CN103828168B - 多个电设备的耗电量的实时测量和调节 - Google Patents

多个电设备的耗电量的实时测量和调节 Download PDF

Info

Publication number
CN103828168B
CN103828168B CN201280035839.8A CN201280035839A CN103828168B CN 103828168 B CN103828168 B CN 103828168B CN 201280035839 A CN201280035839 A CN 201280035839A CN 103828168 B CN103828168 B CN 103828168B
Authority
CN
China
Prior art keywords
power line
frequency
voltage
power
electrical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201280035839.8A
Other languages
English (en)
Chinese (zh)
Other versions
CN103828168A (zh
Inventor
B·海因茨
J-M·乌里
德 圣 杰曼 H·勒菲弗
P·碧瓦斯
M·比诺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Voltalis SA
Original Assignee
Voltalis SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Voltalis SA filed Critical Voltalis SA
Publication of CN103828168A publication Critical patent/CN103828168A/zh
Application granted granted Critical
Publication of CN103828168B publication Critical patent/CN103828168B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/14Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network the power network being locally controlled, e.g. home energy management systems [HEMS]
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R23/00Arrangements for measuring frequencies; Arrangements for analysing frequency spectra
    • G01R23/02Arrangements for measuring frequency, e.g. pulse repetition rate; Arrangements for measuring period of current or voltage
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/13Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network
    • H02J13/1337Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the transmission of data to equipment in the power network involving the use of Internet protocols
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • H02J13/18Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the remotely-controlled equipment, e.g. converters or transformers
    • H02J13/333Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network characterised by the remotely-controlled equipment, e.g. converters or transformers the equipment forming part of substations
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load
    • H02J3/14Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, the networks, e.g. progressively balanced loading
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2105/00Networks for supplying or distributing electric power characterised by their spatial reach or by the load
    • H02J2105/10Local stationary networks having a local or delimited stationary reach
    • H02J2105/12Local stationary networks having a local or delimited stationary reach supplying households or buildings
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2105/00Networks for supplying or distributing electric power characterised by their spatial reach or by the load
    • H02J2105/40Networks for supplying or distributing electric power characterised by their spatial reach or by the load characterised by the loads connecting to the networks or being supplied by the networks
    • H02J2105/42Home appliances
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
CN201280035839.8A 2011-07-19 2012-07-03 多个电设备的耗电量的实时测量和调节 Active CN103828168B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FR1156528 2011-07-19
FR1156528A FR2978309B1 (fr) 2011-07-19 2011-07-19 Mesure et modulation en temps reel de la consommation electrique d'une pluralite d'appareils electriques
PCT/FR2012/051536 WO2013011221A1 (fr) 2011-07-19 2012-07-03 Mesure et modulation en temps reel de la consommation electrique d'une pluralite d'appareils electriques

Publications (2)

Publication Number Publication Date
CN103828168A CN103828168A (zh) 2014-05-28
CN103828168B true CN103828168B (zh) 2017-08-11

Family

ID=46639568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280035839.8A Active CN103828168B (zh) 2011-07-19 2012-07-03 多个电设备的耗电量的实时测量和调节

Country Status (13)

Country Link
US (1) US9217764B2 (enExample)
EP (1) EP2735067B1 (enExample)
JP (1) JP5985628B2 (enExample)
CN (1) CN103828168B (enExample)
CA (1) CA2841347C (enExample)
ES (1) ES2554247T3 (enExample)
FR (1) FR2978309B1 (enExample)
IL (1) IL230480A (enExample)
IN (1) IN2014DN00212A (enExample)
PL (1) PL2735067T3 (enExample)
PT (1) PT2735067E (enExample)
WO (1) WO2013011221A1 (enExample)
ZA (1) ZA201400885B (enExample)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3023078B1 (fr) 2014-06-26 2018-01-19 Smart Grid Energy Procede et dispositif pour gerer le partage de ressources entre equipements producteur et/ou consommateur
CN106597082B (zh) * 2015-10-16 2020-11-10 得能创科有限公司 一种电器能耗识别方法和识别系统
US10310463B2 (en) * 2016-05-25 2019-06-04 Honeywell International Inc. Building system controller configuration propagation
CN106771481A (zh) * 2016-12-02 2017-05-31 郑州云海信息技术有限公司 一种电流采集器、分布式服务器电流监测系统和方法
FR3069721B1 (fr) * 2017-07-31 2019-08-02 Voltalis Lissage d'une courbe de charge comprenant une agregation de courbes de charges elementaires
FR3087055B1 (fr) * 2018-10-04 2021-06-18 Voltalis Estimation d'une grandeur physique par un systeme de mesure distribue
FR3103646B1 (fr) 2019-11-27 2022-05-06 Lancey Energy Storage Micro-réseau résilient d'appareils de chauffage de type radiateur électrique
CN111969596A (zh) * 2020-08-02 2020-11-20 上海千贯节能科技有限公司 一种电器级负荷频率控制系统的负荷自适应校正响应方法
SE2350668A1 (en) * 2023-05-31 2024-12-01 Ab Solask Energi Controller for a Controlling a Power Grid, Computer-Implemented Method, Computer Program, Non-Volatile Data Carrier and Control System

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6487509B1 (en) * 1996-02-20 2002-11-26 Wrap Spa Method for the energy management in a domestic environment
US7174260B2 (en) * 2004-04-01 2007-02-06 Blue Line Innovations Inc. System and method for reading power meters
JP4348450B2 (ja) * 2004-09-21 2009-10-21 独立行政法人産業技術総合研究所 可制御負荷の消費電力制御方法及び可制御負荷制御システム
US20080106146A1 (en) * 2004-11-02 2008-05-08 Lg Electronics Inc. Management System for In-House Power Quantity Consumed
CA2630169A1 (en) * 2005-11-25 2007-05-31 Computerized Electricity Systems Ltd. Flexible electric load management system and method therefor
WO2008032225A2 (en) * 2006-03-21 2008-03-20 Ranco Incorporated Of Delaware Refrigeration monitor unit
FR2904486B1 (fr) * 2006-07-31 2010-02-19 Jean Marc Oury Procede et systeme de gestion et de modulation en temps reel de consommation electrique.
CN201057625Y (zh) * 2006-11-17 2008-05-07 周建林 电性检知保护装置
CN101207302A (zh) * 2006-12-19 2008-06-25 贺祥梅 配变电的运行与监测管理系统
JP4799531B2 (ja) * 2007-11-14 2011-10-26 三菱電機株式会社 集合住宅の電力配電システム、集合住宅の電力配分方法、集合住宅の電力配電管理装置
US8482290B2 (en) * 2009-02-27 2013-07-09 Makad Energy, Llc System for intelligent automated response to line frequency and voltage disturbances by a central control point communication with a plurality of load control devices
EP2476132B1 (en) * 2009-09-07 2019-11-20 ABB Schweiz AG Method and system for power management
JP2011101530A (ja) * 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd ビルの配電システム及びビルの配電システムにおける幹線の保護方法
CN101895121B (zh) 2010-06-08 2012-09-12 国网电力科学研究院 基于多代理技术的低频低压减负荷控制方法
CN101951027B (zh) * 2010-09-01 2014-01-15 中国电力科学研究院 中低压配电网统一数据采集与监控系统

Also Published As

Publication number Publication date
EP2735067A1 (fr) 2014-05-28
CN103828168A (zh) 2014-05-28
PL2735067T3 (pl) 2016-01-29
JP2014521303A (ja) 2014-08-25
WO2013011221A1 (fr) 2013-01-24
PT2735067E (pt) 2015-12-24
FR2978309A1 (fr) 2013-01-25
IN2014DN00212A (enExample) 2015-06-05
JP5985628B2 (ja) 2016-09-06
IL230480A0 (en) 2014-03-31
US20140232372A1 (en) 2014-08-21
FR2978309B1 (fr) 2015-08-21
IL230480A (en) 2016-09-29
US9217764B2 (en) 2015-12-22
EP2735067B1 (fr) 2015-09-09
CA2841347C (fr) 2019-03-05
CA2841347A1 (fr) 2013-01-24
ZA201400885B (en) 2015-11-25
ES2554247T3 (es) 2015-12-17

Similar Documents

Publication Publication Date Title
CN103828168A (zh) 多个电设备的耗电量的实时测量和调节
KR102747724B1 (ko) 전력 그리드의 전기 파라미터들을 결정하는 시스템
US20110153107A1 (en) Apparatus and method for smart energy management by controlling power consumption
JP6566525B2 (ja) グリッド周波数応答
Della Giustina et al. Hybrid communication network for the smart grid: Validation of a field test experience
AU2009322498B2 (en) Method for determining load in a three-phase power supply
US20150253364A1 (en) Electric household appliance remote monitoring system
CN103875188B (zh) 优化使用本地电力线通信网络的家庭自动化系统
US20110147360A1 (en) Thermal Energy Storage Apparatus, Controllers And Thermal Energy Storage Control Methods
US20090265042A1 (en) System and Method for Providing Voltage Regulation in a Power Distribution System
US8027795B2 (en) Load model generation for estimating a load value from a base load value in a system
US20130110304A1 (en) Electric-power management system, electric-power management method, and section controller
CN103384088A (zh) 用于管理电网电力供应的系统和方法
CN105359369A (zh) 能量管理装置及其相关方法
EP2321658A2 (en) Determining electric grid endpoint phase connectivity
CN103718566A (zh) 社会基础设施控制系统、控制方法、控制装置及服务器
JP2019517772A5 (enExample)
EP2989427A1 (en) Monitoring system
CN107112756A (zh) 用于优化无功能量消耗的方法
US10012966B2 (en) Equipment management system, equipment management apparatus, and equipment management method
KR101319449B1 (ko) 무선 라우팅 역할을 수행하는 무정전 전력 측정장치
CN106463963B (zh) 减少至少一个电力负载消耗的电功率的设备、相关联的系统和方法
KR20140086257A (ko) 서브 미터링 기반 피크전력 관리 방법 및 시스템
JP5461722B1 (ja) 太陽光発電装置の健全性を診断する方法及び情報処理装置
WO2005064562A1 (en) Multi-function electric power supply automation system that use plc modem

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant