CN103826228A - Method and device for planning and allocating resources - Google Patents
Method and device for planning and allocating resources Download PDFInfo
- Publication number
- CN103826228A CN103826228A CN201410067273.8A CN201410067273A CN103826228A CN 103826228 A CN103826228 A CN 103826228A CN 201410067273 A CN201410067273 A CN 201410067273A CN 103826228 A CN103826228 A CN 103826228A
- Authority
- CN
- China
- Prior art keywords
- user equipment
- resource
- prb
- cell
- edge customer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a method and device for planning and allocating resources. The method and device for planning and allocating the resources are used for enabling marginal user equipment to actually occupy more planned PRB resources with small interference, so that better inter-cell interference coordination effects can be achieved. The method for planning the resources comprises the steps that a centralized control node receives information reported by a base station, wherein the information comprises the actual resource using amount of the cell marginal user equipment; the centralized control node plans central user equipment resources and marginal user equipment resources for a cell according to the actual resource using amount of the cell marginal user equipment.
Description
Technical field
The present invention relates to communication technical field, relate in particular to a kind of MRP, distribution method and device.
Background technology
Concentrate Inter-Cell Interference Coordination (ICIC) technology to coordinate each Cell Edge User device resource by newly-increased centralized control node, reach the object of avoiding or alleviating edge customer equipment interference between neighbor cell.At present, concentrate ICIC technology to exist edge customer device resource requirements to estimate inaccurate, when actual schedule, may occur that the edge customer device resource of some subframe planning is by central user hold facility, the edge customer equipment of some subframe may take again more central user device resource position, cause phase mutual interference between each Cell Edge User equipment, can not reach the effect of the Inter-Cell Interference Coordination of expection.
Concentrate ICIC technology at Long Term Evolution (Long Term Evolution, LTE) newly-increased centralized control node in network, edge customer device distribution and information on load that centralized control node reports according to each community, focus on and coordinate the edge customer device resource of each community, thereby make Radio Resource reasonably distribute in minizone and cooperate, better control the interference level of whole net, improve the performance of cell edge and community entirety.
Existing scheme is described below:
Reporting subdistrict, each base station edge customer device resource requirements and interference Neighboring Cell List, the edge customer device resource requirements amount here, can predict according to the spectrum efficiency of the assurable bit rate of edge customer equipment (Guaranteed Bit Rate, GBR) or non-assurance bit rate (NGBR) speed and edge customer equipment:
Wherein:
R
dfor the edge customer device resource requirements amount calculating, characterize with Physical Resource Block (Physical Resource Block, PRB) number.
Num
pRB_dfor example, for the descending all existing PRB numbers that take in average each chronomere (frame) in a load measurement period that are carried on of edge customer equipment.
R
sBR_dfor the total active service speed of the descending all existing carryings of edge customer equipment.
it is the bearer rate requirement of a downlink bearing.Downlink bearing rate requirement is GBR speed or minimum bit rate (MinBR) speed.
Kd is in the time that load measurement period arrives, the descending also carrying number that exist and that have rate requirement of edge customer equipment.If Kd is 0, R
dbe 0.
Centralized control node, according to each base station reporting information, is determined the spendable PRB resource location of each Cell Edge User equipment according to certain algorithm, and the edge customer equipment PRB quantity of each plot planning equals the edge customer device resource requirements of this community.Basic thought is to allow the resource location of edge customer hold facility of the community that has interference relationships not overlapping as far as possible, assurance exists the minizone edge customer equipment of interference relationships not disturb mutually, if cannot accomplish completely not overlappingly, it be just the PRB resource location of the edge customer equipment selection minimum interference of each community.
Dispatch according to the edge customer device resource position of centralized control node indication Dui Ge community, base station.When scheduling, be followed successively by user equipment allocation resource according to dispatching priority queue, central user equipment preferentially takies center P RB resource (non-edge customer equipment PRB resource location), if resource not also can take edge customer device resource; Edge customer equipment preferentially takies edge PRB resource, if resource not also can take central user device resource.
But prior art scheme has the following disadvantages:
First, when being each cell allocation edge customer equipment available resources, centralized control node only considers basic service quality (the Quality of Service of this Cell Edge User equipment, QoS) demand, for NGBR, its MinBR demand has only been considered in carrying, and in real network when operation, is in order to receive more users equipment that less MinBR generally can be set, so the service rate of NGBR carrying actual motion is probably greater than MinBR.Centralized control node is the PRB occupancy that the edge resource of edge customer facility planning is just less than edge customer equipment actual schedule needs like this, in the time of actual schedule, because the edge resource that centralized control node is distributed is not enough, edge customer equipment can take more non-edge customer device resource position, the edge customer equipment of this community can be subject to larger interference on the one hand, also can cause interference to the edge customer equipment of other communities on the other hand, can not reach the effect of each Inter-Cell Interference Coordination of expection.
In addition, each community can not guarantee that every subframe can be dispatched to edge customer equipment and central user equipment, also its resource occupation situation is not obligated when control centre or edge customer equipment simultaneously, edge customer equipment also can take center resources, and central user equipment also can take edge resource.Like this, in the time there is a large amount of high priority central user equipment in scheduling queue, just there will be central user equipment to seize the situation of edge customer device resource, otherwise, in the time there is a large amount of high priority edge customer equipment in scheduling queue, just there will be edge customer equipment to seize the situation of central user device resource, can not guarantee that so on the whole the edge resource of planning is by edge customer hold facility, be unfavorable for controlling the interference between each Cell Edge User equipment, can not guarantee edge customer appliance services speed.
Summary of the invention
The embodiment of the present invention provides a kind of MRP, distribution method and device, in order to make the actual little PRB resource of interference that takies more multiple objective programming of edge customer equipment, thereby reaches better Inter-Cell Interference Coordination effect.
A kind of MRP method that the embodiment of the present invention provides, comprising:
Centralized control node receives base station reporting information, comprising the real resource use amount of Cell Edge User equipment;
Centralized control node, according to the real resource use amount of Cell Edge User equipment, is plot planning central user device resource and edge customer device resource.
Centralized control node has been considered the real resource use amount of edge customer equipment when for each plot planning edge customer device resource, thereby edge customer equipment actual use resource and projected resources are consistent as far as possible, have better controlled the interference between each Cell Edge User equipment.
Preferably, in the reporting information of described base station, except comprising the real resource use amount of Cell Edge User equipment
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
Preferably, centralized control node, according to the real resource use amount of Cell Edge User equipment, is plot planning central user device resource and edge customer device resource, comprising:
Centralized control node, according to each base station reporting information, is determined the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i
with the schedulable PRB quantity of central user equipment
Centralized control node is determined the spendable PRB resource location of each Cell Edge User equipment, and planning is Num (i) to the PRB quantity of edge customer equipment;
Centralized control node is notified the spendable PRB resource location of each Cell Edge User equipment, the schedulable PRB quantity of edge customer equipment
with the schedulable PRB quantity of central user equipment
Preferably, the real resource use amount of Cell Edge User equipment
real resource use amount with central user equipment
respectively to adopt following formula to determine:
(edge customer device resource requirements amount
edge customer equipment real resource use amount
);
(central user device resource requirements amount
central user equipment real resource use amount
).
Preferably, centralized control node, according to each base station reporting information, is determined the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i in the following way
with the schedulable PRB quantity of central user equipment
Otherwise,
Wherein, parameter alpha is default calculation of natural resources increment factor, 0< α <1;
For cell i, according to disturbing Neighboring Cell List to determine the interference adjacent area set J of cell i;
Otherwise,
A kind of resource allocation methods that the embodiment of the present invention provides, comprising:
Base station, to centralized control node reporting information, comprising the real resource use amount of Cell Edge User equipment, is used to indicate centralized control node according to the real resource use amount of Cell Edge User equipment, is cell scheduling resources for user equipment;
The resources for user equipment that base station is cell scheduling according to centralized control node is the user equipment allocation resource in community.
The method makes the actual little PRB resource of interference that takies more multiple objective programming of edge customer equipment, thereby reaches better Inter-Cell Interference Coordination effect.
Preferably, in the information that described base station reports, except the real resource use amount that comprises Cell Edge User equipment is expressed as
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
Preferably, the resources for user equipment that base station is cell scheduling according to centralized control node, is the user equipment allocation resource in community, comprising:
Base station is followed successively by user equipment allocation resource according to priority query when to each cell scheduling, and wherein, the schedulable PRB limited amount of central user equipment configures in centralized control node
when PRB resource selection, preferentially take central user equipment PRB resource, exceed part and take edge customer device resource,
after using, will treat that control centre's subscriber equipment temporarily puts into central user device waiting queue; The schedulable PRB limited amount of edge customer equipment configures in centralized control node
when PRB resource selection, preferentially take the edge customer device resource of planning, exceed part and take central user device resource.
Centralized control node has been considered the real resource use amount of edge customer equipment when for each plot planning edge customer device resource, simultaneously guarantee that each subframe can be dispatched to central user equipment and edge customer equipment when each cell scheduling, center subscriber equipment and edge customer device resource are taken and done certain limitation simultaneously, thereby edge customer equipment actual use resource and projected resources are consistent as far as possible, have better controlled the interference between each Cell Edge User equipment.
Preferably, the resources for user equipment that base station is cell scheduling according to centralized control node, is the user equipment allocation resource in community, also comprises:
If a complete system of all edge customer equipment schedulings of subframe remains PRB resource in addition, continue as the central user devices allocation residue PRB resource in central user device waiting queue.
A kind of centralized control node device that the embodiment of the present invention provides, comprising:
Receiving element, for receiving base station reporting information, comprising the real resource use amount of Cell Edge User equipment;
Planning unit, for according to the real resource use amount of Cell Edge User equipment, is plot planning central user device resource and edge customer device resource.
Centralized control node has been considered the real resource use amount of edge customer equipment when for each plot planning edge customer device resource, thereby edge customer equipment actual use resource and projected resources are consistent as far as possible, have better controlled the interference between each Cell Edge User equipment.
Preferably, in the reporting information of described base station, except comprising the real resource use amount of Cell Edge User equipment
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
Preferably, described planning unit specifically for:
According to each base station reporting information, determine the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i
with the schedulable PRB quantity of central user equipment
Determine the spendable PRB resource location of each Cell Edge User equipment, planning is Num (i) to the PRB quantity of edge customer equipment;
Notify the spendable PRB resource location of each Cell Edge User equipment, the schedulable PRB quantity of edge customer equipment
with the schedulable PRB quantity of central user equipment
Preferably, the real resource use amount of Cell Edge User equipment
real resource use amount with central user equipment
respectively to adopt following formula to determine:
(edge customer device resource requirements amount
edge customer equipment real resource use amount
);
(central user device resource requirements amount
central user equipment real resource use amount
).
Preferably, described planning unit, according to each base station reporting information, is determined the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i in the following way
with the schedulable PRB quantity of central user equipment
The schedulable PRB quantity of central user equipment
Otherwise,
Wherein, parameter alpha is default calculation of natural resources increment factor, 0< α <1;
For cell i, according to disturbing Neighboring Cell List to determine the interference adjacent area set J of cell i;
If
Otherwise,
A kind of base station that the embodiment of the present invention provides, comprising:
Reporting unit, for to centralized control node reporting information, comprising the real resource use amount of Cell Edge User equipment, be used to indicate centralized control node according to the real resource use amount of Cell Edge User equipment, is cell scheduling resources for user equipment;
Allocation units, for the resources for user equipment that is cell scheduling according to centralized control node, are the user equipment allocation resource in community.
This base station makes the actual little PRB resource of interference that takies more multiple objective programming of edge customer equipment, thereby reaches better Inter-Cell Interference Coordination effect.
Preferably, described in, report in the information that unit reports, except the real resource use amount that comprises Cell Edge User equipment is expressed as
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
Preferably, described allocation units specifically for:
When to each cell scheduling, be followed successively by user equipment allocation resource according to priority query, wherein, the schedulable PRB limited amount of central user equipment configures in centralized control node
when PRB resource selection, preferentially take central user equipment PRB resource, exceed part and take edge customer device resource,
after using, will treat that control centre's subscriber equipment temporarily puts into central user device waiting queue; The schedulable PRB limited amount of edge customer equipment configures in centralized control node
when PRB resource selection, preferentially take the edge customer device resource of planning, exceed part and take central user device resource.
Centralized control node has been considered the real resource use amount of edge customer equipment when for each plot planning edge customer device resource, simultaneously guarantee that each subframe can be dispatched to central user equipment and edge customer equipment when each cell scheduling, center subscriber equipment and edge customer device resource are taken and done certain limitation simultaneously, thereby edge customer equipment actual use resource and projected resources are consistent as far as possible, have better controlled the interference between each Cell Edge User equipment.
Preferably, described allocation units also for:
If a complete system of all edge customer equipment schedulings of subframe remains PRB resource in addition, continue as the central user devices allocation residue PRB resource in central user device waiting queue.
Accompanying drawing explanation
The schematic flow sheet of a kind of MRP method that Fig. 1 provides for the embodiment of the present invention;
The schematic flow sheet of a kind of resource allocation methods that Fig. 2 provides for the embodiment of the present invention;
The structural representation of a kind of centralized control node device that Fig. 3 provides for the embodiment of the present invention;
The structural representation of a kind of base station that Fig. 4 provides for the embodiment of the present invention.
Embodiment
The embodiment of the present invention provides a kind of MRP, distribution method and device, in order to make the actual little PRB resource of interference that takies more multiple objective programming of edge customer equipment, thereby reaches better Inter-Cell Interference Coordination effect.
LTE system that what the embodiment of the present invention provided be applied to concentrates the resource requirement of ICIC technology to estimate and scheduling scheme, it is all the PRB resource of the interference minimum of planning that actual edge subscriber equipment is in most of the cases taken, thereby reaches good Inter-Cell Interference Coordination effect.
In the embodiment of the present invention, centralized control node has been considered the real resource use amount of edge customer equipment when for each plot planning edge customer device resource, simultaneously guarantee that each subframe can be dispatched to central user equipment and edge customer equipment when each cell scheduling, center subscriber equipment and edge customer device resource are taken and done certain limitation simultaneously, thereby edge customer equipment actual use resource and projected resources are consistent as far as possible, have better controlled the interference between each Cell Edge User equipment.
The technical scheme that the embodiment of the present invention provides comprises:
Step 1: each base station reports edge customer device resource requirements
edge customer equipment real resource use amount
central user device resource requirements
central user equipment real resource use amount
with disturb Neighboring Cell List to centralized control node.
Edge customer device resource requirements
be exactly the R in prior art scheme
d, edge customer equipment real resource use amount
be exactly the Num in prior art scheme
pRB_d.The similar edge customer device resource requirements of computational methods of central user device resource requirements, central user equipment real resource use amount, the computational methods of real resource use amount, just change objects of statistics into central user equipment by edge customer equipment.
Wherein,
(edge customer device resource requirements amount
edge customer equipment real resource use amount
);
(central user device resource requirements amount
central user equipment real resource use amount
).
Step 2: centralized control node, according to each base station reporting information, is determined the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i
with the schedulable PRB quantity of central user equipment
wherein, the PRB quantity Num (i) of planning edge customer device resource need to consider edge customer equipment real resource use amount.Each amount computational methods are as follows:
Else
End
Wherein, parameter alpha is calculation of natural resources increment factor, 0< α <1;
For cell i, according to disturbing Neighboring Cell List to determine the interference adjacent area set J of cell i;
Else
End
Step 3: centralized control node is determined the spendable PRB resource location of each Cell Edge User equipment according to certain algorithm (specifically can adopt existing algorithm), planning is Num (i) to the PRB resource quantity of edge customer equipment.
Step 4: centralized control node is notified the spendable PRB resource location of each Cell Edge User equipment, the schedulable PRB quantity of edge customer equipment
with the schedulable PRB quantity of central user equipment
Step 5: base station is followed successively by user equipment allocation resource according to priority query when to each cell scheduling, the schedulable PRB limited amount of central user equipment configures in centralized control node
when PRB resource selection, preferentially take center P RB resource (non-edge customer equipment PRB resource location), exceed part and can take edge customer device resource,
after using, will treat that control centre's subscriber equipment temporarily puts into central user device waiting queue; The schedulable PRB limited amount of edge customer equipment configures in centralized control node
when PRB resource selection, preferentially take the edge customer device resource of planning, exceed part and can take central user device resource.If a complete system of all edge customer equipment schedulings of subframe remains PRB resource in addition, can continue the central user equipment in control centre's subscriber equipment waiting list.
As can be seen here, referring to Fig. 1, in centralized control node side, a kind of MRP method that the embodiment of the present invention provides, comprising:
S101, centralized control node receive base station reporting information, comprising the real resource use amount of Cell Edge User equipment;
S102, centralized control node, according to the real resource use amount of Cell Edge User equipment, are plot planning central user device resource and edge customer device resource.
Referring to Fig. 2, in base station side, a kind of MRP method that the embodiment of the present invention provides, comprising:
S201, base station, to centralized control node reporting information, comprising the real resource use amount of Cell Edge User equipment, are used to indicate centralized control node according to the real resource use amount of Cell Edge User equipment, are cell scheduling resources for user equipment;
The resources for user equipment that S202, base station are cell scheduling according to centralized control node is the user equipment allocation resource in community.
Referring to Fig. 3, the centralized control node device that the embodiment of the present invention provides, comprising:
Receiving element 301, for receiving base station reporting information, comprising the real resource use amount of Cell Edge User equipment;
Receiving element 301 can be transceiver, and planning unit 302 can be processor.
Referring to Fig. 4, the base station that the embodiment of the present invention provides, comprising:
In sum, in the technical scheme that the embodiment of the present invention provides, centralized control node is the service resources demand that the edge customer device resource PRB quantity of each plot planning has been considered edge customer equipment reality, real resource demand is assessed by the real resource use amount of last measurement period, ideally the edge resource amount of centralized control node planning equals the actual volume of edge customer equipment, and when interference adjacent area too much or edge customer equipment actual volume is excessive, planning amount can be less than actual volume.Do is like this exactly to guarantee that planning amount can be consistent with edge customer equipment actual schedule amount as far as possible.
Simultaneously, centralized control node is being provided with an increment factor according to the last edge customer equipment practical business next cycle of rate estimation in cycle when edge customer equipment can be dispatched PRB quantity, next cycle center and peripheral subscriber equipment can be used the actual use amount of PRB stock number a little more than last measurement period, do be like this for give next dispatching cycle center or edge customer equipment practical business rate variation allow some leeway, next cycle edge customer equipment real resource use amount, central user equipment real resource use amount just can reflect center, the variation tendency of edge customer equipment practical business resource requirement.
In addition, when scheduling, guarantee that every subframe can be dispatched to central user equipment and edge customer equipment, central user equipment scheduling resource temporarily can not be dispatched after reaching limit amount, need to wait for that edge customer equipment scheduling could continue scheduling after complete, the edge resource that guarantees each subframe planning can be by edge customer hold facility, but the resource quantity of edge customer equipment scheduling is also restricted, the final scheduling result of edge customer equipment that as far as possible guarantees each community is the resource of minimum interference in the system using, thereby reach the object of disturbing between the each Cell Edge User equipment of coordination.
In a word, in the embodiment of the present invention, centralized control node has been considered the actual demand amount of edge customer equipment when for each plot planning edge resource, makes edge customer equipment actual schedule amount and planning amount more approaching; When scheduling, guarantee that each subframe can be dispatched to edge customer equipment, central user equipment scheduling stock number and resource location are restricted, edge customer equipment scheduling stock number is also subject to the restriction of projected resources amount and preferentially takies the edge resource of planning, what guarantee that the final scheduling result of the edge customer equipment of each community uses is to disturb minimum resource in the system of planning as far as possible, coordinates thereby reach the object disturbed between each Cell Edge User equipment.
Those skilled in the art should understand, embodiments of the invention can be provided as method, system or computer program.Therefore, the present invention can adopt complete hardware implementation example, completely implement software example or the form in conjunction with the embodiment of software and hardware aspect.And the present invention can adopt the form at one or more upper computer programs of implementing of computer-usable storage medium (including but not limited to magnetic disc store and optical memory etc.) that wherein include computer usable program code.
The present invention is with reference to describing according to flow chart and/or the block diagram of the method for the embodiment of the present invention, equipment (system) and computer program.Should understand can be by the flow process in each flow process in computer program instructions realization flow figure and/or block diagram and/or square frame and flow chart and/or block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, the instruction that makes to carry out by the processor of computer or other programmable data processing device produces the device for realizing the function of specifying at flow process of flow chart or multiple flow process and/or square frame of block diagram or multiple square frame.
These computer program instructions also can be stored in energy vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work, the instruction that makes to be stored in this computer-readable memory produces the manufacture that comprises command device, and this command device is realized the function of specifying in flow process of flow chart or multiple flow process and/or square frame of block diagram or multiple square frame.
These computer program instructions also can be loaded in computer or other programmable data processing device, make to carry out sequence of operations step to produce computer implemented processing on computer or other programmable devices, thereby the instruction of carrying out is provided for realizing the step of the function of specifying in flow process of flow chart or multiple flow process and/or square frame of block diagram or multiple square frame on computer or other programmable devices.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention is also intended to comprise these changes and modification interior.
Claims (18)
1. a MRP method, is characterized in that, the method comprises:
Centralized control node receives base station reporting information, comprising the real resource use amount of Cell Edge User equipment;
Centralized control node, according to the real resource use amount of Cell Edge User equipment, is plot planning central user device resource and edge customer device resource.
2. method according to claim 1, is characterized in that, in the reporting information of described base station, except comprising the real resource use amount of Cell Edge User equipment
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
3. method according to claim 2, is characterized in that, centralized control node, according to the real resource use amount of Cell Edge User equipment, is plot planning central user device resource and edge customer device resource, comprising:
Centralized control node, according to each base station reporting information, is determined the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i
with the schedulable PRB quantity of central user equipment
Centralized control node is determined the spendable PRB resource location of each Cell Edge User equipment, and planning is Num (i) to the PRB quantity of edge customer equipment;
4. method according to claim 3, is characterized in that, the real resource use amount of Cell Edge User equipment
real resource use amount with central user equipment
respectively to adopt following formula to determine:
(edge customer device resource requirements amount
edge customer equipment real resource use amount
);
5. method according to claim 4, it is characterized in that, centralized control node, according to each base station reporting information, is determined the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i in the following way
with the schedulable PRB quantity of central user equipment
Otherwise,
The schedulable PRB quantity of central user equipment
Wherein, parameter alpha is default calculation of natural resources increment factor, 0< α <1;
For cell i, according to disturbing Neighboring Cell List to determine the interference adjacent area set J of cell i;
Otherwise,
6. a resource allocation methods, is characterized in that, the method comprises:
Base station, to centralized control node reporting information, comprising the real resource use amount of Cell Edge User equipment, is used to indicate centralized control node according to the real resource use amount of Cell Edge User equipment, is cell scheduling resources for user equipment;
The resources for user equipment that base station is cell scheduling according to centralized control node is the user equipment allocation resource in community.
7. method according to claim 6, is characterized in that, in the information that described base station reports, except the real resource use amount that comprises Cell Edge User equipment is expressed as
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
8. method according to claim 7, is characterized in that, the resources for user equipment that base station is cell scheduling according to centralized control node is the user equipment allocation resource in community, comprising:
Base station is followed successively by user equipment allocation resource according to priority query when to each cell scheduling, and wherein, the schedulable PRB limited amount of central user equipment configures in centralized control node
when PRB resource selection, preferentially take central user equipment PRB resource, exceed part and take edge customer device resource,
after using, will treat that control centre's subscriber equipment temporarily puts into central user device waiting queue; The schedulable PRB limited amount of edge customer equipment configures in centralized control node
when PRB resource selection, preferentially take the edge customer device resource of planning, exceed part and take central user device resource.
9. method according to claim 8, is characterized in that, the resources for user equipment that base station is cell scheduling according to centralized control node is the user equipment allocation resource in community, also comprises:
If a complete system of all edge customer equipment schedulings of subframe remains PRB resource in addition, continue as the central user devices allocation residue PRB resource in central user device waiting queue.
10. a centralized control node device, is characterized in that, this device comprises:
Receiving element, for receiving base station reporting information, comprising the real resource use amount of Cell Edge User equipment;
Planning unit, for according to the real resource use amount of Cell Edge User equipment, is plot planning central user device resource and edge customer device resource.
11. devices according to claim 10, is characterized in that, in the reporting information of described base station, except comprising the real resource use amount of Cell Edge User equipment
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
12. devices according to claim 11, is characterized in that, described planning unit specifically for:
According to each base station reporting information, determine the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i
with the schedulable PRB quantity of central user equipment
Determine the spendable PRB resource location of each Cell Edge User equipment, planning is Num (i) to the PRB quantity of edge customer equipment;
13. devices according to claim 12, is characterized in that, the real resource use amount of Cell Edge User equipment
real resource use amount with central user equipment
respectively to adopt following formula to determine:
(edge customer device resource requirements amount
edge customer equipment real resource use amount
);
14. devices according to claim 13, it is characterized in that, described planning unit, according to each base station reporting information, is determined the schedulable PRB quantity of edge customer equipment PRB MRP quantity Num (i), edge customer equipment of each cell i in the following way
with the schedulable PRB quantity of central user equipment
Otherwise,
Wherein, parameter alpha is default calculation of natural resources increment factor, 0< α <1;
For cell i, according to disturbing Neighboring Cell List to determine the interference adjacent area set J of cell i;
Otherwise,
15. 1 kinds of base stations, is characterized in that, this base station comprises:
Reporting unit, for to centralized control node reporting information, comprising the real resource use amount of Cell Edge User equipment, be used to indicate centralized control node according to the real resource use amount of Cell Edge User equipment, is cell scheduling resources for user equipment;
Allocation units, for the resources for user equipment that is cell scheduling according to centralized control node, are the user equipment allocation resource in community.
16. base stations according to claim 15, is characterized in that, described in report in the information that unit reports, except the real resource use amount that comprises Cell Edge User equipment is expressed as
also comprise: edge customer device resource requirements
central user device resource requirements
the real resource use amount of central user equipment
with interference Neighboring Cell List.
17. base stations according to claim 16, is characterized in that, described allocation units specifically for:
When to each cell scheduling, be followed successively by user equipment allocation resource according to priority query, wherein, the schedulable PRB limited amount of central user equipment configures in centralized control node
when PRB resource selection, preferentially take central user equipment PRB resource, exceed part and take edge customer device resource,
after using, will treat that control centre's subscriber equipment temporarily puts into central user device waiting queue; The schedulable PRB limited amount of edge customer equipment configures in centralized control node
when PRB resource selection, preferentially take the edge customer device resource of planning, exceed part and take central user device resource.
18. base stations according to claim 17, is characterized in that, described allocation units also for:
If a complete system of all edge customer equipment schedulings of subframe remains PRB resource in addition, continue as the central user devices allocation residue PRB resource in central user device waiting queue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410067273.8A CN103826228B (en) | 2014-02-26 | 2014-02-26 | Method and device for planning and allocating resources |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410067273.8A CN103826228B (en) | 2014-02-26 | 2014-02-26 | Method and device for planning and allocating resources |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103826228A true CN103826228A (en) | 2014-05-28 |
CN103826228B CN103826228B (en) | 2017-05-17 |
Family
ID=50761007
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410067273.8A Active CN103826228B (en) | 2014-02-26 | 2014-02-26 | Method and device for planning and allocating resources |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103826228B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016004630A1 (en) * | 2014-07-11 | 2016-01-14 | 华为技术有限公司 | Resource allocation method, base station and system |
CN105451354A (en) * | 2014-08-15 | 2016-03-30 | 上海贝尔股份有限公司 | Method and equipment for realizing dispatching of users based on inter-cell interference coordination parameters |
CN106817702A (en) * | 2015-11-27 | 2017-06-09 | 普天信息技术有限公司 | Adjust the method and baseband processing unit of edge band |
WO2019095705A1 (en) * | 2017-11-14 | 2019-05-23 | 京信通信系统(中国)有限公司 | Inter-cell interference coordination method and network device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101400135A (en) * | 2007-11-26 | 2009-04-01 | 北京邮电大学 | Staged wireless resource management method based on dynamic cell group in cellular system |
CN102271337A (en) * | 2010-06-03 | 2011-12-07 | 中兴通讯股份有限公司 | Method and device for processing intercell interference coordination information |
WO2012058971A1 (en) * | 2010-11-04 | 2012-05-10 | 中兴通讯股份有限公司 | Method, device, system and apparatus for allocating edge frequency resources |
CN103517441A (en) * | 2012-06-27 | 2014-01-15 | 中兴通讯股份有限公司 | Method of interference coordination among cells and system thereof |
-
2014
- 2014-02-26 CN CN201410067273.8A patent/CN103826228B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101400135A (en) * | 2007-11-26 | 2009-04-01 | 北京邮电大学 | Staged wireless resource management method based on dynamic cell group in cellular system |
CN102271337A (en) * | 2010-06-03 | 2011-12-07 | 中兴通讯股份有限公司 | Method and device for processing intercell interference coordination information |
WO2012058971A1 (en) * | 2010-11-04 | 2012-05-10 | 中兴通讯股份有限公司 | Method, device, system and apparatus for allocating edge frequency resources |
CN103517441A (en) * | 2012-06-27 | 2014-01-15 | 中兴通讯股份有限公司 | Method of interference coordination among cells and system thereof |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016004630A1 (en) * | 2014-07-11 | 2016-01-14 | 华为技术有限公司 | Resource allocation method, base station and system |
CN105557010A (en) * | 2014-07-11 | 2016-05-04 | 华为技术有限公司 | Resource allocation method, base station and system |
CN105557010B (en) * | 2014-07-11 | 2019-04-05 | 华为技术有限公司 | Resource allocation methods, base station and system |
CN105451354A (en) * | 2014-08-15 | 2016-03-30 | 上海贝尔股份有限公司 | Method and equipment for realizing dispatching of users based on inter-cell interference coordination parameters |
CN105451354B (en) * | 2014-08-15 | 2019-01-25 | 上海诺基亚贝尔股份有限公司 | The method and apparatus of scheduling user is realized based on Inter-Cell Interference Coordination parameter |
CN106817702A (en) * | 2015-11-27 | 2017-06-09 | 普天信息技术有限公司 | Adjust the method and baseband processing unit of edge band |
CN106817702B (en) * | 2015-11-27 | 2020-04-24 | 普天信息技术有限公司 | Method for adjusting edge frequency band and baseband processing unit |
WO2019095705A1 (en) * | 2017-11-14 | 2019-05-23 | 京信通信系统(中国)有限公司 | Inter-cell interference coordination method and network device |
Also Published As
Publication number | Publication date |
---|---|
CN103826228B (en) | 2017-05-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Alameddine et al. | Dynamic task offloading and scheduling for low-latency IoT services in multi-access edge computing | |
CN105009475B (en) | In view of the ambulant method and system predicted for admission control and Resource Availability of user equipment (UE) | |
JP2022522057A (en) | Multi-user multi-MEC task unload resource scheduling method based on collaboration between edge and terminal | |
CN102860113B (en) | For the method and apparatus sending packet | |
CN102325378B (en) | Method and device for controlling physical downlink control channel (PDCCH) transmission | |
WO2013154595A1 (en) | Implementing a dynamic cloud spectrum database as a mechanism for cataloging and controlling spectrum availability | |
CN102665282A (en) | Distribution method of multi-user parallel transmission resource in wireless heterogeneous network | |
CN105446817B (en) | A kind of federated resource configuration of reservations algorithm based on robust optimization in mobile cloud computing | |
CN104239154B (en) | Job scheduling method and job scheduler in a kind of Hadoop clusters | |
WO2016086406A1 (en) | Network resource deployment method and device | |
CN109343942A (en) | Method for scheduling task based on edge calculations network | |
CN103428883B (en) | A kind of dispatching method of physical downlink control channel resource and equipment | |
Narmanlioglu et al. | Service-aware multi-resource allocation in software-defined next generation cellular networks | |
CN103945540A (en) | Processing method and device for logical channel priority | |
CN103826228A (en) | Method and device for planning and allocating resources | |
CN103068051A (en) | Distribution method and distribution device of downstream resources | |
CN104901989A (en) | Field service providing system and method | |
CN110502321A (en) | A kind of resource regulating method and system | |
Bhatta et al. | Generalized cost-aware cloudlet placement for vehicular edge computing systems | |
US8965388B2 (en) | Fast efficient resource distribution in long term evolution communication network scheduling | |
CN109963308A (en) | Resource regulating method and device in wireless communication system | |
CN101827446B (en) | Radio bearer scheduling method and device | |
CN102307393B (en) | Resource distribution method and apparatus thereof | |
CN104981014B (en) | Descending resource allocation method and base station | |
CN105592160B (en) | Resource allocation method towards service consumer under a kind of cloud computing environment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |