CN103823132B - Current test method, system and power control - Google Patents

Current test method, system and power control Download PDF

Info

Publication number
CN103823132B
CN103823132B CN201210469780.5A CN201210469780A CN103823132B CN 103823132 B CN103823132 B CN 103823132B CN 201210469780 A CN201210469780 A CN 201210469780A CN 103823132 B CN103823132 B CN 103823132B
Authority
CN
China
Prior art keywords
power
time
server
test point
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210469780.5A
Other languages
Chinese (zh)
Other versions
CN103823132A (en
Inventor
王文方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inventec Pudong Technology Corp
Inventec Corp
Original Assignee
Inventec Pudong Technology Corp
Inventec Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventec Pudong Technology Corp, Inventec Corp filed Critical Inventec Pudong Technology Corp
Priority to CN201210469780.5A priority Critical patent/CN103823132B/en
Publication of CN103823132A publication Critical patent/CN103823132A/en
Application granted granted Critical
Publication of CN103823132B publication Critical patent/CN103823132B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Power Sources (AREA)

Abstract

A kind of current test method, system and power control.Here, sent a power-off signal to a power control by server through the time of test point.Power control, when receiving power-off signal, is stopped power supply to server.If server shuts down, power control resets test point so that current test point deducts the value of the power-off time that successively decreases, and with the test point that resets to re-execute current test method, until test point is less than terminating power-off time.If server does not shuts down, power control, after being powered down to re-power interval time, again supplies power to server, and re-executes current test method with current test point.

