有垫板,垫板贴靠于一侧水平加载板的外侧,四根螺杆依次通过垫板、一侧水平加载板以及另一侧水平加载板的四个角部,位于垫板外侧以及另一侧水平加载板外侧的螺杆端部螺纹配合有螺母。
具体使用时,将本发明所述的带有水平加载板的竖向加载板对接的放置于管桩顶部,安装固定竖向加载千斤顶和水平加载千斤顶,使得竖向加载千斤顶的柱塞与两块竖向加载板对接处加载配合,水平加载千斤顶上的垫板与一侧水平加载板相贴靠,槽块与管桩外壁相配合,通过螺杆与螺母的配合锁紧两槽块之间的距离。安装好之后,竖向加载千斤顶从竖向对管桩进行荷载,同时水平加载千斤顶从水平方向对管桩进行荷载,由于本发明所述管桩竖向和水平加载装置是从两个方向共同进行作用的,整体受力集中,保证了荷载加载的准确性。而且固定于水平加载千斤顶上的垫板使得作用于管桩外壁的槽块受力均匀。
通过本发明所述管桩竖向和水平加载装置在施加竖向和水平荷载过程中共同进行作用,避免二者分开单独使用时产生相互之间的位移变动而引起荷载施加不均匀,进而保证荷载加载的准确性。
附图说明
图1为本发明所述管桩竖向和水平加载装置的结构示意图。
图2为一侧水平加载板与垫板以及槽块的连接示意图。
图中:1-竖向加载千斤顶,2-水平加载千斤顶,3-管桩,4-竖向加载板,5-水平加载板,6-螺杆,7-螺母,8-槽块,9-垫板。
具体实施方式
管桩竖向和水平加载装置,包括竖向加载千斤顶1和水平加载千斤顶2,还包括对接的放置于管桩3顶部的两块竖向加载板4,两块槽块8,四根螺杆6,伸出管桩3的每块竖向加载板4下方均垂直的设有水平加载板5,两块水平加载板5相互平行,所述槽块8的一侧为平面、相对的另一侧为与管桩3外壁相配合的弧面,两块槽块8通过平面固定于两块水平加载板5内侧,所述竖向加载千斤顶1固定于管桩3顶部上方且其柱塞与两块竖向加载板4对接处加载配合,所述水平加载千斤顶2的端部固定有垫板9,垫板9贴靠于一侧水平加载板5的外侧,四根螺杆6依次通过垫板9、一侧水平加载板5以及另一侧水平加载板5的四个角部,位于垫板9外侧以及另一侧水平加载板5外侧的螺杆6端部螺纹配合有螺母7。

Claims (1)

1.管桩竖向和水平加载装置,包括竖向加载千斤顶(1)和水平加载千斤顶(2),其特征在于,还包括对接的放置于管桩(3)顶部的两块竖向加载板(4),两块槽块(8),四根螺杆(6),伸出管桩(3)的每块竖向加载板(4)下方均垂直的设有水平加载板(5),两块水平加载板(5)相互平行,所述槽块(8)的一侧为平面、相对的另一侧为与管桩(3)外壁相配合的弧面,两块槽块(8)通过平面固定于两块水平加载板(5)内侧,所述竖向加载千斤顶(1)固定于管桩(3)顶部上方且其柱塞与两块竖向加载板(4)对接处加载配合,所述水平加载千斤顶(2)的端部固定有垫板(9),垫板(9)贴靠于一侧水平加载板(5)的外侧,四根螺杆(6)依次通过垫板(9)、一侧水平加载板(5)以及另一侧水平加载板(5)的四个角部,位于垫板(9)外侧以及另一侧水平加载板(5)外侧的螺杆(6)端部螺纹配合有螺母(7)。
CN201410097278.5A 2014-03-17 2014-03-17 管桩竖向和水平加载装置 Active CN103835322B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410097278.5A CN103835322B (zh) 2014-03-17 2014-03-17 管桩竖向和水平加载装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410097278.5A CN103835322B (zh) 2014-03-17 2014-03-17 管桩竖向和水平加载装置

Publications (2)

Publication Number Publication Date
CN103835322A true CN103835322A (zh) 2014-06-04
CN103835322B CN103835322B (zh) 2015-08-12

Family

ID=50799187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410097278.5A Active CN103835322B (zh) 2014-03-17 2014-03-17 管桩竖向和水平加载装置

Country Status (1)

Country Link
CN (1) CN103835322B (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169988A (ja) * 2005-12-21 2007-07-05 Tama Engineering Kk 支持杭の圧入方法および載荷試験方法
CN102518152A (zh) * 2011-11-18 2012-06-27 同济大学 模拟桥梁桩基础受双向循环荷载作用的试验装置
CN103015464A (zh) * 2012-11-28 2013-04-03 中交上海三航科学研究院有限公司 水平荷载试验桩顶约束装置及方法
CN103233486A (zh) * 2013-05-10 2013-08-07 山东大学 锚拉式挡土墙模型试验装置及试验方法
CN203396648U (zh) * 2013-08-08 2014-01-15 中国科学院武汉岩土力学研究所 一种锚杆室内拉拔试验装置
CN203741891U (zh) * 2014-03-17 2014-07-30 太原理工大学 管桩竖向和水平加载装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169988A (ja) * 2005-12-21 2007-07-05 Tama Engineering Kk 支持杭の圧入方法および載荷試験方法
CN102518152A (zh) * 2011-11-18 2012-06-27 同济大学 模拟桥梁桩基础受双向循环荷载作用的试验装置
CN103015464A (zh) * 2012-11-28 2013-04-03 中交上海三航科学研究院有限公司 水平荷载试验桩顶约束装置及方法
CN103233486A (zh) * 2013-05-10 2013-08-07 山东大学 锚拉式挡土墙模型试验装置及试验方法
CN203396648U (zh) * 2013-08-08 2014-01-15 中国科学院武汉岩土力学研究所 一种锚杆室内拉拔试验装置
CN203741891U (zh) * 2014-03-17 2014-07-30 太原理工大学 管桩竖向和水平加载装置

Also Published As

Publication number Publication date
CN103835322B (zh) 2015-08-12

Similar Documents

Publication Publication Date Title
CN202298628U (zh) 逆作法钢管柱自动调垂装置
CN103924521A (zh) 用于高架、桥梁安装的纠偏装置及其纠偏方法
CN203977296U (zh) 一种用于桥梁等比例调坡整体顶升的装置
CN104297262B (zh) 一种柱塞式检测定位机构
CN203741891U (zh) 管桩竖向和水平加载装置
CN203385620U (zh) 一种混凝土桥梁静载试验架
CN102854069A (zh) 大型直剪仪
CN104264998B (zh) 用于frp定量控制自锚式预应力张拉机
CN103835322A (zh) 管桩竖向和水平加载装置
CN103245473B (zh) 一种用于拉索模型振动试验的装置
CN103290864B (zh) 一种适用于桩基水平和竖向组合加载的装置
CN104368609A (zh) 活套摆动门托辊找正装置及其找正方法
CN103900915A (zh) 一种自平衡式轻型墙体抗剪试验装置
CN103675265B (zh) 适用于酶标仪的酶标板搁架
CN204255250U (zh) 一种支撑架跨距测量治具
CN204689525U (zh) 一种便于测量的设备顶升装置
CN204230172U (zh) 一种绝缘拉杆压装工装
CN204024054U (zh) 建筑模板拼缝密封器
CN203785612U (zh) 一种矫直辊挠曲度测量装置
CN203849005U (zh) 角度控制装置及具有该角度控制装置的平板显示器件测试装置
CN106370163A (zh) 一种建筑工程造价预算用测量装置
CN201686999U (zh) 大面积地坪施工的平整度及密实度控制平板振动器
CN206438389U (zh) 墩柱用连接支架组件
CN203148768U (zh) 一种拱肋的侧限位移装置
CN203795851U (zh) 一种可调节窗洞模板装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180612

Address after: 030024 Songzhuang Road, Hao Zhuang Town, Yingze District, Taiyuan, Shanxi, 9

Patentee after: Shanxi Hua Ji Tiancheng Civil Engineering Testing Co., Ltd.

Address before: 030024 No. 79 West Main Street, Taiyuan, Shanxi, Yingze

Patentee before: Taiyuan University of Technology

TR01 Transfer of patent right