CN103835198A - Method for manufacturing jacking type sleeper temporary support - Google Patents

Method for manufacturing jacking type sleeper temporary support Download PDF

Info

Publication number
CN103835198A
CN103835198A CN201410067270.4A CN201410067270A CN103835198A CN 103835198 A CN103835198 A CN 103835198A CN 201410067270 A CN201410067270 A CN 201410067270A CN 103835198 A CN103835198 A CN 103835198A
Authority
CN
China
Prior art keywords
base
jack
oblique
shaped
jacking type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410067270.4A
Other languages
Chinese (zh)
Other versions
CN103835198B (en
Inventor
冯世英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG BINWU INDUSTRIAL CO., LTD.
Original Assignee
冯世英
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 冯世英 filed Critical 冯世英
Priority to CN201410067270.4A priority Critical patent/CN103835198B/en
Publication of CN103835198A publication Critical patent/CN103835198A/en
Application granted granted Critical
Publication of CN103835198B publication Critical patent/CN103835198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention provides a method for manufacturing a jacking type sleeper temporary support. The jacking type sleeper temporary support is machined by steel and is structurally composed of a base, a lifting jack and oblique arms. The base is a cross-shaped or oval whole, the lifting jack is welded to the middle of the base, the base and the bottom of the lifting jack are connected into a whole, the two oblique arms are symmetrically arranged on the two sides of a jacking rod of the lifting jack, the oblique arms and the jacking rod are connected into a whole, flat boards are arranged at the upper ends of the two oblique arms respectively, and the middle portions of the flat boards and the top ends of the oblique arms are perpendicularly welded and connected into a whole.

Description

The manufacture method of jacking type sleeper temporary supporting device
Technical field
A manufacture method for jacking type sleeper temporary supporting device, belongs to railway major overhaul tool field.
Background technology
Railway stone ballast roadbed, will change one time rock ballast every several years, in order not affect the current requirement of railway, during changing slag, under the sleeper of emptying rock ballast, need temporary supporting, way is that rock ballast is packed in pocket conventionally, after tying, form a rock ballast bag, then rock ballast bag is put under sleeper, with the two ends of this support sleeper, met the requirement that vehicle passes through temporarily.The defect of this method is that labour intensity is large, operating speed slow, it is high to support cost.
Summary of the invention
Object of the present invention, is the manufacture method that a kind of jacking type sleeper temporary supporting device will be provided, and replaces rock ballast bag with this; Jacking type sleeper temporary supporting device is made with iron and steel processing, and structure is made up of base, jack and oblique arm.Base be shaped as a cross or oval-shaped entirety, the cross section (after the line of base) of base is trapezoidal.Base adopts founding die casting or steel plate cutting to be welded; The bottom lengths of base is more than 20 centimetres.Centre at base is welded with jack, and the bottom vertical of base and jack is connected as a body; Jack adopts hydraulic pressure or screw jack, is provided with two oblique arms in the lifting pin bilateral symmetry of jack, and oblique arm and lifting pin are weldingly connected integral; After oblique arm is connected with lifting pin, be shaped as Y shape, oblique arm forms by the plate body system of cutting; Centre distance between two oblique arm upper ends equals two center width between sleeper; The upper end of two oblique arms is in same level.Upper end at two oblique arms is respectively equipped with flat board, dull and stereotyped is shaped as a square plate body, dull and stereotypedly forms by the steel plate system of cutting, and dull and stereotyped middle part and the top vertical welding of oblique arm are connected as a body.
When use, under two adjacent sleepers of being emptied, put into a jacking type sleeper temporary supporting device, prop up unsettled railway with this, jacking type eyelid retractor be in track under, base position is on the Horizon between two sleepers, adjust the lifting pin height of jack, make dull and stereotypedly to contact with below sleeper, vehicle is with regard to P Passable like this.
Accompanying drawing explanation
Fig. 1, jacking type sleeper temporary supporting device front view
1, base, 2, jack, 3, oblique arm, 4, flat board, 5, lifting pin.
The specific embodiment
As shown in Figure 1, there is shown, a kind of manufacture method of jacking type sleeper temporary supporting device, replaces rock ballast bag with this; Jacking type sleeper temporary supporting device is made with iron and steel processing, and structure is made up of base 1, jack 2 and oblique arm 3.Base 1 be shaped as a cross or oval-shaped entirety, the cross section (after the line of base) of base 1 is trapezoidal.Base 1 adopts founding die casting or steel plate cutting to be welded; The bottom lengths of base 1 is more than 20 centimetres.Be welded with jack 2 in the centre of base 1, the bottom vertical of base 1 and jack 2 is connected as a body; Jack 2 adopts hydraulic pressure or screw jack, is provided with two oblique arms 3 in the bilateral symmetry of the lifting pin 5 of jack 2, and oblique arm 3 and lifting pin 5 are weldingly connected integral; After oblique arm 3 is connected with lifting pin 5, be shaped as Y shape, plate body of oblique arm 3 use system of cutting forms; Centre distance between two oblique arm 3 upper ends equals two center width between sleeper; The upper end of two oblique arms 3 is in same level.Be respectively equipped with dull and stereotyped 4, dull and stereotyped 4 the square plate body that is shaped as in the upper end of two oblique arms 3, the dull and stereotyped 4 use steel plates system of cutting forms, and dull and stereotyped 4 middle part and the top vertical welding of oblique arm 3 are connected as a body.
When use, under two adjacent sleepers of being emptied, put into a jacking type sleeper temporary supporting device, prop up unsettled railway with this, jacking type eyelid retractor be in track under, base 1 is on two Horizons between sleeper, adjust the height of lifting pin 5 of jack 2, make dull and stereotyped 4 to contact with below sleeper, vehicle is with regard to P Passable like this.

Claims (1)

1. a manufacture method for jacking type sleeper temporary supporting device, feature is: jacking type sleeper temporary supporting device is made with iron and steel processing, and structure is made up of base (1), jack (2) and oblique arm (3); Base (1) be shaped as a cross or oval-shaped entirety, the cross section of base (1) is trapezoidal; Base (1) adopts founding die casting or steel plate cutting to be welded; The bottom lengths of base (1) is more than 20 centimetres.Be welded with jack (2) in the centre of base (1), the bottom vertical of base (1) and jack (2) is connected as a body; Jack (2) adopts hydraulic pressure or screw jack, bilateral symmetry at the lifting pin (5) of jack (2) is provided with two oblique arms (3), and oblique arm (3) and lifting pin (5) are weldingly connected integral; After oblique arm (3) is connected with lifting pin (5), be shaped as Y shape, oblique arm (3) forms by the plate body system of cutting; Centre distance between two oblique arms (3) upper end equals two center width between sleeper; The upper end of two oblique arms (3) is in same level; Be respectively equipped with flat board (4) in the upper end of two oblique arms (3), dull and stereotyped (4) be shaped as a square plate body, dull and stereotyped (4) form by the steel plate system of cutting, and the dull and stereotyped middle part of (4) and the top vertical welding of oblique arm (3) are connected as a body.
CN201410067270.4A 2014-02-22 2014-02-22 The method of manufacture and use thereof of jacking type sleeper temporary support device Active CN103835198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410067270.4A CN103835198B (en) 2014-02-22 2014-02-22 The method of manufacture and use thereof of jacking type sleeper temporary support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410067270.4A CN103835198B (en) 2014-02-22 2014-02-22 The method of manufacture and use thereof of jacking type sleeper temporary support device

Publications (2)

Publication Number Publication Date
CN103835198A true CN103835198A (en) 2014-06-04
CN103835198B CN103835198B (en) 2015-12-02

Family

ID=50799067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410067270.4A Active CN103835198B (en) 2014-02-22 2014-02-22 The method of manufacture and use thereof of jacking type sleeper temporary support device

Country Status (1)

Country Link
CN (1) CN103835198B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1329197A (en) * 2000-06-09 2002-01-02 弗兰茨普拉塞铁路机械工业股份有限公司 Machine for removing old track and laying new track and its operation method
CN2729127Y (en) * 2004-08-27 2005-09-28 昆明中铁大型养路机械集团有限公司 Switch laying and changing equipment
CN200949193Y (en) * 2006-09-25 2007-09-19 郑铁利达实业开发总公司 Track raiser
PL206551B1 (en) * 2003-01-21 2010-08-31 Rail One Gmbh Screw device for high-adjusting a track span
KR101260947B1 (en) * 2011-12-13 2013-05-06 동원궤도(주) Track support apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1329197A (en) * 2000-06-09 2002-01-02 弗兰茨普拉塞铁路机械工业股份有限公司 Machine for removing old track and laying new track and its operation method
PL206551B1 (en) * 2003-01-21 2010-08-31 Rail One Gmbh Screw device for high-adjusting a track span
CN2729127Y (en) * 2004-08-27 2005-09-28 昆明中铁大型养路机械集团有限公司 Switch laying and changing equipment
CN200949193Y (en) * 2006-09-25 2007-09-19 郑铁利达实业开发总公司 Track raiser
KR101260947B1 (en) * 2011-12-13 2013-05-06 동원궤도(주) Track support apparatus

Also Published As

Publication number Publication date
CN103835198B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103195450B (en) Hydraulic pressure tunnel invert operation trolley and inverted arch construction method
CN205259074U (en) Basket traveling system is hung to triangle
CN204401448U (en) Simple-supported thencontinuous bridge temporary support
CN103835198B (en) The method of manufacture and use thereof of jacking type sleeper temporary support device
CN208293326U (en) A kind of adaptive gauge rail lifting apparatus
CN203487517U (en) Drainage ditch formwork movement vehicle system
CN103835197B (en) Jacking type sleeper temporary support device
CN204356663U (en) The rear support leg of novel large-tonnage Bridge Erector
CN203248175U (en) Automatic coupling supporting device of mineshaft deep roadway
CN203479511U (en) Railway T beam static load test pedestal
CN103835199B (en) The manufacture method of column sleeper temporary support device
CN203581170U (en) Conveying compartment for concrete prefabricated stair
CN207260603U (en) It is a kind of to play material device for carrying large embossment stone material
CN203513196U (en) Hydraulic loading and unloading machine
CN204356659U (en) The rear auxiliary support apparatus of novel large-tonnage Bridge Erector
CN206033130U (en) Quick replacement driving bull wheel device
CN204532374U (en) The multi-functional chassis of metro station construction
CN204040599U (en) A kind of pole upside-down mounting lift hydraulic lifting apparatus
CN203130107U (en) Hydraulic tunnel inverted arch operation trolley
CN204212057U (en) A kind of mobile formwork girder supports uses equalizer bar device
CN209127966U (en) Mine car overhauls lifting machine
CN204317470U (en) Tobacco falls apart leaf bundling case
CN104179125B (en) A kind of mobile formwork girder supports uses equalizer bar device
CN207483155U (en) A kind of handling ballast welding steel case apparatus
CN103835200B (en) Column sleeper temporary support device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170901

Address after: 226000 Jiangsu city of Nantong province Tongzhou District five Jie Zhen Yuan San Wei Cun

Patentee after: NANTONG BINWU INDUSTRIAL CO., LTD.

Address before: Room 1, unit 34, building 235000, Li Yuan new village, Huaibei, Anhui, China

Patentee before: Feng Shiying

TR01 Transfer of patent right