Description

Current test method, system and power control
Technical field
The invention relates to board testing mechanism, and in particular to a kind of mechanism testing alternating current loss.
Background technology
Alternating current loss (AC loss, AC=Alternating Current) is one of test of often doing in hardware test. Conventional practice need to use a kind of can open/breaker device according to what user setup counted voluntarily.During using, Above-mentioned open/breaker device also exists following shortcoming, causes the inconvenience in use.
Shortcoming 1: above-mentioned open/breaker device needs to arrange a power-on time (on time), and different type of machines or same The different configuration of tested board of type from AC power on entrance disc operating system (Disk Operating System, DOS) time is different, even same tested board, powers on to from AC every time and enters the time of DOS also It is not quite similar, there may be once in a while and bigger amplitude the most once occurs.To this end, arranging power-on time Time first have to know the time required for tested board, and on this basis be set half a minute more, tested to ensure Board has the sufficient time to enter DOS system.So, such practice wastes the time of a large amount of wait.
Shortcoming 2: in AC loss test process, has exceeded setting when there being tested board to enter DOS required time During power-on time (on time) or during electric power opens selftest (Power On Self Test, POST) When tested board pawns or can not enter DOS, in these cases, tested board cannot minute book time Loop.And above-mentioned open/breaker device still will continue executing with open/power operation according to setting, so will cause above-mentioned opening/ Number of times that breaker device is recorded and the number of times that tested board is recorded are inconsistent.Further, tester cannot judge to survey Which kind of try to be unsuccessfully by above-mentioned reason to be caused.To this end, tester will be by the record shelves (LOG) under inquiry DOS Find out the reason of test crash.So, under many circumstances, tester also cannot be sentenced by the record shelves under DOS Determine reason, and then need to heavily run test, hang serial port (serial port) and record POST information.Even if it addition, Have found reason in record shelves under DOS, still to retest.Do in any case, this be all one quite The thing wasted time and energy.
Shortcoming 3: find the critical point that tester table can be made to restart, for this in each survey in AC loss test process Pilot will be observed and be tested whether normal, the most more wants special concern, due to AC open/power-off is by above-mentioned Open/breaker device controlled, and therefore, when tester the most just may will miss, and is not easy to determine real Critical point.
Shortcoming 4: above-mentioned open/breaker device tests every time and can only arrange a test point spacing, i.e. former and later two tests The spacing of difference between Dian.Arranging of test point spacing is excessive, will be unable to find optimal critical point;And between test point Away from arrange too small, then the amount that can cause test point is too much.
Summary of the invention
The present invention provides a kind of current test method, system and power control, can simplify testing process, and significantly Save the testing time.
The present invention proposes the current test method of a kind of server.This current test method comprises the following steps: that (a) opens One power control makes a server power on, and wherein power control is provided with initial power-off time, terminates power-off Time, successively decrease power-off time and be powered down to re-power interval time, and wherein initial power-off time is more than terminating power-off Time, and using initial power-off time as initial set test point;B () server was sent out through the time of this test point Go out a power-off signal to a power control;(c) power control when receiving power-off signal, stop power supply to Server;And (d) power control is powered down to re-power according to this and judges whether server shuts down interval time; (d1) if server shuts down within being powered down to re-power interval time through this, power control is with current Test point deducts the value of the power-off time that successively decreases and resets test point, and re-executes with the test point reset Above-mentioned steps (a) ~ (d), until test point is less than terminating power-off time;(d2) if server does not shuts down, power supply control Device processed, after being powered down to re-power interval time, supplies power to server again, and with current test point Re-execute above-mentioned steps (a) ~ (d).
The present invention proposes a kind of power control, it include storage element, for electrical connecting unit, transmission unit and Control unit.It is coupled to server, to supply power to server for electrical connecting unit.Transmission unit is coupled to server, And transmission unit is corresponding to supplying electrical connecting unit to configure.Storage element, stores initial power-off time, terminates power-off Time, successively decrease power-off time and be powered down to re-power interval time, and wherein initial power-off time is more than terminating power-off Time, and using initial power-off time as initial set test point.Control unit is coupled to storage element, power supply Connect unit and transmission unit.Wherein, above-mentioned control unit performs testing current program, and this testing current program includes: A () is received from, by transmission unit, the power-off signal that server sends through the time of test point;B () is receiving power-off letter Number time, control to stop power supply to server for electrical connecting unit;C () foundation is powered down to re-power and judges clothes interval time Whether business device shuts down;(c1) if server is shutting down, with current within being powered down to re-power interval time Test point deducts the value of the power-off time that successively decreases and resets test point, and re-executes with the test point reset Above-mentioned steps (a) ~ (c), until test point is less than terminating power-off time;(c2) if server is through being powered down to weight Newly power on and shut down not yet after interval time, control again to supply power to server for electrical connecting unit, and with current survey Pilot re-executes above-mentioned steps (a) ~ (c).
