CN103835296B - The safeguard structure of polder area deep foundation pit support and construction method thereof - Google Patents

The safeguard structure of polder area deep foundation pit support and construction method thereof Download PDF

Info

Publication number
CN103835296B
CN103835296B CN201210482419.6A CN201210482419A CN103835296B CN 103835296 B CN103835296 B CN 103835296B CN 201210482419 A CN201210482419 A CN 201210482419A CN 103835296 B CN103835296 B CN 103835296B
Authority
CN
China
Prior art keywords
supporting
delaying
fill stratum
construction
slag fill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210482419.6A
Other languages
Chinese (zh)
Other versions
CN103835296A (en
Inventor
马惠彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ocean University ZJOU
Original Assignee
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ocean University ZJOU filed Critical Zhejiang Ocean University ZJOU
Priority to CN201210482419.6A priority Critical patent/CN103835296B/en
Publication of CN103835296A publication Critical patent/CN103835296A/en
Application granted granted Critical
Publication of CN103835296B publication Critical patent/CN103835296B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of safeguard structure of polder area deep foundation pit support, include the foundation ditch (1) excavated out at polder area, surrounding in described foundation ditch is provided with supporting (2), the top of the beach argillic horizon (3) in polder area is provided with slag fill stratum (4) of delaying, it is characterized in that: described in delay and between slag fill stratum (4) and supporting (2), to be provided with the water barrier (5) of the clay material both blocked, described in the delay surface of slag fill stratum (4) and water barrier (5) be provided with concrete pavement (6).Wherein clay can be gathered materials on the spot; cost can not be increased; utilize the hyposmosis coefficient of clay in addition; can intercept or slow down seepage water to infiltrate to supporting from slag fill stratum of delaying; reduce seepage water and extra lateral pressure is caused to supporting; available protecting supporting, is also convenient to the construction of the supporting adopting cement mixing pile in addition.

Description

The safeguard structure of polder area deep foundation pit support and construction method thereof
Technical field
The present invention relates to a kind of polder area deep foundation pit support, particularly relate to a kind of safeguard structure and construction method thereof of polder area deep foundation pit support.
Background technology
For ensureing the safety of Underground Construction and foundation ditch surrounding enviroment, the gear needing to adopt foundation pit side-wall and surrounding enviroment, to reinforce and safeguard measure.Housing project is built, and often face deep pit digging, the computational methods of current Base hole supporting technology structure are not yet completely unified, and therefore the research of deep foundation pit support problem will be long-term, vigorous.The construction technology of excavation of foundation pit generally has two kinds: put slope excavation (non-support excavation) and excavation (having supporting excavation) under supporting and protection structure protection.The former is not only simple but also economical, can ensure the condition of stability of slope, should preferentially select when open territory or surrounding environment allow.Generally selected supporting excavation compared with the excavation of deep foundation ditch, supporting divides gear soil part and supports or (drawing anchor) two parts, and form of structure has multiple, and the selection of Supporting System of Deep Excavations is exactly determine supporting and protection structure.Pattern foundation pit supporting structure normal method: sheet pile formula, colonnade formula, diaphragm wall, self-supporting cement retaining wall, SMW method, open caisson (case) method, sheet pile formula is applicable to cohesive soil, sandy soil and grain through being not more than the sand cobble stratum of 100mm, because Pile Driving Noise during construction is large, should be used in the middle of the construction away from residential block.Colonnade formula branch borehole castinplace pile and digging hole filling pile, construction noise is little, is suitable for city construction.Diaphragm wall work construction method advantage: vibrate during construction little, noise is low, wall stiffness is large, little to surrounding formations disturbance; Be applicable to multiple soil layer.
Application number is the Chinese invention patent " static steel structure pile is applied to the method for deep foundation pit support " of CN200710052232.1 (publication number is CN101054802A), application number is the Chinese utility model patent " method for supporting and protecting row pile pit " of CN200810152925.2 (notification number is CN101408023A), and application number is the Chinese utility model patent " a kind of steel sheet pile pile tube combined foundation ditch support structure and supporting method thereof " of CN201110031259.9 (notification number is CN102140798A), they disclose various different supporting and protection structure.
For the supporting construction of polder area, there are special requirement, because beach soil property is soft, certain thickness dregs of delaying need be laid before construction on argillic horizon top and form slag fill stratum of delaying, then the construction of foundation ditch peripheral branch protection structure is carried out, supporting and protection structure can be adopt the bored pile of cement mixing pile and a determining deviation to construct Guan Liang again, finally concrete pavement is set on the surface of slag fill stratum of delaying, so just, can walk on concrete pavement and run various apparatus, the void content of slag fill stratum of delaying as everyone knows is large, running in precipitation situation, delay to have in slag fill stratum and produce a lot of seepage water, the top of seepage water to supporting and protection structure produces new pressurized energy, thus it is unfavorable to supporting and protection structure, although supporting and protection structure has sealing effect, but a large amount of seepage water also can partly be infiltrated or be poured in foundation ditch by top.
Summary of the invention
Technical problem to be solved by this invention provides a kind of safeguard structure intercepting or slow down that seepage water invades the polder area deep foundation pit support in foundation ditch for above-mentioned prior art present situation.
The utility model solves the problems of the technologies described above adopted technical scheme: a kind of safeguard structure of polder area deep foundation pit support, be included in the foundation ditch that polder area excavates out, surrounding in foundation ditch is provided with supporting, the top of the beach argillic horizon in polder area is provided with slag fill stratum of delaying, it is characterized in that: described in delay and between slag fill stratum and supporting, to be provided with the water barrier of the clay material both blocked, described in the delay surface of slag fill stratum and water barrier be provided with concrete pavement.
The width of above-mentioned water barrier is greater than 2 meters.
The raceway groove that intercepts water is excavated in contiguous supporting position, above-mentioned water barrier top.The water flow energy pouring into foundation ditch like this from concrete pavement is discharged fast by the raceway groove that intercepts water, and reduces the lateral pressure to supporting.
On above-mentioned slag fill stratum of delaying, excavation has multiple dewatering well, and the top of dewatering well is provided with the dewatering well flange extended upward above concrete pavement.Arrange dewatering well can make to penetrate into delay slag fill stratum to dewatering well concentrate, as dewatering well internal water accumulation exceedes the mobile degree of depth, we can with water pump by dewatering well water extract out.
Above-mentioned dewatering well arranges one every 15 ~ 20 meters, and the degree of depth of dewatering well is greater than the thickness of slag fill stratum of delaying.The spacing distance of this dewatering well can guarantee that each dewatering well is fully utilized, and the setting that simultaneously also can not increase because of too much dewatering well causes the increase of operating expenses.
The planar dimension of above-mentioned dewatering well is 0.8m*0.8m.
Present invention also offers a kind of construction method of safeguard structure of aforementioned polder area deep foundation pit support, comprise following construction sequence:
Step 1, beach argillic horizon is laid with dregs of delaying and forms certain thickness slag fill stratum of delaying;
Step 2, determines foundation ditch sideline, and the slag blanket of delaying diging up certain depth along periphery, foundation ditch sideline forms pit, and the degree of depth of pit is the thickness of slag fill stratum of delaying, and the width of pit is that supporting width separately adds 3 meters;
Step 3, adds cohesive soil in the pit diging up slag fill stratum of delaying and compaction in layers forms water barrier;
Step 4, foundation ditch sideline is carried out supporting construction and forms supporting;
Step 5, carries out excavation of foundation pit, simultaneously intersect carry out dewatering well, the construction of intercept water raceway groove and concrete pavement.
This construction method step is reasonable in design, constructability, and high construction efficiency.
Above-mentioned supporting construction comprises the construction of cement mixing pile facility, the construction of the bored pile facility of a determining deviation and the construction of hat beam facility.Certainly also other supporting construction mode can be adopted as required.
Compared with prior art; the utility model has the advantage of: it is provided with the water barrier of the clay material both blocked between slag fill stratum and supporting delaying; wherein clay can be gathered materials on the spot; cost can not be increased; utilize the hyposmosis coefficient of clay in addition, can intercept or slow down seepage water and infiltrate to supporting from slag fill stratum of delaying, reduce seepage water and extra lateral pressure is caused to supporting; available protecting supporting, is also convenient to the construction of the supporting adopting cement mixing pile in addition.
Accompanying drawing explanation
Fig. 1 is the structural representation after safeguard structure carries out construction sequence 1,2;
Fig. 2 is the structural representation after safeguard structure carries out construction sequence 3;
Fig. 3 is for completing the structural representation of the safeguard structure after constructing in steps.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
As shown in Figure 3, be a preferred embodiment of the present invention.
A kind of safeguard structure of polder area deep foundation pit support, include the foundation ditch 1 excavated out at polder area, surrounding in foundation ditch is provided with supporting 2, the top of the beach argillic horizon 3 in polder area is provided with slag fill stratum 4 of delaying, delay and be provided with the water barrier 5 of the clay material both blocked between slag fill stratum 4 and supporting 2, the width L of water barrier 5 is greater than 3 meters.Clay can be taken in the venue, and the surface of delay slag fill stratum 4 and water barrier 5 is provided with concrete pavement 6.
The raceway groove 7 that intercepts water is excavated in contiguous supporting 2 position, water barrier 5 top.
Excavation on slag fill stratum 4 of delaying has multiple dewatering well 8, dewatering well 8 arranges one every 15 ~ 20 meters, the planar dimension of dewatering well 8 is 0.8m*0.8m, the degree of depth of dewatering well 8 is greater than the thickness of slag fill stratum of delaying, and the top of dewatering well 8 is provided with the dewatering well flange 81 extended upward above concrete pavement 6.
It is provided with the water barrier of the clay material both blocked between slag fill stratum and supporting delaying; wherein clay can be gathered materials on the spot; cost can not be increased; utilize the hyposmosis coefficient of clay in addition; can intercept or slow down seepage water to infiltrate to supporting from slag fill stratum of delaying; reduce seepage water and extra lateral pressure is caused to supporting, available protecting supporting, be also convenient to the construction of the supporting adopting cement mixing pile in addition.
A construction method for the safeguard structure of aforementioned polder area deep foundation pit support, comprises following construction sequence:
Step 1, beach argillic horizon 3 is laid with dregs of delaying and forms certain thickness slag fill stratum 4 of delaying;
Step 2, determines foundation ditch sideline, and the slag fill stratum 4 of delaying diging up certain depth along periphery, foundation ditch sideline forms pit 9, and the degree of depth of pit 9 is the thickness of slag fill stratum of delaying, and the width S of pit 9 is that supporting width D separately adds 3 meters;
Above step 1,2 is with reference to shown in figure 1.
Step 3, adds cohesive soil in the pit 9 diging up slag fill stratum of delaying and compaction in layers forms water barrier 5; This step is with reference to shown in figure 2.
Step 4, foundation ditch sideline is carried out supporting construction and forms supporting 2;
Step 5, carries out foundation ditch 1 and excavates, simultaneously intersect carry out dewatering well 8, the construction of intercept water raceway groove 7 and concrete pavement 6.Step 4,5 is with reference to shown in figure 3.
Wherein supporting construction comprises the construction of cement mixing pile facility, the construction of the bored pile facility of a determining deviation and the construction of hat beam facility.

Claims (8)

1. the safeguard structure of a polder area deep foundation pit support, include the foundation ditch (1) excavated out at polder area, surrounding in described foundation ditch is provided with supporting (2), the top of the beach argillic horizon (3) in polder area is provided with slag fill stratum (4) of delaying, it is characterized in that: described in delay and between slag fill stratum (4) and supporting (2), to be provided with the water barrier (5) of the clay material both blocked, described in the delay surface of slag fill stratum (4) and water barrier (5) be provided with concrete pavement (6).
2. the safeguard structure of polder area deep foundation pit support according to claim 1, is characterized in that: the width (L) of described water barrier (5) is greater than 3 meters.
3. the safeguard structure of polder area deep foundation pit support according to claim 1, is characterized in that: the raceway groove (7) that intercepts water is excavated in contiguous supporting (2) position, described water barrier (5) top.
4. the safeguard structure of polder area deep foundation pit support according to claim 3, it is characterized in that: described in the upper excavation of slag fill stratum (4) of delaying have multiple dewatering well (8), the top of dewatering well (8) is provided with the dewatering well flange (81) extending upward concrete pavement (6) top.
5. the safeguard structure of polder area deep foundation pit support according to claim 4, it is characterized in that: described dewatering well (8) arranges one every 15 ~ 20 meters, the degree of depth (H) of dewatering well (8) is greater than the thickness of slag fill stratum of delaying.
6. the safeguard structure of polder area deep foundation pit support according to claim 4, is characterized in that: the planar dimension of described dewatering well (8) is 0.8m*0.8m.
7. a construction method for the safeguard structure of polder area deep foundation pit support as claimed in claim 4, comprises following construction sequence:
Step 1, beach argillic horizon (3) is laid with dregs of delaying and forms certain thickness slag fill stratum (4) of delaying;
Step 2, determine foundation ditch sideline, the slag fill stratum (4) of delaying diging up certain depth along periphery, foundation ditch sideline forms pit (9), the degree of depth of pit (9) is the thickness of slag fill stratum of delaying, and the width (S) of pit (9) separately adds 3 meters for supporting width (D);
Step 3, adds cohesive soil in the pit (9) diging up slag fill stratum of delaying and compaction in layers forms water barrier (5);
Step 4, foundation ditch sideline is carried out supporting construction and forms supporting (2);
Step 5, carry out foundation ditch (1) excavation, intersection carries out the construction of dewatering well (8), the raceway groove that intercepts water (7) and concrete pavement (6) simultaneously.
8. construction method according to claim 7, is characterized in that: described supporting construction comprises the construction of cement mixing pile facility, the construction of the bored pile facility of a determining deviation and the construction of hat beam facility.
CN201210482419.6A 2012-11-22 2012-11-22 The safeguard structure of polder area deep foundation pit support and construction method thereof Active CN103835296B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210482419.6A CN103835296B (en) 2012-11-22 2012-11-22 The safeguard structure of polder area deep foundation pit support and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210482419.6A CN103835296B (en) 2012-11-22 2012-11-22 The safeguard structure of polder area deep foundation pit support and construction method thereof

Publications (2)

Publication Number Publication Date
CN103835296A CN103835296A (en) 2014-06-04
CN103835296B true CN103835296B (en) 2015-10-28

Family

ID=50799161

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210482419.6A Active CN103835296B (en) 2012-11-22 2012-11-22 The safeguard structure of polder area deep foundation pit support and construction method thereof

Country Status (1)

Country Link
CN (1) CN103835296B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116298211B (en) * 2023-05-15 2023-08-11 西南石油大学 Test device and method for simulating excavation erosion of water-bearing stratum in near tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005264691A (en) * 2004-03-16 2005-09-29 Hiromoto Iizawa Device for bearing cover supporting frame for frost heave
CN102162250A (en) * 2010-02-24 2011-08-24 中国二十冶集团有限公司 Protective construction method of excavating large area deep foundation pit in running sand confined water soil layer
CN102345300A (en) * 2011-07-12 2012-02-08 中交四航工程研究院有限公司 Construction method of underground structures of seacoasts and artificial islands
CN102644286A (en) * 2012-04-10 2012-08-22 广东天竟建设有限公司 Deep foundation pit supporting structure
CN203022005U (en) * 2012-11-22 2013-06-26 浙江海洋学院 Protective structure of tidal flat reclamation district deep foundation pit retaining and protecting structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005264691A (en) * 2004-03-16 2005-09-29 Hiromoto Iizawa Device for bearing cover supporting frame for frost heave
CN102162250A (en) * 2010-02-24 2011-08-24 中国二十冶集团有限公司 Protective construction method of excavating large area deep foundation pit in running sand confined water soil layer
CN102345300A (en) * 2011-07-12 2012-02-08 中交四航工程研究院有限公司 Construction method of underground structures of seacoasts and artificial islands
CN102644286A (en) * 2012-04-10 2012-08-22 广东天竟建设有限公司 Deep foundation pit supporting structure
CN203022005U (en) * 2012-11-22 2013-06-26 浙江海洋学院 Protective structure of tidal flat reclamation district deep foundation pit retaining and protecting structure

Also Published As

Publication number Publication date
CN103835296A (en) 2014-06-04

Similar Documents

Publication Publication Date Title
CN101270579B (en) Foundation pit guard method for expansion construction from deep foundation pit to shallow foundation pit
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN104947682A (en) Foundation pit support construction method and device thereof
CN102116028B (en) Method and structure for excavating soil in core tube region based on raft pile supporting
CN105464074B (en) A kind of artificial digging pile high polymer grouting safeguard structure and its construction method
CN205314116U (en) Continuous type of combined type drilling cling compound structure
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN107012871B (en) A kind of suspension type goes along with sb. to guard him the deep reversed construction method for greatly enhancing foundation pit fabricated construction
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN108560536A (en) The continuous piling wall construction method of Soil-cement
CN110004935A (en) A kind of locally deep pit drain measure trench system and construction method
CN109594575A (en) A kind of open caisson periphery grouting and reinforcing soil body construction method
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN104652444A (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN107059914A (en) A kind of ring-type for being used for shallow overburden or naked rock area in water is embedded to set basis
CN207331746U (en) A kind of underground pipe gallery
CN109881683A (en) A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique
CN204715364U (en) A kind of foundation pit support device
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN208441083U (en) Half coercion underground continuous wall structure
CN103835296B (en) The safeguard structure of polder area deep foundation pit support and construction method thereof
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN102425179A (en) Reinforced soil infiltration ditch structure supported by miniature steel pipe cast-in-place pile
CN203022005U (en) Protective structure of tidal flat reclamation district deep foundation pit retaining and protecting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Putuo University of Science and Technology, No. 127 Datong Road, Zhujiajian Street, Putuo District, Zhoushan City, Zhejiang Province, 316111

Patentee after: Zhejiang Ocean University

Address before: Putuo University of Science and Technology, No. 127 Datong Road, Zhujiajian Street, Putuo District, Zhoushan City, Zhejiang Province, 316111

Patentee before: ZHEJIANG OCEAN University

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140604

Assignee: Lvcheng Technology Services (Zhoushan) Co.,Ltd.

Assignor: Zhejiang Ocean University

Contract record no.: X2023980045987

Denomination of invention: Protective structure and construction method of deep foundation pit support in mudflat reclamation area

Granted publication date: 20151028

License type: Common License

Record date: 20231106