The present invention proposes a kind of current detecting system, including server and power control.Server is performing disk In the case of operating system (Disk Operating System, DOS), send power-off signal.Power control Including storage element, for electrical connecting unit, transmission unit and control unit.It is coupled to server for electrical connecting unit, To supply power to server.Transmission unit is coupled to server, and transmission unit is corresponding to supplying electrical connecting unit to configure. Control unit is coupled to storage element, for electrical connecting unit and transmission unit.Wherein, above-mentioned control unit performs above-mentioned Testing current program.
Based on above-mentioned, by being transmitted power-off signal to power control by server, thus electricity can be ignored completely Source control device enters the time of disc operating system for server, simplifies testing process, has saved the testing time.
For the features described above of the present invention and advantage can be become apparent, special embodiment below, and coordinate institute's accompanying drawings It is described in detail below.
Accompanying drawing explanation
Fig. 1 is the block diagram of the current detecting system according to one embodiment of the invention.
Fig. 2 is the flow chart of the current test method of the server according to one embodiment of the invention.
Fig. 3 is the schematic diagram arranging interface according to one embodiment of the invention.
Fig. 4 is the block diagram of the current detecting system according to another embodiment of the present invention.
[main element symbol description]
110: power control
111: control unit
112,112-1,112-2,112-3: for electrical connecting unit
113,113-1,113-2,113-3,404: transmission unit
114,402: storage element
120,130,140: server
401: processing unit
403: power supply receives unit
311-1 ~ 313-3,314,321,322: parameter field
Each step of the current test method of S201 ~ S225: server
Detailed description of the invention
Fig. 1 is the block diagram of the current detecting system according to one embodiment of the invention.Refer to Fig. 1, testing current system System includes power control 110 and the server 120 as tested board.For asking convenient explanation, at the present embodiment In only show server 120, in other embodiments, power control 110 also can simultaneously and multiple servers Connect, to supply power to multiple servers simultaneously.
Power control 110 includes control unit 111, for electrical connecting unit 112, transmission unit 113 and storage Unit 114.Here, control unit 111 is coupled to for electrical connecting unit 112, transmission unit 113 and storage element 114。
Above-mentioned for electrical connecting unit 112 for example, alternating current output port, it is coupled to server 120, uses power supply To server 120.And the most wired or wireless server 120 that is coupled to of transmission unit 113 so that server 120 Can link up with power control 110.Wherein, transmission unit 113 is corresponding with for electrical connecting unit 112 Ground configuration.Such as, one supplies electrical connecting unit 112 correspondence to a transmission unit 113.In other embodiments, Power control 110 also can arrange many groups for electrical connecting unit 112 and transmission unit 113, use supply power to multiple Server, and link up with multiple servers.
When power control 110 receives a power-off signal by transmission unit 113 from server 120, control Unit 111 can start to perform testing current program, such as, determines a test point, and server 120 is through test point Time sends power-off signal to power control 110, and power control 110 receives power-off signal, and breaks Open the power supply for electrical connecting unit 112, use and stop power supply to server 120.
The storage element 114 of power control 110 can store in advance initial power-off time, terminate power-off time, Successively decrease power-off time and be powered down to re-power interval time.Wherein, initial power-off time is more than end power-off time, And initial power-off time is as initial set test point.Power control 110 is provided with initial power-off time, Terminate power-off time, and the power-off time that successively decreases is set so that the test point of testing current program can be by initially breaking The electricity time is decremented to terminate power-off time;And arrange and be powered down to re-power interval time, re-power cycle-index Etc..It is above-mentioned that to be powered down to re-power interval time be then to represent when stopping power supply to server 120 through above-mentioned disconnected Electricity, to after re-powering interval time, supplies power to the time of server 120 again.
Under i.e. arrange in pairs or groups above-mentioned current detecting system so that each step of testing current program to be described.
Fig. 2 is the flow chart of the current test method of the server according to one embodiment of the invention.Referring to Fig. 1 And Fig. 2, in step s 201, make server 120 power on by power supply control device 110.Here, it is initially set Test point be initial power-off time.For example, it is assumed that initial power-off time is 2000 milliseconds (millisecond, ms), Then turn on the power the test point controlling device 110 and make server 120 power on when starting to perform current test method to be 2000ms。
Then, in step S205, server 120 sends power-off signal to power supply control in the time through test point Device 110.For example, one section of executable program can be write and be placed on the disc operating system (Disk of server 120 Operating System, DOS) under, this executable program is performed when server 120 enters disc operating system, By above-mentioned executable program through initial power-off time (that is, the time of test point) to power control 110 Go out a power-off signal.
Further, since test point is arranged in power control 110, power control 110 such as can make clothes After business device 120 powers on, utilize transmission unit 113 that test point each time is sent to server 120.
Then, in step S210, power control 110, when receiving power-off signal, is stopped power supply to service Device 120.That is, after control unit 111 receives power-off signal, can control to stop power supply for electrical connecting unit 112 To server 120.
Afterwards, in step S215, power control 110 judges whether server 120 shuts down.Power supply controls dress Put 110 to be powered down to re-power in interval time set, it is judged that whether server 120 shuts down.This be because of Power-off can be triggered for power control 100 immediately receiving power-off signal, but server 120 is likely because electricity The reasons such as stream loss are without power-off immediately.If server 120 is re-powering interval time through above-mentioned being powered down to Within shut down, perform step S220, if server 120 through above-mentioned be powered down to re-power interval time after Shut down not yet, perform step S225.
In step S220, if be powered down to re-power server interval time 120 shut down above-mentioned, represent this One test point is not power-off critical point, then power control 110 deducts, with current test point, the power-off time that successively decreases Value and reset test point, and with the test point that resets to re-execute above-mentioned steps S201 ~ S215, directly It is less than to test point terminating power-off time.
Represent that server 120 is sending after 2000ms for example, it is assumed that initial power-off time is 2000ms( Power-off signal), terminate power-off time be 10ms(represent server 120 after 10ms send power-off signal) And the power-off time that successively decreases is 150ms.Accordingly, the initial test point set is then 2000ms, opens a power supply control Device 110 processed makes a server 120 power on, and this server 120 is sending a power-off signal extremely after 2000ms One power control 110, control unit 111, when receiving power-off signal, controls to stop for electrical connecting unit 112 Only supply power to server 120.If being powered down to re-power in interval time, server 120 shuts down, then will Test point 2000ms deducts 150ms(and successively decreases power-off time), resetting test point is 1850ms, and with weight Test point (1850ms) after new settings re-executes step S201, by that analogy.When successively decreasing 14 times, i.e. test It is 10ms that point is decremented to-100ms(less than terminating power-off time) time, just stop performing current test method.
On the other hand, in step S225, if server 120 is after being powered down to re-power interval time Shutting down not yet, power control 110 supplies power to server 120 again, and re-executes with current test point Above-mentioned steps S201 ~ S215.Such as, if test point is 2000ms, control unit 111 is receiving server 120 power-off signals sent after 2000ms, stop power supply to server 120, if server 120 Shut down not yet, then re-execute step S201 with test point for 2000ms.
It addition, control unit 111 is also with a counts to control the number of times that the circulation of same test point performs. Such as, when server 120 does not shuts down (i.e. step S225), control unit 111 can first add up a counts, Judge that whether counts is less than or equal to re-powering cycle-index (being such as set as 5 times) afterwards.If counting Number is less than or equal to re-powering cycle-index, and control unit 111 still re-executes above-mentioned steps with current test point S201 ~ step S215.If counts is more than re-powering cycle-index, control unit 111 is just with current survey Pilot is as the power-off critical point of server 120, and terminates current test method.
It addition, power control 110 may further provide one arranges interface.Wherein, interface is set and includes multiple Test point rule, each test point rule have different initial power-off time, terminate power-off time and successively decrease power-off time Between.Fig. 3 is the schematic diagram arranging interface according to one embodiment of the invention.For convenience of description, the most only Enumerate three groups of test point rules, so, the most also can increase and decrease test point rule according to testing requirement.
Referring to Fig. 2 and Fig. 3, interface 300 is set and is divided into the page 310 and the test parameter of test point rule The page 320.Include that three groups of test point rules and re-power cycle-index, each group of survey at the page 310 Initial power-off time in pilot rule, terminate power-off time and the parameter field of three kinds of parameters of power-off time of successively decreasing 311-1 ~ 311-3,312-1 ~ 312-3,313-1 ~ 313-3 all can be by user's sets itself.Separately, user also can be certainly Row arranges the parameter field 314 re-powering cycle-index, i.e. each test point needs the number of times of retest, with And sets itself is powered down to re-power the parameter field 321 of interval time.In this, it is assumed that parameter field 314 sets Being 5, parameter field 321 is set as 80ms.Separately, three groups of test point rules are assumed as follows.
First group of test point rule is 2000ms(parameter field 311-1) to 1000ms(parameter field 312-1), Its power-off time that successively decreases is 200ms(parameter field 313-1).That is, initial power-off time is by 2000ms, often The secondary 200ms of successively decreasing is until being decremented to 1000ms.Second group of test point rule is 1000ms(parameter field 311-2) to 100ms(parameter field 312-2), its power-off time that successively decreases is 100ms(parameter field 313-2). That is, initial power-off time is by 1000ms, and the 100ms that every time successively decreases is until being decremented to 100ms.3rd Group test point rule is 100ms(parameter field 311-3) to 10ms(parameter field 312-3), its successively decrease power-off time Between be 10ms(parameter field 313-3).That is, initial power-off time is by 100ms, and the 10ms that every time successively decreases is straight To being decremented to 10ms.
Here, as a example by using 2000ms as initial test point, server 120 send after 2000ms disconnected The signal of telecommunication is to power control 110.When power control 110 receives power-off signal, in the page 320 The parameter field 322 of counts is then automatically filled in 1.If through being powered down to re-power 80ms interval time Afterwards, server 120 shuts down not yet, the most again supplies power to server 120, and again holds with test point 2000ms Row testing current program.If the counts added up has added up to be 6, now, counts is more than re-powering Cycle-index, represents that test point 2000ms had been tested 5 times, accordingly, critical with test point 2000ms for power-off Point, and terminate testing current program.
Accordingly, the available interface 300 that arranges of user comes sets itself test point rule, i.e. initial power-off time, knot Bundle power-off time and the power-off time that successively decreases, and also can be powered down to re-power interval time and again by sets itself Power-up cycle number of times.
It addition, in other embodiments, power control 110 also can couple, also with a station server 120 incessantly Can couple with multiple servers.Under it is described as another example.
Fig. 4 is the block diagram of the current detecting system according to another embodiment of the present invention.Refer to Fig. 4, testing current System includes power control 110 and the server 120 ~ 140 etc. as tested board.Wherein, each service Device all correspondences are coupled to one group for electrical connecting unit and transmission unit.That is, server 120 correspondence is coupled to for electrical connection Unit 112-1 and transmission unit 113-1, server 130 correspondence is coupled to for electrical connecting unit 112-2 and transmission unit 113-2, server 140 correspondence is coupled to for electrical connecting unit 112-3 and transmission unit 113-3 etc..Here, supply Electrical connecting unit 112-1 ~ 112-3 and transmission unit 113-1 ~ 113-3 respectively with Fig. 1 for electrical connecting unit 112 with pass The function of defeated unit 113 is identical, does not repeats them here.
In the present embodiment, the component of prescribed server 120 for as a example by server 120.And server 130 and clothes The component of business device 140 or other servers not illustrated is also similar to server 120, therefore omits and do not carry.
Server 120 includes that processing unit 401, storage element 402, power supply receive unit 403 and transmission unit 404.Wherein, processing unit 401 is coupled to storage element 402, power supply receives unit 403 and transmission unit 404. Server 120 utilizes power supply to receive unit 403 and couple for electrical connecting unit 112-1, utilize transmission unit 404 and Transmission unit 113-1 links up.
Storing executable program in storage element 402, thereby the processing unit 401 of server 120 is by holding Line program is often being separated by an interval time (that is, the time of test point) and is sending power-off signal, and by transmission unit 404 Power-off signal is sent to power supply device 110.Here, current test method and step S201 ~ step S225 phase With, by this current test method, re-power cycle-index (such as: 5 times) when passing through in same test point Afterwards, server 120 does not still shut down, then with this test point for power-off critical point, and terminate testing current program.
In sum, in the above-described embodiments, by being transmitted power-off signal to power control by server, because of And power control can be ignored completely server is needed how long to enter disc operating system, simplify test stream Journey, has saved the testing time.Additionally, in the case of test is normal, when server arrives power-off critical point when, Power control will rest on this test point, without carrying out the test of next test point.Also, also can be at electricity Source control device sets according to different test point scopes (i.e. initial power-off time is to the scope terminating power-off time) Fixed different test point spacing (i.e. successively decrease power-off time), the convenience being greatly improved in test.It addition, pass through Being transmitted power-off signal to power control by server, when server goes wrong, such as direct current cannot be gone up Electricity, server pawn or nothing during electric power opens selftest (Power On Self Test, POST) Method enters disc operating system etc., and server just cannot transmit power-off signal to power control so that test process Being in the state of time-out, accordingly, tester can easily learn that server goes wrong, thus eliminates extension The processes a little that search problem such as serial port (serial port) or inquiry record shelves, significantly save the testing time.
Although the present invention is disclosed above with embodiment, so it is not limited to the present invention, any art Middle tool usually intellectual, without departing from the spirit and scope of the present invention, when making a little change and retouching, therefore Protection scope of the present invention is when depending on being as the criterion that appended claims is defined.

Claims (8)

1. a current test method for server, including:
A () opens a power control makes a server power on, and wherein this power control is provided with an initial power-off Time, one terminate power-off time, the power-off time and that successively decreases is powered down to re-power interval time, wherein this is first Beginning power-off time terminates power-off time more than this, and this initial power-off time is as an initial set test point;
B () this server sends a power-off signal to this power control through the time of this test point;
C () this power control, when receiving this power-off signal, is stopped power supply to this server;And
D () this power control is powered down to re-power according to this and judges whether this server shuts down interval time;
(d1) if this server shuts down within being powered down to re-power interval time through this, this power supply controls Device resets this test point so that this current test point deducts the value of this power-off time that successively decreases, and to reset This test point re-execute above-mentioned steps (a)~(d), until this test point less than this terminate power-off time;With And
(d2) if this server shuts down after being powered down to re-power interval time through this not yet, again supply Electricity is to this server, and re-executes above-mentioned steps (a)~(d) with this current test point;
Wherein in above-mentioned steps (d2), this power control further includes execution the following step:
A cumulative counts;
Judge whether this counts re-powers cycle-index less than or equal to one;
If this counts re-powers cycle-index less than or equal to this, again hold with this current test point Row above-mentioned steps (a)~(d);And
If this counts re-powers cycle-index, using this current test point as this server more than this A power-off critical point, and terminate this current test method.
2. the method for claim 1, it is characterised in that further include in this step (b):
This server, in the case of performing a disc operating system, sends this power-off signal.
3. the method for claim 1, it is characterised in that further include:
This power control provides and one arranges interface, and wherein this arranges interface and includes multiple test point rule, each should A little test point rules have different this initial power-off time, this terminate power-off time and this power-off time that successively decreases.
4. the method for claim 1, it is characterised in that step (d1) further includes:
This power control, after being powered down to re-power interval time through this, supplies power to this server again, And re-execute above-mentioned steps (a)~(d) with this test point after resetting.
5. a power control, including:
One storage element, stores an initial power-off time, one terminates power-off time, one successively decreases power-off time and disconnected Electricity is to re-powering interval time, and wherein this initial power-off time terminates power-off time more than this, and during this initial power-off Between as an initial set test point;
One, for electrical connecting unit, is coupled to a server, supplies power to this server;
One transmission unit, is coupled to this server, and wherein this transmission unit is corresponding supplies electrical connecting unit to this;And
One control unit, is coupled to this storage element, this confession electrical connecting unit and this transmission unit,
Wherein, this control unit performs a testing current program, and this testing current program includes:
A () is received from, by this transmission unit, the power-off signal that this server sends through the time of this test point;
B (), when receiving this power-off signal, controls this confession electrical connecting unit and stops power supply to this server;
C () is powered down to re-power according to this and judges whether this server shuts down interval time;
(c1) if this server shuts down within being powered down to re-power interval time through this, should with current Test point deducts the value of this power-off time that successively decreases and resets this test point, and weighs with this test point reset Newly perform above-mentioned steps (a)~(c), until this test point terminates power-off time less than this;And
(c2) if this server shuts down after being powered down to re-power interval time through this not yet, controlling should Again supply power to this server for electrical connecting unit, and re-execute above-mentioned steps with this current test point (a)~(c);
Wherein this control unit is in above-mentioned steps (c2), a cumulative counts;If this counts is less than Or re-power cycle-index equal to one, re-execute above-mentioned steps (a)~(c) with this current test point;If this meter Number re-powers cycle-index more than this for several times, using this current test point as a power-off critical point of this server, And terminate this testing current program.
6. power control as claimed in claim 5, it is characterised in that this control unit provides to arrange interface, This arranges interface and includes multiple test point rule, those test point rules each have different this initial power-off time, This terminates power-off time and this power-off time that successively decreases.
7. power control as claimed in claim 5, it is characterised in that this control unit is at above-mentioned steps (c1) In, after being powered down to re-power interval time through this, control this confession electrical connecting unit and again supply power to this service Device, and re-execute above-mentioned steps (a)~(c) with this test point after resetting.
8. a current detecting system, including:
One server, in the case of performing a disc operating system, sends a power-off signal;And
One power control, including:
One storage element, store an initial power-off time, one end power-off time, one successively decrease power-off time and One is powered down to re-power interval time, and wherein this initial power-off time terminates power-off time more than this, and this initially breaks The electricity time is as an initial set test point;
One, for electrical connecting unit, is coupled to a server, supplies power to this server;
One transmission unit, is coupled to this server, and wherein this transmission unit is corresponding supplies electrical connecting unit to this;With And
One control unit, is coupled to this confession electrical connecting unit and this transmission unit,
Wherein, this control unit performs a testing current program, and this testing current program includes:
A () receives, by this transmission unit, the power-off signal that this server sends through the time of test point;
B (), when receiving this power-off signal, controls this confession electrical connecting unit and stops power supply to this server;
C () is powered down to re-power according to this and judges whether this server shuts down interval time;
(c1) if this server shuts down, with at present within being powered down to re-power interval time through this This test point deduct the value of this power-off time that successively decreases and reset this test point, and with this test point reset Re-execute above-mentioned steps (a)~(c), until this test point terminates power-off time less than this;And
(c2) if this server shuts down after being powered down to re-power interval time through this not yet, control Make this confession electrical connecting unit and again supply power to this server, and re-execute above-mentioned steps with this current test point (a)~(c);
Wherein this control unit is in above-mentioned steps (c2), a cumulative counts;If this counts Re-power cycle-index less than or equal to one, re-execute above-mentioned steps (a)~(c) with this current test point;If This counts re-powers cycle-index more than this, critical as a power-off of this server using this current test point Point, and terminate this testing current program.
CN201210469780.5A 2012-11-19 2012-11-19 Current test method, system and power control Active CN103823132B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210469780.5A CN103823132B (en) 2012-11-19 2012-11-19 Current test method, system and power control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210469780.5A CN103823132B (en) 2012-11-19 2012-11-19 Current test method, system and power control

Publications (2)

Publication Number Publication Date
CN103823132A CN103823132A (en) 2014-05-28
CN103823132B true CN103823132B (en) 2016-09-07

Family

ID=50758289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210469780.5A Active CN103823132B (en) 2012-11-19 2012-11-19 Current test method, system and power control

Country Status (1)

Country Link
CN (1) CN103823132B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107064700B (en) * 2017-06-09 2023-11-14 杭州意能电力技术有限公司 Testing system and testing method for longest allowable power failure time of electric equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1619466A (en) * 2003-11-20 2005-05-25 英业达股份有限公司 Power source monitoring and management method for detecting single non interrupted power system and multiple service units
CN101035388A (en) * 2006-03-10 2007-09-12 电盛兰达株式会社 Uninterruptible power supply device, uninterruptible power supply system and close method
CN101566960A (en) * 2008-04-25 2009-10-28 佛山市顺德区顺达电脑厂有限公司 Method for testing automatically powering on and off
CN101931566A (en) * 2009-06-26 2010-12-29 英业达股份有限公司 Test device of server
CN102752156A (en) * 2011-04-19 2012-10-24 鸿富锦精密工业(深圳)有限公司 Test device for server

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102087625A (en) * 2009-12-04 2011-06-08 鸿富锦精密工业(深圳)有限公司 Boot test system and test method
TW201237610A (en) * 2011-03-01 2012-09-16 Hon Hai Prec Ind Co Ltd System and method for testing power supplies

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1619466A (en) * 2003-11-20 2005-05-25 英业达股份有限公司 Power source monitoring and management method for detecting single non interrupted power system and multiple service units
CN101035388A (en) * 2006-03-10 2007-09-12 电盛兰达株式会社 Uninterruptible power supply device, uninterruptible power supply system and close method
CN101566960A (en) * 2008-04-25 2009-10-28 佛山市顺德区顺达电脑厂有限公司 Method for testing automatically powering on and off
CN101931566A (en) * 2009-06-26 2010-12-29 英业达股份有限公司 Test device of server
CN102752156A (en) * 2011-04-19 2012-10-24 鸿富锦精密工业(深圳)有限公司 Test device for server

Also Published As

Publication number Publication date
CN103823132A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN102387022B (en) A kind of POE method and apparatus
CN105788227B (en) Fault diagnosis equipment for electricity consumption information acquisition system
US8234086B2 (en) Detection of multiple powered devices connected to an inline power delivery channel
CN102967815B (en) Chip testing method, automated testing equipment and system
TW201235857A (en) Method and system for determining an arbitrary charging protocol in USB charging ports
CN105306927B (en) A kind of switching on and shutting down Apparatus for Impacting at low-temp, shock measuring system and its method
CN108897647B (en) Test system, test method and device
CN107908511A (en) ACPI test methods, test machine and the system of a kind of network interface card
CN203376424U (en) Wire harness detection apparatus
CN104635722A (en) Abnormal power failure simulation test device
CN103888308A (en) Method, system and device for serial port tests
CN106055443A (en) Multichannel DC circulation test system
US20130046502A1 (en) Motherboard test device
CN205751223U (en) Power information acquisition system failure diagnosis apparatus
CN103823132B (en) Current test method, system and power control
CN106936496B (en) Hot plug device for multiple IIC communication devices
CN105892609B (en) A kind of method and intelligent terminal of terminal booting and identification memory card synchronous operation
CN104898070B (en) Power supply test method and device
US9859813B2 (en) Power converter and method for setting the operation and the start-up of a power converter
CN102223268A (en) Network equipment as well as method and device for starting hardware testing of same
CN105117254B (en) Wireless communication module and operation method and device thereof
CN105718338B (en) Information processing method and electronic equipment
CN203365564U (en) Automatic testing system of remote controller
CN207588113U (en) Network interface plug-in and pull-off device and network interface insert-pull detection system
CN106099833A (en) A kind of electric current or voltage setting method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant